--- title: Butts County Zoning Ordinance (the whole text) collection: local-codes id: local-code:butts-county/zoning/whole cite_as: Butts County, Ga., Zoning Ordinance canonical_url: https://georgiacommons.org/code/local/butts-county/zoning/whole md_url: https://georgiacommons.org/code/local/butts-county/zoning/whole.md text_url: https://georgiacommons.org/code/local/butts-county/zoning/whole/text source_url: https://library.municode.com/ga/butts_county/codes/code_of_ordinances date: 2026-04-13 status: active jurisdiction: county:butts jurisdiction_name: Butts County county_fips: "13035" corpus_version: local-codes-butts-county-1a118e27a844 publisher: Georgia Commons, an independent project of Georgia Civic Data. Not the State of Georgia. Not legal advice. up: https://georgiacommons.org/code/local/butts-county/zoning.md previous: https://georgiacommons.org/code/local/butts-county/code/division-12.md index: https://georgiacommons.org/code/local/butts-county.md branch: zoning edition: As published by Municode, current through 2026-04-13 edition_date_kind: current_through source_publisher: Municode version_id: local-code:butts-county/zoning/whole@2026-04-13-cd344fba4b --- # Butts County Zoning Ordinance (the whole text) > As published by Municode, current through 2026-04-13 > The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included. > Read by OCR from a scanned page: a character, a name, or a number may be misread. PART III UNIFIED DEVELOPMENT ORDINANCE CHAPTER 1 GENERAL PROVISIONS* Sec. 1.01.00. Title. This code shall be known as and entitled the "Butts County Unified Development Ordinance" and may be referred to as the "UDO." Sec. 1.02.00. Authority. This UDO is enacted pursuant to the requirements and authority of Article IX, Section 2, Paragraph 4 of the Georgia Constitution and the amendments thereto. Sec. 1.03.00. Legal provisions. (a) Effective date. This UDO shall be effective immediately upon its adoption by the board of commissioners of Butts County, Georgia. (b) Repealer. This UDO is intended to consolidate, repeal and replace the existing provisions of the Butts County Code of Ordinances pertaining to land use and development. Upon adoption of this ordinance, the pre-existing provisions of the Butts County Code provided for in this UDO, or in conflict with this UDO, shall be repealed, except as provided herein. Without limiting the generality of the foregoing, the following chapters of the Butts County Code are hereby repealed and replaced with this UDO: Chapter 17; Chapter 34, Articles V, VI and VII; Chapter 42; Chapter 66, Article III; Chapter 100; Chapter 101; and Chapter 102. To the extent that any legal process is currently ongoing under a pre-existing section of the Butts County Code and arising out of facts occurring prior to the adoption of this UDO, such process shall continue, and the pre-existing code sections shall continue to be enforceable for the purposes of such process. In the event that any portion of this UDO, or the UDO in its entirety, is found to be unconstitutional or invalid, it is the intent of the board of commissioners that this repealer not be effective as to the unconstitutional or invalid code or provisions such that the pre-existing ordinances replaced by the unconstitutional or invalid code or provision shall be determined to continue in force and effect. (c) Severability. Should any section or provision of this UDO be declared by the courts to be unconstitutional or invalid, such declaration shall not affect the validity of the chapter as a whole or any part thereof other than the part so declared to be unconstitutional or invalid. It is hereby declared to be the intent of the board of commissioners that any provision of this UDO that is not itself unconstitutional or invalid would have been adopted and enforced independently of any provisions found to be unconstitutional or invalid. (d) Conflict of law. Whenever the provisions of this UDO conflict with any law or regulation of the state or federal government, the more restrictive provision shall control, except where the law or regulation of the state or federal government expressly and lawfully provides that it preempts local government regulation. Sec. 1.04.00. Applicability. Sec. 1.04.01. Generally. (a) This UDO shall apply only to the unincorporated areas of Butts County, Georgia, as now or hereafter established. (b) No building, structure, or land shall be used or occupied and no building, structure, or part thereof shall be erected, constructed, reconstructed, moved, enlarged, or structurally altered unless in conformity with the regulations of this UDO. (c) A change of use shall conform to the standards, criteria, requirements, and procedures of this UDO. Sec. 1.05.00. Purpose and intent. (a) These regulations are enacted to promote the proper location, height, bulk, number of stories, and size of buildings and other structures, sizes of yards, courts, and the use of other open spaces, density and distribution of population, and the use of buildings, structures, and land for trade, industry, residence, recreation, agriculture, forestry, conservation, sanitation, protection against floods, and public activities. (b) The purpose of these regulations is to: (1) Lessen congestion in the streets; (2) Secure safety from fire, panic, and other dangers; (3) Promote health and the general welfare; (4) Provide adequate light and air; (5) Prevent the overcrowding of land; (6) Avoid undue concentration of population; (7) Prevent urban sprawl; (8) Assure the provision of required streets, utilities, and other facilities and services; (9) Assure the adequate provision of safe and convenient traffic access and circulation, both vehicular and pedestrian; (10) Assure the provision of space for recreational, educational, and other public purposes; (11) Promote desirable living conditions and the sustained stability of neighborhoods; (12) Protect against blight and depreciation; (13) Secure economy in governmental expenditures; (14) Conserve the value of buildings; (15) Encourage the most appropriate use of land, buildings, and structures; (16) Promote economically sustainable development; (17) Encourage "green building" practices; and (18) Assure that land is developed in conformity with the Butts County comprehensive plan. Sec. 1.06.00. Relationship to comprehensive plan. The Butts County comprehensive plan (plan) is the official development policy and implementation guide for the county to coordinate and direct physical and economic development, related public investment, and to provide reasonable regulations for the development of private property in the interest of public health, safety, and welfare. This UDO is designed to implement all provisions of that plan for the development and use of land. It is intended that the comprehensive plan should guide decision making under this UDO, but ultimately the power to zone and regulate uses shall be in the board of commissioners. No decision shall be invalid simply because it does not strictly follow the comprehensive plan. Sec. 1.07.00. Zoning administrator. The Butts County zoning administrator is assigned to administer, interpret, and implement the standards, criteria, and procedures of this UDO. The zoning administrator may delegate such responsibilities to county staff. Throughout this UDO, the term "zoning administrator" is used to indicate the responsibility for specified actions, except where specified actions are reserved or specifically delegated by law to another official. In all instances, "zoning administrator" means the "zoning administrator or designee." Sec. 1.08.00. Documents adopted by reference. Sec. 1.08.01. Official zoning map of Butts County. The map entitled, "The Official Zoning Map of Butts County, Georgia," indicating the locations of zoning district boundaries in Butts County. The official zoning map shall be signed by the chairman of the board of commissioners and dated, and shall be maintained by the zoning administrator. Sec. 1.08.02. Building and construction codes. The latest editions of the mandatory Georgia state minimum standard codes, as may be adopted and amended by the Georgia Department of Community Affairs from time to time, are hereby incorporated by reference. Sec. 1.09.00. Rules of interpretation. Sec. 1.09.01. Generally. (a) Specific provisions of this UDO shall be followed in lieu of general provisions that may be in conflict with the specific provisions. (b) In the interpretation and application of this UDO, all standards, provisions, and requirements shall be liberally construed in favor of the objectives and purposes of the county and shall not be construed to limit nor repeal any other powers granted under state statutes. (c) Where provisions of this UDO conflict with other regulations, the more stringent restrictions shall be applied. Sec. 1.09.02. Responsibility for interpretations. (a) In the event that any question arises concerning the application of regulations, standards, definitions, development criteria, or any other provision of this UDO, the zoning administrator shall be responsible for interpretation. In the interpretation of this UDO, the zoning administrator shall be guided by the Butts County comprehensive plan and applicable state law. (b) Responsibility for interpretation by the zoning administrator as set forth in this section shall be limited to standards, regulations, and requirements of this UDO and shall not be construed to include interpretation of any technical codes adopted by reference in this UDO. Interpretation shall not be construed to override the responsibilities assigned by the Butts County board of commissioners to any commission, board, or official named in other sections or chapters of this UDO. Sec. 1.09.03. Rules for boundary interpretations. Where uncertainty exists with respect to the exact location of the boundary of a zoning district shown on the official maps, the following guidelines will be used in establishing the exact location of the boundary: (a) Where a zoning district boundary line as appearing on the official map divides a single lot that was a single lot at the time of the enactment of this ordinance, the requirements for the zoning district in which the greater portion of the lot lies must be extended to the balance of the lot. (b) Where a zoning district boundary is indicated as approximately following a municipal/county boundary, such municipal/county boundary is the boundary. (c) Where a zoning district boundary is indicated as approximately following a property line or such line extended, the line or lines extended is the boundary. (d) Where a zoning district boundary is indicated as approximately following the centerline of a stream bed, such a centerline is the boundary. (e) Where a zoning district boundary is indicated as approximately following or parallel to the centerline of a street, road, railroad, or the right-of-way of such a facility, the zoning district boundary is parallel to the line and at a distance from it as indicated by scale on the official map. (f) Where a zoning district boundary is indicated as approximately following section lines, half-section lines, or quarter-section lines, the boundary shall be construed as following such lines. (g) Where a zoning district boundary is indicated as approximately following the shoreline of a river, stream, lake or other water body, the boundary shall be construed as following such shoreline. Sec. 1.09.04. Rules of construction. (a) Words used in the present tense include the future tense. (b) Words used in the singular include the plural, and words used in the plural include the singular. (c) The masculine gender includes the feminine and the neuter. (d) The word "person" includes a firm, partnership, company, corporation, or association as well as individuals. (e) The word "shall" is always mandatory; the word "may" is permissive. (f) The term "written" or "in writing" shall include any representation of words, letters, or figures, whether by printing or otherwise. (g) The term "day" means a calendar day. (h) The term "month" means a calendar month. (i) The word "week" shall mean seven days. (j) The word "year" shall mean a calendar year. Sec. 1.09.05. Computation of time. When a number of days is prescribed for the exercise of any privilege or the discharge of any duty, the first or last day shall not be counted; and if the last day falls on Saturday or Sunday, the person having such privilege or duty shall have through the following Monday to exercise the privilege or to discharge the duty. When the last day prescribed for such action falls on a public and legal holiday as provided for in O.C.G.A. § 1-4-1, the person having the privilege or duty shall have through the following day to exercise the privilege or to discharge the duty; however, when the following day is a Saturday or Sunday, the person shall have through the following Monday to exercise the privilege or to discharge the duty. Sec. 1.10.00. Definitions. When determining the meaning of a word or phrase, the following rules shall apply in the order of priority in which they are listed: (a) The following words and phrases have the meanings as defined below; (b) Terms that relate to the local implementation of state or federal laws and regulations, when not defined by this ordinance, shall have the meaning ascribed to them by the law, regulation or the agency responsible for interpreting and applying the law or regulation; (c) Terms not defined by this ordinance or applicable law or regulation shall have the definition provided by Muskowitz and Lindbloom, The Latest Illustrated Book of Development Definitions; (d) Terms defined in particular chapters of this UDO shall have the defined meaning whenever used in the context of matter regulated by such chapter; (e) All other terms shall have their commonly understood meaning. Access easement means an easement devoted to vehicular access which affords a principal means of access to abutting property or properties, but which is not necessarily open to the general public and which is not necessarily improved to standards of the County. Accessory structure/building means a structure used for a purpose that is customarily incidental and subordinate to the principal use or structure, and located on the same lot as such a principal use or structure. Examples would include garages, carports, storage sheds, pole barns, hay sheds and the like. Administrator, zoning means the person, officer, or official and her/his authorized representative whom the board of commissioners of Butts County has designated as its agent for the administration of these regulations. Adult entertainment establishment means, in addition to any definition of adult business or adult entertainment establishment as it now or hereafter appears in the Butts County Code, adult entertainment establishment in the context of this ordinance shall include, but not be limited to, any "adult bookstore," "adult movie house," "explicit media" outlet, or any place involving "sexual conduct" or "sexually explicit nudity" for commercial purposes, as those terms are defined in O.C.G.A. § 36-60-3, or any business or activity regulated under the Butts County adult amusements and entertainments ordinance. Airstrip, private means an area designated for the takeoff and landing of private, noncommercial aircraft, with no terminal facilities and no scheduled takeoffs and landings. Alteration means any change in the supporting members of a building, any modification or change in construction, any addition which increases the area or height, or any change in use from that of one district classification to another or movement of a building from one location to another. Automobile service station means a land use where gasoline, oils, greases, batteries, tires, and general automobile accessories may be provided, but where no part of the premises is used for the storage or dismantling of wrecked or junked vehicles. Bar, tavern, or nightclub means any place devoted primarily to the retailing and on-premise drinking of malt, wine, or other alcoholic beverages, or any place where any sign visible from the public right-of-way is exhibited or displayed indicating that alcoholic beverages are obtainable for consumption on the premises. The incidental service of food for consumption on the premise shall be allowed. Live entertainment shall be allowed. Batching plant means a plant for the manufacture or mixing of asphalt, concrete, cement, or concrete or cement products, including any apparatus incidental to such manufacturing and mixing. Best management practices (BMPs). See section 3.08.02 for definition. Boardinghouse or roominghouse means a building other than an apartment building where, for compensation, both lodging and meals are provided for not more than ten persons. Buffer means that portion of a lot or parcel established for open space purposes and intended to separate properties with different and possibly incompatible types of uses or as a condition of zoning approval for a specified property. It can be a natural (undisturbed) or enhanced vegetated area with only limited minor land disturbances, such as trails and picnic areas. A buffer must provide reasonable visual screening of the property. Building height means the vertical distance of a building, measured from the average elevation of the finished grade at the front of the building to the highest point of the building. Building inspector means the authorized representative of building department responsible for performing inspections on all permitted building projects. Building line means a line parallel to and located a specified minimum distance from the front, side, or rear property lines beyond which no foundation wall or part of the structure of any building projects with the exception of roof overhang, steps, and the subsurface projection of footings. Building permit means the document issued by Butts County that authorizes the construction, repair, alteration, addition, and/or permanent placement of a building, dwelling or other structure on a site. Building, principal means the building on a lot in which the principal use of the lot is conducted. Bulk storage means the storage of chemicals, petroleum products, or similar materials in above-ground or below-ground storage containers designed for wholesale distribution or mass consumption. This includes fuel oil distributors with storage of products. Canopy tree means any tree having reached a relatively tall height compared to surrounding trees and vegetation and providing shade from its foliage mass; also individual or tree groups forming an overhead cover. Cemetery means land either already reserved for burial plots for the deceased or which may, in the future, be so reserved; it may be maintained either by a family, a church or other place of worship, or a private corporation. Cemetery, family means a private, non-commercial cemetery that is restricted to members of the family that owns the property. Church means a building or structure, or groups of buildings or structures, that by design and construction are primarily intended for conducting organized religious services. Associated accessory uses include, but are not limited to, residences for pastors, ministers, priests, or rabbis; schools; meeting halls; indoor recreational facilities; day cares; and kitchens. This term includes synagogues, temples, and other places of worship. Clinic means an establishment where medical or dental patients are admitted for examination and treatment but where there is no overnight lodging. Club or lodge means an incorporated or unincorporated association for civic, social, cultural, religious, fraternal, literary, political, recreation, or like activities, operated for the benefit of its members and not open to the general public. Compatibility means the characteristics of different land uses or activities that permit them to be located near each other in harmony and without conflict. Composting facility means a facility where compost or organic matter that is derived primarily from off site is processed by composting and/or processed for commercial purposes. Activities of a composting facility may include management, collection, transportation, staging, composting, curing, storage, marketing, or use of compost. Conservation easement means a nonpossessory interest of a holder in real property imposing limitations or affirmative obligations, the purposes of which include retaining or protecting natural, scenic, or open-space values of real property; assuring its availability for agricultural, forest, recreational, or open-space use; protecting natural resources; maintaining or enhancing air or water quality; or preserving the historical, architectural, archeological, or cultural aspects of real property (O.C.G.A. § 44-10-1); a legally enforceable agreement between a property owner and the holder of the easement in a form acceptable to the governing body and recorded in the office of the clerk of the Superior Court of Butts County. A conservation easement restricts the existing and future use of the defined tract or lot to conservation use, agriculture, passive recreation, or other specifically permitted use and prohibits further subdivision or development. Conservation subdivision means a subdivision for dwellings where open space is the central organizing element of the subdivision design and that identifies and permanently protects all primary and all or some of the secondary conservation areas within the boundaries of the subdivision. A conservation subdivision is not a use per se, but rather, a land planning technique that allows the clustering of uses in order to protect open spaces. Cut means a portion of land surface or area from which earth has been removed or will be removed by excavation; the depth below original ground surface to the excavated surface. Also known as excavation. Density, gross means the total number of dwelling units divided by the total project area, expressed as gross dwelling units per acre. Density, net means the number of dwelling units per acre of land when the acreage involved includes only the land devoted to residential uses and excludes such areas as street rights-of-way, parks, open space, flood hazard areas, required buffers, stormwater facilities, and public land. Development means the division of a parcel of land into two or more parcels; the construction, reconstruction, conversion, structural alteration, relocation, or enlargement of any structure; any mining, excavation, landfill, or land disturbance; or any use or extension of the use of land. Development agreement means, for purposes of this article, a written document prepared by the applicant and negotiated with Butts County for the conditions of zoning approval that will apply to a particular rezoning application. It may include provisions regarding infrastructure (e.g., water and sewer lines, drainage facilities, roads, utilities, etc.) to be provided by the developer and limitations on certain land uses. Development director means the director of the Butts County community development department or his/her designee. Drainage structure means a device composed of a virtually nonerodible material such as concrete, steel, plastic or other such material that conveys water from one place to another by intercepting the flow and carrying it to a release point for stormwater management, drainage control, or flood control purposes. Dwelling means a building or portion thereof designed, arranged, or used principally for residential occupancy, not including motels, hotels, boardinghouses, or roominghouses. Dwelling, apartment means one or more dwelling units, under a single ownership, located on one lot of land, occupied by renters. Dwelling, cluster means one of a series of attached and/or detached dwelling units developed under a single ownership. Dwelling, condominium means an individually-owned dwelling unit in an attached, detached, or multi-family structure, combined with joint ownership of common areas of the buildings and grounds. Dwelling, garden apartment means a multi-family dwelling one or two stories in height containing from one to four dwelling units and where the area immediately surrounding the dwelling is landscaped and may contain recreation facilities for the private use of dwelling occupants. Dwelling, multiple-family means a building containing three or more dwelling units, including units that are located one over another. Dwelling, patio means a single-family dwelling in which all or a portion of the area required for side and rear setbacks may be consolidated into one or more garden court spaces within the walls of the dwelling unit. Dwelling, single-family attached means a building containing two or more single-family dwelling units joined at one or more points by one or more party walls or other common facilities (not including the walls of an enclosed court yard or similar area) and with property lines separating each dwelling unit. Dwelling, single-family detached means a single residential detached building designed for or containing one dwelling unit. Dwelling, townhouse means one of a series of three or more attached dwelling units on separate lots which are separated from each other by firewalls extending at least from the lowest floor level to the roof. Dwelling, two-family means a detached dwelling designed, constructed, altered, or used for two adjoining dwelling units, with each dwelling unit having a party wall connecting it with the other dwelling unit, located on one lot; also known as a duplex. Dwelling unit means one or more rooms designed, occupied, or intended for occupancy as separate living quarters, with cooking, sleeping, and sanitary facilities provided within the dwelling unit for the exclusive use of a single family maintaining a household. Eating/drinking establishment means a building and/or structure upon which food and alcoholic beverages are cooked, prepared and offered for sale and includes establishments known as bars, grilles, cafes, taverns, nightclubs, drive-ins and any fast food locations. Enforcer means the director of the Butts County community development department or his/her designee. Existing land use means a land use which, prior to the effective date of this ordinance, or an amendment thereto, is either: (1) Completed; (2) Ongoing, as in the case of agricultural activity; (3) Lawfully under construction; (4) Fully approved by the governing authority where such approval has not expired or been abandoned; or (5) The subject of a completed application, with all necessary supporting documentation, which has been submitted for approval to the governing authority or the appropriate government official, for any construction-related permit. Family means one or more persons occupying a dwelling unit and living as a single housekeeping unit and having no more than two adult members who are not related within the second degree of kinship by blood, adoption, marriage or civil union to the remaining members. This definition expressly excludes dormitories, sororities, fraternities, convents and communes. Farm means any tract or parcel of land containing three or more acres which is devoted to the raising of agricultural products including, but not limited to, soil crops, livestock, fish, fowl, and commercial timber regardless of the quantity or value of production. Feepayor means that person who pays a development impact fee or his/her successor in interest. In the absence of any express transfer or assignment of the right or entitlement to any refund of previously paid development impact fees, the right or entitlement shall be deemed "not to run with the land." Fence means an enclosure or barrier composed of wood, masonry, stone, wire, iron, or other approved materials or combination of materials used as a boundary, means of protection, privacy screening, or confinement, including brick or concrete walls, but not including hedges, shrubs, trees, or other natural growth. Fence, chain-link means an open mesh fence made entirely of wire woven in squares of approximately 1.5 inches with vertical supports, usually spaced at an interval of six feet, usually at a height of three or more feet. Fence, solid means a fence, including entrance and exit gates where access openings appear, through which no visual images can be seen. Fill means a portion of land surface to which soil or other solid material has been added; the depth above the original ground surface or an excavation. Final plat means an as-built drawing or map of a subdivision, meeting all of the requirements of this ordinance, and complying with the Georgia statutes pertaining to the recording of plats. Finished grade means the final elevation and contour of the ground after cutting or filling and conforming to the proposed design. Flag lot means a lot, the main portion of which is located away from the public street, with a connecting strip of land at least 60 feet wide providing frontage on the public street. Floor area means the area of a dwelling exclusive of attic, basement, garage, carport, patios, and open porches measured from the exterior face of the exterior walls of a dwelling. Also, the gross leasable floor area for any business or industry based on interior dimensions. Food processing plant means a manufacturing establishment producing or processing foods for human or animal consumption and certain related products or by-products, including, but not limited to, the following products: Sugar, dairy, fruit and vegetable (including canning, preserving and processing), grain mill products and by-products, meat, poultry and seafood (including by-product processing, but not including the slaughtering of animals), and miscellaneous food preparation from raw products. Frontage or road frontage means the width in linear feet of a lot where its front lot line abuts the right-of-way of any road from which access may be directly gained. Fueling center means a facility that provides for fueling for tractor-trailer rigs and has each of the following characteristics: (1) A convenience store or restaurant as the principal facility on the property; (2) There are no more than five diesel fuel pumps accessible by tractor-trailer rigs, all of which are located in the rear of the facility and screened from the public right-of-way; (3) There are less than ten tractor-trailer parking spaces, which must be in the rear of the facility and screened from the public right-of-way; (4) Overnight tractor-trailer parking is not permitted; and (5) There are no bathrooms with public bathing facilities. The screening discussed above shall be accomplished by a 20-foot wide buffer with a fully opaque evergreen vegetation. No fueling center shall be established within 300 feet of an existing fueling center measured along the shortest direct line, property line to property line. Garage or carport, private means a covered space for the storage of one or more motor vehicle(s) belonging to the occupants of the principal use on the lot. No business occupation or service may be conducted for profit within the private garage except a home occupation under conditions specified in this section. Garage, public means any garage, other than a private garage, which is used for storage, minor repair, rental, servicing, washing, adjusting, or equipping of automobiles or other motor vehicles, but not including the storage of wrecked or junked vehicles. Garden means any tract or parcel of land containing no more than three acres devoted to the raising of soil crops. This includes only soil crops. Other agricultural activities included under the term "farm" are specifically excluded. Gas station means a facility to obtain motor vehicle fueling, but which does not possess any of the criteria listed in the definition for truck stop. Gas tank sales means the retail sale of bulk storage tanks for flammable and combustible liquids, compressed gases or liquefied petroleum (LP) gas. Generalized wetlands map means the current U.S. Fish and Wildlife Service National Wetlands Inventory Map for Butts County, Georgia. Grading means altering the shape of ground surfaces to a predetermined condition; this includes stripping, cutting, filling, stockpiling and shaping or any combination thereof and shall include the land in its cut or filled condition. Greenspace means permanently protected land and water, including agricultural and forestry land, which is in its undeveloped, natural state or that has been developed only to the extent consistent with, or is restored to be consistent with, one or more of the following goals: (1) Water quality protection for rivers, streams, and lakes; (2) Flood protection; (3) Wetlands protection; (4) Reduction of erosion through protection of steep slopes, areas with erodible soils, and stream banks; (5) Protection of riparian buffers and other areas that serve as natural habitat and corridors for native plant and animal species; (6) Scenic protection; (7) Protection of archaeological and historic resources; (8) Provision of recreation in the form of boating, hiking, camping, fishing, hunting, running, jogging, biking, walking, and similar outdoor activities; (9) Connection of existing or planned areas contributing to the goals specified in this definition and/or the county's comprehensive plan. Hazardous waste/hazardous material means any solid waste which has been defined as "hazardous waste" in regulations promulgated by the administrator of the United States Environmental Protection Agency pursuant to the Federal Act which are in force and effect on February 1, 1991, codified as 40 CFR Section 261.3 as hereafter amended and any designated hazardous waste. Also any substance defined as "hazardous waste" by the Georgia Department of Natural Resources pursuant to O.C.G.A. § 12-8-60 et seq. as hereafter amended. Historic structure means any structure that is: (1) Listed individually in the National Register of Historic Places (a listing maintained by the U.S. Department of Interior) or preliminarily determined by the Secretary of the Interior as meeting the requirements for individual listing on the National Register; (2) Certified or preliminarily determined by the Secretary of the Interior as contributing to the historical significance of a registered historic district or a district preliminarily determined by the Secretary to qualify as a registered historic district; (3) Individually listed on a state inventory of historic places and determined as eligible by states with historic preservation programs which have been approved by the Secretary of the Interior; or (4) Individually listed on a local inventory of historic places and determined as eligible by communities with historic preservation programs that have been certified either: a. By an approved state program as determined by the Secretary of the Interior; or b. Directly by the Secretary of the Interior in states without approved programs. Hotel means a facility offering transient lodging accommodations to the general public and which may include additional facilities and services, such as restaurants, meeting rooms, entertainment, personal services, and recreational facilities. Immediate family member means grandfather, grandmother, father, mother, son, daughter, grandson, granddaughter, brother, sister. Impervious surface means any paved, hardened or structural surface which does not allow for complete on-site infiltration of precipitation. Such surfaces include, but are not limited to, buildings, driveways, streets, parking lots, swimming pools, dams, tennis courts, and any other structures that meet the above definitions. Incinerator means a facility with equipment that uses a thermal combustion process to destroy or alter the character or composition of medical waste, sludge, soil, or municipal solid waste, not including animal or human remains. Industrialized building means any structure or component thereof which is, wholly or in substantial part, made, fabricated, formed, or assembled in manufacturing facilities for installation or assembly and installation on a building site and has been manufactured in such a manner that all parts or processes cannot be inspected at the installation site without disassembly, damage to, or destruction thereof; and which bears the insignia of approval issued by the commissioner of the Georgia Department of Community Affairs. Industrialized home means a home manufactured in accordance with the Georgia Industrialized Building Act and the Rules of the Commissioner of the Georgia Department of Community Affairs issued pursuant thereto. State approved buildings meet the state building and construction codes and bear an insignia of approval issued by