Braselton · Zoning Ordinance
Article 8 - SUBDIVISION AND DEVELOPMENT REQUIREMENTS
8.2. Sanitary Sewer & Water Requirements
About this text
- As posted on the city's website, retrieved 2026-11-11
A. A sanitary sewer system is required with a service connection to the property line for each lot; except in cases where septic tanks are approved.
B. When a public sewer line and adequate treatment capacity is available within 1,500 feet of a subdivision by gravity flow, the subdivision system must be connected to the public sewer system.
C. When a public reuse water line is available within 1,500 feet of a subdivision, the
subdivision must install a gray-water reuse system and connect to the public reuse line.
D. Water mains for both domestic use and fire protection must be properly connected with the public water system. Lines must be
constructed in such a manner as to adequately serve all lots shown on the subdivision plat. All lines must be installed in conformance with the Town of Braselton
Water and Wastewater Standards.
Read this code where it is posted (city website (Revize)) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.