General buildings are allowed in CX and EX districts, subject to compliance with the lot and building regulations of table 3-5. TABLE 3-5 — GENERAL BUILDING LOT AND BUILDING REGULATIONS Regulation CS EX a. Lot TABLE 3-5 — GENERAL BUILDING LOT AND BUILDING REGULATIONS Regulation CS EX Minimum Lot Area (square feet) 6,000 6,000 Minimum Lot Width & Frontage (feet) 50 50 Maximum Impervious Coverage (%) 80 85 b. Building Siting Principal Building Setbacks (feet) Front Street, Minimum/Maximum ("BTZ") 5/15[1] 5/30[1] Minimum Building Coverage within BTZ (%) 65 50 Side Street, Minimum/Maximum 5/15 5/30 Interior Side, Minimum 5 5 Rear, Minimum 30 30 c. Building Height Minimum Height per Story (floor-to-floor, feet) 9 9 Maximum Height per Story (floor-to-floor, feet) 14 14 Overall Principal Building Height (stories/feet) Minimum (stories) Maximum (stories/feet) 1 3/45[2] 1 5/70[2] Maximum Accessory Building Height (feet) 20[3] 20[3] d. Street Facades Minimum Front Facade Transparency (%) Ground Story 20 15 Upper Stories 15 15 Minimum Street Side Facade Transparency (%) 15 15 Front Street-facing Entrance Minimum Number — — — — 1 per building — — — — e. Parking and Garages Permitted Location of In-Building Parking Anywhere below grade and in above-grade floors if set back at least 20 ft. from front facade Permitted Location of Surface Parking Rear yard or side yard (behind principal building setback); side parking limited to one double-loaded aisle with centerline perpendicular to street f. Transition Buffers (See Division 9-2) Minimum Buffer Depth Abutting R-Zoned Lot (feet) 30 30 [1] Street-facing garage entries must be set back at least 20 feet from the back of the sidewalk or from the street right-of-way, whichever results in a greater setback. [2] Buildings on O-1 or M-zoned lots located within the Buford Highway Overlay may be eligible for increased as-of-right building height, in accordance with Article V, Division 2. Outside the Buford Highway Overlay, greater building heights may be approved through the special land use permit procedures of Article X, Division 3. [3] Or height of principal building, whichever is less.