the commissioner. Intermediate care home means a facility which admits residents on medical referral. It maintains the services and facilities for institutional care and has a satisfactory agreement with a physician and dentist who will provide continuing supervision including emergencies. It otherwise complies with the rules and regulations contained in chapter 290-5-9: Intermediate Care Homes (Rules of the Georgia Department of Human Resources). Junked vehicle means a vehicle in inoperative or junk condition shall include, but shall not be limited to, any automobile, vehicle, trailer of any kind or type, or contrivance, or a part thereof, the condition of which is one or more of the following: (1) Wrecked; (2) Dismantled; (3) Partially dismantled; (4) Inoperative; (5) Abandoned; (6) Discarded; (7) Scrapped; or (8) Does not have a valid license plate attached thereto. No automobile, vehicle or trailer of any kind or type, which shall be inoperative or in a junk condition, or abandoned, shall be parked or stand on any property unless: (1) It shall be in an enclosed building; (2) It shall be on the premises of a business enterprise operated in a lawful manner, when necessary to the operation of such business enterprise; or (3) It shall be on property lawfully occupied and used for repair, reconditioning or remodeling of vehicles in conformance with the ordinances of Butts County. Jurisdictional wetland means an area that meets the definitional requirements for wetlands as determined by the U.S. Army Corps of Engineers. Land-disturbing activity means any activity which may result in soil erosion from water or wind and the movement of sediments into state waters or onto lands within the state, including, but not limited to, clearing, dredging, grading, excavating, transporting, and filling of land but not including agricultural practices as described in section 3.08.03, paragraph (e). Land trust means a private, nonprofit conservation organization formed to protect natural resources, such as productive farm or forest land, natural areas, historic structures, and recreational areas. Landfill, construction and demolition means a disposal facility accepting waste building materials and rubble resulting from construction, remodeling, repair and demolition operations on pavements, houses, commercial buildings, and other structures. Such wastes include, but are not limited to, wood, bricks, metal, concrete, wall board, paper, cardboard, inert waste landfill material and other inert wastes which have a low potential for groundwater contamination. Large water supply watershed means a watershed containing 100 square miles or more of land within the drainage basin upstream of a governmentally-owned public drinking water supply intake. Larger common plan of development or sale means a contiguous area where multiple separate and distinct construction activities are occurring under one plan of development or sale. For the purposes of this paragraph, "plan" means an announcement; piece of documentation such as a sign, public notice or hearing, sales pitch, advertisement, drawing, permit application, zoning request, or computer design; or physical demarcation such as boundary signs, lot stakes, or surveyor markings, indicating that construction activities may occur on a specific plot. Limited development area means an all land within a watershed water supply district that lies outside of the water quality critical area. Lot, corner means a lot located at the intersection of two or more streets. Lot, double frontage means a lot, other than a corner lot, which has frontage on more than one street. Lot of record means a lot which is part of a subdivision, the plat of which has been recorded in the office of the clerk of the superior court of Butts County, Georgia; or a parcel of land described by metes and bounds, the plat or description of which has been recorded in said office. If a portion of a parcel has been conveyed at the time of the adoption of this ordinance, the remaining portion of the lot or parcel will be considered a lot of record. Lot remnant means any portion or portions of a lot not suitable for building upon because of size or topography and remaining after the transfer of other portions of the lot to adjoining lots. Lot width means the distance between side lot lines measured at the setback. Lowest floor means the lowest floor of the lowest enclosed area, including basement. An unfinished or flood resistant enclosure, used solely for parking of vehicles, building access, or storage, in an area other than a basement, is not considered a building's lowest floor, provided that such enclosure is not built so as to render the structure in violation of other provisions of this Code. Manufactured home means a building, transportable in one or more sections, built on a permanent chassis and designed to be used with or without a permanent foundation when connected to the required utilities. The term also includes park trailers, travel trailers, and similar transportable structures placed on a site for 180 consecutive days or longer and intended to be improved property. Manufactured homes are not permitted to be used as storage buildings. Manufactured home space means an area of land within a planned manufactured home community designed to accommodate one manufactured home. Manufacturing, heavy means manufacturing activity which tends to use raw materials and basic components to produce items which are generally intended for use in further industrial processes, such as machinery and construction equipment, as opposed to use by consumers. Manufacturing, light means manufacturing activity that uses moderate amounts of partially processed materials to produce items generally intended for purchase by the consumer or retailer, such as textiles or electronics, as opposed to users engaged in further industrial processes. Marina means a facility for the storing, servicing, fueling, berthing, and securing of boats and from which boats and boating supplies, including food, fuel, and recreational items, may be purchased or rented. Materials recovery facility means a solid waste handling facility that provides for the extraction from solid waste of recoverable material, materials suitable for use as a fuel or soil amendment, or any combination of such materials. (O.C.G.A. § 12-8-22) Motor vehicle impound lot means an area used to store disabled or impounded motor vehicles until such time as their disposition (either by junk, salvage, repair, etc.) has been determined by an insurance company, the owner of the vehicle, his or her legal representative, or a repossessing creditor. Vehicles shall only be stored on site temporarily, for a period of no more than 60 days. Multi-use trail means a path that does not permit motorized vehicles (except for publicly authorized emergency and service vehicles) and which may accommodate multiple nonmotorized uses, including bicyclists, pedestrians, wheelchair users, joggers, pet owners, roller bladders, skateboarders, etc. New development means any development approved or constructed subsequent to the adoption of this ordinance or amendments thereto. Office/finance facilities means a structure principally devoted to providing office space for a general range of consumer services or devoted to primarily provide space for consumer financial services. Outfall means the location where stormwater in a discernible, confined and discrete conveyance leaves a facility or site or, if there is a receiving water on site, becomes a point source discharging into that receiving water. Overlay district means a district that applies supplementary regulations to land previously classified as belonging to a specific zoning district or land-use category. Pawn shop means a type of used merchandise store in which merchandise is offered as collateral for obtaining loans and wherein such merchandise is offered for sale in recompense for default of loan repayment. Person means any individual, partnership, firm, association, joint venture, public or private corporation, trust, estate, commission, board, public or private institution, utility, cooperative, state agency, municipality or other political subdivision of the state of Georgia, any interstate body or any other legal entity. Personal services establishment means establishments providing non-medically related services, including beauty and barber shops, clothing rental, dry cleaning pick-up stores, laundromats (self-service laundries), shoe repair shops, and tanning salons. These uses may also include accessory retail sales of products related to the services provided. Phase or phased means sub-parts or segments of construction projects where the sub-part or segment is constructed and stabilized prior to completing construction activities on the entire construction site. Planned development means a coordinated large scale or comprehensive group development designed and constructed according to a development plan which has been approved by the board of commissioners. Planned manufactured home community means a lot used or intended for use as a residential area occupied by manufactured homes and conforming to an approved development plan with appropriate and adequate community services, recreation facilities, utilities, streets, and sidewalks provided by the developer where the resident owns or rents the manufactured home and rents the manufactured home space. Planned residential development means a form of development characterized by a unified site design for a number of housing units, clustered buildings, and common open space. Power plant, private means a facility, distinguished from a public use, that converts one or more energy sources, including, but not limited to, water power, fossil fuels, nuclear power, or solar power, into electrical energy or steam, the primary function of which is the provision of electricity to the use on the site the facility is located or off site. Preliminary plat means a tentative drawing or map of a proposed subdivision meeting requirements of this ordinance and showing the proposed layout in sufficient detail, although not completely computed, to indicate unquestionably its workability. Project means the entire proposed development project regardless of the size of the area of land to be disturbed. Recreation, active means equipment and areas prepared for active use for recreational and leisure purposes, including, but not limited to, playground equipment (swing sets and climbing structures); courts for basketball, volleyball, and tennis; leveled, striped fields for football, soccer, or multiple purposes; community picnic pavilions (including covered facilities with grills and/or fire rings); community buildings for recreational events; and golf courses, including clubhouses, developed areas and accessory uses. Trails and bikeways through open spaces shall not be considered active recreational facilities. Recreation, passive means recreational activities and places that generally do not require a developed site. This generally includes such activities as hiking (e.g., trails and bikeways through open spaces) and horseback riding and shall not be considered active recreational facilities, provided that such activities occur in a manner that is consistent with existing natural conditions. Recreational vehicle means a vehicle which is: (1) Built on a single chassis; (2) Four hundred square feet or less when measured at the largest horizontal projection; (3) Designed to be self-propelled or permanently towable by a light duty truck; and (4) Designed primarily not for use as a permanent dwelling but as temporary living quarters for recreational, camping, travel, or seasonal use. Recycling center means a state-permitted facility engaged in the collection, storage, processing, resale or reuse of materials which would otherwise become solid waste. Reservoir boundary means the edge of a reservoir, defined by its normal pool level (elevation above mean sea level). Residential means a structure designed and used solely for residential occupancy with common facilities such as dining room, bath room, family room, kitchen and bedrooms. Right-of-way means a strip of land designated, reserved, dedicated, or purchased for the purpose of pedestrian access, vehicular access, or utility line installation. Right-of-way, private means that area, distinguished from an access easement or public right-of-way, dedicated to property owners of the subdivision involved or to other individuals, and which affords permanent access to abutting property or properties. A private right-ofway is distinguishable from a public road right-of-way in that maintenance and ownership of the road and accessory improvements is by private individuals or an association rather than the Butts County board of commissioners or another government. Right-of-way, public means that area, distinguished from an easement or private road right-of-way, which is owned in fee-simple title or by prescription by the Butts County board of commissioners or other government, for the present or future use of roads and highways, together with its drainage facilities and other supporting uses and structures. Road, private means any road or street that is not dedicated to Butts County, is not public, and is privately owned and maintained. Road, public means a state highway, county road, a road adopted as a county-owned right-of-way approved for county maintenance by the Butts County Board of Commissioners, or a street owned and/or maintained by a municipality. Self-storage facility means a building or group of buildings containing separate, individual, and private storage spaces of varying sizes available for lease or rent for varying periods of time. This may include open or enclosed spaces to park or store vehicles. The following activities are not permitted as part of a self-storage facility: (1) The operation of power tools, spray-painting equipment, table saws, lathes, compressors, welding equipment, kilns or similar equipment by renters; (2) The operation of a transfer or storage business by renters; (3) The fabrication, repair or servicing of motor vehicles, appliances, equipment or tools; and (4) Auctions, commercial, wholesale or retail sales by renters. Setback means a required open space on a lot that is left undeveloped with buildings, except parking lots and signs. Setback, front means the open space on a lot located between the right-of-way boundary of the abutting street(s) and the front building line projected to the side lot lines. For lots abutting Jackson Lake and High Falls Lake, the front yard setback applies to the waterfront side of the property, and the area between the public right-of-way and the building shall be subject to the rear setback. Whenever the provisions of this UDO provide that front setback shall be measured from the right-of-way, the measurement shall be from the center-line of the right-of-way. Setback, rear means the open space between the rear property line and the rear building line projected to the side lot lines. Setback, side means the open space between the side property line and the side building line extending from the rear building line to the front building line. Shade tree means any tree, evergreen or deciduous, whose mature height can be expected to exceed 35 feet and whose crown spread can be expected to exceed 30 feet. Shade trees existing or planted shall be at least eight feet in height and two inches in diameter, measured at six inches above grade for new trees and measured at four and one-half feet above grade for existing trees. Shoulder means the portion of a roadway contiguous with the travel way for accommodation of stopped vehicles, for emergency use, and for lateral support of the subbase, base, and surface courses. Sign means any display of words, shapes or images designed to convey a message to the viewer, located on the exterior of any dwelling, building or structure, or located anywhere on a lot upon a dedicated supporting structure or device, including poles, banners, windows and similar devices. Significant recharge areas means those areas mapped by the Georgia Department of Natural Resources in Hydrologic Atlas 18, 1989 edition. Silviculture means the art of producing, reproducing and growing a forest of distinctive stands of trees. Slaughterhouse means a facility for the slaughtering and processing of animals and the refining of their byproducts. Small water supply watershed means a watershed that contains less than 100 square miles of land within the drainage basin upstream of a governmentally-owned public drinking water supply intake. Solar power facility means a development of property primarily intended to capture or generate energy for sale or distribution from solar power panels or similar technology. This definition excludes the use of solar power technology where the majority of the power generated by the solar panels is retained or used by the owner or occupant of the property, which is considered a permissible accessory use. Special events facility means a building available for lease by private parties for uses including, but not limited to, weddings, birthdays, reunions, anniversaries, and the like. Occupancy requirements shall meet the current construction and safety codes adopted by the governing authority. Specialty shops means retail operations that specialize in one type or line of merchandise. Such stores may include, but are not limited to, apparel stores, jewelry stores, bookstores, shoe stores, stationary stores, antique stores, and similar establishments. Stabilization means the process of establishing an enduring soil cover of vegetation by the installation of temporary or permanent structures for the purpose of reducing to a minimum the erosion process and the resultant transport of sediment by wind, water, ice or gravity. Story means that portion of a building, not including a basement, between the surface of any floor and the surface of the floor next above it, or if there is no floor above, then the space between the floor and the ceiling next above it. Stream or river means all of the following: (1) Any perennial stream or river (or portion thereof) that is portrayed as a solid line on a United States Department of Agriculture Soil Survey Map of the most recent edition. (2) Any intermittent stream or river (or portion thereof) that is portrayed as a dashed line on a United States Department of Agriculture Soil Survey Map of the most recent edition. (3) Any other streams as may be identified by Butts County. (4) Any lake or impoundment not entirely contained within a single parcel of land. Street/road means: (1) Local street/road means a street used primarily for access to the abutting properties and serves travel demands in the immediate area, and designated as such on the road classification map of the Butts County land use plan (where one exists). (2) Collector street/road means a street which usually serves to either provide direct access to lots or distribute traffic from individual lots to major streets. It may also connect neighborhoods with one another. It should be designed to discourage excessive speeds and through traffic. It is designated as such on the road classification map of the Butts County land use plan (where one exists). (3) Arterial street/road means a street that connects and distributes traffic to and from collector streets and between communities at higher speeds. It is designated as such on the road classification map of the Butts County land use plan (where one exists). (4) Tangent means a straight section of road that connects two curved sections of road. Minimum sight distance on tangents is as follows: a. Arterial streets/roads: 500 feet. b. Collector streets/roads: 200 feet. Road classification map means the official map adopted by the Butts County board of commissioners showing the county's road system and identifying the roads on it by their intended level of service, such as local streets, collector streets and arterial streets. When the street is adopted, it shall be marked on the road classification map and be signed and dated by the chairman of the board of commissioners. Structure means a combination of materials that form a construction for use, occupancy, or ornamentation whether installed on, above, or below the surface of land or water. Comment: By this definition, all buildings are structures; however, not all structures are buildings. Subdivision means a division of, or the act of dividing, a tract or parcel of land into two or more lots, building sites or other divisions for the purpose of conveyance or development, whether immediate or future. Tree diameter means the widest cross-sectional dimension of a tree trunk measured at diameter breast height (dbh) or at a point below diameter breast height for new trees or multitrunk species, but in no case less than six inches from the ground. Truck stop means a facility that provides fueling for tractor trailer rigs and which has at least one of the following characteristics: (1) More than five diesel fuel pumps accessible by tractor trailer rigs; (2) Parking spaces for ten or more tractor trailers; (3) Overnight tractor trailer parking; or (4) Bathrooms with public bathing facilities. Truck terminal means a facility or premise for the receipt, transfer, short-term storage, and dispatching of goods not produced on the premises and which are transported by truck. Use means any purpose for which a building or tract of land may be designed, arranged, intended, maintained, or occupied; or any activity, occupation, business, or operation carried on, or intended to be carried on, in a building or structure or a tract of land. Use, accessory means a use or structure customarily incidental and subordinate to the principal use or structure and located on the same lot as the principal use or structure. Use, conditional means a use which is permitted in a particular zoning district, but only under certain specified conditions. Use, nonconforming means a use of land and/or buildings that does not conform to the regulations and standards of the district in which it is located which lawfully existed at the time of adoption of this ordinance and is allowed to continue under the provisions for nonconforming uses. Use, principal means the main purpose for which a lot is intended and for which it is used. Utility means public or private water or sewer piping systems, water or sewer pumping stations, electric power lines, fuel pipelines, telephone lines, roads, driveways, bridges, river/lake access, facilities, stormwater systems and railroads. Vehicular use areas means any area, paved or unpaved, used for egress or ingress, or to store or park motor vehicles. View corridor means the line of sight identified as to height, width, and distance of an observer looking toward an object. Water supply watershed means the drainage area (watershed) of lands upstream of a governmentally-owned public drinking water intake or water supply reservoir or a proposed public drinking water intake or water supply reservoir. Watercourse means any natural or artificial watercourse, stream, river, creek, channel, ditch, canal, conduit, culvert, drain, waterway, gully, ravine, or wash in which water flows either continuously or intermittently and which has a definite channel, bed and banks, and including any area adjacent thereto subject to inundation by reason of overflow or floodwater. Wetlands means those areas that are inundated or saturated by surface or groundwater at a frequency and duration sufficient to support, and that under normal circumstances do support, a prevalence of vegetation typically adapted for life in saturated soil conditions. Wetlands generally include swamps, marshes, bogs and similar areas. (Ord. of 5-24-2021, § 1.A.; Ord. No. CR2026-04-029, § 6, 4-13-2026) Sec. 1.11.00. Standards for the exercise of the zoning powers. (a) The board of commissioners will, when considering a proposed amendment to the zoning ordinance, first determine whether the limitation imposed by such an amendment, if any, on the right to unrestricted use of property which might result from the proposed amendment is necessary to promote the public health, safety, or general welfare. In considering whether to recommend a change in the zoning classification of any particular property, the planning and zoning commission will balance the benefit to the public of the present zoning classification of the property against the detriment to the property owner and scrutinize the application in light of the character of the land in question and the effect of the zoning decision upon the property owner's rights. In making these determinations, the planning and zoning commission must consider the following: (1) The existing uses and zoning of nearby property. (2) The suitability of the property for the zoned purpose. (3) The length of time the property has been vacant. (4) The threat to the public health, safety, and welfare if rezoned. (5) The extent to which the value of the property is diminished by the present zoning. (6) The balance between the hardship on the property owner and the benefit to the public in not rezoning. (7) Whether there are substantial reasons why the property cannot be used in accordance with existing zoning; provided, however, evidence that the economic value of the property as currently zoned is less than its economic value if rezoned as requested will not alone constitute a significant detriment. (8) The aesthetic effect of existing and future use of the property as it relates to the surrounding area. (9) The impact on the environment including, but not limited to, drainage, soil erosion and sedimentation, flooding, air quality and water quality and quantity. (b) The board of commissioners may also consider whether development of the property in the zoning classification sought would do any of the following: (1) Have an adverse effect on the insurance rating of the county, or any substantial portion of the county, issued by the insurance service office or a similar rating agency. (2) Overtax the public utilities and streets presently existing to serve the site. (3) Create an isolated district unrelated to adjacent and nearby districts. (4) Unduly increase or over-tax the load on public facilities including, but not limited to, schools, utilities, and streets. (5) Unduly increase the cost to the county and other governmental entities in providing, improving, increasing or maintaining public utilities, schools, streets and other public safety measures. CHAPTER 2 ZONING DISTRICTS AND USES Sec. 2.00.00. Generally. The use of buildings, structures, and land shall comply with the use requirements for zoning districts set forth in this UDO. Buildings, structures, or land shall be occupied or used only in conformity with all of the regulations set forth herein for the district in which it is located. Sec. 2.01.00. Establishment and purpose of zoning districts. Sec. 2.01.01. Official zoning map of Butts County, Georgia. The official zoning map and official zoning block maps, Butts County, Georgia, are hereby designated to be section 2.01.01 of this Code. Any reference to the official map or official maps in this Code refers to the official zoning map and official zoning block maps, Butts County, Georgia. All properties within the unincorporated portions of Butts County, Georgia, shall be zoned as set forth on the official county zoning map and the official zoning block maps of the county, as amended from time to time. The official maps shall be kept under the custody of the community development department and shall be subject to public inspection. The official county zoning maps are incorporated in this ordinance by express reference. Sec. 2.01.02. Rural zoning districts. A-R agricultural-residential. A-R zoning districts are intended to establish and preserve quiet areas where the primary activities are those of farming, agriculture, livestock, timber cultivation, and related uses consistent with maintaining the land resources of Butts county reserved for these purposes. Residences of a low-density nature which are incidental to these activities are also permitted. These districts are free from other uses which are incompatible with a low-density, agricultural-residential neighborhood. Sec. 2.01.03. Residential zoning districts. (a) R-1 single-family residential—low density. R-1 zoning districts are intended to establish and preserve quiet, relatively low-density neighborhoods of single-family residences as desired by large numbers of people. These districts are free from other uses which are incompatible with single-family homes. (b) R-2 single-family residential—medium density. R-2 zoning districts are intended to establish and preserve quiet, relatively low-density neighborhoods of single-family residences as desired by large numbers of people, but at a higher density of development than that allowed in R-1 districts. These districts are free from other uses which are incompatible with single-family homes. (c) R-3 single-family residential—high density. R-3 zoning districts are intended to establish and preserve quiet neighborhoods of single-family residences of relatively high density. Required development standards permit stable, attractive residential neighborhoods to be established and preserved, while the higher permitted density reduces the costs of housing and the costs of providing services to them. The R-3 district is allowed only for existing housing and lots of record zoned R-3. It shall not be available for new developments, subdivisions or lots and shall not constitute an available zoning district for any landowner or applicant seeking re-zoning. (d) R-4 general residential. R-4 zoning districts are intended to establish and preserve quiet neighborhoods of single-family duplex and multi-family residences of relatively high density. Required development standards permit stable, attractive residential neighborhoods to be established and preserved, while higher permitted density reduces the costs of housing and the costs of providing services to them. The R-4 district is allowed only for existing housing and lots of record currently zoned R-4. It shall not be available for new developments, subdivisions or lots and shall not constitute an available zoning district for any landowner or applicant seeking re-zoning. (e) R-5 residential—manufactured home communities. R-5 zoning districts are intended to provide a place for manufactured housing communities, as more fully provided in, and subject to, the requirements of section 4.08.00. (f) R-M multi-family residential. R-M zoning districts are intended to establish and preserve quiet neighborhoods of multi-family residences of relatively high density. Required development standards permit stable, attractive residential neighborhoods to be established and preserved, while the higher permitted density reduces the costs of housing and the costs of providing services to them. R-M districts are permitted only where public water is provided. Sec. 2.01.04. Commercial, office, and institutional zoning districts. (a) O-1 office-residential. O-1 zoning districts are intended to establish and preserve districts for lower density office activities with a mix of certain compatible residential activities also permitted. In many cases the O-1 district may be appropriate to provide a transition from residential uses where it is elected not to use a buffer for such purposes and where adequate space exists for such a transition area. O-1 district development standards require adequate setback space and off-street parking and service facilities. Permitted uses are restricted and protected from encroachment by uses capable of adversely affecting the limited character of the district. (b) C-1 commercial light/neighborhood. C-1 zoning districts are intended to establish and preserve small business areas of a limited nature that serve primarily the residential neighborhood in which they are located. Development standards for C-1 districts are designed to promote compatibility with the surrounding residential neighborhood. (c) C-2 commercial—general/highway. C-2 zoning districts are intended to establish and preserve business areas that are motor vehicle oriented, rather than pedestrian oriented. C-2 districts provide areas that are convenient and attractive for retail activities, business transactions, and services to the public designed primarily to meet the day-to-day shopping and service needs not only of residents of Butts County, but of surrounding communities as well. Off-street parking and minimum setbacks are required. These areas are more suburban in nature than of a "downtown" character. Sec. 2.01.05. Industrial zoning districts. (a) M-1 manufacturing—light. M-1 zoning districts are intended to establish and preserve physically and aesthetically desirable areas in which clean, low-intensity manufacturing activities may locate and be protected from the intrusion of incompatible land uses. By having such areas available, both new and existing industries may operate and undertake expansion of facilities with the least possible adverse effect on other types of activities which might be incompatible with manufacturing. The elimination of non-manufacturing activities from M-1 districts benefits manufacturing activities by removing some possible obstacles to their smooth operation and expansion. (b) M-2 manufacturing—general. M-2 zoning districts are intended to establish and preserve physically and aesthetically desirable areas in which higher intensity manufacturing activities may locate and be protected from the intrusion of incompatible land uses. By having such areas available, both new and existing industries may operate and undertake expansion of facilities with the least possible adverse effect on other types of activities which might be incompatible with manufacturing. The elimination of non-manufacturing activities from M-2 districts benefits manufacturing activities by removing some possible obstacles to their smooth operation and expansion. (c) M-3 manufacturing—heavy. M-3 zoning districts are intended to establish and preserve physically and aesthetically desirable areas in which heavy manufacturing activities may locate and be protected from the intrusion of incompatible land uses. By having such areas available, both new and existing industries may operate and undertake expansion of facilities with the least possible adverse effect on other types of activities which might be incompatible with manufacturing. The elimination of non-manufacturing activities from M-3 districts benefits manufacturing activities by removing some possible obstacles to their smooth operation and expansion. M-3 districts are permitted only where frontage on an arterial street/road is available. In regards to properties in the M-1, M-2 and M-3 zoning districts, no activity which is part of the principal use shall occur on the setback (i.e., where a recycling center is established, no part of the collection or storage of the recyclable materials shall occur in the setback). Sec. 2.01.06. Mixed use development district. (a) P-M planned development—mixed use. P-M zoning districts are intended to provide for planned developments with mixed use. (b) P-R planned development—residential. P-R zoning districts are intended to provide for planned residential communities which may include both residential use and commonly associated civic and public uses. Sec. 2.01.07. Zoning districts explained. (a) Districts are areas of land within Butts County to which different development requirements and standards are applied. These differences are intended to promote the separation of incompatible uses, encourage sound land use patterns, and retain the character of the community. Although this ordinance establishes the locations of district boundaries, as indicated on the official map, the boundaries may be amended in the future in order to meet changing needs if facts are presented and accepted in support of such an amendment. (b) In making the decision to amend the boundary of a district, the standards for the exercise of the zoning power as well as the other specific criteria in the UDO should be considered by the planning and zoning commission as well as the board of commissioners. Sec. 2.01.08. Zoning districts and future development map relationship. (a) The Butts County comprehensive plan was prepared by the planning and zoning commission and adopted by the board of commissioners of Butts County. It should provide the best possible indication of desirable land use patterns that will meet projected future demand for land uses of various types. The Butts County land use plan supplies a body of