--- title: Braselton Zoning Ordinance, 8.19. As-Built Data collection: local-codes id: local-code:braselton/zoning/8.19 cite_as: Braselton, Ga., Zoning Ordinance ยง 8.19 canonical_url: https://georgiacommons.org/code/local/braselton/zoning/8.19 md_url: https://georgiacommons.org/code/local/braselton/zoning/8.19.md text_url: https://georgiacommons.org/code/local/braselton/zoning/8.19/text source_url: https://cms2.revize.com/revize/braseltonga/Braselton%20Development%20Code%20thru%200526.pdf date: 2026-11-11 status: active jurisdiction: city:braselton jurisdiction_name: Braselton place_fips: "1310076" corpus_version: local-codes-braselton-4adaa3b5563e publisher: Georgia Commons, an independent project of Georgia Civic Data. Not the State of Georgia. Not legal advice. up: https://georgiacommons.org/code/local/braselton/zoning/~article-8.md previous: https://georgiacommons.org/code/local/braselton/zoning/8.18.md next: https://georgiacommons.org/code/local/braselton/zoning/8.20.md index: https://georgiacommons.org/code/local/braselton.md branch: zoning edition: As posted on the city's website, retrieved 2026-11-11 edition_date_kind: retrieved source_publisher: city website (Revize) version_id: local-code:braselton/zoning/8.19@2026-11-11-e747af515b --- # Braselton Zoning Ordinance, 8.19. As-Built Data > As posted on the city's website, retrieved 2026-11-11 Part of: Article 8 - SUBDIVISION AND DEVELOPMENT REQUIREMENTS A. Upon completion of the development activity as authorized by the development permit and prior to final inspection, the owner must submit to the Town Engineer for review and approval a complete set of record drawings showing "as-built" conditions prepared by the design professional of record who prepared the original plans, or a professional land surveyor, engineer, or landscape architect licensed in the State of Georgia. These drawings must show the following: 1. Street centerlines and rights-of-way lines. 2. Drainage system pipes, manholes and channels, including finished elevations. 3. Storm water detention facilities including finished elevations. 4. Sanitary sewer system (if any) including finished elevations. 5. Water system and reuse water system (if any) including finished elevations. 6. All other information as required by the Town Engineer. B. The as-built data must be certified and sealed by the design professional of record or other professional preparer, subject to the tolerances of accuracy indicated in the certification.