(a) Subdivision construction plan submittal. The subdivision construction plan submittal shall consist of the engineering construction plans meeting all design standards and development requirements outlined in this chapter or otherwise provided by this Code or land development code. Once approved a performance bond may be submitted to the city to ensure that the infrastructure will be installed. (1) The engineered construction plans shall include street and drainage information, water and sewer plans and erosion control plans meeting the applicable city requirements. (2) Samples of required bonds are available from the codes enforcement officer and engineer. (b) Qualified engineers. Engineered construction plans shall be prepared by a registered professional engineer currently licensed in the state, regularly engaged in the design of such facilities.