information on which decisions on future development may be made that are guided by sound planning principles. The plan does not legally regulate land uses. It contains a land use map which shows suitable areas for various types of land uses. Actual land uses may not necessarily conform to the land use map. (b) The zoning districts contained on the official map carry standards which must be met by all new development and construction in the County. The arrangement of zoning districts is based on land use information contained in the Butts County comprehensive plan. Establishment and amendment of zoning district boundaries should be in conformance with the Butts County comprehensive plan. (This does not necessarily mean a one-to-one correspondence.) This ensures that such amendments to the official map are based on defensible findings of fact as well as sound comprehensive planning principles. Sec. 2.02.00. Land uses permitted in each zoning district. Sec. 2.02.01. Generally. The following table of permitted uses is hereby adopted. No principal use shall be established on any property unless it is shown as permitted, by right or subject to special use approval, for the applicable zoning district on the table of permitted uses. A "P" on the table of permitted uses means that the listed use is permitted in the particular zoning classification. An "SU" on the table of permitted uses means that the use is permitted in the particular zoning district as a special use. Uses shown as permitted by right or by special use are subject to the regulations and restrictions provided in this UDO. Sec. 2.02.02. Table of permitted uses. Uses and Structures A-R R-1 R-2 R-3 R-4 R-5 R-M P-M P-R O-1 C-1 C-2 M-1 M-2 M-3 Acid storage and manufacturing SU Adult entertainment establishment (subject to the county's adult amusements and entertainment ordinance) P P Agriculture P P P P Airports SU Airstrip, private SU Ambulance or emergency service SU Amusement or recreational activities commercial P P P P Animal hospital, commercial kennels, veterinary clinic or animal boarding place SU SU P P Animal processing facility SU Antenna: Satellite, television, radio, etc. P P P P P P P Apothecary (drug sales only) P P Armory SU P P Auto parts and tire stores P P P Automobile, construction and commercial vehicle dealers (includes rental) a. Automobile, light truck and motorcycle dealers b. Antique auto dealers c. Commercial truck dealers d. Heavy equipment dealers e. Farm equipment dealers f. Motor home and recreational vehicle dealers g. All-terrain vehicle (ATV), golf cart and snowmobile dealers h. Boat and watercraft dealers i. Aircraft dealers j. Utility trailer dealers P Automobile washateria P Baking establishment P Bank and financial institutions P Bar, tavern, or nightclub P P Batching plant P SU SU Uses and Structures A-R R-1 R-2 R-3 R-4 R-5 R-M P-M P-R O-1 C-1 C-2 M-1 M-2 M-3 Bed and breakfast inn P P Boardinghouse or roominghouse P P Book binding, printing, engraving, blueprinting, photostatting, letter shop P P P P Bottling plant P P Building contractor and related activities: Sale and storage of building supplies and materials P P Bulk petroleum plant P Bulk storage SU SU SU SU Business offices such as insurance and real estate offices, where the nature of the business is primarily that of personal service P P Business or commercial school P Business service centers P P Cabinet shop P P Campground/recreational vehicle park SU Carnival, rodeo, horse show or athletic event, community fair or other event of interest to the public (subject to special event permit requirement) P Cement, lime, gypsum, or plaster of Paris manufacture P Cemetery SU P Cemetery, family SU Ceramic products manufacture, limited to use of electric kilns P Church, synagogue, chapel, or other place of religious worship P P P P P P P P P P P P P Clinic P P P Clothing and dry good stores P P Club or lodge P P P P Cold storage, ice plant, or freezer locker P P College, university, or private school P P Uses and Structures A-R R-1 R-2 R-3 R-4 R-5 R-M P-M P-R O-1 C-1 C-2 M-1 M-2 M-3 College or university with dormitories, fraternity and/or sorority houses, when located on main campus SU Uses and Structures A-R R-1 R-2 R-3 R-4 R-5 R-M P-M P-R O-1 C-1 C-2 M-1 M-2 M-3 Commercial livestock processing P Commercial or large scale slaughter of animals SU Congregated personal care home P P P Cosmetic and pharmaceuticals manufacturing P P Crematory SU Cultural facilities P P Dairy plant, ice cream manufacturing P P Dance school or studio P P Day care center P Deck, patio, barbecue grill, or other such facility P P P P P P P Department stores P P Distillation of bones, coal, petroleum, animal refuse, grain, tar, and wood SU Distilleries and breweries P P Distribution of products or merchandise P P Drive-in restaurants P P Drive-in theater SU P P Drug stores P P Dry cleaning or laundering establishment SU P P P Dwelling, apartment; dwelling, cluster; dwelling, condominium; dwelling, garden apartment; dwelling, multiple-family; dwelling, patio; dwelling, singlefamily attached; and dwelling, townhouse subject to the limitation that no more than 40 percent of the total housing units shown in the approved development plan shall consist of any one type or combination of the specified dwelling types P P P Dwelling, industrialized housing P P P P P P P P P Dwelling, single-family detached P P P P P P P Dwelling, two-family P P P P Dwelling, manufactured homes P P P Uses and Structures A-R R-1 R-2 R-3 R-4 R-5 R-M P-M P-R O-1 C-1 C-2 M-1 M-2 M-3 Education or training facility P P P Electrical appliance and equipment sales and repair P P Electronic manufacturing and assembly P P Experimental laboratory SU SU Explosives, including fireworks manufacture or storage in bulk quantities SU Fabricating shop such as woodworking or sheet metal shop P P Family personal care home P P P P P P P Farmers market SU SU SU Fat rendering, production of fats and oils from animals or vegetable products by boiling or distillation SU Feed, grain, or fertilizer manufacture or storage P Feed, grain, or fertilizer wholesaling and storage P P Feed, seed, and insecticides and fertilizer retail sales P P P P Flower shop P P Food processing plant P Food stores P P Foundry or forging of iron, steel, brass, copper, and other metals SU SU Fraternities and sororities SU Freezer lock service, ice storage P P P P Freight express office P Fueling center P P Funeral home P P Garbage, waste animal parts, dead animal reductions or dumping SU Garden, noncommercial P P P P P P P P Garden, commercial P Gas station P P P Gasoline storage terminal P Glass sales and storage P P P P Glue, size, or gelatin manufacture SU Golf course, planned as an integral part of the planned residential development P Uses and Structures A-R R-1 R-2 R-3 R-4 R-5 R-M P-M P-R O-1 C-1 C-2 M-1 M-2 M-3 Golf course—Public or private SU Grain elevator P Greenhouse and plant nursery (commercial) SU P P P P Group care home (six or less residents) P P P P P P P P P Group care home (more than six residents) P P P P Gun store P P Heavy agricultural equipment sales and repair P Heavy manufacturing SU SU Home furnishings and hardware P P P P Home occupation, Type I P P P P P P P P P Home occupation, Type II SU SU SU SU SU SU SU SU SU Hospital SU P P Hotels P Ice manufacture, including dry ice plant P Immediate family member housing SU Incinerators, commercial SU Intermediate care home P P P Intermediate care home, nursing home, or personal care home P Junkyard and salvage yards SU Kennel SU Laboratory serving professional requirements—Medical, dental P P P Landfill SU Launderette or washateria P P Library SU P P Light manufacturing SU Locksmith, gunsmith P P P Lumber yard, coal storage yards, or other storage not specifically listed in this column P P Machine shop P P Manufactured home for temporary hardship meeting the development standards contained in chapter 54 of the Code of Ordinances SU SU SU SU SU Uses and Structures A-R R-1 R-2 R-3 R-4 R-5 R-M P-M P-R O-1 C-1 C-2 M-1 M-2 M-3 Manufacturing activity which does not cause injurious or obnoxious noise, vibrations, smoke, gas, fumes, odor, dust, fire hazard, or other objectionable conditions P P Manufacturing activity which may cause noise, vibrations, smoke, gas, fumes, odor, dust, fire hazard, or other objectionable conditions SU SU Manufacturing in connection with the principal retail business or service on the lot P Marinas SU SU Medical, dental, or similar clinic P P P Mineral exploration (commercial) SU Motels P Motor vehicle impound lot P Motorized race tracks SU SU SU Music teaching studio (also see home occupation) SU SU SU SU SU SU SU SU SU P P Neighborhood dry-cleaning plants P SU Newspaper or magazine publication and distribution P P P Nondepository credit intermediation businesses as specified under 2002 and 2007 NAICS Code 522298 SU Nursery school, day care center SU P P P Nursing home P P P P Off-street parking lot or parking garage, automobile, being the primary use on the lot P P Office P Office equipment sales and service P P Offices, enclosed retail trade establishments, and personal service establishments P Organized camp program SU Paint, oil shellac, turpentine, or varnish manufacture SU Uses and Structures A-R R-1 R-2 R-3 R-4 R-5 R-M P-M P-R O-1 C-1 C-2 M-1 M-2 M-3 Paper mills, chemical pulp manufacture SU Parking of one unoccupied RV and one pleasure boat P P P P P Parking of one unoccupied travel trailer, motor coach, or pleasure boat P P Parks and playgrounds P P P P P P P Pawn shops P Personal service shops P P Pest control P P P Petroleum bulk dist. P P Photography studio SU SU SU SU SU SU SU SU SU P P Planing or saw mill P Plumbing shop, other contractor, including open storage of materials when located in rear setback P P Potash works SU Poultry processing plant P SU Printing, publishing, reproducing establishment P P P Private garage or carport not to exceed the storage capacity of three automobiles per dwelling unit P P P P P P P Private swimming pool and bathhouse or cabana P P P P P P P Private tennis court and/or basketball facilities. If lighted, lights must be designed so that they do not intrude upon adjacent lots. Such a court may be surrounded by a fence up to ten feet high. P P P P P P P Professional or business office meeting the following development standards: No wholesale or retail merchandise may be offered for sale. P Public buildings, structures, and uses P Public garage P P Publicly owned and operated park or recreation area P P P P P P P P Uses and Structures A-R R-1 R-2 R-3 R-4 R-5 R-M P-M P-R O-1 C-1 C-2 M-1 M-2 M-3 Race tracks and similar amusement or recreational activities (commercial), carried on outside a building which produce noise and/or noxious fumes, such as drag racing strips, race tracks, motorcycle races or ATV (all terrain vehicle) courses, and uses of a similar nature SU SU Radio or television tower SU Radio or television transmission tower over 35 feet high SU SU Radio station P Radio transmission tower less than 35 feet high P Railroad classification and repair yard P SU Railroad freight station SU SU SU Railroad or bus passenger station P P P Railroad setback P Raising or sale of livestock P SU SU Recovered materials processing and solid waste handling facilities SU Recreation area owned, operated, and maintained by the owner(s) of the permitted use, exclusively for the use of residents and their guests P P P P P P P P Recycling center P Repair garage; paint and body shop SU P P Residential manufactured housing sales room and sales lot P Restaurants and food catering service P P Retail business, other SU SU Retail or service business greater than 45,000 gross square feet SU Retail or service business greater than 150,000 gross square feet SU Uses and Structures A-R R-1 R-2 R-3 R-4 R-5 R-M P-M P-R O-1 C-1 C-2 M-1 M-2 M-3 Retail uses in conjunction with and normally appurtenant to office/ institutional uses, including florist shop, cafeteria, snack shop, pharmacy, or gift shop when located within an office or medical building P Roadside stands for sale of agricultural products grown on the premises, but not to exceed 500 square feet in floor area P Rock, sand, or gravel distribution or storage P Roofing operation P Satellite dish antennas and television antennas P School—Elementary, middle, high—Public or private, kindergarten SU P P P Scrap metal processor SU Self-storage facility SU P P P Shell home display yards P Shooting range, indoor P P P P Shooting range, outdoor SU Shrubbery sales SU P P P Sign painting and fabricating shop P P Smelting of tin, copper, zinc, or iron ores SU Solar power facilities SU SU SU SU Solid waste landfill or incineration SU Uses and Structures A-R R-1 R-2 R-3 R-4 R-5 R-M P-M P-R O-1 C-1 C-2 M-1 M-2 M-3 Spa, massage parlor, or other personal care services as specified under 2007 NAICS Code 812199. These include: a. Baths, steam or Turkish b. Color consulting services (i.e., personal care services) c. Day spas d. Depilatory (i.e., hair removal) salons e. Ear piercing services f. Electrolysis (i.e., hair removal) salons g. Hair removal (i.e., depilatory, electrolysis) services h. Hair replacement services (except by offices of physicians) i. Hair weaving services j. Make-up salons, permanent k. Massage parlors l. Saunas m. Scalp treating services n. Steam baths o. Sun tanning salons p. Tanning salons q. Tattoo parlors r. Turkish bathhouses s. Turkish baths SU SU Special events facility P P Specialty shops P P Talon, grease, or lard manufacture or refining from or of animal fat SU Tanning, curing, or storage of raw hides or skins SU Tattoo parlors SU Taxi services or related services as specified under 2002 and 2007 NAICS Code 485310 SU Taxidermist SU P Textile manufacturing plant SU SU Theatre P P Tinsmith operation P Tire recapping SU SU Truck stop P P Truck terminal P Upholstery shop P P P Use requiring a license for removal of asbestos-containing material SU Uses and Structures A-R R-1 R-2 R-3 R-4 R-5 R-M P-M P-R O-1 C-1 C-2 M-1 M-2 M-3 Use requiring a state permit for the collection, transfer, or disposal of radioactive equipment, supplies, etc. SU Use requiring a state permit for the collection, transfer, or disposal of solid waste SU Use requiring a state permit for the generation, transport, storage, treatment, and/or disposal of hazardous waste SU Use requiring a state permit for the storage of petroleum products or certain chemicals underground SU Use requiring an EPD wastewater discharge permit SU Utility substation P P P P P P P P P P P P P P P Vehicle storage yard, being the primary use on the lot P P P Wholesale and warehousing operation P P (Ord. of 4-12-2021(1), § 1; Ord. of 5-24-2021, § 1.B.; Ord. of 6-14-2021(2), § 1; Ord. of 6-14-2021(4), § 1; Ord. No. CR2026-04-029, § 7, 4-13-2026) Sec. 2.02.03. Dimensional standards for building height and location. The following table of lot standards shows the minimum lot size; minimum floor area per dwelling unit; minimum lot width; minimum front yard setback from right-of-way of street for arterial streets, collector streets, and other streets; minimum side setback; maximum building height; and minimum rear setback for lots in each zoning classification. No lot shall be used or created in a manner that violates any of the regulations shown in the table of lot standards for that lot's particular zoning classification, except by grant of variance. A-R R-1 R-2 R-3 R-4 R-M P-R14 O-1 C-1 C-2 M-1 M-2 M-3 Minimum lot size 3 acres acre 1 acre4 1 acre4 1 acre 1 acre acre Without public water: 1 acre4 With public water: acre7 Without public water: 1 acre4 With public water: acre7 Without public water: 1 acre4 With public water: acre7 1 acre4 1 acre4 1 acre Minimum floor area per dwelling unit (in square feet) 1,500 1,800 1,600 1,400 1,200 for sitebuilt, singlefamily attached; 750 all others 1,200 for sitebuilt, singlefamily attached; 750 all others 1,200 for sitebuilt, singlefamily attached; 750 all others Duplex dwellings: 750 1,050 all others 1,050 Produce stands: 200 1,050 all others 1,050 1,050 1,050 Minimum lot width (in feet) 200 125 150 80 60 60 60 100 100 100 100 100 150 Minimum front yard setback from right-ofway of street for: A: Arterial streets 1001 1001 1001 801 751 751 751 1001 1001 1001 1001 10010 B: Collector streets 1001 801 801 501 501 501 501 801 801 801 801 10010 200 C: Other streets 1001 551 551 501 501 501 501 551 551 551 551 10010 Minimum side setback (in feet) 30 15 15 15 6 6 15 15 15 15 15 11 13 Maximum building height (in feet) 352 353 353 353 353 353 35 353 353 352 352, 15 352, 15 352, 15 Minimum rear setback (in feet) 50 30 30 305 305 305 30 30 30 30 30 12 13 1. The front of all buildings must be at least 35 feet from the front property line. 2. This height limit does not apply to projections not intended for human habitation. For buildings and structures with such projections, the minimum required setbacks must be increased one foot for every two feet (or part of two feet) of height greater than 35 feet. 3. This height limit does not apply to projections not intended for human habitation, except for satellite, television, and radio antennas, to which this limit does apply. For buildings and structures with such projections, the minimum required setbacks must be increased one foot for every two feet (or part of two feet) of height greater than 35 feet. 4. A lot of record lawfully existing at the time of passage of this ordinance and having an area of less than one acre (nonconforming) may nevertheless be developed with a use which is permitted within this district if approved by the Butts County health department. 5. If abutting a stream, 100 feet from the stream bank. 6 Total for both side yards of 20 feet (for example, side yards of ten feet and ten feet, or side yards of five feet and 15 feet, or side yards of ten feet or less). If the side lot line adjoins an R-1 or R-2 district, the minimum required side yard is 30 feet, regardless of the type of wall. 7 A lot of record lawfully existing at the time of passage of this ordinance and having an area of less than three-quarters of an acre (non-conforming) may nevertheless be developed with a use which is permitted within this district if approved by the Butts County health department. 8 The front of all buildings must be at least 75 feet from the front property line. 9 The front of all buildings must be at least 50 feet from the front property line. 10 The front of all buildings must be at least 100 feet from the front property line. 11 Fifteen feet, unless abutting a district other than M-1, M-2, or M-3. In that case, the minimum setback is 100 feet. 12 Thirty feet, unless abutting a district other than M-1, M-2 or M-3. In that case, the minimum setback is 100 feet. 13 Fifty feet, unless abutting an M-1, M-2 or M-3 district. In that case, the minimum setback is 200 feet. 14 These minimum standards apply unless there is an approved plan for development of the property as a P-R district, in which case the minimum standard specified by the approved plan will apply. 15 The maximum building height may be raised to 55 feet if the Butts County fire marshal so approves based upon a finding that an appropriate fire suppression system is provided for the facility and the zoning administrator determines that the additional height shall not unduly impact the surrounding community. CHAPTER 3 PROTECTION OF NATURAL FEATURES AND RESOURCES District, descriptions, maps, critical areas and limited development areas. Sec. 3.00.00. Generally. The provisions set forth in chapter 3 are intended to protect the natural features and natural resources within Butts County, and to implement policies in the Butts County comprehensive plan. The natural features and natural resources included in chapter 3 are the floodplain, water supply watersheds, groundwater recharge areas, riparian buffer zone, wetlands, and aquifer recharge areas. Sec. 3.01.00. Floods. Sec. 3.01.01. Statutory authorization. Article IX, Section II of the Constitution of the State of Georgia and O.C.G.A. § 36-120(a) have delegated the responsibility to local governmental units to adopt regulations designed to promote the public health, safety, and general welfare of its citizenry. Therefore, the board of commissioners of Butts County, Georgia, does ordain the provisions of this article. Sec. 3.01.02. Findings of fact. (a) The flood hazard areas of Butts County, Georgia, are subject to periodic inundation which results in loss of life and property, health and safety hazards, disruption of commerce and governmental services, extraordinary public expenditures for flood relief and protection, and impairment of the tax base, all of which adversely affect the public health, safety and general welfare. (b) These flood losses are caused by the occupancy in flood hazard areas of uses vulnerable to floods, which are inadequately elevated, flood-proofed, or otherwise unprotected from flood damages, and by the cumulative effect of obstructions in floodplains causing increases in flood heights and velocities. Sec. 3.01.03. Statement of purpose. It is the purpose of this article to promote the public health, safety and general welfare and to minimize public and private losses due to flood conditions in specific areas by provisions designed to: (a) Require that uses vulnerable to floods, including facilities which serve such uses, be protected against flood damage at the time of initial construction; (b) Restrict or prohibit uses which are dangerous to health, safety and property due to water or erosion hazards, or which increase flood heights, velocities, or erosion; (c) Control filling, grading, dredging and other development which may increase flood damage or erosion; (d) Prevent or regulate the construction of flood barriers which will unnaturally divert flood waters or which may increase flood hazards to other lands; and (e) Control the alteration of natural floodplains, stream channels, and natural protective barriers, which are involved in the accommodation of floodwaters. Sec. 3.01.04. Objectives of article. The objectives of this article are: (a) To protect human life and health; (b) To minimize damage to public facilities and utilities such as water and gas mains, electric, telephone and sewer lines, streets and bridges located in floodplains; (c) To help maintain a stable tax base by providing for the sound use and development of flood-prone areas in such a manner as to minimize flood blight areas; (d) To minimize expenditure of public money for costly flood control projects; (e) To minimize the need for rescue and relief efforts associated with flooding and generally undertaken at the expense of the general public; (f) To minimize prolonged business interruptions; and (g) To ensure that potential homebuyers are notified that property is in a flood area. Sec. 3.01.05. Lands to which this article applies. This article shall apply to all areas of special flood hazard within the jurisdiction of Butts County, Georgia. Sec. 3.01.06. Basis for area of special flood hazard. The areas of special flood hazard identified by the Federal Emergency Management Agency in its most recent applicable flood insurance study (FIS), with accompanying maps and other supporting data and any revision thereto, are adopted by reference and declared a part of this article. For those land areas acquired by a municipality through annexation, the current effective FIS, with accompanying maps and other supporting data and any revision thereto for Butts County, are hereby adopted by reference. Areas of special flood hazard may also include those areas known to have flooded historically or defined through standard engineering analysis by governmental agencies or private parties but not yet incorporated in a FIS such as the United States Geological Survey Ocmulgee River Flood study presented to Butts County in 1995. The repository for public inspection of the flood insurance study (FIS), accompanying maps, and other supporting data is located in the Butts County community development department. Sec. 3.01.07. Establishment of development permit. A development permit shall be required in conformance with the provisions of this article prior to the commencement of any development activities. Sec. 3.01.08. Compliance with article provisions. No structure or land shall hereafter be located, extended, converted or altered without full compliance with the terms of this article and other applicable regulations. Sec. 3.01.09. Abrogation and greater restrictions. This article is not intended to repeal, abrogate, or impair any existing ordinance, easements, covenants, or deed restrictions. However, where this article and another conflict or overlap, whichever imposes the more stringent restrictions shall prevail. Sec. 3.01.10. Interpretation and definitions. In the interpretation and application of this article, all provisions shall be: (a) Considered as minimum requirements; (b) Liberally construed in favor of the governing body; and (c) Deemed neither to limit nor repeal any other powers granted under state statutes. Addition (to an existing building) means any walled and roofed expansion to the perimeter of a building in which the addition is connected by a common load-bearing wall other than a firewall. Any walled and roofed addition, which is connected by a firewall or is separated by an independent perimeter load-bearing wall, shall be considered new construction. Elevated building means a non-basement building built to have the lowest floor of the lowest enclosed area elevated above the ground level by means of fill, solid foundation perimeter walls, pilings, columns, piers, or shear walls adequately anchored so as not to impair the structural integrity of the building during a base flood event. Flood-proofing means any combination of structural and non-structural additions, changes, or adjustments to structures which reduce or eliminate flood damage to real estate or improved real property, water and sanitary facilities, structures and their contents. Floodway means the channel of a river or other watercourse and the adjacent land areas that must be reserved in order to discharge the base flood without cumulatively increasing the water surface elevation more than a designated height. Highest adjacent grade means the highest natural elevation of the ground surface, prior to construction, adjacent to the proposed foundation of a building. Start of construction means the date the development permit was issued, provided the actual start of construction, repair, reconstruction, or improvement occurs within 180 days of the permit date. The actual start means the first placement of permanent construction of the structure such as the pouring of slabs or footings, installation of piles, construction of columns, or any work beyond the stage of excavation, and includes the placement of a manufactured home on a foundation. (Permanent construction does not include initial land preparation, such as clearing, grading and filling; nor does it include the installation of streets and/or walkways; nor does it include excavation for a basement, footings, piers or foundations or the erection of temporary forms; nor does it include the installation on the property of buildings appurtenant to the permitted structure, such as garages or sheds not occupied as dwelling units or part of the main structure.) (Note: accessory structures are not exempt from any article requirements.) For a substantial improvement, the actual start of construction means the first alteration of any wall, ceiling, floor, or other structural part of a building, whether or not that alteration affects the external dimensions of the building. Substantial damage means damage of any origin sustained by a structure whereby the cost of restoring the structure to its before damaged condition would equal or exceed 50 percent of the market value of the structure before the damage occurred. Substantial improvement means any reconstruction, rehabilitation, addition, or other improvement of a structure, taking place during a five-year period, in which the cumulative cost equals or exceeds 50 percent of the market value of the structure prior to the start of construction of the improvement. Note: The market value of the structure should be: (1) The appraised value of the structure prior to the start of the initial repair or improvement; or (2) In the case of damage, the value of the structure prior to the damage occurring. This term includes structures which have incurred substantial damage, regardless of the actual amount of repair work performed. For the purposes of this definition, substantial improvement is considered to occur when the first alteration of any wall, ceiling, floor, or other structural part of the building commences, whether or not that alteration affects the external dimensions of the building. The term does not, however, include: (1) Those improvements of a structure required to comply with existing violations of state or local health, sanitary, or safety code specifications which are solely necessary to assure safe living conditions and which have been identified by the code enforcement official, and not solely triggered by an improvement or repair project; or (2) Any alteration of a historic structure provided that the alteration will not preclude the structure's continued designation as a historic structure. Substantially improved manufactured home parks or subdivisions means where the repair, reconstruction, rehabilitation or improvement of the streets, utilities and pads equals or exceeds 50 percent of the value of the streets, utilities and pads before the repair, reconstruction or improvement commenced. Sec. 3.01.11. Warning and disclaimer of liability. The degree of flood protection required by this article is considered reasonable for regulatory purposes and is based on scientific and engineering considerations. Larger floods can and will occur; flood heights may be increased by man-made or natural causes. This article does not imply that land outside the areas of special flood hazard or uses permitted within such areas will be free from flooding or flood damages. This article shall not create liability on the part of Butts County or by any officer or employee thereof for any flood damages that result from reliance on this article or any administrative decision lawfully made hereunder. Sec. 3.01.12. Designation of article administrator. The zoning administrator is hereby appointed to administer and implement the provisions of this article. Sec. 3.01.13. Permit procedures. Application for a development permit shall be made to the zoning administrator on forms furnished by the community prior to any development activities and may include, but not be limited to, the following: Plans in duplicate drawn to scale showing the elevations of the area in question and the nature, location and dimensions of existing or proposed structures, earthen fill placement, storage of materials or equipment, and drainage facilities. Specifically, the following information is required: (a) Application stage. (1) Elevation in relation to mean sea level (or highest adjacent grade) of the lowest floor, including basement, of all proposed structures; (2) Elevation in relation to mean sea level to which any nonresidential structure will be flood-proofed; (3) Design certification from a registered professional engineer or architect that any proposed non-residential flood-proofed structure will meet the floodproofing criteria of section 3.01.16(b); (4) Description of the extent to which any watercourse will be altered or relocated as a result of a proposed development; and (b) Construction stage. For all new construction and substantial improvements, the permit holder shall provide to the zoning administrator an as-built certification of the regulatory floor elevation or flood-proofing level immediately after the lowest floor or flood-proofing is completed. Any lowest floor certification made relative to mean sea level shall be prepared by or under the direct supervision of a registered land surveyor or professional engineer and certified by same. When flood-proofing is utilized for non-residential structures, said certification shall be prepared by or under the direct supervision of a professional engineer or architect and certified by same. Any work undertaken prior to submission of these certifications shall be at the permit holder's risk. The zoning administrator shall review the above-referenced certification data submitted. Deficiencies detected by such review shall be corrected by the permit holder immediately and prior to further progressive work being allowed to proceed. Failure to submit certification or failure to make said corrections required hereby shall be cause to issue a stop-work order for the project. Sec. 3.01.14. Duties and responsibilities of the administrator. Duties of the zoning administrator shall include, but shall not be limited to: (a) Review proposed development to assure that the permit requirements of this article have been satisfied. (b) Review proposed development to assure that all necessary permits have been received from governmental agencies from which approval is required by federal or state law, including Section 404 of the Federal Water Pollution Control Act Amendments of 1972, 33 U.S.C. 1334. Require that copies of such permits be provided and maintained on file. (c) Review all permit applications to determine whether proposed building sites will be reasonably safe from flooding. (d) When base flood elevation data or floodway data have not been provided in accordance with section 3.01.06, then the zoning administrator shall obtain, review and reasonably utilize any base flood elevation and floodway data available from a federal, state or other source in order to administer the provisions of this article. (e) Review and record the actual elevation in relation to mean sea level (or highest adjacent grade) of the lowest floor, including basement, of all new or substantially improved structures in accordance with section 3.01.13(b). (f) Review and record the actual elevation in relation to mean sea level to which any new or substantially improved structures have been flood-proofed in accordance with section 3.01.13(b). (g) When flood-proofing is utilized for a structure, the zoning administrator shall obtain certification of design criteria from a registered professional engineer or architect in accordance with section 3.01.13(a)(3) and 3.01.16(b) or 3.01.18(b). (h) Make substantial damage determinations following a flood event or any other event that causes damage to structures in flood hazard areas. (i) Notify adjacent communities and the Georgia Department of Natural Resources prior to any alteration or relocation of a watercourse and submit evidence of such notification to the Federal Emergency Management Agency (FEMA). (j) For any altered or relocated watercourse, submit engineering data/analysis within six months to the FEMA to ensure accuracy of community flood maps through the letter of map revision process. Assure flood-carrying capacity of any altered or relocated watercourse is maintained. (k) Where interpretation is needed as to the exact location of boundaries of the areas of special flood hazard (for example, where there appears to be a conflict between a mapped boundary and actual field conditions), the zoning administrator shall make the necessary interpretation. Any person contesting the location of the boundary shall be given a reasonable opportunity to appeal the interpretation as provided in this article. (l) All records pertaining to the provisions of this article shall be maintained in the office of the zoning administrator and shall be open for public inspection. Sec. 3.01.15. General standards. In all areas of special flood hazard, the following provisions are required: (a) New construction and substantial improvements of existing structures shall be anchored to prevent flotation, collapse or lateral movement of the structure; (b) New construction and substantial improvements of existing structures shall be constructed with materials and utility equipment resistant to flood damage; (c) New construction or substantial improvements of existing structures shall be constructed by methods and practices that minimize flood damage; (d) Elevated buildings. All new construction or substantial improvements of existing structures that include any fully enclosed area located below the lowest floor formed by foundation and other exterior walls shall be designed so as to be an unfinished or flood-resistant enclosure. The enclosure shall be designed to equalize hydrostatic flood forces on exterior walls by allowing for the automatic entry and exit of floodwater; (1) Designs