Bremen · Zoning Ordinance

Part III - LAND DEVELOPMENT CODE / Chapter 106 - ENVIRONMENTAL PROTECTION / Article IV - GROUNDWATER RECHARGE AREAS PROTECTION

Sec. 106-90. Administration and enforcement procedures.

About this text

  • As published by Municode, current through 2025-10-13
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

(a) Site plans. Application for a local development permit within the groundwater recharge area district shall include a site plan, drawn at a scale of one inch equals 50 feet, with the following information:

(1) A map of all planned excavation and fill, including calculations of the volume of cut and fill involved, cross-sectional drawings showing existing and proposed grades.

Elevations, horizontal scale and vertical scale must be shown on the cross-sectional drawings.

(2) A map of any wetland boundaries occurring within the site must be provided. This boundary may be included on other maps provided by the applicant.

(3) Location, dimensions and area of all impervious surfaces, both existing and proposed, on the site and adjacent to the site for a distance of 200 feet.

(4) The orientation and distance from the boundaries of the proposed site to the nearest bank of an affected perennial stream or water body.

(5) Elevations of the site and adjacent lands within 200 feet of the site at contour intervals of no greater than two feet; and no greater than one foot for slopes less than or equal to two percent.

(6) Location and detailed design of any spill and leak collection systems designed for the purpose of containing accidentally released hazardous or toxic materials.

(7) All proposed temporary disruptions or diversions of local hydrology.

(b) Activities to comply with site plan. All development activities or site work conducted after approval of the site plan shall conform with the specifications of said site plan. Significant changes to the site plan that would alter the amount and velocity of stormwater runoff from the site, increase the amount of impervious surface within the development, alter the overall density of development, result in a considerable increase in the amount of excavation, fill or removal of the overall appearance of the development as proposed, can be amended only with the approval of the building official. Minor changes, such as the realignment of streets or minor alterations to drainage structures and other infrastructure to meet unexpected conditions are exempted from this requirement.

(c) Exemptions to site plan requirements. The following activities and developments are exempt from the requirement for detailed site plans.

(1) Single-family detached homes constructed within a subdivision of fewer than five parcels.

(2) Repairs to a facility that is part of a previously approved and permitted development.

(3) Construction of minor structures, such as sheds or additions to single-family residences.

(d) Review procedures. The application shall be made to the building official and will be reviewed within 15 days. At the time of the application, the applicant shall pay a filing fee as specified by the city. Filing fees up to a maximum of $100.00 may be required to evaluate the application. This fee may be used to retain expert consultants who will provide services pertaining to functional assessment, mitigation, and wetland boundary determinations, as deemed necessary by the building official. The review period shall include the preparation of findings (approval, approval with conditions, or disapproval) by the building official. The applicant will receive written notification of the findings of the building official. If the review process is not completed within 30 days, the application is considered to be approved. Decisions of the building official may be appealed to the city council.

(e) Duration of permit validity.

(1) If construction described in the development permit has not commenced within 12 months from the date of issuance, the permit shall expire.

(2) If construction described in the development permit is suspended or abandoned after work has commenced, the permit shall expire 12 months after the date that work ceased.

(3) Written notice of pending expiration of the development permit shall be issued by the building official.

(f) Penalties.

(1) When a building or other structure has been constructed in violation of this section, the violator may be required to remove the structure at the discretion of the director of license and permits and/or the building official.

(2) When removal of vegetative cover, excavation, or fill has taken place in violation of this section, the violator may be required to restore the affected land to its original contours and to restore vegetation, as far as practicable, at the discretion of the director of license and permits and/or the building official.

(3) If the director of license and permits and/or the building official discovers a violation of this article that also constitutes a violation of any provision of the Clean Water Act as amended, the board of commissioners shall issue written notification of the violation to the U.S. Environmental Protection Agency, the U.S. Army Corps of Engineers, and the landowner.

(g) Suspension, revocation. The building official may suspend or revoke a permit if he finds that the applicant has not complied with the conditions or limitations set forth in the permit or has exceeded the scope of the work set forth in the permit. The building official or designated appointee shall cause notice of denial, issuance, conditional issuance, revocation or suspension of a permit to be published in a daily newspaper having a broad circulation in the area where the wetland is located.

(h) Judicial review.

(1) Jurisdiction. All final decisions of the city concerning denial, approval or conditional approval of a permit shall be reviewable in the Haralson County Superior Court.

(2) Alternative actions. Based on these proceedings and the decision of the Superior Court in which the property is located, the city council or its designee may, within the time specified by the Superior Court, elect to:

a. Institute negotiated purchase or condemnation proceedings to acquire an easement or fee interest in the applicant's land;

b. Approve the permit application with lesser restrictions or conditions (i.e., grant a variance); or

c. Institute other appropriate actions ordered by the court that fall within the jurisdiction of the city council.

(i) Amendments. These regulations and the groundwater recharge areas map may from time to time be amended in accordance with procedures and requirements in the general statutes and as new information becomes available.

(j) Relief assessment. Assessors and boards of assessors shall consider requirements of these regulations in determining the fair market value of land.

(k) Separability and abrogation. All sections and subsections of this article are considered separate and distinct. Should any section, subsection, paragraph or part of this article be declared by a court of jurisdiction to be invalid for any reason, it shall not invalidate any other section, subsection, paragraph, or part of this article.

History

The history line the source prints at the end of the section.

(Code 1996, § 42-156; Ord. No. 01-03-22A, § VI, 3-22-2001)

Read this code where it is posted (Municode) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:bremen/zoning/106-90@2025-10-13-218df24e29

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.

Bremen Zoning Ordinance, Sec. 106-90. Administration and enforcement procedures | Georgia Commons