26-6.03.00 BOARD OF HEALTH REQUIREMENTS. 26-6.03.01 On-site sewage management systems. (a) Where individual septic tanks or means other than connection to a public sanitary sewerage system are to be employed temporarily or permanently as a method of sewage disposal for one or more lots within a subdivision, evidence of the tentative approval of such methods by the county health officer shall be submitted with the subdivision plat. (b) Acceptable evidence of such tentative approval shall be a written statement bearing the signature of the county health officer and specifying that the subdivider has consulted the county board of health as to the suitability of such methods within the subdivision and each lot therein and that the tentative approval of the board of health has been granted for the use of such methods or that the subdivider has been apprised of subdivision design modifications to be made to render proposed lots suitable for septic tank use. Such modifications shall be specifically stated in the health officer's certification statement. (Ord. No. 18-01, ยงยง 1, 2, 9-11-2018) 26-6.04.00 SANITARY SEWER, POTABLE WATER, AND OTHER UTILITIES.