for complying with this requirement must either be certified by a professional engineer or architect or meet the following minimum criteria: a. Provide a minimum of two openings having a total net area of not less than one square inch for every square foot of enclosed area subject to flooding; b. The bottom of all openings shall be no higher than one foot above grade; and c. Openings may be equipped with screens, louvers, valves or other coverings or devices provided they permit the automatic flow of floodwater in both directions; (2) So as not to violate the "lowest floor" criteria of this ordinance, the unfinished or flood-resistant enclosure shall only be used for parking of vehicles, limited storage of maintenance equipment used in connection with the premises, or entry to the elevated area; and (3) The interior portion of such enclosed area shall not be partitioned or finished into separate rooms; (e) All heating and air conditioning equipment and components (including ductwork) and all electrical, ventilation, plumbing, and other service facilities shall be designed and/or located so as to prevent water from entering or accumulating within the components during conditions of flooding; (f) Manufactured homes shall be anchored to prevent flotation, collapse, or lateral movement. Methods of anchoring may include, but are not limited to, use of over-the-top or frame ties to ground anchors. This standard shall be in addition to and consistent with applicable state requirements for resisting wind forces; (g) New and replacement water supply systems shall be designed to minimize or eliminate infiltration of floodwaters into the system; (h) New and replacement sanitary sewage systems shall be designed to minimize or eliminate infiltration of floodwaters into the systems and discharges from the systems into floodwaters; (i) On-site waste disposal systems shall be located and constructed to avoid impairment to them or contamination from them during flooding; and (j) Any alteration, repair, reconstruction or improvement to a structure which is not compliant with the provisions of this article shall be undertaken only if the nonconformity is not furthered, extended or replaced. Sec. 3.01.16. Specific standards. In all areas of special flood hazard, the following provisions are required: (a) New construction and/or substantial improvements. Where base flood elevation data are available, new construction and/or substantial improvement of any structure or manufactured home shall have the lowest floor, including basement, elevated no lower than one foot above the base flood elevation. Should solid foundation perimeter walls be used to elevate a structure, openings sufficient to facilitate equalization of flood hydrostatic forces on both sides of exterior walls shall be provided in accordance with standards of section 3.01.15(d), "Elevated Buildings." All heating and air conditioning equipment and components (including ductwork) and all electrical, ventilation, plumbing, and other service facilities shall be elevated at or above one foot above the base flood elevation. (b) Non-residential construction. New construction and/or the substantial improvement of any structure located in A1-30, AE, or AH zones may be flood-proofed in lieu of elevation. The structure, together with attendant utility and sanitary facilities, must be designed to be watertight to one foot above the base flood elevation, with walls substantially impermeable to the passage of water, and structural components having the capability of resisting hydrostatic and hydrodynamic loads and the effect of buoyancy. A registered professional engineer or architect shall certify that the design and methods of construction are in accordance with accepted standards of practice for meeting the provisions above, and shall provide such certification to the official as set forth above and in section 3.01.14(f). (c) Standards for manufactured homes and recreational vehicles. Where base flood elevation data is available: (1) All manufactured homes placed and/or substantially improved on: a. Individual lots or parcels; b. In new and/or substantially improved manufactured home parks or subdivisions; c. In expansions to existing manufactured home parks or subdivisions; or d. On a site in an existing manufactured home park or subdivision where a manufactured home has incurred "substantial damage" as the result of a flood must have the lowest floor including basement elevated no lower than one foot above the base flood elevation. (2) Manufactured homes placed and/or substantially improved in an existing manufactured home park or subdivision may be elevated so that either: a. The lowest floor of the manufactured home is elevated no lower than one foot above the level of the base flood elevation; or b. The manufactured home chassis is elevated and supported by reinforced piers (or other foundation elements of at least an equivalent strength) of no less than 36 inches in height above grade. (3) All manufactured homes must be securely anchored to an adequately anchored foundation system to resist flotation, collapse and lateral movement. (Ref. section 3.01.15(f)) (4) All recreational vehicles placed on sites must either: a. Be on the site for fewer than 180 consecutive days; b. Be fully licensed and ready for highway use (a recreational vehicle is ready for highway use if it is licensed, on its wheels or jacking system, attached to the site only by quick disconnect type utilities and security devices, and has no permanently attached structures or additions); or c. The recreational vehicle must meet all the requirements for new construction, including the anchoring and elevation requirements of subsections (c)(1) and (c)(3) of this section. (d) Floodway. Located within areas of special flood hazard established in section 3.01.06 are areas designated as floodway. A floodway may be an extremely hazardous area due to velocity floodwaters, debris or erosion potential. In addition, the area must remain free of encroachment in order to allow for the discharge of the base flood without increased flood heights. Therefore, the following provisions shall apply: (1) Encroachments are prohibited, including earthen fill, new construction, substantial improvements or other development within the regulatory floodway. Development may be permitted, however, provided it is demonstrated through hydrologic and hydraulic analyses performed in accordance with standard engineering practice that the encroachment shall not result in any increase in flood levels or floodway widths during a base flood discharge. A registered professional engineer must provide supporting technical data and certification thereof. (2) Only if subsection (d)(1) of this section is satisfied, then any new construction or substantial improvement shall comply with all other applicable flood hazard reduction provisions of this ordinance. Sec. 3.01.17. Building standards for streams without established base flood elevations and/or floodway (A zones). Located within the areas of special flood hazard established in section 3.01.06, where streams exist but no base flood data has been provided (A zones), or where base flood data has been provided but a floodway has not been delineated, the following provisions apply: (a) When base flood elevation data or floodway data has not been provided in accordance with section 3.01.06, then the zoning administrator shall obtain, review, and reasonably utilize any scientific or historic base flood elevation and floodway data available from a federal, state, or other source in order to administer the provisions of this ordinance. Only if data is not available from these sources, then the following subsections (b) and (c) shall apply: (b) No encroachments, including structures or fill material, shall be located within an area equal to the width of the stream or 20 feet, whichever is greater, measured from the top of the stream bank. (c) In special flood hazard areas without base flood elevation data, new construction and substantial improvements of existing structures shall have the lowest floor of the lowest enclosed area (including basement) elevated no less than three feet above the highest adjacent grade at the building site. (Note: Require the lowest floor to be elevated one foot above the estimated base flood elevation in A-zone areas where a limited detail study has been completed.) Openings sufficient to facilitate the unimpeded movements of floodwaters shall be provided in accordance with standards of section 3.01.15(d), "Elevated Buildings." All heating and air conditioning equipment and components (including ductwork) and all electrical, ventilation, plumbing, and other service facilities shall be elevated no less than three feet above the highest adjacent grade at the building site. The zoning administrator shall certify the lowest floor elevation level, and the record shall become a permanent part of the permit file. Sec. 3.01.18. Standards for areas of special flood hazard (zones AE) with established base flood elevations without designated floodways. Located within the areas of special flood hazard established in section 3.01.06, where streams with base flood elevations are provided but no floodways have been designated (zones AE), the following provisions apply: (a) No encroachments, including fill material, new structures or substantial improvements, shall be located within areas of special flood hazard unless certification by a registered professional engineer is provided demonstrating that the cumulative effect of the proposed development, when combined with all other existing and anticipated development, will not increase the water surface elevation of the base flood at any point within the community. The engineering certification should be supported by technical data that conforms to standard hydraulic engineering principles. (b) New construction or substantial improvements of buildings shall be elevated or flood-proofed to elevations established in accordance with section 3.01.16. Sec. 3.01.19. Standards for areas of shallow flooding (AO zones). Areas of special flood hazard established in section 3.01.06 may include designated AO shallow flooding areas. These areas have base flood depths of one to three feet above ground, with no clearly defined channel. The following provisions apply: (a) All new construction and substantial improvements of residential and nonresidential structures shall have the lowest floor, including basement, elevated to the flood depth number specified on the flood insurance rate map (FIRM) above the highest adjacent grade. If no flood depth number is specified, the lowest floor, including basement, shall be elevated at least three feet above the highest adjacent grade. Openings sufficient to facilitate the unimpeded movements of flood waters shall be provided in accordance with standards of section 3.01.15(d), "Elevated Buildings." The zoning administrator shall certify the lowest floor elevation level, and the record shall become a permanent part of the permit file. (b) New construction or the substantial improvement of a non-residential structure may be flood-proofed in lieu of elevation. The structure, together with attendant utility and sanitary facilities, must be designed to be watertight to the specified FIRM flood level plus one foot above highest adjacent grade, with walls substantially impermeable to the passage of water, and structural components having the capability of resisting hydrostatic and hydrodynamic loads and the effect of buoyancy. A registered professional engineer or architect shall certify that the design and methods of construction are in accordance with accepted standards of practice for meeting the provisions above and shall provide such certification to the official as set forth above and as required in sections 3.01.13(a)(3) and 3.01.13(b). (c) Drainage paths shall be provided to guide floodwater around and away from any proposed structure. Sec. 3.01.20. Standards for subdivisions. (a) All subdivision and/or development proposals shall be consistent with the need to minimize flood damage; (b) All subdivision and/or development proposals shall have public utilities and facilities such as sewer, gas, electrical and water systems located and constructed to minimize flood damage; (c) All subdivision and/or development proposals shall have adequate drainage provided to reduce exposure to flood hazards; and (d) For subdivisions and/or developments greater than 50 lots or five acres, whichever is less, base flood elevation data shall be provided for subdivision and all other proposed development, including manufactured home parks and subdivisions. Any changes or revisions to the flood data adopted herein and shown on the FIRM shall be submitted to FEMA for review as a conditional letter of map revision (CLOMR) or conditional letter of map amendment (CLOMA), whichever is applicable. Upon completion of the project, the developer is responsible for submitting the as-built data to FEMA in order to obtain the final LOMR. Sec. 3.01.21. Standards for critical facilities. Critical facility means any public or private facility, which, if flooded, would create an added dimension to the disaster or would increase the hazard to life and health. Critical facilities include: (a) Structures or facilities that produce, use, or store highly volatile, flammable, explosive, toxic, or water-reactive materials; (b) Hospitals and nursing homes, and housing for the elderly, which are likely to contain occupants who may not be sufficiently mobile to avoid the loss of life or injury during flood and storm events; (c) Emergency operation centers or data storage centers which contain records or services that may become lost or inoperative during flood and storm events; and (d) Generating plants, and other principal points of utility lines. Critical facilities shall not be located in the 100-year floodplain or the 500-year floodplain. All ingress and egress from any critical facility must be protected to the 500-year flood elevation. Sec. 3.01.22. Appeals and variance procedures. (a) The Butts County board of appeals, as established by the board of commissioners, shall hear and decide requests for appeals or variance from the requirements of this article, and chapters 9 and 10 of this UDO. (b) The board shall hear and decide appeals when it is alleged an error in any requirement, decision, or determination is made by the zoning administrator in the enforcement or administration of this article. (c) Any person aggrieved by the decision of the board of appeals may appeal such decision to the Superior Court of Butts County, as provided in O.C.G.A. § 5-41 et seq. (d) Variances may be issued for the repair or rehabilitation of historic structures upon a determination that the proposed repair or rehabilitation will not preclude the structure's continued designation as a historic structure and the variance is the minimum to preserve the historic character and design of the structure. (e) Variances may be issued for development necessary for the conduct of a functionally dependent use, provided the criteria of this article are met, no reasonable alternative exists, and the development is protected by methods that minimize flood damage during the base flood and create no additional threats to public safety. (f) Variances shall not be issued within any designated floodway if any increase in flood levels during the base flood discharge would result. (g) In reviewing such requests, the board of appeals shall consider all technical evaluations, relevant factors, and all standards specified in this and other sections of this article. (h) Conditions for variances. (1) A variance shall be issued only when there is: a. A finding of good and sufficient cause; b. A determination that failure to grant the variance would result in exceptional hardship; and c. A determination that the granting of a variance will not result in increased flood heights, additional threats to public safety, extraordinary public expense, create nuisance, cause fraud on or victimization of the public, or conflict with existing local laws or ordinances. (2) The provisions of this article are minimum standards for flood loss reduction; therefore, any deviation from the standards must be weighed carefully. Variances shall only be issued upon a determination that the variance is the minimum necessary, considering the flood hazard, to afford relief; and, in the instance of an historic structure, a determination that the variance is the minimum necessary so as not to destroy the historic character and design of the building. (3) Any applicant to whom a variance is granted shall be given written notice specifying the difference between the base flood elevation and the elevation of the proposed lowest floor and stating that the cost of flood insurance will be commensurate with the increased risk to life and property resulting from the reduced lowest floor elevation. (4) The zoning administrator shall maintain the records of all appeal actions and report any variances to the Federal Emergency Management Agency upon request. (i) Upon consideration of the factors listed above and the purposes of this article, the board of appeals may attach such conditions to the granting of variances as it deems necessary to further the purposes of this article. Sec. 3.02.00. Establishment and purpose of overlay districts. Sec. 3.02.01. Generally. Overlay districts are a special purpose zoning classification used to supplement, not substitute for, the current zoning districts, called the "underlying district," in order to protect and promote public and private investment. More stringent controls generally apply within the overlay districts than would normally be required in the underlying districts. In addition, overlay districts apply additional standards to specific areas which may lie within any of the above districts. Those districts are as follows: (a) Watershed Water Supply District. (1) Tussahaw Creek and Reservoir Area Watershed District. (2) Ocmulgee River Watershed District. (3) Towaliga River Watershed District. (b) GRAP, Groundwater Recharge Area Protection. (c) RBZ, Riparian Buffer Zone. (d) WP, Wetlands Protection. (e) Interstate 75 Corridor Overlay District. Sec. 3.03.00. Watershed water supply districts. Sec. 3.03.01. Findings and purpose. In order to provide for the health, safety, and welfare of the public and a healthy economic climate within Butts County and surrounding communities, it is essential that the quality of public drinking water be assured. The ability of natural systems to filter stormwater runoff can be threatened by unrestricted urban and suburban development. Land-disturbing activities associated with development can increase erosion and sedimentation that threaten the storage capacity of reservoirs. In addition, stormwater runoff, particularly from impervious surfaces, can introduce toxicants, nutrients, and sediment into drinking water supplies, making water treatment more complicated and expensive and rendering water resources unusable for recreation. Industrial land uses that involve the manufacture, use, transport and storage of hazardous or toxic waste materials result in the potential risk of contamination of nearby public drinking water supplies. The purpose of this article is to establish measures to protect the quality and quantity of the present and future water supply of Butts County (and Henry County with respect to the Tussahaw Creek, Peeksville Creek, Wolf Creek, Malholms Creek, their tributaries, and the Tussahaw Reservoir); to minimize the transport of pollutants and sediment to the water supply; and to maintain the yield of the water supply watershed. This article shall apply to the portions of the following watersheds which occur within the jurisdiction of Butts County and are hereinafter identified as water supply watersheds. Sec. 3.03.02 Enforcement. (a) The Butts County community development department is hereby designated as the administrator and enforcement authority of this article. (b) The county, their agent, officers, and employees shall have authority to enter upon privately owned land for the purpose of performing their duties under this ordinance and may take or cause to be made such examinations, surveys, or sampling as the county deems necessary. (c) All applications for building permits shall be first submitted to the building inspection section of the Butts County community development department for issuance of building permits when the application is in compliance with the regulations of this article. The building inspection section shall submit applications for review to the development director when there is a need for interpretation and enforcement of specific sections of this article. (d) Agents and employees of the County, Henry Authority, Butts Authority and law enforcement officials of the County and other law enforcement officials having police powers shall have authority to assist the enforcer in enforcement of this article. (e) The enforcer shall have the authority to enforce this article; to authorize issuance of permits thereunder; to address violations and to refer violations to the code enforcement department of the county; to issue citations for violation of this article; to issue administrative orders; and to commence civil and criminal actions. Sec. 3.03.03. Nonconforming uses. (a) Previous uses preserved generally. The lawful use of any building, structure, or land use existing at the time of the enactment of this article may be continued, even though such use does not conform with the provisions of this article except that the nonconforming structures of use shall not be: (1) Changes to another conforming use; (2) Reestablished after discontinuance for one year; (3) Extended except in conformity with this section; or (4) Structurally altered, except for repairs necessary for the continuation of the existing use. (b) Replacement of nonconforming uses. The replacement of nonconforming uses shall be in compliance with the provisions of chapter 9. (c) Application to projects partially complete. For any development which has received, before the effective date of this ordinance, either preliminary plat approval, site plan approval, a building permit or other relevant permits provided by the county, and/or which substantial work has been completed or substantial investment made in reliance upon such a permit, any future work included in said plat or plan may be completed without being subject to the additional regulations imposed in this article. Any significant additions, expansions, or phases that deviate significantly from said plat or plan or that have not yet received a permit shall be subject to the provisions of this article. Sec. 3.03.04. Preexisting conditions. All parcels of land within the watershed protection districts that do not conform to the space requirements or come within the permitted uses or the minimum standards hereinafter set shall be governed by the zoning ordinance as it relates to conforming use activities. No property owner within said district or area, nor successor in title, who is engaged in a use which is rendered nonconforming by this article shall be required to limit, restrict, amortize, or discontinue such use within the boundaries of her/his property. Nothing in this article shall require any change in development or proposed use of properties which are presently under development or a preliminary plat has been submitted and approved as of the effective date of this article. All parcels or tracts of land within said district or area shall be subject to the rules and regulations of the Butts County health department. Sec. 3.03.05. Variances. (a) Pursuant to chapter 9, the Butts County board of appeals may authorize upon appeal in individual cases such variances from the terms of this ordinance as will not be contrary to the public interest where, owing to special conditions, literal enforcement of the provisions of this article will, in an individual case, result in unnecessary hardship only upon a finding by the board of appeals that all of the following conditions exist: (1) There are extraordinary and exceptional conditions pertaining to the particular piece of property in question because of its size, shape or topography; (2) The application of this article to this particular piece of property would create an unnecessary hardship; (3) Relief, if granted, would not cause substantial detriment to the water quality of a water supply watershed district or impair the purposes and intent of this article; (4) The special circumstances surrounding the request for a variance are not the result of acts by the applicant; (5) The variance is not a request to permit a use of land, building or structure which is not permissible in the district involved; and (6) The variance will not result in an increase of the impervious surface of the development beyond that prescribed for each water supply watershed district herein. (b) Administrative variances may be granted in accordance with the provisions of chapter 9 of this UDO. Sec. 3.03.06. Conditions of variance. The county may, as a condition of variances to certain provisions of this ordinance, require alternative measures to be taken by the applicant such that the purpose of this ordinance may be achieved through alternative means. Sec. 3.03.07. Appeals. Decisions made by the enforcer may be appealed to the Butts County board of appeals pursuant to chapter 10. Sec. 3.03.08. Amendments. These regulations and the watershed district map may from time to time be amended in accordance with procedures and requirements in the general statutes. Sec. 3.03.09. Assessment relief. Assessors and boards of assessors shall consider the requirements of these regulations in determining the fair market value of land. Sec. 3.03.10. Establishment of the Tussahaw Creek and Reservoir Area Watershed District, descriptions, maps, critical areas and limited development areas. (a) The Tussahaw Creek and Reservoir Area Watershed District (Tussahaw Watershed District) is hereby established and designated. (b) The Tussahaw Watershed District is defined as follows: All land that lies on each side of Tussahaw Creek and each perennial stream that flows into Tussahaw Creek to the ridge line from the west right-of-way line of Fincherville Road located in Butts County, Georgia, to the beginning points of Tussahaw Creek and each perennial stream that drains into Tussahaw Creek in said area. The main perennial streams that flow into the Tussahaw Creek at the location of the reservoir site are Peeksville Creek and its tributaries, Wolf Creek and its tributaries, and Malholms Creek and its tributaries. All of said creeks are located in the Tussahaw Watershed District. (c) A map of the Tussahaw Watershed District will be maintained by the County and the authority. The county's district map will overlie the official Butts County zoning map and each of said maps are hereby incorporated herein and made a part of this article by reference. The Tussahaw Watershed District shall be designated as WS-TS on the official Butts County zoning map. (d) Water quality critical area for the above-stated watershed district is all land that lies adjacent to the normal pool level of a reservoir and extending either to the ridge line boundary of the watershed or 500 feet, whichever is shorter, and all land extending a distance of three miles upstream from the normal pool level of the reservoir that is adjacent to each perennial stream upstream from the reservoir and extending either to the ridge line boundary of the watershed on each side of the perennial stream or 500 feet, whichever is shorter. The normal pool elevation of the existing and proposed reservoirs of the authority are Tussahaw Creek Reservoir contour line El. 600.0. (e) A limited development area (LDA) is established for the remaining part of the watershed district that is located outside of the WQCA to the ridge line of each district. Sec. 3.03.11. Permit required. Within the Tussahaw Watershed District, no land-disturbing activity, construction or other development, other than certain exempted activities identified within, may be conducted without a permit from the county and must be in full compliance with the terms of this ordinance and other applicable regulations. All activities that are not permissible as of right or as a special use shall be prohibited. Sec. 3.03.12. Exceptions. The following land use activities are exempted from the development review and permit requirements of this article with regard to the Tussahaw Watershed District: (a) Agriculture and forestry. Normal agricultural and forestry activities involving planting and harvesting of crops are exempted if they conform to best management practices established by the Georgia Department of Agriculture. Silvicultural activities must conform to best management practices by the Georgia Forestry Commission. (b) Mining. All mining activities that are permitted by the Georgia Department of Natural Resources under the Georgia Surface Mining Act, as amended, are exempted. Sec. 3.03.13. Permit review. Applications for a development permit within the Tussahaw Watershed District shall include the following: (a) Existing ordinances. Each application shall comply with all existing ordinances and amendments thereto. (b) In addition to the requirements of each of the above-referenced ordinances, site plans or construction improvement plans for development of property shall contain the following additional information: (1) The total square feet and acres of property to be developed. (2) Location, dimensions, and area (in square feet) of all impervious surfaces, both existing and proposed, on the site. (3) The distance of each impervious structure and surface to the nearest bank of an affected perennial stream and reservoir. (4) The location of each perennial stream that crosses or abuts the site. (5) The location of each public reservoir that abuts the site. (6) The location, elevation, and orientation of the 100-year flood plain on the site. (7) The site plan submitted shall contain a certification issued by a registered land surveyor or registered engineer verifying the location of the site as being located either within the WQCA, the LDA, or outside of both areas. (8) Location and detailed design of any spill and leak collection systems designed for the purpose of containing accidentally released hazardous or toxic materials. (c) In addition to the requirements above, the following information shall accompany each building permit requested: (1) The total square feet and acres of property to be developed. (2) Location, dimensions, and area (in square feet) of all impervious surfaces, both existing and proposed, on the site. (3) The location of each perennial stream that crosses or abuts the site. (4) The location of each public reservoir that abuts the site. (5) The location and orientation of the 100-year flood plain on the site. (6) The site plan submitted shall contain a certification issued by a registered land surveyor or registered engineer verifying the location of the site as being located either within the WQCA, the LDA, or outside of both areas. (7) Location and detailed design of any spill and leak collection systems designed for the purpose of containing accidentally released hazardous or toxic materials. Sec. 3.03.14. Activities to comply with site development plan. All development activities or site work conducted after approval of the site plan shall conform with the specifications of said approved plans. Significant changes to the site plan that would alter the amount and velocity of stormwater runoff from the site; increase the amount of impervious surface within the development; alter the overall density of development; result in a considerable increase in the amount of excavation, fill, or removal of vegetation during construction; or otherwise result in an alteration of the overall appearance of the development as proposed can be amended only with the approval of the community development department. Any such amendments shall also comply with all other applicable ordinances and laws. Sec. 3.03.15. Exemptions from site development plan requirements. (a) Repairs to a facility that is part of a previously approved and permitted development. (b) Accessory structures such as barns, sheds, or additions to single-family dwellings, provided that the construction or placement of such accessory structure does not cause the parcel to exceed the impervious surface limitations set forth herein. Sec. 3.03.16. Duration of permit validity. (a) If construction described in the development permit has not commenced within 12 months from the date of issuance, the permit shall expire. (b) If construction described in the development permit is suspended after work has commenced, the permit shall expire 12 months after the date the work ceased. In cases of permit expiration due to abandonment or suspension of work, the landowner shall be required to restore topography to its original contours and restore vegetation as far as practicable. Sec. 3.03.17. Land use restrictions. The following limitations on permissible uses together with the limitations on land use prescribed under the ordinances of Butts County, the laws of the state of Georgia, the regulations of the regulatory agencies of the state of Georgia, the laws of the United States of America, and the regulations of the regulatory agencies of the United States of America shall apply. (a) Within the water quality critical area. The following limitations on permissible uses shall apply to the WQCA: (1) Agricultural land use. No confined animal feeding operations may be conducted within the WQCA. (2) Commercial establishments. No commercial activity may be conducted within the WQCA. (3) Fuel and chemical storage tanks. No above ground storage tanks shall be allowed in the WQCA. (4) Industries. No industrial activity may be conducted within the WQCA. (5) Landfills and wastewater disposal. No landfills or wastewater disposal facilities of any kind (except for septic tanks approved by the Butts County health department and wastewater disposal facilities owned and operated by the authority) shall be allowed within the WQCA. (6) Offices. Offices are not permissible within the WQCA. (7) Residential land use. Single-family residential lots are permissible if acreage requirements hereinafter set forth are met. Residential lots must have no less than two acres when served by a septic tank system and no less than one and one-half acres when served by a public sewer system. The minimum lot width permissible for development with septic tank systems when using a public water system is 175 feet. (8) Toxic and hazardous materials. No facility that stores or disposes of underground fuel or chemical storage tanks shall be allowed in the WQCA. No industry or business that generates hazardous waste may be located within the WQCA. (b) Within the limited development area. The following limitations on permissible uses shall apply to the LDA: (1) Agriculture. There are no additional limitations on the type of agricultural land use permissible within the LDA. (2) Commercial establishments. Commercial establishments shall only be permissible on land parcels of no less than one and one-half acres if served by a septic tank system and no less than one acre if served by a public sewer system. (3) Fuel and chemical storage tanks. Underground fuel and chemical storage tanks will be allowed if they meet all of the requirements set forth by the Georgia Department of Natural Resources Environmental Protection Division. (4) Industries. No industry that manufactures toxic or hazardous materials may be located in the LDA. Only those industries that are not large quantity generators of hazardous waste may be located within the LDA. Permitted industries must be located on land parcels of no less than four acres if served by a septic tank system and no less than two acres if served by a public sewer system. (5) Landfills and waste disposal. No landfills shall be allowed within said area. Septic tanks approved by the county health department and sewage disposal facilities owned and operated by the authority will be allowed in this area. (6) Offices. Offices shall be permissible on land parcels of no less than one and one-half acres if served by a septic tank system and no less than one acre if served by a public sewer system. (7) Residential. Single-family residential lots are permissible if acreage requirements hereinafter set forth are met. Residential lots served by a septic tank system shall be a minimum of one acre. Residential lots served by a