(a) Commercial campgrounds. (1) Commercial campgrounds are subject to the standards of this code, the rules of the Department of Human Resources Chapter 290-5-18, Tourist Accommodations, and the plan submittal process described in this LDC. (2) The submittal plan pack shall include: Site layout meeting specifications of Table 4.03.08(E) prepared by a design professional, written certification from EPD accepting the well system design, written certification from the county health officer accepting the septic sewage system design, and the appropriate fee as set forth in the fee schedule. The following common use facilities shall be required to be included in the site plan: a. Solid waste collection area and facilities, permanently dedicated to service the development, with a minimum of one six-cubic-yard dumpster per 15 campsites; b. Designation for postal appurtenances/equipment; c. Dedicated ingress and egress for the development; d. Identification of third-party performing inspection to assure roads meet or exceed county road standards; e. Any required detention/retention facilities; f. Common bathhouses or community shower facilities; and g. Common laundry facilities, to include details concerning grey water disposal. (3) Plans shall be reviewed for compliance with this LDC by the building official and shall also be submitted to the planning commission for review and consideration of approval in accordance with the procedures in section 9.02.03 of this LDC. (4) All construction activities must comply with state licensing regulations. Any required inspections of internal rights-of-way shall be the responsibility of the owner and completed by a third party. (5) All occupied campsites must be subject to lease and or rental by written agreement between the owner of the development and the occupant. Such written agreement shall provide the obligations of the occupant and include the designation of an agent who may be personally contacted concerning such occupancy. (6) Site design standards for commercial campgrounds are as follows: Development Features Standard Minimum setbacks for camper sites on lots adjoining public roads 150 feet from any public right-of-way Minimum camper site setbacks from side and rear property lines and utility easements 50 feet Development Features Standard Minimum lot size 45 feet by 50 feet Minimum setback between camper sites, or any portion thereof 20 feet Driveway construction • A 60-foot right-of-way with stormwater ditches and swells. 30-foot right-ofway with third party analyst. • A minimum of 6-inch mixed in place and compacted sub base. • 4 inches of graded and compacted aggregate. • Slope of road surface from the centerline shall be one-quarter inch per foot. • Shall extend to a Burke Countymaintained roadway. • 30-foot culvert drain with 5-foot shoulder each side. • Open ditch sections shall be within the right-of-way of the road and designed with criteria for 25-year flood. • The building official may accept a site analysis from an independent third party registered Professional Engineer, soil engineer, or equivalent in lieu of the 25-year flood design. The analysis must show that the soils on the property are capable of absorbing the water from a 25-year rain event. • The design and construction of the road within the county right-of-way shall be approved by the county road superintendent following third party inspection obtained by owner. Development Features Standard Water and Sanitary Sewage (for each camper site) • Individual connection to a private or public central water supply system. • Written certification must be obtained from the Environmental Protection Division certifying the use or a private or public water system. • Written certification must be obtained from the county health officer that the proposed location can satisfactorily accommodate the central water system and on-site sewage disposal. • Written certification must be obtained from the county health officer of the proposed septic design. Electricity (for each camper site) Individual electric power connection per state minimum electrical code Buffer As to any adjoining residential use, a minimum buffer of 50 feet must be maintained (b) Recreational campgrounds. (1) Recreational campgrounds are subject to the standards of this code, the rules of the Department of Human Resources Chapter 290-5-18, Tourist Accommodations, and the plan submittal process described in this LDC. (2) The submittal plan pack shall include: Site layout meeting specifications of Table 4.03.08(E) prepared by a design professional, written certification from EPD accepting the well system design, written certification from the county health officer accepting the septic sewage system design, and the appropriate fee as set forth in the fee schedule. The following common use facilities shall be required to be included in the site plan: a. Solid waste collection area and facilities, permanently dedicated to service the development, with a minimum of one six-cubic-yard dumpster per 15 campsites; b. Designation for postal appurtenances/equipment; c. Dedicated ingress and egress for the development; d. Identification of third-party performing inspection to assure roads meet or exceed county road standards; e. Any required detention/retention facilities; f. Common bathhouses or community shower facilities; and g. Common laundry facilities, to include details concerning grey water disposal. (3) All construction activities must comply with state licensing regulations. (4) Site design standards for recreational campgrounds are as follows: Development Features Standard Minimum setbacks for camper sites on lots adjoining public roads 150 feet from the right-of-way and shall include an undisturbed vegetative buffer complying with 26-4.05.02 within such setback Minimum camper site setbacks from side and rear property lines 50 feet and shall include an undisturbed vegetative buffer complying with 26-4.05.02 within such setback Minimum lot size 45 feet by 50 feet Water and Sanitary Sewage (for each camper site) Individual connection to a central water supply system. Written certification must be obtained from the county health officer that the proposed location can satisfactorily accommodate the central water system and on-site sewage disposal. Electricity (for each camper site) Individual electric power connection.