--- title: Braselton Zoning Ordinance, 9.11. Construction Requirements collection: local-codes id: local-code:braselton/zoning/9.11 cite_as: Braselton, Ga., Zoning Ordinance § 9.11 canonical_url: https://georgiacommons.org/code/local/braselton/zoning/9.11 md_url: https://georgiacommons.org/code/local/braselton/zoning/9.11.md text_url: https://georgiacommons.org/code/local/braselton/zoning/9.11/text source_url: https://cms2.revize.com/revize/braseltonga/Braselton%20Development%20Code%20thru%200526.pdf date: 2026-11-11 status: active jurisdiction: city:braselton jurisdiction_name: Braselton place_fips: "1310076" corpus_version: local-codes-braselton-4adaa3b5563e publisher: Georgia Commons, an independent project of Georgia Civic Data. Not the State of Georgia. Not legal advice. up: https://georgiacommons.org/code/local/braselton/zoning/~article-9.md previous: https://georgiacommons.org/code/local/braselton/zoning/9.10.md next: https://georgiacommons.org/code/local/braselton/zoning/9.12.md index: https://georgiacommons.org/code/local/braselton.md branch: zoning edition: As posted on the city's website, retrieved 2026-11-11 edition_date_kind: retrieved source_publisher: city website (Revize) version_id: local-code:braselton/zoning/9.11@2026-11-11-67700e1061 --- # Braselton Zoning Ordinance, 9.11. Construction Requirements > As posted on the city's website, retrieved 2026-11-11 Part of: Article 9 - STREET DESIGN AND CONSTRUCTION A. Shoulder Requirements 1. The street right-of-way must be graded at least 8 feet, as measured from the back of the curb on both sides of the street, to provide space for installation of utilities, to prevent the encroachment of driveways into the street, and to provide proper sight distances along curved streets. 2. Shoulders must be sloped and backfilled as necessary following paving and curb and gutter installation. All curbs and gutters must be backfilled. All eroded areas must be reconstructed to the original final grade. Re-grass is required for bare spots, areas of insufficient stand and reconstructed areas. B. Sub-Surface Drainage Systems Sub-surface drainage installations may be required by the Town Engineer to provide a stable sub-surface and base for fills and base course construction over wet weather springs, soft spots, swamps, and other unsuitable soils. The Town Engineer may require the owner to have a soil analysis and drainage design performed by the Design Professional of Record if these conditions are encountered. C. Drainage During Construction Provisions must be made to drain low points in street construction when final paving is delayed. A break in the berm section is required when the curbing has not been constructed. Drainage under the curb to side slopes after installation is required, using minimum four-inch diameter pipe sections. Vegetated or stabilized swales should be considered for managing road construction runoff. Swales must be constructed in accordance with the Georgia Stormwater Management Manual. D. Cuts, Fills, and Subgrade Cuts, fills, and subgrades are subject to approval by the Town Engineer. The Town Engineer may vary the required slope and may specify any improvements necessary to protect community assets and to reduce the potential undue deterioration of street improvements. The developer will be guided by the following general requirements: 1. Slope maximums must be at a ratio of 3 feet horizontal distance to 1 foot rise (3:1). No slope line may extend closer than 8 feet to back of curb or 15 feet to edge of pavement on uncurbed sections. Minimum shoulder cross slope must be ½-inch fall per running foot. 2. All slopes must be adequately planted with approved vegetation. A suitable mulch of straw, hay, etc. may be used. 3. The developer is responsible for any erosion that occurs before the expiration of the maintenance period. 4. Compaction must be 95 percent by Modified Standard Proctor Density Test. Subgrade compaction will be field tested through the use of a roll test, as specified in this article. 5. All organic and other unsuitable materials located within the proposed roadbed and 2 feet on either side of the back of curb or edge of pavement must be removed prior to subgrade preparation. 6. Fill must be placed in uniform, horizontal layers not more than 8 inches thick (loose measurement). Moisture content must be adjusted as necessary to compact material to 95 percent of maximum dry density except for the top 12 inches, which must be compacted to 100 percent of maximum dry density. 7. Backfill behind curbs must be free of organic material (roots, trunks, etc.), stone, broken concrete, etc. Topsoil and other similar unsuitable soil types removed from the roadbed may be utilized for shoulder construction, but not for fill construction, beyond 8 feet on either side of the back of curb or edge of pavement. The use of topsoil within 8 feet of the back of curb or edge of pavement is limited to a maximum depth of 6 inches. 8. Cut and fills may extend beyond the rightof-way as required, but a slope easement must be provided for maintenance purposes. Trees outside of the graded right-of-way with driplines extended into the right-of-way may be removed at the direction of the Town Engineer or Planning Director. Tree removal will be decided on a case-by-case basis due to public safety concerns, potential interference with public infrastructure, or the survivability of the tree. 9. Sub-base stabilization may be required by the Town Engineer if necessary to allow safe access of construction vehicles and equipment. 10. Shaping and backfilling of shoulders, ditches and slopes must be accomplished to final grade lines following the installation of underground utilities by the owner. Care must be taken to fill and compact settled or eroded areas. 11. Grassing of all cleared portions of the shoulders and slopes must be accomplished immediately following the achievement of final grade lines. If limitations require the application of temporary vegetative cover, the owner must make contractual provisions for regrassing with permanent cover. Requirements for grass species, mixture, fertilizer, and application methods in each individual subdivision must be in accordance with the Georgia Soil and Water Conservation Commission standards for critical areas. Bermuda grass is required during the season from May through September and as permanent grass species. 12. Conduits for utility crossings must be installed before subgrade inspection. Conduits must be indicated on the construction plans. No bores will be allowed for utility distribution/ transmission systems after subgrade inspections or paving operations without prior approval of the Town Engineer. 