public sewer system shall be a minimum of one-half acre. (8) Toxic and hazardous materials. No facilities that dispose of toxic or hazardous waste may be located within the LDA. No facility that manufactures, stores or disposes of toxic or hazardous waste may be located within the LDA. Sec. 3.03.18. Property abutting perennial streams and perennial streams crossing property located in limited development area. If a perennial stream abuts or crosses any property upon which an industrial facility, office facility, commercial facility, service facility, or residential building is located, the following minimal lot sizes will be required: (a) If served by a septic tank system: (1) Industrial lots: Five acres. (2) Office lots: Two acres. (3) Commercial establishments: Two acres. (4) Residential: One and one-quarter acres. (b) If served by public sewer system: (1) Industrial lots: Two acres. (2) Office lots: One and one-half acres. (3) Commercial establishments: One and one-half acres. (4) Residential: One acre. Sec. 3.03.19. Impervious surface limitations. The percentage of impervious area allowed in the WQCA and LDA of the Tussahaw Watershed District are set forth below. The percentages set forth below shall be determined by the addition of all land areas to be covered by impervious structures during the development of the property (i.e., roads, streets, driveways, houses, buildings, and parking areas). (a) Water quality critical area. No more than 20 percent of the land area of any parcel on which a new development is placed may be covered by impervious surface within the WQCA. (b) Limited development area. No more than 25 percent of the land area of any parcel on which a new development is placed may be covered by impervious surface within the LDA. (c) The impervious surface of a single-family residential development within the LDA may be increased to 35 percent provided that: (1) Development of land in the LDA includes area(s) set aside to remain in natural vegetation or open space in the amount of two times the area of impervious surface above the 25 percent limit. Ownership of such parcels in fee simple or as a conservation easement must be conveyed to the county, a homeowners' association, or some other governmental or nonprofit entity. (2) If the recipient of the property or conservation easement is to be an existing or proposed organization other than a governmental entity, the developer must submit to the county articles of association or incorporation which establish the entity. Said document must be approved in writing by the county prior to approving said development. Any proposed changes in said articles shall require the prior written approval of the county. (3) If the recipient is a homeowners' association, membership in the homeowners' association shall be mandatory for property owners and made a required covenant in all deeds issued or passed. The association shall provide voting and use rights in the natural vegetated area when applicable and charge dues or levy assessments to cover expenses, which may include tax liabilities of common areas, and for the maintenance of such common areas, natural vegetated areas, improvements, rights-of-way, utilities, etc. Such association shall be responsible for the perpetuation, maintenance, and function of all common lands, uses, and facilities. (4) All lands and improvements shall be described and identified as to location, size, use, and control in a restrictive covenant. The details of all easements conveyed shall be likewise described. These restrictive covenants shall be written so as to run with the land and become a part of the deed of each lot or dwelling unit within the development. (5) Such restrictive covenants and the association shall continue in effect so as to control the availability of facilities for their intended function and to protect the development from additional unplanned densities and use. Such association shall not be dissolved, nor shall such association dispose of any land set aside for the purposes of this article, by sale or otherwise, without prior written consent of the county. (6) Any and all natural vegetated areas shall be held in common ownership by the dwelling unit owners. Any change in the natural or vegetated area, other than to maintain it in reasonable order and condition in accordance with the final approval plan, shall require prior written approval of the county. (7) The natural vegetated area may be set aside by the developer by acquiring property in fee simple or a conservation easement within the watershed district. (d) The impervious surfaces for industrial, commercial, office, institutional, public, and multi-family residential development within the LDA may be more than 25 percent impervious surfaces provided the following structural stormwater controls are taken: (1) Stormwater management plan detailing the stormwater control structures proposed for the development shall be required. Said plan shall be in conformity with the requirements of the Georgia Stormwater Management Manual, latest edition. The preferred structure control is a wet detention pond which shall be located on site or as part of a regional pond where available. The design standards for detention ponds intended for watershed protection shall be found in the Georgia Stormwater Management Manual, latest edition. The construction of all stormwater controls designed for watershed protection shall be completed and have received final inspection approval from the Butts County building inspection section prior to issuance of a certificate of occupancy for a building or final plat approval if developed as an industrial, business, or office park. (2) Channelization of perennial streams shall be prohibited, except for road crossings, erosion and sedimentation control, or storm management control devices. (3) All permanent stormwater control structures and easements for maintenance and access shall be recorded in the final plat of the property in accordance with the subdivision ordinance and the Georgia Stormwater Management Manual, latest edition. The developer shall submit a detailed, long-term schedule for inspection and maintenance of stormwater control structures. The schedule shall include a legal agreement for maintenance responsibility between the local government and property owner. No final plat approval or building occupancy permit shall be issued until a fully executed maintenance agreement has been executed and accepted by the county. Inspections can include, but are not limited to: a. Initial review of stormwater management plan which must occur prior to issuance of development permit or building permit. b. Inspection prior to burial of any underground drainage structure. c. Erosion and sedimentation inspections as required on the approved project soil erosion and sedimentation control plan and the county soil erosion and sedimentation control ordinance. d. A final inspection when all work, including installation of drainage facilities, has been completed. e. Inspection prior to final subdivision plat approval for acceptance of public improvements (streets, stormwater management and drainage facilities). f. Subsequent inspections, measurements, and enforcement actions as necessary to ensure continued functioning of the facilities for stormwater management and watershed protection. (4) A development may participate in a regional wet detention pond program which has been established by one or more public or private entities subject to the following conditions: a. Runoff from the development drains into a regional stormwater management control facility approved by the county. b. An agreement between the county and the landowner has been executed which guarantees stormwater arrangement of the property and the detention pond. c. Construction of a regional detention pond meets or exceeds the design requirements of the Georgia Stormwater Management Manual, latest edition. (e) A development may provide an alternative method for stormwater control other than a wet detention pond provided that it is in compliance with the Georgia Stormwater Management Manual, latest edition, and design criteria for pollutant removal equivalent to those associated with wet detention ponds included in the Georgia Stormwater Management Manual, latest edition. Sec. 3.03.20. Impervious surface setbacks. (a) Water quality critical area. No impervious surface shall be constructed within 200 feet of the normal pool level of the reservoir or of any perennial stream located in the WQCA. (b) Limited development area. No impervious surface shall be constructed within 150 feet of the setback area on both sides of a perennial stream as measured from the stream banks in the LDA. Sec. 3.03.21. Vegetative setbacks/buffers. (a) Stream buffers within WQCA. A natural or enhanced vegetative buffer shall be maintained for a distance of 150 feet from the normal pool level of a reservoir and 100 feet on both sides of a perennial stream as measured from the banks. (b) Stream buffers within the LDA. A natural or enhanced vegetative buffer shall be maintained for a distance of 100 feet on both sides of a perennial stream as measured from the stream's banks. (c) Agricultural BMPs. Notwithstanding any other provisions of this article, the continued cultivation of agricultural crops and the occasional pasturing of livestock shall be permissible within the buffer area, provided that the best management practices of the Georgia Department of Agriculture are followed. Sec. 3.03.22. Septic tank drainfield restrictions. Septic tanks and septic tank drainfields are prohibited in the setback area established in section 3.03.21. Sec. 3.03.23. Soil erosion and sedimentation control. All developments and land-disturbing activity within the Tussahaw Watershed District shall comply fully with the soil erosion and sedimentation control ordinance of the county. Sec. 3.03.24. Hazardous materials handling. New facilities located within the Tussahaw Watershed District that handle hazardous materials of a type and amount requiring a permit from the Department of Natural Resources or that require disposal by a hazardous materials handler permitted or licensed by the Department of Natural Resources at a hazardous materials facility shall perform their operations on impermeable surfaces having spill and leak collection systems. Such spill and leak collections systems shall be shown on the site plan in detail and must be approved, as part of the site plan, by the enforcer. Sec. 3.03.25. Establishment of the Ocmulgee River Watershed District, descriptions, maps, critical areas and limited development areas. (a) The Ocmulgee River Watershed District is hereby established and designated and shall comprise the land that drains to the Ocmulgee River. (b) The Ocmulgee River Watershed District is defined as follows: The Ocmulgee River is a large water supply watershed. An intake for Butts County is located on the Ocmulgee River just south of Jackson Lake. This water supply watershed does not contain a reservoir. The boundaries of this overlay are defined by the ridgelines of the respective watersheds. This overlay shall be further delineated and defined on the Water Supply Watershed Protection District Overlay Map of Butts County. (c) A map of the Ocmulgee River Watershed District will be maintained by the county and the authority. The county's district map will overlie the official Butts County zoning map and each of said maps are hereby incorporated herein and made a part of this ordinance by reference. The Ocmulgee River Watershed District shall be designated as WS-OC on the official Butts County zoning map. Sec. 3.03.26. Permit required. Within the Ocmulgee River Watershed District, no land-disturbing activity, construction, or other development, other than certain exempted activities identified within, may be conducted without a permit from the county and must be in full compliance with the terms of this ordinance and other applicable regulations. All activities that are not permissible as of right or as a special use shall be prohibited. Sec. 3.03.27. Exceptions. The following land use activities are exempted from the development review and permit requirements of this article with regard to the Ocmulgee River Watershed District: (a) Land uses lawfully existing prior to the adoption of this article. (b) Mining activities permitted by the Department of Natural Resources under the Surface Mining Act. (c) If utilities cannot feasibly be located outside the buffer or setback areas required by this article, such utility locations can be exempted from the stream corridor buffer and setback area provisions subject to the following conditions: (1) The utilities shall be located as far from the stream bank as reasonably possible; (2) The installation and maintenance of the utilities shall be such to protect the integrity of the buffer and setback areas as best as reasonably possible; and (3) The utilities shall not impair the quality of the drinking water stream. (d) Specific forestry and agricultural activities in the stream corridor buffer and setback areas in accordance with the following conditions: (1) The activity shall be consistent with best management practices established by the Georgia Forestry Commission or the Georgia Department of Agriculture; and (2) The activity shall not impair the quality of the drinking water stream. Sec. 3.03.28. Permit review. Applications for a development permit within the Ocmulgee River Watershed District shall include the following: (a) Existing ordinances. Each application shall comply with all existing ordinances and amendments thereto. (b) In addition to the requirements of each of the above-referenced ordinances, site plans or construction improvement plans drawn at a scale of one inch equals 50 feet for development of property shall contain the following additional information: (1) A map of all planned excavation and fill, including calculations of the volume of cut and fill involved, and cross-sectional drawings showing existing and proposed grades. Elevations, horizontal scale, and vertical scale must be shown on the cross-sectional drawings. (2) A map of any Ocmulgee River or Jackson Lake boundaries occurring within the site must be provided. This boundary may be included on other maps provided by the applicant. (3) Location, dimensions, and area of all impervious surfaces, both existing and proposed, on the site and adjacent to the site for a distance of 200 feet. (4) The orientation and distance from the boundaries of the proposed site to the nearest bank of an affected perennial stream or water body. (5) Elevations of the site and adjacent lands within 200 feet of the site at contour intervals of no greater than two feet and no greater than one foot for slopes less than or equal to two percent. (6) Location and detailed design of any spill and leak collection systems designed for the purpose of containing accidentally released hazardous or toxic materials. (7) All proposed temporary disruptions or diversions of local hydrology. Sec. 3.03.29. Activities to comply with site development plan. All development activities or site work conducted after approval of the site plan shall conform to the specifications of said approved plans. Significant changes to the site plan that would alter the amount and velocity of stormwater runoff from the site; increase the amount of impervious surface within the development; alter the overall density of the development; result in a considerable increase in the amount of excavation, fill, or removal of vegetation during construction; or otherwise result in an alteration of the overall appearance of the development as proposed can be amended only with the approval of the Butts County community development department. Minor changes, such as realignment of streets or minor alterations to drainage structures and other infrastructure to meet unexpected conditions, are exempted from this requirement. Any such amendments shall also comply with all other applicable ordinances and laws. Sec. 3.03.30. Exemptions from site development plan requirements. (a) Single-family detached homes constructed on a subdivision of fewer than five parcels. (b) Repairs to a facility that is part of a previously approved and permitted development. (c) Accessory structures such as barns, sheds, or additions to single-family dwellings, provided that the construction or placement of such accessory structure does not cause the parcel to exceed the impervious surface limitations set forth herein. Sec. 3.03.31. Duration of permit validity. (a) If construction described in the development permit has not commenced within 12 months from the date of issuance, the permit shall expire. (b) If construction described in the development permit is suspended or abandoned after work has commenced, the permit shall expire 12 months after the date the work ceased. In cases of permit expiration due to abandonment or suspension of work, the landowner shall be required to restore topography to its original contours and restore vegetation as far as practicable. (c) Written notice of pending expiration of the development permit shall be issued by the development director or designated appointee. Sec. 3.03.32. Land use restrictions. The following limitations on permissible uses together with the limitations on land use prescribed under the ordinances of Butts County, the laws of the state of Georgia, the regulations of the regulatory agencies of the state of Georgia, the laws of the United States of America, and the regulations of the regulatory agencies of the United States of America shall apply. (a) The following regulations shall apply to the Ocmulgee River Watershed District identified on the adopted map as a large supply watershed without a reservoir: (1) For any property located within 1,000 feet of any property owned, managed, maintained, or operated by any government in Butts County as an existing reservoir or designated by a government agency in Butts County as a future reservoir, the following development standards are required: a. Agricultural uses: 1. Minimum lot area: Three acres. 2. Minimum front setback as measured from the right-of-way of the road: 250 feet. 3. Minimum side setback: 250 feet. 4. Minimum rear setback: 250 feet. 5. Minimum setback for cultivation: 250 feet. b. Residential uses: 1. Minimum lot area: Three acres. 2. Minimum front setback as measured from the right-of-way of the road: 250 feet. 3. Minimum side setback: 250 feet. 4. Minimum rear setback: 250 feet. 5. Minimum setback for cultivation: 250 feet. c. Commercial uses: 1. None permitted. d. Industrial uses: 1. None permitted. (2) For other properties located within the district, but not located within 1,000 feet of any property owned, managed, maintained, or operated by any government in Butts County as an existing reservoir or designated by a government agency in Butts County as a future reservoir, the following development standards are required: a. Agricultural uses: 1. Minimum lot area: Three acres. 2. Minimum front setback as measured from the right-of-way of the road: 100 feet. 3. Minimum side setback: 100 feet. 4. Minimum rear setback: 100 feet. 5. Minimum setback for nitrification field lines: 100 feet. b. Residential uses: 1. Minimum lot area: 1.25 acres for single-family dwellings, unless served by public sewage; 30,000 square feet per two-family dwelling (must be served by public sewage); 4,356 square feet per dwelling unit for multi-family dwellings (must be served by public sewage). 2. Minimum front setback as measured from the right-of-way of the road: 100 feet. 3. Minimum side setback: 100 feet. 4. Minimum rear setback: 100 feet. 5. Minimum setback for nitrification field lines: 100 feet. c. Commercial uses: 1. Minimum lot area: 1.25 acres. 2. Minimum front setback as measured from the right-of-way of the road: 200 feet. 3. Minimum side setback: 200 feet. 4. Minimum rear setback: 200 feet. (3) Any setback measurements stated in this section are measured from the outer edge of any river, creek, stream, spring, or body of water that is located within the district or the outer property line of any property owned, operated, managed, or maintained by any government agency in Butts County as an existing reservoir or designated by a government agency in Butts County as a future reservoir. (4) All other setback requirements of the primary zoning district in which a specific parcel of property lies must be complied with where they are either more stringent than or are not addressed by the development standards of this article. (5) Variances for the WS-OC district may be considered by the zoning board of appeals as to lot sizes and setbacks, provided that sewage generated by the facility located on the property is serviced by an approved public sewage facility. However, variances may not be made as to any residential, commercial, agricultural, or industrial facilities which use, make, or create as a product or a byproduct any toxic substance or waste. Sec. 3.03.33. Hazardous materials handling. New facilities located within seven miles of a water supply intake that handle hazardous materials of the types and amounts listed in Section 312 of the Resource Conservation and Recovery Act of 1976 (excluding underground storage tanks) and amounts of 10,000 pounds or more on any one day shall perform their operations on impervious surfaces and in conformance with any applicable federal spill prevention requirements, the requirements of the Standard Fire Prevention Code, and local fire code requirements. Such spill and leak collections systems shall be shown on the site plan in detail and must be approved, as part of the site plan, by the enforcer. Sec. 3.03.34. Soil erosion and sedimentation control. All developments and land-disturbing activity within the Ocmulgee River Watershed District shall comply fully with the soil erosion and sedimentation control ordinance of the county. Sec. 3.03.35. Prohibited uses. (a) Sewage treatment facility—Unless prior approval is granted by the board of commissioners and the Georgia Environmental Protection Division (EPD). (b) Commercial business which causes, sells, stores, or maintains any toxic chemicals, toxic wastes, or toxic products. (c) Agricultural activity that does not strictly comply with the Georgia Pesticide Act of 1976, Georgia Pesticide Use and Application Act of 1976, and Georgia Laws 1982, House Bill 1780 (O.C.G.A. § 2-1-4). (d) Industry, business or facility which uses, makes or creates as a product or byproduct any toxic wastes, heavy materials, grease, animal fat, or organic loading. (e) Dumping, discharging, releasing, spraying, or distributing of any toxic or other harmful products onto the land, into the atmosphere, or in a stream or body of water. Sec. 3.03.36. Establishment of the Towaliga River Watershed District, descriptions, maps, critical areas and limited development areas. (a) The Towaliga River Watershed District is hereby established and designated and shall comprise the land that drains to the Towaliga River. (b) The Towaliga River Watershed District is defined as follows: The Towaliga River is a small water supply watershed. An intake for the city of Jackson is located on the Towaliga River near the Georgia Diagnostic and Classification State Prison. This water supply watershed does not contain a reservoir. The boundaries of this overlay are defined by the ridgelines of the respective watersheds. This overlay shall be further delineated and defined on the Water Supply Watershed Protection District Overlay Map of Butts County. (c) A map of the Towaliga River Watershed District will be maintained by the County and the authority. The County's district map will overlie the official Butts County Zoning Map, and each of said maps are hereby incorporated herein and made a part of this ordinance by reference. The Towaliga River Watershed District shall be designated as WS-TW on the official Butts County zoning map. Sec. 3.03.37. Permit required. Within the Towaliga River Watershed District, no land-disturbing activity, construction, or other development, other than certain exempted activities identified within, may be conducted without a permit from the county and must be in full compliance with the terms of this ordinance and other applicable regulations. All activities that are not permissible as of right or as a special use shall be prohibited. Sec. 3.03.38. Exceptions. The following land use activities are exempted from the development review and permit requirements of this article regarding the Towaliga River Watershed District: (a) Land uses existing prior to the adoption of this article. (b) Mining activities permitted by the Department of Natural Resources under the Surface Mining Act. (c) If utilities cannot feasibly be located outside the buffer or setback areas required by this article, such utility locations can be exempted from the stream corridor buffer and setback area provisions subject to the following conditions: (1) The utilities shall be located as far from the stream bank as reasonably possible; (2) The installation and maintenance of the utilities shall be such to protect the integrity of the buffer and setback areas as best as reasonably possible; and (3) The utilities shall not impair the quality of the drinking water stream. (d) Specific forestry and agricultural activities in the stream corridor buffer and setback areas in accordance with the following conditions: (1) The activity shall be consistent with Best Management Practices established by the Georgia Forestry Commission or the Georgia Department of Agriculture; and (2) The activity shall not impair the quality of the drinking water stream. Sec. 3.03.39. Permit review. Applications for a development permit within the Towaliga River Watershed District shall include the following: (a) Existing ordinances. Each application shall comply with all existing ordinances and amendments thereto. (b) In addition to the requirements of each of the above-referenced ordinances, site plans or construction improvement plans for development of property shall contain the following additional information: (1) A map of all planned excavation and fill, including calculations of the volume of cut and fill involved, and cross-sectional drawings showing existing and proposed grades. Elevations, horizontal scale, and vertical scale must be shown on the cross-sectional drawings. (2) A map of any Towaliga River boundaries occurring within the site must be provided. This boundary may be included on other maps provided by the applicant. (3) Location, dimensions, and area of all impervious surfaces, both existing and proposed, on the site and adjacent to the site for a distance of 200 feet. (4) The orientation and distance from the boundaries of the proposed site to the nearest bank of an affected perennial stream or water body. (5) Elevations of the site and adjacent lands within 200 feet of the site at contour intervals of no greater than two feet and no greater than one foot for slopes less than or equal to two percent. (6) Location and detailed design of any spill and leak collection systems designed for the purpose of containing accidentally released hazardous or toxic materials. (7) All proposed temporary disruptions or diversions of local hydrology. Sec. 3.03.40. Activities to comply with site development plan. All development activities or site work conducted after approval of the site plan shall conform with the specifications of said approved plans. Significant changes to the site plan that would alter the amount and velocity of stormwater runoff from the site; increase the amount of impervious surface within the development; alter the overall density of development; result in a considerable increase in the amount of excavation, fill, or removal of vegetation during construction; or otherwise result in an alteration of the overall appearance of the development as proposed can be amended only with the approval of the community development department. Minor changes, such as realignment of streets or minor alterations to drainage structures and other infrastructure to meet unexpected conditions, are exempted from this requirement. Any such amendments shall also comply with all other applicable ordinances and laws. Sec. 3.03.41. Exemptions from site development plan requirements. (a) Single-family detached homes constructed on a subdivision of fewer than five parcels. (b) Repairs to a facility that is part of a previously approved and permitted development. (c) Accessory structures such as barns, sheds, or additions to single-family dwellings, provided that the construction or placement of such accessory structure does not cause the parcel to exceed the impervious surface limitations set forth herein. Sec. 3.03.42. Duration of permit validity. (a) If construction described in the development permit has not commenced within 12 months from the date of issuance, the permit shall expire. (b) If construction described in the development permit is suspended or abandoned after work has commenced, the permit shall expire 12 months after the date the work ceased. In cases of permit expiration due to abandonment or suspension of work, the landowner shall be required to restore topography to its original contours and restore vegetation as far as practicable. (c) Written notice of pending expiration of the development permit shall be issued by the development director or designated appointee. Sec. 3.03.43. Land use restrictions. The following limitations on permissible uses together with the limitations on land use prescribed under the ordinances of Butts County, the laws of the state of Georgia, the regulations of the regulatory agencies of the state of Georgia, the laws of the United States of America, and the regulations of the regulatory agencies of the United States of America shall apply. (a) The following regulations shall apply to the Towaliga River Water Supply Watershed identified on the adopted map as a small supply watershed: (1) The corridors of all perennial streams within a seven-mile radius upstream of a governmentally-owned public drinking water supply intake or water supply reservoir must be protected by the following criteria: a. A buffer shall be maintained for a distance of 100 feet on both sides of the stream as measured from the stream banks. b. No impervious surface shall be constructed within a 150-foot setback area on both sides of the stream as measured from the stream banks. c. Septic tanks and septic tank drainfields are prohibited in the 150-foot setback area as described in (1)b. above. (2) The corridors of all perennial streams outside a seven-mile radius upstream of a governmentally-owned public drinking water supply intake or water supply reservoir must be protected by the following criteria: a. A buffer shall be maintained for a distance of 100 feet on both sides of the stream as measured from the stream banks. Where more stringent buffer requirements of other articles of this UDO or other ordinances apply, the greater buffer requirement shall take precedence. b. No impervious surfaces shall be constructed within a 75-foot setback area on both sides of the stream as measured from the stream banks. Where more stringent impervious surface requirements of other articles of this UDO or other ordinances apply, the greater impervious surface limitation shall take precedence. c. Septic tanks and septic tank drainfields are prohibited in the setback area as described in (2)b. above. (3) The impervious surface area of developments within the Towaliga River Water Supply Watershed, including all public and private structures, utilities, or facilities, shall be limited to 25 percent, or the percent of the existing use, as of the date of the adoption of this provision of the UDO, whichever is greater, unless the following structural stormwater controls are taken: a. Stormwater management plan detailing the stormwater control structures proposed for the development shall be required. Said plan shall be in conformity with the requirements of the Georgia Stormwater Management Manual, latest edition. The preferred structure control is a wet detention pond which shall be located on site or as part of a regional pond where available. The design standards for detention ponds intended for watershed protection shall be found in the Georgia Stormwater Management Manual, latest edition. The construction of all stormwater controls designed for watershed protection shall be completed and have received final inspection approval from the Butts County building inspection section prior to issuance of a certificate of occupancy for a building or final plat approval if developed as an industrial, business, or office park. b. Channelization of perennial streams shall be prohibited, except for road crossings, erosion and sedimentation control, or storm management control devices. c. All permanent stormwater control structures and easements for maintenance and access shall be recorded in the final plat of the property in accordance with the subdivision ordinance and the Georgia Stormwater Management Manual, latest edition. The developer shall submit a detailed, long-term schedule for inspection and maintenance of stormwater control structures. The schedule shall include a legal agreement for maintenance responsibility between the local government and property owner. No final plat approval or building occupancy permit shall be issued until a fully executed maintenance agreement has been executed and accepted by the county. Inspections can include, but are not limited to: 1. Initial review of stormwater management plan which must occur prior to issuance of development permit or building permit. 2. Inspection prior to burial of any underground drainage structure. 3. Erosion and sedimentation inspections as required on the approved project soil erosion and sedimentation control plan and the county soil erosion and sedimentation control ordinance. 4. A final inspection when all work, including installation of drainage facilities, has been completed. 5. Inspection prior to final subdivision plat approval for acceptance of public improvements (streets, stormwater management and drainage facilities). 6. Subsequent inspections, measurements, and enforcement actions as necessary to ensure continued functioning of the facilities for stormwater management and watershed protection. d. A development may participate in a regional wet detention pond program which has been established by one or more public or private entities subject to the following conditions: 1. Runoff from the development drains into a regional stormwater management control facility approved by the county. 