(a) No activities conducted shall be within 500 feet of any residence, or within 250 feet of the lot line of a property with any other use. (b) Activities shall be setback 250 feet from any public road. (c) Minimum lot size of ten acres. (d) The buffer width shall be two times the minimum required with an approved fence, wall or berm. (e) Hours of operation are limited to 7:00 a.m. to 7:00 p.m., Monday through Saturday. (f) Activities having greater than one acre of disturbed area must obtain state and local permits. (g) Surety in the form of a bank letter of credit is required as a guarantee against the damages of any publicly maintained roads and shall remain in place until operations have ceased, and all reclamation activities have been completed. (h) An operation plan containing the following information shall be submitted as part of the application for conditional use: (1) Date of commencement of the operation and its expected duration. (2) A description of the method of operation, including the disposition of topsoil, overburden and by-products. (3) A description of the equipment to be used in the extraction process. (4) A statement regarding the intended use of explosives, if any, or other hazardous materials, if any, and the methods and procedures proposed for handling, use, storage and disposal of the materials. (5) A plan for reclamation of the land upon completion of mining, quarrying, or other excavation. (6) An analysis by a licensed civil engineer containing the following information shall be submitted as part of the application for conditional use approval identifying any state or county-maintained road or bridge within or adjacent to the property, and shall state any repaving, alterations, turning lanes, signalization, or other road additions or improvements necessary to accommodate the potential increase of traffic volume or weight occasioned by the proposed operations.