Temporary turnarounds shall be required at the discretion of the City Council. Said turnarounds shall consist of a tack coat with one inch of asphalt. 164.7. Quality control and testing requirements. It will be the responsibility of the developer or his authorized representative to ensure that all tests required are made. The cost of all testing and quality control will be performed at the expense of the developer by qualified testing laboratories approved by the City Council. In all test reports, thickness of base and asphaltic concrete will be shown. Table 6-10.5: Quality Control and Testing Requirements Type of Test to be Performed Minimum Number of Tests to be Performed Testing Standards Sub-grade compaction (density in place) One (1) per 500 L.F. of roadway 95% max. density ATSM-1557 Field Tests ASTM D-1556 F-2922 & D-2167 Base compaction One (1) per 500 L.F. of roadway 100% max. density ATSM-1557 Field Test-ASTM D-1556, D-2922 & D-2167 Asphaltic concrete (density in place) One (1) per 1,000 L.F. of roadway 92% laboratory density Asphaltic concrete (thickness in cores) Intervals not to exceed 500 L.F. Deficient in thickness not more than 1 /2" Sec. A-165. Installation of utilities.