Skip to content
Georgia Commons
Menu

Bremen · Zoning Ordinance

Part III - LAND DEVELOPMENT CODE / Chapter 108 - FLOOD DAMAGE PREVENTION / Article III - ADMINISTRATION

Sec. 108-58. Permit procedures.

About this text

  • As published by Municode, current through 2025-10-13
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

Application for a development permit shall be made to the city department of community development on forms furnished by the community prior to any development activities, and may include, but not be limited to the following: plans in duplicate drawn to scale showing the elevations of the area in question and the nature, location, dimensions, of existing or proposed structures, earthen fill placement, storage of materials or equipment, and drainage facilities.

Specifically, the following information is required:

(1) Application stage.

a. Elevation in relation to mean sea level (or highest adjacent grade) of the lowest floor, including basement, of all proposed structures;

b. Elevation in relation to mean sea level to which any non-residential structure will be flood-proofed;

c. Design certification from a registered professional engineer or architect that any proposed non-residential floodproofed structure will meet the floodproofing criteria of section 108-78(2);

d. Description of the extent to which any watercourse will be altered or relocated as a result of a proposed development; and

(2) Construction stage.

a. For all new construction and substantial improvements, the permit holder shall provide to the administrator an as-built certification of the regulatory floor elevation or floodproofing level immediately after the lowest floor or floodproofing is completed. Any lowest floor certification made relative to mean sea level shall be prepared by or under the direct supervision of a registered land surveyor or professional engineer and certified by same. When floodproofing is utilized for non-residential structures, said certification shall be prepared by or under the direct supervision of a professional engineer or architect and certified by same.

b. Any work undertaken prior to submission of these certifications shall be at the permit holder's risk.

c. The city manager or his designee shall review the above-referenced certification data submitted. Deficiencies detected by such review shall be corrected by the permit holder immediately and prior to further progressive work being allowed to proceed. Failure to submit certification or failure to make said corrections required hereby, shall be cause to issue a stop-work order for the project.

History

The history line the source prints at the end of the section.

(Ord. No. 2008-05-19, art. 3, § B, 5-19-2008)

Read this code where it is posted (Municode) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:bremen/zoning/108-58@2025-10-13-476f332117

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.

Bremen Zoning Ordinance, Sec. 108-58. Permit procedures | Georgia Commons