--- title: Bremen Zoning Ordinance, Sec. 116-80. Sign permits required; expiration of permit collection: local-codes id: local-code:bremen/zoning/116-80 cite_as: Bremen, Ga., Zoning Ordinance § 116-80 canonical_url: https://georgiacommons.org/code/local/bremen/zoning/116-80 md_url: https://georgiacommons.org/code/local/bremen/zoning/116-80.md text_url: https://georgiacommons.org/code/local/bremen/zoning/116-80/text source_url: https://library.municode.com/ga/bremen date: 2025-10-13 status: active jurisdiction: city:bremen jurisdiction_name: Bremen place_fips: "1310132" corpus_version: local-codes-bremen-716bcd8c1e6f publisher: Georgia Commons, an independent project of Georgia Civic Data. Not the State of Georgia. Not legal advice. up: https://georgiacommons.org/code/local/bremen/zoning/~part-iii/~chapter-116/~article-iv.md previous: https://georgiacommons.org/code/local/bremen/zoning/116-54-to-116-79.md next: https://georgiacommons.org/code/local/bremen/zoning/116-81.md index: https://georgiacommons.org/code/local/bremen.md branch: zoning edition: As published by Municode, current through 2025-10-13 edition_date_kind: current_through source_publisher: Municode version_id: local-code:bremen/zoning/116-80@2025-10-13-35c11db5c1 --- # Bremen Zoning Ordinance, Sec. 116-80. Sign permits required; expiration of permit > As published by Municode, current through 2025-10-13 > The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included. Part of: Part III - LAND DEVELOPMENT CODE / Chapter 116 - SIGNS / Article IV - PERMITS, ADMINISTRATION, ENFORCEMENT (a) Except as specifically excluded under section 116-83, it shall be unlawful for any person to post, display, or erect a sign without a permit. (b) A sign permit is required before a sign may be erected or attached to, suspended from or supported on a building or structure or before an existing sign may be enlarged, relocated or materially improved upon except as is herein provided by this chapter. (c) A new sign permit is required when the cost of changes to the sign structure are more than 50 percent of the reconstruction cost of the entire sign. (d) If the plans, specifications and intended use of the sign or part thereof for which application is made conform in all respects to the applicable provisions of this chapter and the city building and electrical codes, a sign permit shall be issued. (e) A sign permit shall become null and void if the sign for which the permit was issued has not been completed and inspection requested within six months after the date of issuance. (1) The holder of the sign permit shall be responsible for contacting the community development department to arrange inspection of the sign within the six months after the date of issuance of the sign permit. (2) The inspection shall be conducted by a representative of the community development department pursuant to the provisions of the standard building code or its amendments and other applicable ordinances. ## History (Code 1996, § 70-71; Ord. of 12-12-2005(1))