Skip to content
Georgia Commons
Menu

Bryan County · Zoning Ordinance

Part II - CODE / Part B - LAND DEVELOPMENT / Chapter 114 / Article VI - SITE DEVELOPMENT STANDARDS / Division 5 - LANDSCAPING, TREE PRESERVATION, BUFFERING AND SCREENING

Sec. 114-633. Plant, planting and maintenance standards.

About this text

  • As published by Municode, current through 2026-01-13
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

(a) Plant material standards. The following standards apply as a minimum to all required buffer, streetyards, and other planting requirements, including plantings for canopy coverage unless specifically stated in other parts of this division.

(1) Native and regionally appropriate plant species are required. Invasive species, as identified by the United States Forest Service and/or the University of Georgia, are prohibited from being planted.

(2) All plant and tree material shall meet the American Standard for Nursery Stock standards that are published by and available from the American Association of Nurserymen.

(3) Tree and landscape materials selected for planting must be free from injury, pests, disease, nutritional disorders or root defects, and must be of good vigor in order to assure a reasonable expectation of survivability.

(4) The minimum standards specified in Exhibit 633a shall apply to all plantings required by this section at time of planting, except as otherwise specified.

Exhibit 633a: Plant Specifications1 Plant Type Min. Diameter (Trees) or Min.

Spread (Shrubs) Min. Height Canopy Coverage Other Canopy trees-large 3 in. caliper 16 feet 1500 sq. ft./tree planted Canopy trees-medium 2 in. caliper 10 feet 550 sq. ft./tree planted Multi-stemmed - one (1) in. on any cane Canopy trees-small 1½ in. caliper 6 feet 250 sq. ft./tree planted Multi-stemmed - one-half (½) in. on any cane Shrubs-deciduous1 18 inches 18 inches n/a 3-gallon container (min.)

Shrubs-large evergreen1 n/a 24 inches n/a 5-gallon container (min.)

Shrubs-medium and small evergreen1 15 inches 18 inches n/a 3-gallon container (min.)

1 Shrubs shall meet either the required minimum spread or minimum height at time of planting.

(b) Installation standards.

(1) Installation of trees and landscape materials shall be in accordance with the standards established by the American National Standards Institute (ANSI).

(2) Root barriers shall be installed within landscape/streetyard areas with less than seven feet between the back of curb and the sidewalk to prevent root penetration and destruction of infrastructure.

(3) Large and medium canopy trees shall not be planted underneath or directly adjacent to overhead power lines and shall be a minimum of ten feet from any building or underground utility unless a root barrier is used.

(4) Small trees and palms shall be a minimum of five feet from any building or underground utility.

(5) Permanent built in or temporary water systems shall be installed to ensure the plants will survive the critical establishment period. This may include the use of tree gator watering bags for replacement or new trees.

(c) Planting bond. A planting bond for tree and/or landscape installation that cannot be planted because of continued construction, weather, and/or plant availability may be utilized for a period of up to six months. This bond allows a project to receive a certificate of occupancy once all other requirements have been met. The planting bond shall be equal to 100 percent of the total cost of materials and installation, plus 15 percent contingency. The planting bond will be released upon final inspection and compliance with the approved landscaping plan. Planting bonds shall be in the form of cashier's check, bond, or letter of credit.

(d) Maintenance guarantee.2

(1) Maintenance guarantee required. Prior to the issuance of a certificate of occupancy, the developer shall submit a maintenance guarantee in the form provided in paragraph (d)(3), below, for all of the landscaping required to meet the provisions of this division.

(2) Amount of maintenance guarantee. The amount of the guarantee shall be 25 percent of the total cost of landscaping installation, including materials and maintenance, as identified by a registered landscape architect, and approved by the community development director. The maintenance guarantee shall remain in effect for a minimum of two years after issuance of the certificate of occupancy. After one year and upon approval of the community development director, the maintenance bond may be reduced to 50 percent of the total cost of the original bond.

(3) Type of security. The security shall be in the form of a maintenance bond, an irrevocable letter of credit, or cashier's check.

(4) Release of maintenance guarantee. Prior to the community development director releasing/ closing the maintenance guarantee, the applicant shall submit a request for final inspection no less than 30 days but no more than 60 days in advance of the maintenance guarantee expiring.

If the community development director or duly authorized representative, determines the required landscaping does not comply with the maintenance standards specified in section 2 Spaced no more than 50 feet on center for the entire lot frontage. Where overhead utilities preclude planting large trees, groups of three small canopy trees shall be provided for each one large tree required.

