Sec. 120-35. Required grading and drainage information.

About this text

  • As published by Municode, current through 2025-10-13
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

The following information must be shown on the engineered construction plans to demonstrate compliance with applicable land development requirements, including the construction and design standards applicable to drainage and soil erosion control:

(1) The watershed area shall be provided in acres at all culvert pipes, catch basins and other entrances.

(2) The existing location or relocation of all streams that are not to be piped and all existing surface drainage structures shall be shown with profiles as follows:

a. Profile of all flow lines of the stream bed.

b. A detailed typical section and the type of stabilization employed is to be provided.

c. A floodplain study is required of all land areas proposed for development that might be subject to flooding.

(3) The direction of drainage flow in streams, storm sewers, gutters, subdrains and the like.

(4) The location of all springs, either with the right-of-way or draining to the right-of-way.

(5) The location of storm sewers and appurtenances, including:

a. Catch basins with proposed elevations for the tops and inverts.

b. All stream crossings.

c. All outfalls of the storm sewer to the existing streams.

(6) Storm sewer profiles as follows:

a. Profiles of all existing and finished grade ground at the centerline of the proposed storm sewer.

b. Profiles of proposed finished grades.

c. Percent of grade of proposed storm sewer.

(7) Show all existing or proposed drainage easements and associated grading.

(8) The size and type or class of drainage pipe to be installed both within and outside of the road right-of-way and within drainage easements.

(9) Proposed drainage ditches for the full length in all easements. Showing the centerline profiles, a detailed typical section and the type of stabilization to be provided when the velocity exceeds five feet per second.

(10) Show all utilities in the storm drain profiles as required to demonstrate freedom of conflicts.

(11) Overall grading and drainage plans shall be drawn at a scale of 20, 50 or 100 feet to one inch with contour intervals as follows:

Grade Slope Contour Interval 1 2-5% 2 5% 5 or 10

(12) Providing a grading plan for any detention facilities, complete with spillway, overflow structure, and related surface water elevations.

History

The history line the source prints at the end of the section.

(Code 1996, § 82-85(f); Ord. of 3-8-1999, pt. II, art. 9)

Read this code where it is posted (Municode) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:bremen/zoning/120-35@2025-10-13-815d219b82

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.

Bremen Zoning Ordinance, Sec. 120-35. Required grading and drainage information | Georgia Commons