13. All manhole covers must be flush with top of intermediate pavement course if there is a delay in applying the final surface course. Manhole covers will be required to be adjusted flush when final surface course is installed. E. Temporary Surface When a street is to be used for construction traffic before paving is completed, a layer of stone (except crusher run) must be laid as a traffic surface. This material may not be used as a part of the base material. It must either be worked into the subgrade or removed before the base course is set up for paving. F. Street Base 1. The base course must consist of graded aggregate of a minimum compacted thickness placed on a stabilized subgrade in accordance with these specifications and in conformity with the lines, grade, and typical cross-section as shown on the drawings approved by the Town. Tolerance is +/-0.10 foot. Base course depth requirements vary based on street type. 2. Base course materials. a. All materials must be secured from Georgia Department of Transportation approved sources. b. All aggregate material must meet the GDOT requirements as contained in Section 800 for Group I or II; and Class A or B. c. Graded Aggregate must consist of hard, durable particles of fragments of stone, and stone mortar, and must be graded as specified by GDOT for road base construction. 3. All base course material must be deposited and spread by means of spreader boxes, approved mechanical equipment, or from moving vehicles equipped to distribute the material in a uniform layer. G. Required Base and Pavement Thickness 1. The following table determines the minimum thickness for each layer of the pavement structure based on the type of street. The pavement structure for development entrances is based on the classification of the adjacent mainline roadway. The use of reclaimed asphalt pavement (RAP) is not permitted on initial construction of roadways. Binder course may use RAP with prior approval of the Town Engineer. Street Serving an Industrial Use Street Serving Any Other Use Average Annual Daily Traffic Volume (Any traffic volume) 2,501-9,999 251-2,500 250 or less Graded Aggregate Base Course 10 inches 8 inches 8 inches 6 inches Asphalt Binder Course 9 inches 4 inches 2½ inches 2 inches Surface 1½ inches 1½ inches 1½ inches 1½ inches 2. Alternative pavement structures may be considered by the Town Engineer for approval for non-local streets or streets with unusual or poor subgrade conditions. Unusual or poor subgrade conditions are defined as soil structures with a modulus of subgrade reaction of less than or equal to 100 psi/inch, or a soil structure that is not stable after conventional compaction techniques. Structures must be designed by a registered professional engineer, licensed in the state, in accordance with AASHTO and GDOT design policies and procedures. Design data and calculations must be provided with any alternative design. The design professional must consult with the Town Engineer for the appropriate design methodology and factors to be used in the design process. 3. Pavement mix design(s) must be provided to the Town for approval at least 2 weeks prior to paving. 4. The Town reserves the right to require depth testing on base materials. Asphalt cores may be taken at random locations at five hundred foot intervals at the discretion of the Town Engineer. Any area found deficient must be brought up to the required thickness prior to placing any additional layer of material. All asphalt core holes must be filled with hot mix asphalt of similar grade prior to final acceptance. H. Roll and Compaction Testing 1. Both the subgrade and base course will be load tested when required by the Town Engineer with a minimum 18 ton hauling capacity tandem dump truck (fully loaded) or an equivalent. The test will cover the material thoroughly to assure a maximum tolerance of a ½-inch settling and the absence of any cracking or pumping, prior to all paving. This test must be witnessed by the Town Engineer or his or her designee. 2. All testing must be scheduled with the Town Engineer at least 24 hours in advance. Compaction testing may not be performed until the surface/material is to the lines and grades shown on the plans. Once an embankment, subgrade, or base course has been certified, then that material may not be disturbed, or additional testing will be required. All areas or sections of the subgrade and base course that do not pass compaction testing must be corrected. Once the developer makes all necessary corrections, it is their responsibility to schedule any subsequent test. All certifications provided must contain all test data and results to support certification. I. Sidewalks 1. Sidewalks must be 4 inches thick and constructed of Class “B” concrete with a 28 day strength of 2,500 psi. 2. Sidewalks must be sloped at ¼ inch per foot toward the street. 3. Sidewalks constructed adjacent to storm drain structures must be flush with the concrete top of storm drain lid. J. Substandard Streets No development will be approved if the street providing access to the property is substandard. A street is considered substandard if it fails to satisfy current Town specifications and/or AASHTO standards. If a developer wishes to provide access to the property at his or her own expense, the following apply: 1. The street must be upgraded to a paved street from the project entrance to the nearest standard paved road along the primary route of access. Improvements must, at a minimum, result in a full-section street meeting all applicable requirements of this article. 2. Additional right-of-way and paving may be required as needed to meet minimum Town standards for a local residential street. 3. The developer must design the road and provide the labor, equipment, and materials required for street and drainage improvements. 4. All right-of-way required for off-site improvements must be acquired by the developer and deeded to the Town at time of final plat approval. 5. If the Town desires the street to be improved to a standard greater than a local street, the Town must pay the cost of the additional right-of-way, materials, and labor. K. Seasonal Limits No street construction material may be deposited or shaped when the subgrade is frozen or thawing at any depth or during unfavorable weather conditions including rain of any intensity. Paving material installation is subject to the temperature and weather conditions in GDOT construction standards. The time period from December 1 to March 1 will require special construction procedures unique to the individual site and weather conditions. The contractor or developer must consult with the Public Works Department prior to conducting any street construction work during this period.