--- title: Braselton Zoning Ordinance, 8.17. Certificate of Final Subdivision Plat collection: local-codes id: local-code:braselton/zoning/8.17 cite_as: Braselton, Ga., Zoning Ordinance § 8.17 canonical_url: https://georgiacommons.org/code/local/braselton/zoning/8.17 md_url: https://georgiacommons.org/code/local/braselton/zoning/8.17.md text_url: https://georgiacommons.org/code/local/braselton/zoning/8.17/text source_url: https://cms2.revize.com/revize/braseltonga/Braselton%20Development%20Code%20thru%200526.pdf date: 2026-11-11 status: active jurisdiction: city:braselton jurisdiction_name: Braselton place_fips: "1310076" corpus_version: local-codes-braselton-4adaa3b5563e publisher: Georgia Commons, an independent project of Georgia Civic Data. Not the State of Georgia. Not legal advice. up: https://georgiacommons.org/code/local/braselton/zoning/~article-8.md previous: https://georgiacommons.org/code/local/braselton/zoning/8.16.md next: https://georgiacommons.org/code/local/braselton/zoning/8.18.md index: https://georgiacommons.org/code/local/braselton.md branch: zoning edition: As posted on the city's website, retrieved 2026-11-11 edition_date_kind: retrieved source_publisher: city website (Revize) version_id: local-code:braselton/zoning/8.17@2026-11-11-910497c9d5 --- # Braselton Zoning Ordinance, 8.17. Certificate of Final Subdivision Plat > As posted on the city's website, retrieved 2026-11-11 Part of: Article 8 - SUBDIVISION AND DEVELOPMENT REQUIREMENTS Approval The following must be stamped or printed on the final subdivision plat for execution upon its approval by the Planning Commission. CERTIFICATE OF FINAL PLAT APPROVAL All applicable zoning and subdivision requirements of the Town of Braselton having been fulfilled by this plat, the Town of Braselton Planning Director hereby approves this plat for recordation by the Clerk of Superior Court. ____________________________ Date_________ (Signature of Planning Director or Designee) CERTIFICATE OF PUBLIC WORKS APPROVAL All applicable requirements and standards of the Town of Braselton for water, sewer, stormwater, and streets having been represented as being fulfilled by this plat and the related as-built surveys approved on ________ (date) _______ , the Town of Braselton Public Works Director hereby recognizes the owner’s offer of dedication of street rights-of way, water improvements and easements, and sewerage improvements and easements shown thereon and on said asbuilt surveys on behalf of the Town, subject to maintenance and guarantee by the owner for at least 18 months or until 75% of the dwellings within the development are constructed from the date of this approval, whichever occurs later. ____________________________ Date_________ (Signature of Public Works Director or Designee) *The type of improvements and infrastructure to be dedicated to the Town may differ from project to project. The language of the Certificate of Public Works Approval, Owner’s Certificate, and the Public Utility Dedication note can be amended, as deemed necessary, for specific projects and plats to reflect this variation. If dedication of right-of-way or other land to the Town is required by this code, acceptance by the Town is contingent on the developer submitting a metes and bounds description of the required right-of-way and transferring title to the land by deed to the Town prior to issuance of building permits. Required Access A. A publicly approved street meeting the requirements of this article must serve every development and every lot within a subdivision. B. Every subdivision must have access to the public street system via a paved street. Subdivisions containing more than 200 lots must have at least two points of access. C. When land is subdivided into parcels larger than ordinary building lots, those parcels must be arranged and designed to allow for the opening of future streets and to provide access to those areas not presently served by streets. D. No subdivision or development may be designed in a way that would completely eliminate street access to abutting parcels. E. Where, in the opinion of the Town Engineer or Planning Director, it is necessary to provide for street access to abutting property, proposed streets must be extended by dedication of right-of-way to the boundary of such property through the development. F. Where an arterial street abuts or is included in a residential subdivision, the responsible engineer may limit access to the arterial street. Lots that abut the arterial street must be provided with another means of access, such as with reverse frontage lots, a separate street parallel to the arterial street, or a loop street or cul-de-sac.