2. An agreement between the county and the landowner has been executed which guarantees stormwater arrangement of the property and the detention pond. 3. Construction of a regional detention pond meets or exceeds the design requirements of the Georgia Stormwater Management Manual, latest edition. e. A development may provide an alternative method for stormwater control other than a wet detention pond provided that it is in compliance with the Georgia Stormwater Management Manual, latest edition, and design criteria for pollutant removal equivalent to those associated with wet detention ponds included in the Georgia Stormwater Management Manual, latest edition. Sec. 3.03.44. Hazardous materials handling. New facilities located within seven miles of a water supply intake that handle hazardous materials of the types and amounts listed in Section 312 of the Resource Conservation and Recovery Act of 1976 (excluding underground storage tanks) and amounts of 10,000 pounds or more on any one day shall perform their operations on impervious surfaces and in conformance with any applicable federal spill prevention requirements, the requirements of the Standard Fire Prevention Code, and local fire code requirements. Such spill and leak collections systems shall be shown on the site plan in detail and must be approved, as part of the site plan, by the enforcer. Sec. 3.03.45. Soil erosion and sedimentation control. All developments and land-disturbing activity within the Towaliga River Watershed District shall comply fully with the soil erosion and sedimentation control ordinance of the county. Sec. 3.03.46. Prohibited uses. (a) Sanitary landfills without synthetic liners and leachate collection systems. New sanitary landfills are allowed only if they have synthetic liners and leachate collection systems. (b) New hazardous waste treatment facilities. Sec. 3.03.47. Amendments. These regulations, and maps incorporated herein, may from time to time be amended in accordance with procedures and requirements in the general statutes and as new information becomes available. Sec. 3.03.48. Assessment relief. Assessors and boards of assessors shall consider requirements of these regulations in determining the fair market value of land. Sec. 3.04.00. GRAP, groundwater recharge area protection. Sec. 3.04.01. Purpose. In order to provide for the health, safety, and welfare of the public and a healthy economic climate within Butts County and surrounding communities, it is essential that the quality of public drinking water be ensured. For this reason, it is necessary to protect the subsurface water resources that Butts County and surrounding communities rely on as sources of public water. Groundwater resources are contained within underground reservoirs known as aquifers. These aquifers are zones of rock beneath the earth's surface capable of containing or producing water from a well. They occupy vast regions of the subsurface and are replenished by infiltration of surface water runoff in zones of the surface known as groundwater recharge areas. Groundwater is susceptible to contamination when unrestricted development occurs within significant groundwater recharge areas. It is, therefore, necessary to manage land use within groundwater recharge areas in order to ensure that pollution threats are minimized. Sec. 3.04.02. Establishment of the Groundwater Recharge Area Protection District. The Groundwater Recharge Area Protection (GRAP) District is hereby established which shall correspond to all lands within the jurisdiction of Butts County, Georgia, that are mapped as significant recharge areas by the Georgia Department of Natural Resources in Hydrologic Atlas 18, 1989 edition. Said map is hereby adopted and made a part of this ordinance. Determination of pollution susceptibility: Each recharge area shall be determined to have a pollution susceptibility of high, medium, or low based on the Groundwater Pollution Susceptibility Map, Hydrologic Atlas 20, 1992 edition. Said map is hereby adopted and made a part of this ordinance. Sec. 3.04.03. Protection criteria. (a) No construction may proceed on a building or manufactured home to be served by a septic tank unless the Butts County Health Department first approves the proposed septic tank installations as meeting the requirements of the Georgia Department of Human Resource for On-Site Sewage Management Manual (hereinafter DHR Manual), and sections (b) and (c) below. (b) New homes served by a septic tank/drain field system shall be on lots having minimum size limitations as follows, based on application of Table MT-1 of the DHR Manual (hereinafter DHR Table MT-1). The minimums set forth in DHR Table MT-1 may be increased further based on consideration of other factors (set forth in Sections A-F) of the DHR Manual. (1) One hundred fifty percent of the subdivision minimum lot size calculated based on application of DHR Table MT-1 if they are within a high pollution susceptibility area; (2) One hundred twenty-five percent of the subdivision minimum lot size calculated based on application of DHR Table MT-1 if they are within a medium pollution susceptibility area; or (3) One hundred ten percent of the subdivision minimum lot size calculated based on application of DHR Table MT-1 if they are within a low pollution susceptibility area. (c) New manufactured home parks served by septic tank/drain field systems shall have lots or spaces having minimum size limitations as follows, based on application of Table MT-2 of the DHR Manual (hereinafter DHR Table MT-2). The minimums set forth in DHR Table MT-2 may be increased further based on consideration of other factors (set forth in Sections A-F) of the DHR Manual. (1) One hundred fifty percent of the subdivision minimum lot or space size calculated based on application of DHR Table MT-2 if they are within a high pollution susceptibility area; (2) One hundred twenty-five percent of the subdivision minimum lot or space size calculated based on application of DHR Table MT-2 if they are within a medium pollution susceptibility area; or (3) One hundred ten percent of the subdivision minimum lot or space size calculated based on application of DHR Table MT-2 if they are within a low pollution susceptibility area. (d) New agricultural waste impoundment sites shall be lined if they are within a high pollution susceptibility area; a medium pollution susceptibility area and exceed 15 acre-feet; or a low pollution susceptibility area and exceed 50 acre-feet. As a minimum, the liner shall be constructed of compacted clay having a thickness of one foot and a vertical hydraulic conductivity of less than 5 x 10-7 cm/sec or other criteria established by the Natural Resource and Conservation Service. (e) New above-ground chemical or petroleum storage tanks, having a minimum volume of 660 gallons, shall have secondary containment for 110 percent of the volume of such tanks or 110 percent of the volume of the largest tank in a cluster of tanks. Such tanks used for agricultural purposes are exempt, provided they comply with all federal requirements. (f) New facilities that handle hazardous materials of the types listed in Section 312 of the Resource Conservation and Recovery Act of 1976 (excluding underground storage tanks) and in amounts of 10,000 pounds or more on any one day shall perform their operations on impervious surfaces and in conformance with any applicable federal spill prevention requirements and local fire code requirements. (g) Permanent stormwater infiltration basins shall not be constructed in areas having high pollution susceptibility. Sec. 3.04.04. Exemptions. Any lot of record approved prior to the adoption of this ordinance is exempt from the minimum lot size requirements contained in sections 3.04.03(b) and 3.04.03(c) of this ordinance. Sec. 3.04.05. Permit requirements and enforcement. (a) Site plans. Application for a local development permit within the Butts County Groundwater Recharge Area Protection District shall include a site plan, drawn at a scale of one inch equals 50 feet, with the following information: (1) A map of all planned excavation and fill, including calculations of the volume of cut and fill involved, and cross-sectional drawings showing existing and proposed grades. Elevations, horizontal scale, and vertical scale must be shown on the cross-sectional drawings. (2) A map of any Groundwater Recharge Area Protection District boundaries occurring within the site must be provided. This boundary may be included on other maps provided by the applicant. (3) Location, dimensions, and area of all impervious surfaces, both existing and proposed, on the site and adjacent to the site for a distance of 200 feet. (4) The orientation and distance from the boundaries of the proposed site to the nearest bank of an affected perennial stream or water body. (5) Elevations of the site and adjacent lands within 200 feet of the site at contour intervals of no greater than two feet and no greater than one foot for slopes less than or equal to two percent. (6) Location and detailed design of any spill and leak collection systems designed for the purpose of containing accidentally released hazardous or toxic materials. (7) All proposed temporary disruptions or diversions of local hydrology. (b) Activities to comply with site plan. All development activities or site work conducted after approval of the site plan shall conform with the specifications of said site plan. Significant changes to the site plan that would alter the amount and velocity of stormwater runoff from the site, increase the amount of impervious surface within the development, alter the overall density of the development, or result in a considerable increase in the amount of excavation, fill or removal of the overall appearance of the development as proposed can be amended only with the approval of the zoning administrator. Minor changes, such as the realignment of streets or minor alterations to drainage structures and other infrastructure to meet unexpected conditions, are exempted from this requirement. (c) Exemptions to site plan requirements. The following activities and developments are exempt from the requirement for detailed site plans: (1) Single-family detached homes constructed within a subdivision of fewer than five parcels. (2) Repairs to a facility that is part of a previously approved and permitted development. (3) Construction of minor structures, such as sheds or additions to single-family residences. (d) Review procedures. The application shall be made to the zoning administrator and will be reviewed within 15 days. At the time of the application, the applicant shall pay a filing fee as specified by Butts County. This fee may be used to retain expert consultants who will provide services pertaining to functional assessment, mitigation, and Butts County Groundwater Recharge Area Protection District boundary determinations, as deemed necessary by the zoning administrator. The review period shall include the preparation of findings (approval, approval with conditions, or disapproval) by the zoning administrator. The applicant will receive written notification of the findings of the zoning administrator. Decisions of the zoning administrator may be appealed to the Butts County board of appeals. (e) Duration of permit validity. (1) If construction described in the development permit has not commenced within 12 months from the date of issuance, the permit shall expire. (2) If construction described in the development permit is suspended or abandoned after work has commenced, the permit shall expire 12 months after the date that work ceased. (3) Written notice of pending expiration of the development permit shall be issued by the zoning administrator. (f) Suspension, revocation. The zoning administrator may suspend or revoke a permit if s/he finds that the applicant has not complied with the conditions or limitations set forth in the permit or has exceeded the scope of the work set forth in the permit. Sec. 3.04.06. Judicial review. (a) Jurisdiction. All final decisions of the Butts County board of appeals concerning denial, approval or conditional approval of a permit shall be reviewable in the Butts County Superior Court. (b) Alternative actions. Based on these proceedings and the decision of the Butts County Superior Court, the Butts County board of commissioners or its designee may elect to: (1) Institute negotiated purchase or condemnation proceedings to acquire an easement or fee interest in the applicant's land; or (2) Institute other appropriate actions ordered by the court that fall within the jurisdiction of the Butts County board of commissioners. Sec. 3.04.07. Amendments. These regulations, and maps incorporated herein, may from time to time be amended in accordance with procedures and requirements in the general statutes and as new information becomes available. Sec. 3.04.08. Assessment relief. Assessors and boards of assessors shall consider requirements of these regulations in determining the fair market value of land. Sec. 3.05.00. RBZ, Riparian Buffer Zone. Sec. 3.05.01. Intent and purpose. The streams and rivers of Butts County supply much of the water required by Butts County citizens for drinking and other municipal and industrial uses. The quality of the groundwater that is used for drinking, agricultural and industrial purposes in Butts County is connected with the quality of the surface water in the streams and rivers of Butts County. Furthermore, the people of Butts County use the surface waters for fishing, canoeing, and other recreational and economic purposes. The Butts County board of commissioners finds that the protection of the streams and rivers of Butts County is vital to the health, safety and economic welfare of its citizens. It is therefore the intent of this ordinance to establish a new riparian buffer zone of restricted development and limited land use adjacent to all perennial streams and rivers in Butts County. The purposes of the riparian buffer zone are: to protect public and private water supplies, to trap sediment and other pollutants in surface runoff, to promote bank stabilization, to protect riparian wetlands, to minimize the impact of floods, to prevent decreases in base flow, to protect wildlife habitat, and to generally maintain water quality. The standards and regulations set forth in this ordinance are created under the authority of Butts County's home rule and zoning powers defined in the Georgia Constitution (Article DC, Section 2). In the event of a conflict between or among any provisions of this ordinance, or any other ordinances of Butts County, the requirement that is most restrictive and protective of water quality shall apply. Sec. 3.05.02. Title. This section shall be known as "The Riparian Buffer Zone Requirements of Butts County" and may be referred to generally as "riparian buffer requirements." Sec. 3.05.03. District use and regulations. (a) The Riparian Buffer Zone (RBZ) District is an overlay district that encompasses all land within 100 feet on either side of all streams in Butts County, measured as a line extending from the stream bank. The RBZ must be maintained in a naturally vegetated state. Any property or portion thereof that lies within the RBZ is subject to the restrictions of the RBZ as well as any and all zoning restrictions that apply to the tax parcel as a whole. (b) The following land uses are prohibited within the protected area: (1) Any land-disturbing activity; (2) Septic tanks and septic tank drain fields; (3) Buildings, accessory structures, and all types of impervious surfaces; (4) Hazardous or sanitary waste landfills; (5) Receiving areas for toxic or hazardous waste or other contaminants; (6) Mining; and (7) Stormwater retention and detention facilities, except those built as constructed wetlands that met the approval of the community development department of Butts County. Sec. 3.05.04. Exceptions. (a) The following land uses are excepted from the provisions of section 3.05.03: (1) Existing land uses, except as follows: a. When the existing land use, or any building or structure involved in that use, is enlarged, increased, or extended to occupy a greater area of land; b. When the existing land use, or any building or structure involved in that use, is moved (in whole or in part) to any other portion of the property; or c. When the existing land use ceases for a period of more than one year. (2) Agricultural production, provided that it is consistent with all state and federal laws, regulations promulgated by the Georgia Department of Agriculture, and Best Management Practices established by the Georgia Soil and Water Conservation Commission. (3) Timber harvesting as promulgated by the Georgia Forestry Commission incorporating and complying with best management practices. (4) Crossings by transportation facilities and utility lines. However, issuance of permits for such uses or activities is contingent upon the completion of a feasibility study that identifies alternative routing strategies that do not violate the RBZ, as well as a mitigation plan to minimize impacts on the RBZ. (5) Temporary stream, stream bank, and vegetation restoration projects, the goal of which is to restore the stream or RBZ to an ecologically healthy state. (6) Structures which, by their nature, cannot be located anywhere except within the RBZ. These include docks, boat launches, public water supply intake structures, facilities for natural water quality treatment and purification, and public wastewater treatment plant sewer lines and outfalls. (7) Wildlife and fishery management activities consistent with the purposes of O.C.G.A. § 12-2-8 (as amended). (8) Construction of a single-family residence, including the usual appurtenances, provided that: a. Based on the size, shape or topography of the property, as of the effective date of this ordinance, it is not reasonably possible to construct a single-family dwelling without encroaching upon the RBZ; b. The dwelling conforms with all other zoning regulations; c. The dwelling is located on a tract of land containing at least two acres. For purposes of these standards, the size of the tract of land shall not include any area that lies within the protected river or stream; and d. There shall be only one such dwelling on each two-acre or larger tract of land. (9) Other uses permitted by the Georgia DNR or under Section 404 of the Clean Water Act. (b) Notwithstanding the above, all excepted uses, structures or activities shall comply with the requirements of the Erosion and Sedimentation Act of 1975 (as amended) and all applicable Best Management Practices and shall not diminish water quality as defined by the Clean Water Act. All excepted uses shall be located as far from the stream bank as reasonably possible. Sec. 3.06.00. WP, wetlands protection. Sec. 3.06.01. Purpose. The wetlands in Butts County are indispensable and fragile natural resources with significant development constraints due to flooding, erosion, and soils limitations. In their natural state, wetlands serve man and nature. They provide habitat areas for fish, wildlife and vegetation; water quality maintenance and pollution control; flood control; erosion control; natural resource education; scientific study; and open space and recreational opportunities. In addition, the wise management of forested wetlands is essential to the economic well-being of many communities within the state of Georgia. Nationally, a considerable number of these important natural resources have been lost or impaired by draining, dredging, filling, excavating, building, pollution and other acts. Piecemeal or cumulative losses will, over time, destroy additional wetlands. Damaging or destroying wetlands threatens public safety and the general welfare. The Georgia Department of Natural Resources and the Georgia Department of Community Affairs have determined that each local government with classified wetlands located in its jurisdiction must adopt a wetlands protection ordinance under the requirements of House Bill 215, Georgia's 1989 Growth Strategies Legislation and the rules promulgated thereunder. It is therefore necessary for Butts County, Georgia, to ensure maximum protection for wetlands by discouraging development activities in wetlands that may adversely affect wetlands. The purpose of this ordinance is to promote wetlands protection while taking into account varying ecological, economic development and recreational and aesthetic values. Activities that may damage wetlands should be located on upland sites to the greatest degree practicable as determined through a permitting process. The objective of this article is to protect wetlands from alterations which will significantly affect or reduce their primary functions for water quality, flood plain and erosion control, ground water recharge, aesthetic nature, and wildlife areas and to comply with the requirements of state law related to wetland protection. Sec. 3.06.02. Establishment of the Wetlands Protection District. The Wetlands Protection (WP) District is hereby established which shall correspond to all lands within the jurisdiction of Butts County, Georgia, that are mapped as wetland areas by the U.S. Fish and Wildlife Service National Wetlands Inventory Map. This map shall be referred to as the Generalized Wetlands Map and is hereby adopted by reference and declared to be a part of this ordinance, together with all explanatory matter thereon and attached thereto. The Generalized Wetlands Map does not necessarily represent the boundaries of jurisdictional wetlands within Butts County and cannot serve as a substitute for a delineation of wetland boundaries by the U.S. Army Corps of Engineers, as required by Section 404 of the Clean Water Act, as amended. Any local government action under this ordinance does not relieve the landowner from federal or state permitting requirements. Sec. 3.06.03. Protection criteria. Requirement for local permit or permission. No regulated activity will be permitted within the Wetlands Protection District without written permission or a permit from Butts County. If the area proposed for development is located within 50 feet of a Wetlands Protection District boundary, as determined by the zoning administrator using the Generalized Wetlands Map, a U.S. Army Corps of Engineers' determination shall be required. If the Corps determines that wetlands are present on the proposed development site, the local permit or permission will not be granted until a Section 404 permit or letter of permission is issued. For purposes of this section, regulated activity means any activity which will, or which may reasonably be expected to, result in the discharge of dredged or fill material into waters of the United States excepting those activities exempted in section 3.06.04 of this article and exempted in Section 404 of the Federal Clean Water Act. Sec. 3.06.04. Permitted uses. The following uses shall be allowed as of right within the Wetlands Protection District to the extent that they are not prohibited by any other ordinance or law, including laws of trespass, and provided they do not require structures, grading, fill, draining, or dredging except as provided herein. [The activities listed in this section are exempted from Section 404 regulations provided they do not have impacts on a navigable waterway that would necessitate acquisition of an individual 404 permit. However, under Section 10 of the Rivers and Harbors Act, a permit may be required in some circumstances.] (a) Operations conducted during normal silvicultural activities, including minor dredge and fill associated with road construction, harvesting, and reforestation practices provided they meet the performance standards and road construction best management practices required under Section 404 of the Clean Water Act. (b) Conservation or preservation of soil, water, vegetation, fish and other wildlife, provided it does not affect waters of Georgia or of the United States in such a way that would require an individual 404 permit. (c) Outdoor passive recreational activities, including fishing, bird watching, hiking, boating, horseback riding, and canoeing. (d) Forestry practices applied in accordance with best management practices approved by the Georgia Forestry Commission and as specified in Section 404 of the Clean Water Act. (e) The cultivation of agricultural crops. Agricultural activities shall be subject to best management practices approved by the Georgia Department of Agriculture. (f) The pasturing of livestock, provided that riparian wetlands are protected, that soil profiles are not disturbed, and that approved agricultural best management practices are followed. (g) Education, scientific research, and nature trails. (h) Temporary emergency permit. A temporary emergency permit can be issued by the county or its designee for the following reasons: (1) Maintenance or repair of lawfully located roads or structures and of facilities used in the service of the public to provide transportation, electric, gas, water, telephone, telegraph, telecommunication or other services, provided that such roads, structures, or facilities are not materially changed or enlarged and that, prior to the commencement of work, written notice has been given to the county or its designee and provided that the work is conducted using best management practices to ensure that flow and circulation patterns and chemical and biological characteristics of the wetland are not impaired and that any adverse effect on the aquatic environment will be minimized. (2) Temporary water level stabilization measures associated with silvicultural operations, provided that they are necessary to alleviate abnormally wet or dry conditions that would have an adverse impact on the conduct of silvicultural activities if not corrected. (3) Limited ditching, tilling, dredging, excavating, or filling done solely for the purpose of maintaining or repairing existing drainage systems necessary for the cultivation of agricultural crops, provided that the maintenance or repair activity does not result in the impairment, alteration, or loss of wetlands not previously subject to agricultural and silvicultural use under the terms and provisions of this section. (4) Limited excavating and filling necessary for the repair and maintenance of piers, walkways, nature trails, observation decks, wildlife management shelters, boathouses, or other similar water-related structures, provided that they are built on pilings to allow unobstructed flow of water and preserve the natural contour of the wetland. Sec. 3.06.05. Prohibited uses. The following uses are not permitted within the Wetlands Protection District: (a) Receiving areas for toxic or hazardous waste or other contaminants; or (b) Hazardous or sanitary waste landfills. Sec. 3.06.06. Permit requirements and enforcement procedures. (a) Site plans. Application for a local development permit within Butts County shall include a site plan, drawn at a scale of one inch equals 50 feet, with the following information: (1) A map of all planned excavation and fill, including calculations of the volume of cut and fill involved, and cross-sectional drawings showing existing and proposed grades. Elevations, horizontal scale, and vertical scale must be shown on the cross-sectional drawings. (2) A map of any wetland boundaries occurring within the site must be provided. This boundary may be included on other maps provided by the applicant. (3) Location, dimensions, and area of all impervious surfaces, both existing and proposed, on the site and adjacent to the site for a distance of 200 feet. (4) The orientation and distance from the boundaries of the proposed site to the nearest bank of an affected perennial stream or water body. (5) Elevations of the site and adjacent lands within 200 feet of the site at contour intervals of no greater than two feet and no greater than one foot for slopes less than or equal to two percent. (6) Location and detailed design of any spill and leak collection systems designed for the purpose of containing accidentally released hazardous or toxic materials. (7) All proposed temporary disruptions or diversions of local hydrology. (b) Activities to comply with site plan. All development activities or site work conducted after approval of the site plan shall conform to the specifications of said site plan. Significant changes to the site plan that would alter the amount and velocity of stormwater runoff from the site, increase the amount of impervious surface within the development, alter the overall density of the development, or result in a considerable increase in the amount of excavation, fill, or removal of the overall appearance of the development as proposed can be amended only with the approval of the zoning administrator. Minor changes, such as the realignment of streets or minor alterations to drainage structures and other infrastructure to meet unexpected conditions, are exempted from this requirement. (c) Exemptions to site plan requirements. The following activities and developments are exempt from the requirement for detailed site plans: (1) Single-family detached homes constructed within a subdivision of fewer than five parcels. (2) Repairs to a facility that is part of a previously approved and permitted development. (3) Construction of minor structures, such as sheds or additions to single-family residences. (d) Review procedures. The application shall be made to the zoning administrator and will be reviewed within 30 days. At the time of the application, the applicant shall pay a filing fee as specified by the Butts County fee schedule. This fee may be used to retain expert consultants who will provide services pertaining to functional assessment, mitigation, and wetland boundary determinations, as deemed necessary by the zoning administrator. The review period shall include the preparation of findings (approval, approval with conditions, or disapproval) by the zoning administrator. The applicant will receive written notification of the findings of the zoning administrator. Decisions of the zoning administrator may be appealed to the Butts County board of appeals. (e) Duration of permit validity. (1) If construction described in the development permit has not commenced within 12 months from the date of issuance, the permit shall expire. (2) If construction described in the development permit is suspended or abandoned after work has commenced, the permit shall expire 12 months after the date that work ceased. (3) Written notice of pending expiration of the development permit shall be issued by the zoning administrator. (f) Suspension, revocation. The zoning administrator may suspend or revoke a permit if s/he finds that the applicant has not complied with the conditions or limitations set forth in the permit or has exceeded the scope of the work set forth in the permit. Sec. 3.06.07. Amendments. These regulations, and maps incorporated herein, may from time to time be amended in accordance with procedures and requirements in the general statutes and as new information becomes available. Sec. 3.06.08. Assessment relief. Assessors and boards of assessors shall consider requirements of these regulations in determining the fair market value of land. Sec. 3.07.00. Aquifer recharge area protection. Sec. 3.07.01. Title of the article, findings, and objectives. (a) Title of article. This article shall be known as the Aquifer Recharge Area Protection Ordinance of Butts County, Georgia. (b) Findings of fact. In order to provide for the health, safety, and welfare of the public and a healthy economic climate within the county and surrounding communities, it is essential that the quality of public drinking water be ensured. For this reason, it is necessary to protect the subsurface water resources that Butts County, Georgia, and surrounding communities rely on as sources of public water. Groundwater resources are contained within aquifers, which are permeable, rock strata occupying vast subsurface regions. These aquifers are replenished by infiltration of stormwater runoff in zones of the surface known as aquifer recharge areas. Aquifers are susceptible to contamination when unrestricted development occurs within significant aquifer recharge areas. It is, therefore, necessary to manage land use within aquifer recharge zones in order to ensure that pollution threats are minimized. (c) Adoption of aquifer recharge protection ordinance. The Georgia Department of Natural Resources and the Georgia Department of Community Affairs have determined that each local government with "significant groundwater recharge areas" (identified on the Ground Water Pollution Susceptibility Map of Georgia Hydrologic Atlas #20) must adopt an aquifer recharge protection ordinance under the requirements of House Bill 215, Georgia's 1989 Growth Strategies Legislation and the rules promulgated thereunder. (d) Objectives. The objectives of this article are to: (1) Protect groundwater by prohibiting land uses that generate dangerous pollutants in recharge areas; (2) Protect groundwater by limiting density of development; (3) Protect groundwater by reducing adverse effects on groundwater from the development that occurs within the recharge area; and (4) Comply with the requirements of the Georgia 1989 Growth Strategies Legislation. Sec. 3.07.02. Establishment of an aquifer recharge area district. An aquifer recharge area district is hereby established which shall correspond to all lands within the jurisdiction of Butts County, Georgia, that are mapped as significant recharge areas by the Georgia Department of Natural Resources in Hydrologic Atlas 18 (1989 Edition) and are indicated as "most significant groundwater recharge areas" on the Groundwater Pollution Susceptibility Map of Georgia. Sec. 3.07.03. Determination of pollution susceptibility. Each recharge area shall be determined to have a pollution susceptibility of high, medium, or low based on the Groundwater Pollution Susceptibility Map of Georgia. Said map is hereby adopted and made a part of this article. Sec. 3.07.04. Permit requirements and enforcement. No building permit, rezoning request, or subdivision plan may be approved by Butts County or its designee unless the permit, request or plan is in compliance with the aquifer protection standards listed in section 3.07.05. (a) Enforcement. Butts County or its designee, its agent, officers, and employees shall have authority to enter upon privately-owned land for the purpose of performing their duties under this article and may take or cause to be made such examination, surveys, or sampling as Butts County or its designee deems necessary. (1) The Butts County zoning and planning department and the Butts County building inspector are hereby designated respectively as the administrator and enforcement officer for this article. (2) The County building inspector shall have authority to enforce this article; issue permits thereunder; and address violations or threatened violations thereof by issuance of violation notices, administrative orders, and civil and criminal actions. All costs, fees, and expenses in connection with such actions may be recovered as damages against the violator. (3) Law enforcement officials or other officials having police powers shall have authority to assist the county building inspector in enforcement. (4) Any person who commits, takes part in, or assists in any violation of any provision of this article shall be guilty of a misdemeanor and, upon conviction thereof, shall be punished as provided by law. Each violation of this act shall be a separate offense, and, in the case of a continuing violation, each day's continuance shall be deemed to be a separate and distinct offense. (5) The county building inspector shall have the authority to issue cease and desist orders in the event of any violation of this article. Cease and desist orders may be appealed to a court of competent jurisdiction, as identified in section 3.07.06. (6) When a building or other structure has been constructed in violation of this article, the violator shall be required to remove the structure or bring said structure into compliance with this article. (7) When removal of vegetative cover, excavation or fill has taken place in violation of this article, the violator shall be required to restore the affected land to its original contours and to restore vegetation, as far as practicable. (b) Permit review and site plan requirement. Applications for a development permit within the aquifer recharge area district shall include a site plan, with the exception of certain exempted activities identified in subsection (c) of this section. The following information is required for all site plans: (1) A map shall be drawn to a scale of one inch equals 50 feet or other appropriate scale as determined by the county, showing all planned improvements including the width, depth, and length of all existing and proposed structures, roads, water courses, and drainage ways; water, waste water, and storm water facilities; and utility installations. (2) Location, dimensions and area of all impervious surfaces, both existing and proposed, on the site. (3) The orientation and distance from the boundaries of the proposed site to the nearest bank of an affected perennial stream or water body. (4) Elevations of the site and adjacent lands within 200 feet of the site at contour intervals of no greater than five feet. (5) Location and detailed design of any spill and leak collection systems designed for the purpose of containing accidentally released hazardous or toxic materials. (6) Calculations of the amount of cut and fill proposed and cross-section drawings showing existing and proposed grades in areas of fill or excavation. Elevations, horizontal scale, and vertical scale must be shown on cross-sectional drawings. (7) Activities to comply with site plan. All development activities or site work conducted after approval of the site plan shall conform with the specifications of said site plan. Significant changes to the site plan, that would alter the amount and velocity of stormwater runoff from the site, increase the amount of impervious surface within the development, alter the overall density of development, result in a considerable increase in the amount of excavation, fill, or removal of vegetation during construction, or otherwise result in an alteration of the overall appearance of the development proposed, can be amended only with the approval of the county. Minor changes, such as realignment of other infrastructure to meet unexpected conditions, are exempted from this requirement. (c) Exemptions to site plan requirements. The following activities and developments are exempt from the