--- title: Bulloch County Zoning Ordinance, Section 1444. Solar electric power generation collection: local-codes id: local-code:bulloch-county/zoning/1444 cite_as: Bulloch County, Ga., Zoning Ordinance § 1444 canonical_url: https://georgiacommons.org/code/local/bulloch-county/zoning/1444 md_url: https://georgiacommons.org/code/local/bulloch-county/zoning/1444.md text_url: https://georgiacommons.org/code/local/bulloch-county/zoning/1444/text source_url: https://library.municode.com/ga/bulloch_county/codes/code_of_ordinances date: 2026-02-03 status: active jurisdiction: county:bulloch jurisdiction_name: Bulloch County county_fips: "13031" corpus_version: local-codes-bulloch-county-4e0d311e8c77 publisher: Georgia Commons, an independent project of Georgia Civic Data. Not the State of Georgia. Not legal advice. up: https://georgiacommons.org/code/local/bulloch-county/zoning/~appendix-c/~article-14.md previous: https://georgiacommons.org/code/local/bulloch-county/zoning/1443.md next: https://georgiacommons.org/code/local/bulloch-county/zoning/1445.md index: https://georgiacommons.org/code/local/bulloch-county.md branch: zoning edition: As published by Municode, current through 2026-02-03 edition_date_kind: current_through source_publisher: Municode version_id: local-code:bulloch-county/zoning/1444@2026-02-03-67d9844cf8 --- # Bulloch County Zoning Ordinance, Section 1444. Solar electric power generation > As published by Municode, current through 2026-02-03 > The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included. Part of: Appendix C - ZONING / Article 14 - SUPPLEMENTAL STANDARDS FOR SPECIFIC USES (a) Buildings or structures shall be 500 feet from any residence. (b) Inverters, transformers and similar noise producing equipment (not including arrays or panels) shall be placed a minimum of 75 feet away from properties abutting adjacent residential properties. (c) Minimum lot size is ten acres. (d) The buffer width shall be two times the minimum required with an approved fence, wall or berm. (e) Screened chain-link or pressure treated lumber security fencing will be required at a minimum height of six feet, but not at a greater height than eight feet around the perimeter of the facility inside the required setbacks, and it shall be regularly maintained. (f) All mechanical equipment (including arrays and panels) and outdoor lighting fixtures shall be limited to a height of 15 feet. (g) All outdoor lighting fixtures must be recessed and downcast and shall not produce glare or a nuisance to drivers or the surrounding properties. (h) Solar panels shall not be placed in the vicinity of any airport in a manner that would interfere with airport flight patterns. (i) A right-of-way encroachment permit shall be applied for with the county engineer's office with design and construction providing for a paved asphalt or concrete surface driveway and apron leading to any access gate upon completion of the project. (j) The developer shall be able to graphically demonstrate to the administrative officer through the use of renderings, photographs or similar credible media that proposed solar collection devices, or combination of devices, shall be designed and located to avoid glare or reflection onto adjacent properties and adjacent roadways and shall not interfere with traffic or create a safety hazard. (k) Textured glass and/or anti-reflective coating shall be used on solar panels to minimize glare. (l) Any solar collection device or combination of devices that is not operated for a continuous period of 12 months and for which there are no applications pending for permitted use of the structure at the end of such 12-month period, shall be considered abandoned, whether or not the owner or operator intends to make use of the device(s). The owner of an abandoned solar collection device and the owner of the property where the abandoned solar collection device is located shall be under a duty to remove such device. If such device is not removed within a reasonable time, not to exceed three months, after receipt of notice from the governing authority notifying the owner(s) of such abandonment, the governing authority may remove such device(s) and place a lien upon the property for the costs of removal. The governing authority may pursue all legal remedies available to it to ensure that abandoned device(s) are removed. Delay by the governing authority to act shall not in any way waive the governing authority's right to do so. (m) The developer of any solar collection device or combination of devices shall provide the following documentation to the administrative official before any land development begins: (1) A recorded plat creating a new parcel containing the boundaries of the facility and showing the panel locations within a properly fenced area. (2) Name, address, phone number and contact information of the owners of the installed solar infrastructure which shall be submitted the county tax appraiser's office for personal property tax purposes. (3) Proof of adequate project financing, along with insurance or surety. (4) Proof of compliance with regard to interconnection requirements with appropriate public utilities or public utilities regulatory agencies. (5) A letter from the Georgia Department of Natural Resources that there are no adverse impacts on historical or cultural resources. (6) Submission of a site plan that meets the requirements of the county soil erosion and sedimentation ordinance, and a drainage plan approved by the county engineer. ## History (Amd. of 4-4-23(2), § 1444)