Public Utility Dedication A. For lots not served by public sewer, certification by the applicable County department must be provided stating that the sewerage systems installed or proposed to be installed fully meets the requirements of the department’s regulations. The applicable department or agency certification statement must include written notice that each lot not on public sewer must have a septic tank permit prior to the start of construction. For developments with public sewerage and public water systems this certification may be omitted, but approval by the Town Engineer is required with a statement that public utilities are available to the development. B. Public Utility Dedication must read as follows: “Sanitary sewer piping, water system piping and appurtenances thereof, along with water and sewer easements shall be dedicated to the Town of Braselton after the date of acceptance by the Town of Braselton with a 18 month warranty by the developer for materials and installation defects or until 75% of the dwellings within the development are constructed from the date of this approval, whichever occurs later.”