requirement for detailed site plans: (1) Single-family detached homes constructed within a subdivision of fewer than five parcels. (2) Repairs to a facility that is part of a previously approved and permitted development. (3) Construction of minor structures, such as sheds, or additions to single-family residences. (d) Review procedures. The application shall be made to the county zoning administrator and will be reviewed within 60 days or in accordance with established review procedures for the type of development being constructed, whichever is greater. The review period shall include the preparation of findings (approval or disapproval) by the county zoning administrator. The applicant may request written notification of the findings of the county zoning administrator. If the review process is not completed within 60 days or in accordance with established review procedures for the type of development being considered, whichever is greater, the application is considered to be approved for the purposes of this article. Decisions of the county zoning administrator may be appealed to the Butts County board of appeals. (e) Duration of permit validity. (1) If construction described in the development permit has not commenced within 12 months from the date of issuance, the permit shall expire. (2) If construction described in the development permit is suspended or abandoned after work has commenced, the permit shall expire 12 months after the date that work ceased. (3) Written notice of pending expiration of the development permit shall be issued by the zoning administrator or designee. Sec. 3.07.05. Aquifer protection standards. (a) For all pollution susceptibility areas, new solid waste disposal facilities must have synthetic liners and leachate collection systems. (b) New agricultural waste impoundments shall meet the following requirement: For areas of low susceptibility, a SCS approved liner shall be provided if the site exceeds 50 acre-feet. (c) No land disposal of hazardous waste shall be permitted within any significant aquifer recharge area. (d) For all significant aquifer recharge areas, the handling, storage, and disposal of hazardous materials must take place on an impermeable surface having spill and leak protection approved by the Georgia Department of Natural Resources, Environmental Protection Division (EPD). (e) For all significant aquifer recharge areas, new aboveground chemical or petroleum storage tanks larger than 650 gallons must have secondary containment for 110 percent of tank volume or 110 percent of the largest tanks in a cluster of tanks. Sec. 3.07.06. Judicial review. (a) Jurisdiction. All final decisions of the county board of appeals concerning denial, approval, or conditional approval of a permit shall be reviewable in the Butts County Superior Court pursuant to chapter 10. (b) Alternative actions. Based on these proceedings and the decision of the court, the county may, within the time specified by the court, elect to: (1) Institute negotiated purchase or condemnation proceedings to acquire an easement or fee interest in the applicant's land; or (2) Institute other appropriate actions ordered by the court that fall within the jurisdiction of the county. Sec. 3.07.07. Amendments. These regulations may, from time to time, be amended in accordance with procedures and requirements in the general statutes and as new information becomes available. Sec. 3.07.08. Assessment relief. Assessors and boards of assessors shall consider the requirements of these regulations in determining the fair market value of land. Sec. 3.08.00. Soil erosion, sedimentation and pollution control. Sec. 3.08.01. Title. This article will be known as "The Butts County Soil Erosion, Sedimentation and Pollution Control Ordinance." Sec. 3.08.02. Definitions. The following definitions shall apply in the interpretation and enforcement of this article, unless otherwise specifically stated: Best management practices (BMPs) means sound conservation and engineering practices to prevent and minimize erosion and resultant sedimentation, which are consistent with, and no less stringent than, those practices contained in the Manual for Erosion and Sediment Control in Georgia published by the commission as of January 1 of the year in which the land-disturbing activity was permitted. Buffer means, for purposes of this chapter, the area of land immediately adjacent to the banks of state waters in its natural state of vegetation, which facilitates the protection of water quality and aquatic habitat. Certified personnel means a person who has successfully completed the appropriate certification course approved by the Georgia Soil and Water Conservation Commission. Commission means, for purposes of this chapter, the Georgia Soil and Water Conservation Commission (GSWCC). Design professional means a professional licensed by the State of Georgia in the field of: Engineering, architecture, landscape architecture, forestry, geology, or land surveying; or a person that is a certified professional in erosion and sediment control (CPESC) with a current certification by EnviroCert, Inc. Design professionals shall practice in a manner that complies with applicable Georgia law governing professional licensure. Director means, for purposes of this chapter, the director of the Environmental Protection Division or an authorized representative. District means, for purposes of this chapter, the Towaliga Soil and Water Conservation District. Division means, for purposes of this chapter, the Environmental Protection Division (EPD) of the Department of Natural Resources. Erosion, sedimentation and pollution control plan means a plan required by the Erosion and Sedimentation Act, O.C.G.A. Ch. 12-7, that includes, at a minimum, protections at least as stringent as the state general permit, best management practices, and requirements in section 3.08.04(c). Final stabilization means all soil-disturbing activities at the site have been completed and for unpaved areas and areas not covered by permanent structures and areas located outside the waste disposal limits of a landfill cell that has been certified by EPD for waste disposal, 100 percent of the soil surface is uniformly covered in permanent vegetation with a density of 70 percent or greater, or landscaped according to the plan (uniformly covered with landscaping materials in planned landscape areas), or equivalent permanent stabilization measures as defined in the manual (excluding a crop of annual vegetation and seeding of target crop perennials appropriate for the region). Final stabilization applies to each phase of construction. Local issuing authority means the governing authority of any county or municipality which is certified pursuant to subsection O.C.G.A. § 12-7-8(a). Nephelometric turbidity units (NTU) means numerical units of measure based upon photometric analytical techniques for measuring the light scattered by finely divided particles of a substance in suspension. This technique is used to estimate the extent of turbidity in water in which colloidally dispersed or suspended particles are present. Operator means, for purposes of this chapter, the party or parties that have: (1) Operational control of construction project plans and specifications, including the ability to make modifications to those plans and specifications; or (2) Day-to-day operational control of those activities that are necessary to ensure compliance with an erosion, sedimentation and pollution control plan for the site or other permit conditions, such as a person authorized to direct workers at a site to carry out activities required by the erosion, sedimentation and pollution control plan or to comply with other permit conditions. Properly designed means designed in accordance with the design requirements and specifications contained in the Manual for Erosion and Sediment Control in Georgia (manual) published by the Georgia Soil and Water Conservation Commission as of January 1 of the year in which the land-disturbing activity was permitted and amendments to the manual as approved by the commission up until the date of notice of intent submittal. Roadway drainage structure means a device such as a bridge, culvert, or ditch, composed of a virtually nonerodible material such as concrete, steel, plastic, or other such material that conveys water under a roadway by intercepting the flow on one side of a traveled roadway consisting of one or more defined lanes, with or without shoulder areas, and carrying water to a release point on the other side. State general permit means the National Pollution Discharge Elimination System (NPDES) general permit or permits for stormwater runoff from construction activities as is now in effect or as may be amended or reissued in the future pursuant to the state's authority to implement the same through federal delegation under the Federal Water Pollution Control Act, as amended, 33 U.S.C. 1251 et seq., O.C.G.A. § 12-5-30(f). Trout streams means all streams or portions of streams within the watershed as designated by the Wildlife Resources Division of the Georgia Department of Natural Resources under the provisions of the Georgia Water Quality Control Act, O.C.G.A. § 12-5-20, in the rules and regulations for Water Quality Control, Chapter 391-3-6 at www.gaepd.org. Streams designated as primary trout waters are defined as water supporting a self-sustaining population of rainbow, brown or brook trout. Streams designated as secondary trout waters are those in which there is no evidence of natural trout reproduction but are capable of supporting trout throughout the year. First order trout waters are streams into which no other streams flow except springs. Sec. 3.08.03. Exemptions. This article shall apply to any land-disturbing activity undertaken by any person on any land except for the following: (a) Surface mining, as the same is defined in O.C.G.A. § 12-4-72, "The Georgia Surface Mining Act of 1968"; (b) Granite quarrying and land clearing for such quarrying; (c) Such minor land-disturbing activities as home gardens and individual home landscaping, repairs, maintenance work, fences, and other related activities which result in minor soil erosion; (d) The construction of single-family residences, when such construction disturbs less than one acre and is not a part of a larger common plan of development or sale with a planned disturbance of equal to or greater than one acre and not otherwise exempted under this paragraph; provided, however, that construction of any such residence shall conform to the minimum requirements as set forth in O.C.G.A. § 12-7-6 and this paragraph. For single-family residence construction covered by the provisions of this paragraph, there shall be a buffer zone between the residence and any state waters classified as trout streams pursuant to Article 2 of Chapter 5 of the Georgia Water Quality Control Act. In any such buffer zone, no land-disturbing activity shall be constructed between the residence and the point where vegetation has been wrested by normal stream flow or wave action from the banks of the trout waters. For primary trout waters, the buffer zone shall be at least 50 horizontal feet, and no variance to a smaller buffer shall be granted. For secondary trout waters, the buffer zone shall be at least 50 horizontal feet, but the director may grant variances to no less than 25 feet. Regardless of whether a trout stream is primary or secondary, for first order trout waters, which are streams into which no other streams flow except for springs, the buffer shall be at least 25 horizontal feet, and no variance to a smaller buffer shall be granted. The minimum requirements of O.C.G.A. § 12-7- 6(b) and the buffer zones provided by this paragraph shall be enforced by the local issuing authority; (e) Agricultural operations as defined in O.C.G.A. § 1-3-3, "definitions," to include raising, harvesting or storing of products of the field or orchard; feeding, breeding or managing livestock or poultry; producing or storing feed for use in the production of livestock, including, but not limited to, cattle, calves, swine, hogs, goats, sheep, and rabbits or for use in the production of poultry, including, but not limited to, chickens, hens and turkeys; producing plants, trees, fowl, or animals; the production of aquaculture, horticultural, dairy, livestock, poultry, eggs and apiarian products; farm buildings and farm ponds; (f) Forestry land management practices, including harvesting; provided, however, that when such exempt forestry practices cause or result in land-disturbing or other activities otherwise prohibited in a buffer, as established in paragraphs (15) and (16) of section 3.08.04(c), no other land-disturbing activities, except for normal forest management practices, shall be allowed on the entire property upon which the forestry practices were conducted for a period of three years after completion of such forestry practices; (g) Any project carried out under the technical supervision of the Natural Resources Conservation Service (NRCS) of the United States Department of Agriculture; (h) Any project involving less than one acre of disturbed area; provided, however, that this exemption shall not apply to any land-disturbing activity within a larger common plan of development or sale with a planned disturbance of equal to or greater than one acre or within 200 feet of the bank of any state waters, and for purposes of this paragraph, "state waters" excludes channels and drainage ways which have water in them only during and immediately after rainfall events and intermittent streams which do not have water in them year-round; provided, however, that any person responsible for a project which involves less than one acre, which involves land-disturbing activity, and which is within 200 feet of any such excluded channel or drainage way, must prevent sediment from moving beyond the boundaries of the property on which such project is located and provided, further, that nothing contained herein shall prevent the local issuing authority from regulating any such project which is not specifically exempted by paragraphs (a), (b), (c), (d), (e), (f), (g), (i) or (j) of this section; (i) Construction or maintenance projects, or both, undertaken or financed in whole or in part, or both, by the Department of Transportation, the Georgia Highway Authority, or the state road and tollway authority; or any road construction or maintenance project, or both, undertaken by any county or municipality; provided, however, that construction or maintenance projects of the Department of Transportation or the state road and tollway authority which disturb one or more contiguous acres of land shall be subject to provisions of O.C.G.A. § 12-7-7.1; except where the Department of Transportation, the Georgia Highway Authority, or the state road and tollway authority is a secondary permittee for a project located within a larger common plan of development or sale under the state general permit, in which case a copy of a notice of intent under the state general permit shall be submitted to the local issuing authority, the local issuing authority shall enforce compliance with the minimum requirements set forth in O.C.G.A. § 12-7-6 as if a permit had been issued, and violations shall be subject to the same penalties as violations by permit holders; (j) Any land-disturbing activities conducted by any electric membership corporation or municipal electrical system or any public utility under the regulatory jurisdiction of the Public Service Commission, any utility under the regulatory jurisdiction of the Federal Energy Regulatory Commission, any cable television system as defined in O.C.G.A. § 36-18-1, or any agency or instrumentality of the United States engaged in the generation, transmission, or distribution of power; except where an electric membership corporation or municipal electrical system or any public utility under the regulatory jurisdiction of the Public Service Commission, any utility under the regulatory jurisdiction of the Federal Energy Regulatory Commission, any cable television system as defined in O.C.G.A. § 36-18-1, or any agency or instrumentality of the United States engaged in the generation, transmission, or distribution of power is a secondary permittee for a project located within a larger common plan of development or sale under the state general permit, in which case the local issuing authority shall enforce compliance with the minimum requirements set forth in O.C.G.A. § 12-7-6 as if a permit had been issued, and violations shall be subject to the same penalties as violations by permit holders; and (k) Any public water system reservoir. Sec. 3.08.04. Minimum requirements for erosion, sedimentation and pollution control using best management practices. (a) General provisions. Excessive soil erosion and resulting sedimentation can take place during land-disturbing activities if requirements of this article and the NPDES general permit are not met. Therefore, plans for those land-disturbing activities which are not exempted by this article shall contain provisions for application of soil erosion, sedimentation and pollution control measures and practices. The provisions shall be incorporated into the erosion, sedimentation and pollution control plans. Soil erosion, sedimentation and pollution control measures and practices shall conform to the minimum requirements of section 3.08.04(b) and (c). The application of measures and practices shall apply to all features of the site, including street and utility installations, drainage facilities and other temporary and permanent improvements. Measures shall be installed to prevent or control erosion, sedimentation and pollution during all stages of any land-disturbing activity in accordance with requirements of this ordinance and the NPDES general permit. (b) Minimum requirements/BMPs. (1) Best management practices as set forth in section 3.08.04(b) and (c) shall be required for all land-disturbing activities. Proper design, installation, and maintenance of best management practices shall constitute a complete defense to any action by the director or to any other allegation of noncompliance with paragraph (2) of this subsection or any substantially similar terms contained in a permit for the discharge of stormwater issued pursuant to O.C.G.A. § 12-5-30(f), the "Georgia Water Quality Control Act." As used in this subsection, the terms "proper design" and "properly designed" mean designed in accordance with the hydraulic design specifications contained in the Manual for Erosion and Sediment Control in Georgia specified in O.C.G.A. § 12-7-6(b). (2) A discharge of stormwater runoff from disturbed areas where best management practices have not been properly designed, installed, and maintained shall constitute a separate violation of any land-disturbing permit issued by a local issuing authority or of any state general permit issued by the division pursuant to O.C.G.A. § 12-5-30(f), the "Georgia Water Quality Control Act," for each day on which such discharge results in the turbidity of receiving waters being increased by more than 25 nephelometric turbidity units for waters supporting warm water fisheries or by more than ten nephelometric turbidity units for waters classified as trout waters. The turbidity of the receiving waters shall be measured in accordance with guidelines to be issued by the director. This paragraph shall not apply to any land disturbance associated with the construction of single-family homes which are not part of a larger common plan of development or sale unless the planned disturbance for such construction is equal to or greater than five acres. (3) Failure to properly design, install, or maintain best management practices shall constitute a violation of any land-disturbing permit issued by a local issuing authority or of any state general permit issued by the division pursuant to O.C.G.A. § 12-5-30(f), the "Georgia Water Quality Control Act," for each day on which such failure occurs. (4) The director may require, in accordance with regulations adopted by the board of natural resources, reasonable and prudent monitoring of the turbidity level of receiving waters into which discharges from land-disturbing activities occur. (5) The local issuing authority may set more stringent buffer requirements than stated in section 3.08.04(c)(15) and (16), in light of O.C.G.A. § 12-7-6(c). (c) The rules and regulations, ordinances, or resolutions adopted pursuant to O.C.G.A. § 12-7-1 et seq. for the purpose of governing land-disturbing activities shall require, as a minimum, protections at least as stringent as the state general permit and best management practices, including sound conservation and engineering practices to prevent and minimize erosion and resultant sedimentation, which are consistent with, and no less stringent than, those practices contained in the Manual for Erosion and Sediment Control in Georgia published by the Georgia Soil and Water Conservation Commission as of January 1 of the year in which the land-disturbing activity was permitted, as well as the following: (1) Stripping of vegetation, regrading and other development activities shall be conducted in a manner so as to minimize erosion; (2) Cut-fill operations must be kept to a minimum; (3) Development plans must conform to topography and soil type so as to create the lowest practicable erosion potential; (4) Whenever feasible, natural vegetation shall be retained, protected and supplemented; (5) The disturbed area and the duration of exposure to erosive elements shall be kept to a practicable minimum; (6) Disturbed soil shall be stabilized as quickly as practicable; (7) Temporary vegetation or mulching shall be employed to protect exposed critical areas during development; (8) Permanent vegetation and structural erosion control practices shall be installed as soon as practicable; (9) To the extent necessary, sediment in run-off water must be trapped by the use of debris basins, sediment basins, silt traps, or similar measures until the disturbed area is stabilized. As used in this paragraph, a disturbed area is stabilized when it is brought to a condition of continuous compliance with the requirements of O.C.G.A. § 12-7-1 et seq.; (10) Adequate provisions must be provided to minimize damage from surface water to the cut face of excavations or the sloping of fills; (11) Cuts and fills may not endanger adjoining property; (12) Fills may not encroach upon natural watercourses or constructed channels in a manner so as to adversely affect other property owners; (13) Grading equipment must cross flowing streams by means of bridges or culverts except when such methods are not feasible, provided, in any case, that such crossings are kept to a minimum; (14) Land-disturbing activity plans for erosion, sedimentation and pollution control shall include provisions for treatment or control of any source of sediments and adequate sedimentation control facilities to retain sediments on site or preclude sedimentation of adjacent waters beyond the levels specified in section 3.08.04(b)(2); (15) Except as provided in paragraph (16) of this subsection, there is established a 25-foot buffer along the banks of all state waters, as measured horizontally from the point where vegetation has been wrested by normal stream flow or wave action, except where the director determines to allow a variance that is at least as protective of natural resources and the environment, where otherwise allowed by the director pursuant to O.C.G.A. § 12-2-8, where a drainage structure or a roadway drainage structure must be constructed, provided that adequate erosion control measures are incorporated in the project plans and specifications, and are implemented; or along any ephemeral stream. As used in this provision, the term "ephemeral stream" means a stream that under normal circumstances has water flowing only during and for a short duration after precipitation events; that has the channel located above the ground-water table year round; for which ground water is not a source of water; and for which runoff from precipitation is the primary source of water flow. Unless exempted as along an ephemeral stream, the buffers of at least 25 feet established pursuant to Part 6 of Article 5, Chapter 5 of Title 12, the "Georgia Water Quality Control Act," shall remain in force unless a variance is granted by the director as provided in this paragraph. The following requirements shall apply to any such buffer: a. No land-disturbing activities shall be conducted within a buffer, and a buffer shall remain in its natural, undisturbed state of vegetation until all landdisturbing activities on the construction site are completed. Once the final stabilization of the site is achieved, a buffer may be thinned or trimmed of vegetation as long as a protective vegetative cover remains to protect water quality and aquatic habitat and a natural canopy is left in sufficient quantity to keep shade on the stream bed; provided, however, that any person constructing a single-family residence, when such residence is constructed by or under contract with the owner for his or her own occupancy, may thin or trim vegetation in a buffer at any time as long as protective vegetative cover remains to protect water quality and aquatic habitat and a natural canopy is left in sufficient quantity to keep shade on the stream bed; and b. The buffer shall not apply to the following land-disturbing activities, provided that they occur at an angle, as measured from the point of crossing, within 25 degrees of perpendicular to the stream; cause a width of disturbance of not more than 50 feet within the buffer; and adequate erosion control measures are incorporated into the project plans and specifications and are implemented: 1. Stream crossings for water lines; or 2. Stream crossings for sewer lines; and (16) There is established a 50-foot buffer as measured horizontally from the point where vegetation has been wrested by normal stream flow or wave action along the banks of any state waters classified as trout streams pursuant to Article 2 of Chapter 5 of Title 12, the "Georgia Water Quality Control Act," except where a roadway drainage structure must be constructed; provided, however, that small springs and streams classified as trout streams which discharge an average annual flow of 25 gallons per minute or less shall have a 25-foot buffer or they may be piped, at the discretion of the landowner, pursuant to the terms of a rule providing for a general variance promulgated by the Board of Natural Resources, so long as any such pipe stops short of the downstream landowner's property and the landowner complies with the buffer requirement for any adjacent trout streams. The director may grant a variance from such buffer to allow land-disturbing activity, provided that adequate erosion control measures are incorporated in the project plans and specifications and are implemented. The following requirements shall apply to such buffer: a. No land-disturbing activities shall be conducted within a buffer, and a buffer shall remain in its natural, undisturbed, state of vegetation until all landdisturbing activities on the construction site are completed. Once the final stabilization of the site is achieved, a buffer may be thinned or trimmed of vegetation as long as a protective vegetative cover remains to protect water quality and aquatic habitat and a natural canopy is left in sufficient quantity to keep shade on the stream bed: provided, however, that any person constructing a single-family residence, when such residence is constructed by or under contract with the owner for his or her own occupancy, may thin or trim vegetation in a buffer at any time as long as protective vegetative cover remains to protect water quality and aquatic habitat and a natural canopy is left in sufficient quantity to keep shade on the stream bed; and b. The buffer shall not apply to the following land-disturbing activities, provided that they occur at an angle, as measured from the point of crossing, within 25 degrees of perpendicular to the stream; cause a width of disturbance of not more than 50 feet within the buffer; and adequate erosion control measures are incorporated into the project plans and specifications and are implemented: 1. Stream crossings for water lines; or 2. Stream crossings for sewer lines. (d) Nothing contained in O.C.G.A. § 12-7-1 et seq. shall prevent any local issuing authority from adopting rules and regulations, ordinances, or resolutions which contain stream buffer requirements that exceed the minimum requirements in section 3.08.04(b) and (c). (e) The fact that land-disturbing activity for which a permit has been issued results in injury to the property of another shall neither constitute proof of nor create a presumption of a violation of the standards provided for in this article or the terms of the permit. Sec. 3.08.05. Application/permit process. (a) General. The property owner, developer and designated planners and engineers shall design and review before submittal the general development plans. The local issuing authority shall review the tract to be developed and the area surrounding it. They shall consult the zoning ordinance, stormwater management ordinance, subdivision ordinance, flood damage prevention ordinance, this article, and any other ordinances, rules, regulations or permits which regulate the development of land within the jurisdictional boundaries of the local issuing authority. However, the owner and/or operator are the only parties who may obtain a permit. (b) Application requirements. (1) No person shall conduct any land-disturbing activity within the jurisdictional boundaries of the county without first obtaining a permit from the Butts County community development department to perform such activity and providing a copy of notice of intent submitted to EPD if applicable. (2) The application for a permit shall be submitted to the Butts County community development department and must include the applicant's erosion, sedimentation and pollution control plan with supporting data, as necessary. Said plans shall include, as a minimum, the data specified in section 3.08.05(c). Erosion, sedimentation and pollution control plans, together with supporting data, must demonstrate affirmatively that the land-disturbing activity proposed will be carried out in such a manner that the provisions of section 3.08.04(b) and (c) will be met. Applications for a permit will not be accepted unless accompanied by two copies of the applicant's erosion, sedimentation and pollution control plans. All applications shall contain a certification stating that the plan preparer or the designee thereof visited the site prior to creation of the plan in accordance with EPD Rule 391-3-7-.10. (3) In addition to the local permitting fees, fees will also be assessed pursuant to paragraph (5) subsection (a) of O.C.G.A. § 12-5-23, provided that such fees shall not exceed $80.00 per acre of land-disturbing activity, and these fees shall be calculated and paid by the primary permittee as defined in the state general permit for each acre of land-disturbing activity included in the planned development or each phase of development. All applicable fees shall be paid prior to issuance of the landdisturbance permit. In a jurisdiction that is certified pursuant to O.C.G.A. § 12-7- 8(a), half of such fees levied shall be submitted to the division; except that any and all fees due from an entity which is required to give notice pursuant to O.C.G.A. § 12-7-17(9) or (10) shall be submitted in full to the division, regardless of the existence of a local issuing authority in the jurisdiction. (4) Immediately upon receipt of an application and plan for a permit, the local issuing authority shall refer the application and plan to the district for its review and approval or disapproval concerning the adequacy of the erosion, sedimentation and pollution control plan. The district shall approve or disapprove a plan within 35 days of receipt. Failure of the district to act within 35 days shall be considered an approval of the pending plan. The results of the district review shall be forwarded to the local issuing authority. No permit will be issued unless the plan has been approved by the district and any variances required by section 3.08.04(c)(15) and (16) have been obtained, all fees have been paid, and bonding, if required as per section 3.08.05(b)(6), has been obtained. Such review will not be required if the local issuing authority and the district have entered into an agreement which allows the local issuing authority to conduct such review and approval of the plan without referring the application and plan to the district. The local issuing authority with plan review authority shall approve or disapprove a revised plan submittal within 35 days of receipt. Failure of the local issuing authority with plan review authority to act within 35 days shall be considered an approval of the revised plan submittal. (5) If a permit applicant has had two or more violations of previous permits, this section, or the Erosion and Sedimentation Act, as amended, within three years prior to the date of filing the application under consideration, the local issuing authority may deny the permit application. (6) The local issuing authority may require the permit applicant to post a bond in the form of government security, cash, irrevocable letter of credit, or any combination thereof up to, but not exceeding, $3,000.00 per acre or fraction thereof of the proposed land-disturbing activity, prior to issuing the permit. If the applicant does not comply with this section or with the conditions of the permit after issuance, the local issuing authority may call the bond or any part thereof to be forfeited and may use the proceeds to hire a contractor to stabilize the site of the land-disturbing activity and bring it into compliance. These provisions shall not apply unless there is in effect an ordinance or statute specifically providing for hearing and judicial review of any determination or order of the local issuing authority with respect to alleged permit violations. (c) Plan requirements. (1) Plans must be prepared to meet the minimum requirements as contained in section 3.08.04(b) and (c), or through the use of more stringent, alternate design criteria which conform to sound conservation and engineering practices. The Manual for Erosion and Sediment Control in Georgia is hereby incorporated by reference into this article. The plan for the land-disturbing activity shall consider the interrelationship of the soil types, geological and hydrological characteristics, topography, watershed, vegetation, proposed permanent structures including roadways, constructed waterways, sediment control and storm water management facilities, local ordinances and state laws. Maps, drawings and supportive computations shall bear the signature and seal of the certified design professional. Persons involved in land development design, review, permitting, construction, monitoring, or inspections or any land-disturbing activity shall meet the education and training certification requirements, dependent on his or her level of involvement with the process, as developed by the commission and in consultation with the division and the stakeholder advisory board created pursuant to O.C.G.A. § 12-7-20. (2) Data required for site plan shall include all the information required from the appropriate erosion, sedimentation and pollution control plan review checklist established by the commission as of January 1 of the year in which the landdisturbing activity was permitted. (d) Permits. (1) Permits shall be issued or denied as soon as practicable but in any event not later than 45 days after receipt by the local issuing authority of a completed application, providing variances and bonding are obtained, where necessary, and all applicable fees have been paid prior to permit issuance. The permit shall include conditions under which the activity may be undertaken. (2) No permit shall be issued by the local issuing authority unless the erosion, sedimentation and pollution control plan has been approved by the district and the local issuing authority has affirmatively determined that the plan is in compliance with this article, any variances required by section 3.08.04(c)(15) and (16) are obtained, bonding requirements, if necessary, as per section 3.08.05(b)(6) are met, and all ordinances and rules and regulations in effect within the jurisdictional boundaries of the local issuing authority are met. If the permit is denied, the reason for denial shall be furnished to the