A. If construction of any required public improvements was deferred at the time of final plat approval, said work must be completed during the maintenance period for the subdivision while bonding instruments are still in effect. B. Prior to end of the maintenance period, a final acceptance inspection of the public improvements must be conducted by the Town. C. The owner must correct all defects or deficiencies in materials or workmanship and make such repairs as necessary to approximate the as-built condition of the improvements. All deficiencies must be corrected during the performance and maintenance bond period. D. Upon certification by the Town Engineer that the public improvements depicted on the asbuilt surveys are in conformance with the specifications of this Development Code and are in good repair, the Town Council must accept the public improvements into perpetual maintenance. This certification and final acceptance can occur after a minimum one year after final plat, or final infrastructure is installed, whichever occurs last.