156.2.1. A combination of storage and controlled release of stormwater runoff shall be required when the proposed development shall increase the peak rate of runoff by more than one percent for a ten-year frequency storm; 156.2.2. Should the peak rate of stormwater runoff from the site exceed the permitted peak release rate, then on-site retention or detention shall be required. All retention or detention facilities shall be designed for all intensities up to and including the 100-year frequency for all duration of rainfall. All stormwater management facilities shall comply with the provisions of the Buena Vista Stormwater Ordinance. The peak runoff from the site after the development shall not be greater than the permitted peak release rate; and 156.2.3. The live retention or detention storage to be provided shall be calculated on the basis of the 100-year frequency rainfall, as published by the National Weather Service for the affected site. The retention or detention volume required shall be that necessary to handle the runoff of the 100-year rainfall for any and all duration from the proposed development, less than that volume discharged during the same duration at the approved release rate as specified above.