114-633(e), below, the applicant shall be required to take the necessary corrective action to meet the required standards. The community development director may require an updated registered landscape architect's cost estimate and an updated/amended maintenance guarantee.

(e) Maintenance standards.

(1) All plant material shall be maintained in good condition at all times in accordance with standards established by ANSI. All required plantings that die or are destroyed must be replaced, during the next suitable planting season.

(2) To ensure the viability of all plant material, the landscape plan and/or tree protection and preservation plan shall identify the permanent water system.

(3) Attaching lights, signage, fence rails, and any other items to trees is strictly prohibited.

(4) All sites are required to remain in compliance with the requirements for development of this division and are subject to inspection by the county for this purpose. If deficiencies are found, the owner of the property shall be notified to correct the deficiencies within 90 days. If the deficiencies are not corrected in 90 days, the county will seek administrative or judicial relief, as appropriate.

(5) From the effective date of this UDO, no person, firm, corporation or other entity shall trim, prune, cut, excavate near, dig or trench near, or otherwise disturb any tree on any property owned or controlled by the county and subject to this UDO without strictly complying with the following regulations:

a. Trees on public property may be pruned for utility line clearance only by tree pruners who have attended a certified utility line training course within a 12-month period of pruning activity. At each pruning site, names of pruning crew with date of certification shall be available for county review. All pruning of public trees shall be done in accordance with the American National Standard for Tree Care Operations (ANSI A300-2001) and the most current standards as developed by the National Arborist Association.

b. Requirements pertaining to utility companies.

1. Prior to conducting any non-emergency tree pruning, all utility companies shall notify the community development director in writing, no less than three days prior to the start of any work.

2. Utilities and telecommunications companies shall use directional pruning unless the county otherwise consents in writing.

3. The county may halt the cutting when it is deemed to be detrimental to any protected tree or when the cutting exceeds what is needed for continued utility service.

4. When in the judgment of a utility company and the community development director, a tree interferes with the safe and reliable operation of the electric power system along a street right-of-way and cannot be pruned in accordance with ANSI Standard A300 to provide the required clearance, the utility company may offer to remove the tree and replant an acceptable specie tree for the location or in a location mutually acceptable to the county, the utility company, and the property owner.

Such trees may be planted on public land, or private property, within the limitations and intent of this section.

(f) Protection of trees during site development and construction.

(1) The area directly beneath and covered by the canopy of a tree shall be designated as a tree protection zone (see Exhibit 633b: Tree Protection Zone) and shall be kept safe from harmful impact during construction and site development.

(2) Trees designated on the tree protection and preservation plan as protected trees must be completely enclosed by rigid tree protection fencing as approved by a licensed Georgia Landscape Architect or International Society of Arboriculture ISA certified Arborist prior to clearing or grading or the erection of any building. Tree protection fencing must be located as described on the tree protection and preservation plan.

(3) Tree protection fencing must remain in place until all construction has been completed or final occupancy permit has been issued, whichever is last.

(4) Failure to install tree protection fencing prior to any clearing, demolition, or construction will result in the loss of tree protection credits, a stop work order, and/or a possible fine.

(5) Any damage to protected trees, breach of the tree protection zone, or other protection violation outlined herein which occurs during site development and construction phases must be documented and reported to the community development director within seven days.

(g) General tree protection.

(1) The area directly beneath and within the drip line of trees shall be designated as the critical root zone (see Exhibit 633c).

Exhibit 633b: Fencing for Tree Protection Zone

(2) No soil disturbance or compaction, stock piling of soil or other construction materials, vehicular traffic, or storage of equipment are allowed in the critical root zone.

(3) No ropes, signs, wires, unprotected electrical installation, or other device or material shall be secured or fastened around or through a tree.

(4) Toxic chemicals, gas, smoke, salt brine, oil, or other injurious substances shall not be stored or allowed to seep, drain, or empty within the critical root zone.

(5) Except for sidewalks and curb and gutter, no paving with concrete, asphalt, or other impervious material within the drip line of trees to be retained shall be allowed.

History

The history line the source prints at the end of the section.

(Ord. No. 06-2020, § 3, 12-8-2020; Ord. No. 18-2022, § 3, 12-13-2022)

Read this code where it is posted (Municode) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:bryan-county/zoning/114-633@2026-01-13-b99d0aebc4

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.

Bryan County Zoning Ordinance, Sec. 114-633. Plant, planting and maintenance standards | Georgia Commons