(a) The build-to zone is the area on the lot where all or a portion of the street-facing building façade shall be located, established as a minimum and maximum setback range. (b) The street-facing building façade shall be located in and extend along the length of the build-to-zone for a minimum distance equal to a percentage of the width of the lot, as required by specific provisions of this zoning ordinance. The required minimum percentage is calculated by dividing the width of the building façade located within the build-to-zone by the width of the lot. For purposes of this calculation, the width of the lot is the narrowest width of the lot within the build-to-zone.