applicant. (3) Any land-disturbing activities by a local issuing authority shall be subject to the same requirements of this ordinance, and any other ordinances relating to land development, as are applied to private persons, and the division shall enforce such requirements upon the local issuing authority. (4) If the tract is to be developed in phases, then a separate permit shall be required for each phase. (5) The permit may be suspended, revoked, or modified by the local issuing authority, as to all or any portion of the land affected by the plan, upon finding that the holder or his successor in the title is not in compliance with the approved erosion and sedimentation control plan or that the holder or his successor in title is in violation of this article. A holder of a permit shall notify any successor in title to him as to all or any portion of the land affected by the approved plan of the conditions contained in the permit. (6) The local issuing authority may reject a permit application if the applicant has had two or more violations of previous permits or the Erosion and Sedimentation Act permit requirements within three years prior to the date of the application, in light of O.C.G.A. § 12-7-7(f)(1). (7) No permit shall be issued unless the applicant provides a statement by the tax commissioner's office certifying that all ad valorem taxes levied against the property and due and owing have been paid. Sec. 3.08.06. Inspection and enforcement. (a) The Butts County community development department will periodically inspect the sites of land-disturbing activities for which permits have been issued to determine if the activities are being conducted in accordance with the plan and if the measures required in the plan are effective in controlling erosion and sedimentation. Also, the local issuing authority shall regulate primary, secondary and tertiary permittees as such terms are defined in the state general permit. Primary permittees shall be responsible for installation and maintenance of best management practices where the primary permittee is conducting land-disturbing activities. Secondary permittees shall be responsible for installation and maintenance of best management practices where the secondary permittee is conducting land-disturbing activities. Tertiary permittees shall be responsible for installation and maintenance where the tertiary permittee is conducting land-disturbing activities. If, through inspection, it is deemed that a person engaged in land-disturbing activities as defined herein has failed to comply with the approved plan, with permit conditions, or with the provisions of this article, a written notice to comply shall be served upon that person. The notice shall set forth the measures necessary to achieve compliance and shall state the time within which such measures must be completed. If the person engaged in the land-disturbing activity fails to comply within the time specified, he shall be deemed in violation of this article. (b) The local issuing authority must amend its ordinances to the extent appropriate within 12 months of any amendments to the Erosion and Sedimentation Act of 1975. (c) The Butts County community development department shall have the power to conduct such investigations as it may reasonably deem necessary to carry out duties as prescribed in this article, and for this purpose to enter at reasonable times upon any property, public or private, for the purpose of investigation and inspecting the sites of land-disturbing activities. (d) No person shall refuse entry or access to any authorized representative or agent of the local issuing authority, the commission, the district, or division who requests entry for the purposes of inspection, and who presents appropriate credentials, nor shall any person obstruct, hamper or interfere with any such representative while in the process of carrying out his official duties. (e) The district or the commission or both shall semi-annually review the actions of counties and municipalities which have been certified as local issuing authorities pursuant to O.C.G.A. § 12-7-8(a). The district or the commission or both may provide technical assistance to any county or municipality for the purpose of improving the effectiveness of the county's or municipality's erosion, sedimentation and pollution control program. The district or the commission shall notify the division and request investigation by the division if any deficient or ineffective local program is found. (f) The division may periodically review the actions of counties and municipalities which have been certified as local issuing authorities pursuant to O.C.G.A. § 12-7-8(a). Such review may include, but shall not be limited to, review of the administration and enforcement of a governing authority's ordinance and review of conformance with an agreement, if any, between the district and the governing authority. If such review indicates that the governing authority of any county or municipality certified pursuant to O.C.G.A. § 12-7-8(a) has not administered or enforced its ordinances or has not conducted the program in accordance with any agreement entered into pursuant to O.C.G.A. § 12-7-7(e), the division shall notify the governing authority of the county or municipality in writing. The governing authority of any county or municipality so notified shall have 90 days within which to take the necessary corrective action to retain certification as a local issuing authority. If the county or municipality does not take necessary corrective action within 90 days after notification by the division, the division shall revoke the certification of the county or municipality as a local issuing authority. Sec. 3.08.07. Penalties and incentives. (a) Failure to obtain a permit for land-disturbing activity. If any person commences any land-disturbing activity requiring a land-disturbing permit as prescribed in this article without first obtaining said permit, the person shall be subject to revocation of his business license, work permit or other authorization for the conduct of a business and associated work activities within the jurisdictional boundaries of the local issuing authority. (b) Stop-work orders. (1) For the first and second violations of the provisions of this article, the director or the local issuing authority shall issue a written warning to the violator. The violator shall have five days to correct the violation. If the violation is not corrected within five days, the director or the local issuing authority shall issue a stop-work order requiring that land-disturbing activities be stopped until necessary corrective action or mitigation has occurred; provided, however, that if the violation presents an imminent threat to public health or waters of the state or if the land-disturbing activities are conducted without obtaining the necessary permit, the director or the local issuing authority shall issue an immediate stop-work order in lieu of a warning; (2) For a third and each subsequent violation, the director or the local issuing authority shall issue an immediate stop-work order; and (3) All stop-work orders shall be effective immediately upon issuance and shall be in effect until the necessary corrective action or mitigation has occurred; (4) When a violation in the form of taking action without a permit, failure to maintain a stream buffer, or significant amounts of sediment, as determined by the local issuing authority or by the director or his or her designee, have been or are being discharged into state waters and where best management practices have not been properly designed, installed, and maintained, a stop-work order shall be issued by the local issuing authority or by the director or his or her designee. All such stop-work orders shall be effective immediately upon issuance and shall be in effect until the necessary corrective action or mitigation has occurred. Such stop-work orders shall apply to all land-disturbing activity on the site with the exception of the installation and maintenance of temporary or permanent erosion and sediment controls. (c) Bond forfeiture. If, through inspection, it is determined that a person engaged in land-disturbing activities has failed to comply with the approved plan, a written notice to comply shall be served upon that person. The notice shall set forth the measures necessary to achieve compliance with the plan and shall state the time within which such measures must be completed. If the person engaged in the land-disturbing activity fails to comply within the time specified, he shall be deemed in violation of this ordinance and, in addition to other penalties, shall be deemed to have forfeited his performance bond, if required to post one under the provisions of section 3.08.05(b)(6). The local issuing authority may call the bond or any part thereof to be forfeited and may use the proceeds to hire a contractor to stabilize the site of the land-disturbing activity and bring it into compliance. (d) Monetary penalties. Any person who violates any provisions of this article, or any permit condition or limitation established pursuant to this article, or who negligently or intentionally fails or refuses to comply with any final or emergency order of the director issued as provided in this article shall be liable for a civil penalty not to exceed $2,500.00 per day. For the purpose of enforcing the provisions of this article, notwithstanding any provisions in any city charter to the contrary, municipal courts shall be authorized to impose a penalty not to exceed $2,500.00 for each violation. Notwithstanding any limitation of law as to penalties which can be assessed for violations of county ordinances, any magistrate court or any other court of competent jurisdiction trying cases brought as violations of this article under county ordinances approved under this article shall be authorized to impose penalties for such violations not to exceed $2,500.00 for each violation. Each day during which violation or failure or refusal to comply continues shall be a separate violation. Sec. 3.08.08. Education and certification. (a) Persons involved in land development design, review, permitting, construction, monitoring, or inspection or any land-disturbing activity shall meet the education and training certification requirements, dependent on their level of involvement with the process, as developed by the commission in consultation with the division and the stakeholder advisory board created pursuant to O.C.G.A. § 12-7-20. (b) For each site on which land-disturbing activity occurs, each entity or person acting as either a primary, secondary, or tertiary permittee, as defined in the state general permit, shall have as a minimum one person who is in charge of erosion and sedimentation control activities on behalf of said entity or person and meets the applicable education or training certification requirements developed by the commission present on site whenever landdisturbing activities are conducted on that site. A project site shall herein be defined as any land-disturbance site or multiple sites within a larger common plan of development or sale permitted by an owner or operator for compliance with the state general permit. (c) Persons or entities involved in projects not requiring a state general permit but otherwise requiring certified personnel on site may contract with certified persons to meet the requirements of this ordinance. (d) If a state general permittee who has operational control of land-disturbing activities for a site has met the certification requirements of O.C.G.A. § 12-7-19(b)(1), then any person or entity involved in land-disturbing activity at that site and operating in a subcontractor capacity for such permittee shall meet those educational requirements specified in O.C.G.A § 12-7-19(b)(4) and shall not be required to meet any educational requirements that exceed those specified in said paragraph. Sec. 3.08.09. Administrative appeal judicial review. (a) Administrative remedies. The suspension, revocation, modification or grant with condition of a permit by the local issuing authority upon finding that the holder is not in compliance with the approved erosion, sediment and pollution control plan; that the holder is in violation of permit conditions; or that the holder is in violation of any ordinance shall entitle the person submitting the plan or holding the permit to a hearing before the board of appeals within 30 days after receipt by the local issuing authority of written notice of appeal. (b) Judicial review. Any person, aggrieved by a decision or order of the local issuing authority, after exhausting his administrative remedies, shall have the right to appeal to the Superior Court of Butts County. Sec. 3.08.10. Validity and liability. (a) Validity. If any section, paragraph, clause, phrase, or provision of this article shall be adjudged invalid or held unconstitutional, such decisions shall not affect the remaining portions of this article. (b) Liability. (1) Neither the approval of a plan under the provisions of this article nor the compliance with provisions of this article shall relieve any person from the responsibility for damage to any person or property otherwise imposed by law nor impose any liability upon the local issuing authority or district for damage to any person or property. (2) The fact that a land-disturbing activity for which a permit has been issued results in injury to the property of another shall neither constitute proof of nor create a presumption of a violation of the standards provided for in this ordinance or the terms of the permit. (3) No provision of this article shall permit any persons to violate the Georgia Erosion and Sedimentation Act of 1975, the Georgia Water Quality Control Act or the rules and regulations promulgated and approved thereunder or pollute any waters of the state as defined thereby. Sec. 3.09.00. Tree and vegetation protection. Sec. 3.09.01. Purpose. The purpose of this section is to provide for the protection, conservation, and replacement of trees and landscaping in order to improve the urbanized and natural environment of Butts County. It is the policy of Butts County to minimize the removal of trees on development sites and, upon proper site completion, achieve replacement of trees by uniform standards set forth in this section. Sec. 3.09.02. Applicability. (a) The terms and provisions of this section and the standards set forth shall apply to: (1) Individuals engaged in any activity, private and/or governmental, on real property which requires the issuance of a land disturbance permit within the county. (2) Individuals engaged in the building and/or development of single-family homes or subdivisions, multifamily and manufactured home developments, and all nonresidential uses. (3) Owners of individual properties more than five acres in size and which are not part of a platted subdivision. (b) Nothing in this section shall be construed to allow the removal of any tree or vegetation in a required stream buffer, watershed buffer, buffer adjacent to waters of the state, or other undisturbed or planted buffer located for protection of natural resources, except where such removal has been specifically authorized as set forth in this UDO. Sec. 3.09.03. Specific requirements for timber lands. (a) Land that is used for silviculture shall comply with the requirements of subsection 3.09.03(b) or subsection 3.09.03(c), below. (b) Land that is declared silviculture shall be exempt from the requirements for tree protection provided that the following conditions are met: (1) A certificate from the tax assessor indicating agricultural preference; (2) A forest management plan, demonstrating compliance with the erosion control standards set forth in section 3.08.00; and (3) A commitment to follow the Georgia Forestry Commission's "Best Management Practices" as set forth in paragraph (e), below. (c) Land that has been designated silviculture may subsequently be developed, provided that a development plan has been prepared and approved by the zoning administrator prior to any clearing, grading, clear-cutting, or other land disturbance. The purpose of the development plan is to ensure that cutting or harvesting of trees occurs in such a manner as to avoid the practice called "clear-cutting" prior to any subsequent development. (d) Prior to clearing, harvesting, or cutting trees, or any grading or land disturbance, a combined timbering and logging permit shall be obtained from the county. The development plan shall include a forest management plan for the timberlands site. The management plan shall demonstrate compliance with erosion control standards set forth in section 3.08.00, protection of soil and water resources, and compliance with best management practices. (e) Georgia Forestry Commission's "Best Management Practices" (BMPs) include, but are not limited to: (1) Analyze and plan site preparation, taking into account all aspects of streamside management zones. (2) Avoid the cutting of roads or trails unless absolutely necessary. If roads/trails are necessary, do not locate them on ridge-tops and avoid use of soft roads/trails during wet ground conditions. (3) Avoid harrowing, root raking, or bulldozing. (4) When forestry activities are completed for a particular period of time, temporary access roads shall be retired. This includes reshaping, mulching, and seeding, in combination with water bars. (5) Leave logging debris on exposed soil, dry washes, and at points of concentrated drainage from skid trails and road. Do not pile debris in live or wet-weather streams. (6) Do not service logging equipment where it will have an impact on soil or water quality. (7) Skidding on steep slopes shall be done on a gradual grade rather than straight up the slope, and skidding shall be alternated between several skidding trails to minimize soil exposure and disturbance. (f) In addition to the BMPs set forth above and by the Georgia Forestry Commission, the property owner shall not conduct any other land-disturbing activities for a period of three years after the completion of such forestry practices. Sec. 3.09.04. Exemptions. The following situations are exempt from the provisions of section 3.09.00: (a) Individual homeowners within platted subdivisions. The exemption does not include an exemption from requirements for protective buffers along streams, creeks, and reservoirs. (b) All properties for which a covenant has been established with the Butts County board of tax assessors, pursuant to O.C.G.A. §§ 48-5-7.1 and 48-5-7.4, shall be exempt from the terms of this section so long as such covenant has not been breached and/or remains in effect. (c) The following situations within all residential districts shall also be exempted: (1) Where the addition to a principal structure will constitute structural and exterior changes to the home. (2) Where the construction of an accessory structure(s) and/or uses including, but not limited to, swimming pools and tennis courts, is permitted, including an accessory residential living facility (a.k.a. guest quarters). (3) The removal of diseased, deceased, infested or dying trees, or living pine trees or other trees which may pose a danger to an existing or proposed home, or other structure. (4) Mass grading is allowed for lots 10,890 square feet or smaller. Sec. 3.09.05. Requirements in all zoning districts. (a) The mass grading and/or clear-cutting of properties and/or parcels of land which are five acres in size or greater for residential development is strictly prohibited, except as noted in subsection 3.09.04(c). As to each such development, only so much land area shall be cleared as is necessary for the development and construction of roadways, utilities, and amenity areas (i.e., parking lots for clubhouses, pool areas, tennis courts, etc.). (b) Mass grading and clear-cutting of any lot in a residential subdivision are prohibited, except as noted in subsection 3.09.04(c). On such lots, land area shall be cleared only as is necessary for purposes of the proper development of said lot. Clearing shall be limited to the specific development and an area not to exceed ten feet from the specific development, including areas for: (1) The placement of the individual home; (2) The placement of driveways and sidewalks; (3) The placement of utilities and detention ponds; (4) The placement of septic systems; (5) The placement of roads; (6) The placement of decks and patios; and (7) Proper drainage as required by the county. (c) Developers and builders shall coordinate the location of all utilities with all utility companies in order to prevent root damage within the critical root zones of protected trees, so as to minimize damage to trees in the protected zones. (d) Topographical difficulties and/or the installation of utilities shall be considered at the time of the development of a residential subdivision or parcel. Each parcel of land shall be considered on a case-by-case basis as to the removal of trees where topography and/or utility installation is a factor. Special consideration should be given to maintaining the natural topography of the land when possible, and to applying existing trees to the development of a site. The zoning administrator shall have final approval of the site. Failure to follow the approved development plan shall result in denial of the issuance of a certificate of occupancy. (e) Unnecessary removal of trees or other vegetation shall be prohibited. The planting of grass or other ground covers shall not supersede the requirement for trees as indicated by each zoning district. (f) Efforts should be taken to preserve existing trees, especially those trees which are eight inches dbh or larger and which are of a considerable age but not dying or diseased. The preservation of large specimen trees is encouraged. (g) It is desirable that planted trees be ecologically compatible with the site and neighborhood. (h) Replacement trees shall be planted in a manner that will provide adequate space for nourishment, light, and maturation. Sec. 3.09.06. Protection of trees during construction. Methods and standards for tree protection shall be required as follows: (a) Trees identified to be preserved and/or planted, and being counted as credit for meeting the requirements of section 3.09.00, shall have a valid, recognizable method of tree-protection (tree-save) marking or delineation installed at the critical root zones. (b) No person engaged in the construction of any structure(s) or improvement(s) shall encroach on a designated tree-save/critical root zone area with heavy machinery or the storage of heavy building materials. (c) During construction, a tree-save area must be designated around any trees that are to remain at the end of construction. Desirable trees should be identified and a physical barrier set up around the tree or group of trees. This barrier can consist of a four-foot high orange safety fence, wide plastic caution tape, a simple fence made of lumber, or other appropriate methods that can identify the noninvasive drip line area. (d) The barrier should be placed beyond the drip zone (critical root zone) and should prevent the stockpiling of soil or building materials, dumping cleaning solvents, or parking vehicles or equipment within this barricaded area. CHAPTER 4 SITE DESIGN STANDARDS Sec. 4.00.00. Generally. Sec. 4.00.01. Purpose. The purpose of this chapter is to provide design standards applicable to all development activity within the county. This chapter also provides design standards applicable in specific situations, such as development within overlay districts or development of specific uses that require additional standards to address potential impacts. Sec. 4.00.02. Development standards in general. (a) Suitability of land. Land on which there is a danger to health, safety, or property should not be platted for residential use or other use that will continue or increase such danger when practicable, unless such hazards can be and are corrected. Examples of such conditions are as follows: (1) Land subject to flooding, improper drainage, or erosion. (2) Land with excessive slope or other physical constraints which make it unsuitable for development. (b) Name of subdivision. The name of the subdivision must have the approval of the planning and zoning commission. The name must not duplicate or closely approximate the name of an existing subdivision. (c) Access. Except where expressly provided herein, access to every subdivision must be provided over a public street, and every lot within a subdivision must be served by a publicly dedicated street or a private street approved by the planning and zoning commission. (d) Conformance with adopted land use plan. Proposed subdivisions should conform with the adopted Butts County land use plan and development policies in effect at the time of submission to the planning and zoning commission. When features of the Butts County land use plan such as sites for schools, public buildings, parks, major streets, or other public uses are located in whole or in part in a proposed subdivision, such features should be either dedicated or reserved by the subdivider for acquisition within a reasonable time by the appropriate public agency. (e) Reservation or dedication of public use areas. (1) Reservation of plan features. Where the features of the Butts County land use plan such as sites for schools, public buildings, parks, major streets, or other public uses are located in whole or in part in a proposed subdivision, such features must be reserved by the subdivider. However, no more than ten percent of the total area of the subdivision will be required for reservation to fulfill this requirement. Whenever the land required for such plan features is not purchased, acquired, optioned, or condemned by the appropriate public agency within a two-year period from the date of recording of the subdivision or by the time that at least 75 percent of the lots are built on and occupied, whichever is sooner, the subdivider may claim the original reservation and subdivide it in a manner that meets the requirements of this ordinance. Whenever a public body responsible for land acquisition executes a written release stating that the reserved land is not to be acquired, the planning and zoning commission will waive the reservation requirements. (2) Reservation omissions. The planning and zoning commission will not approve a subdivision plat when features specified in the Butts County land use plan are not incorporated into the subdivision plat and the reservation requirements for such features have not been waived. (3) Unsuitable reservations. Whenever the planning and zoning commission finds that a proposed reservation or dedication of land for public use is not suitable for such public use, it may require the rearrangement of lots to provide suitable land for public use. (4) Unnecessary reservations. Whenever the planning and zoning commission finds that a proposed reservation or dedication of land for public use is not necessary, it may permit the rearrangement of lots to eliminate the area proposed for such public use. (f) Planned developments. A planned development, including large-scale construction of housing units, streets, and off-street parking facilities, may be approved in accordance with the requirements for planned developments set forth in this ordinance. If the design of the project does not include standard streets, lots, or subdivision arrangements, departure from the normal requirements of this ordinance may be permitted if such deviations are consistent with the intent of this ordinance or are permitted in the requirements for planned developments set forth in this ordinance. If a planned development is to be phased, then each phase shall require a separate application and approval. The developer of such a proposal is urged to consult early with the planning and zoning commission to coordinate, plan, and plat properly. (g) Community assets. In all subdivisions, due regard must be shown for all natural features such as large trees, watercourses, historical sites, and similar community assets which will add attractiveness and value to the property if preserved. Sec. 4.00.03. Principles of site design and development. Development design shall first take into account the protection of environmental and natural resources as set forth in chapter 3. All development shall be designed to avoid unnecessary impervious surface cover; to provide adequate access to lots and sites; and to avoid adverse effects of shadow, glare, noise, odor, traffic, drainage, and utilities on surrounding properties. Sec. 4.00.04. Applicability. The design standards set forth in this chapter apply to all development in unincorporated Butts County. Sec. 4.01.00. Site design standards for base zoning districts. Sec. 4.01.01. Development standards for subdivision lots. All subdivision lots established in Butts County must comply with the development standards contained in this ordinance. However, where provisions of the zoning ordinance apply and are stricter, those provisions take precedence. Development standards for lots are as follows: (a) Lot lines. As far as practical, side lot lines must be perpendicular or radial to street lines. (b) Jurisdictional limits and lot lines. Subdivision lots must not be divided by city or county boundary lines. (c) Lot frontage arrangements. Land must be subdivided in a manner that provides each lot in the subdivision with direct abutting access to an existing public street or to an approved private street contained within the proposed subdivision. Each lot must front for at least 60 feet upon an approved street or road. Flag lots are prohibited in subdivisions unless topographic conditions or the shape and orientation of the property to be subdivided make the inclusion of some flag lots necessary. Flag lots are not intended to provide access to other properties so as to circumvent the street and right-of-way requirements of this ordinance. When such a lot is allowed, the street frontage of each panhandle access must be at least 60 feet wide and no more than 500 feet long. No more than two such panhandle access points may abut each other or be closer than 1,000 feet apart. A flag lot is intended only to provide a means of using the rear portion of an extremely deep tract of land for residential purposes. (d) Adequate building sites. Each subdivision lot must contain an adequate building site not subject to flooding and outside the limits of existing easements or building setback lines required by this ordinance or any existing ordinance as is appropriate. (e) Double or reverse frontage lots. Double and reverse frontage lots, unless required by the planning and zoning commission, are prohibited except where essential to provide separation of residential development from traffic arteries or to overcome specific disadvantages of slope, orientation, or property size. A reserve strip planted with a vegetative screen across which there is no right of access may be required along the line of lots abutting a traffic artery or other such incompatible use. (f) Commercial and industrial lots. Size, shape, and arrangement of commercial and industrial lots, where platted and classified as a subdivision, are subject to the approval of the planning and zoning commission. (g) Lot remnants. Lot remnants are prohibited. Such remnant areas must be added to adjacent lots, rather than remain as unusable parcels. (h) Monuments. Solid steel rods at least one-half inch in diameter or square and two feet long must be set at all street corners, at all points where street lines intersect the exterior boundaries of the subdivision, at angle points in streets, at points of curve in streets, and at points of change of direction in the exterior boundaries of the subdivision. The top of the monument must have an indented cross to identify the finished grade. All other lot corners must be marked with solid steel rods no less than one-half inch in diameter, and at least two feet long, driven so as to be flush with the finished grade. Sec. 4.01.02. Design standards for lots. The following regulations apply to properties in all zoning districts, unless the regulations of a particular zoning district expressly provide otherwise. (a) Sight distance. In order to ensure maintenance of adequate sight distances at intersections, no fence, wall, shrubbery, or other obstruction to vision between the heights of three feet and 15 feet above the ground is permitted within 20 feet of the intersection of the rights-of-way of streets or of streets and railroads. (b) Applicability to land, buildings, and open space. No building, structure, land, or open space may be used or occupied—and no building or structure or part of a building or structure may be erected, constructed, reconstructed, moved, or structurally altered — unless in conformity with all of the regulations specified for the district in which it is located. (c) Every use must be on a lot. No building or structure may be erected or use established unless upon a lot. (d) Only one principal building per lot. Only one principal building and its accessory buildings may be erected on any lot, except for planned developments or as otherwise provided. (e) Open space not to be encroached upon. No open space may be encroached upon or reduced in any manner except in conformity with the setback, off-street parking spaces, and other such required development standards contained in this ordinance. Shrubbery, driveways, retaining walls, fences, curbs, and buffers are not considered to be encroachments of setbacks. Open space areas as required by this ordinance must be permanently maintained as open space in accordance with the requirements of this ordinance. (f) Reduction of setbacks or lot area. Except as otherwise provided in this ordinance, a lot existing at the time of passage of this ordinance may not be reduced, divided, or changed as to produce a tract of land which does not comply with the minimum dimension or area requirements of this ordinance for the district in which it is located unless that reduction or division is necessary to provide land which is needed and accepted for public use. (g) Lots with multiple frontage. In the case of a corner lot or double frontage lot, front setback requirements apply to all lot lines abutting a street. (h) Landlocked lots. In the case of a landlocked lot (a lot without direct access to a public street or road) lawfully existing as of the effective date of this ordinance, the property owner is entitled to one building permit, as long as all of the following requirements are met: (1) No other principal building exists or is being constructed on the property. (2) No other valid building permit has been issued prior to the effective date of this ordinance and is currently valid. (3) The property was and continues to be under single ownership since the effective date of this ordinance. (4) The property owner has acquired a 60-foot easement to a city-maintained, county-maintained, or state-maintained street or road, and the easement has been duly recorded and made a part of the property deed. (5) In the event the property is divided, no additional permits will be issued. Within the A-R district only, tracts of land which are accessible only by recorded easement may be divided one time only into no more than three lots when each new lot will be accessible by the recorded easement and shall in all other aspects comply with the requirements of this UDO. Any lot so created shall not be eligible for further division until such time as the lot has the required amount of road frontage except by approval of the planning commission. (i) Street frontage. Except where expressly provided herein, no principal building may be erected on any lot which has less than 60 feet of immediate frontage on at least one public street. (j) Setbacks and other spaces. No part of a setback, other open space, off-street parking, or loading space required for another building may be included as a part of the setback, off-street parking, or loading space required for another building, except as specifically provided for in this ordinance. (k) Substandard lots. Any lot existing at the time of the adoption of this ordinance which has an area or a width which is less than required by this ordinance is subject to the following exceptions and modifications: (1) Adjoining lots in same ownership. When two or more adjoining and vacant lots are within a non-approved development with continuous frontage and are in single ownership at the time of application and such lots have a frontage or lot area less than is required by the district in which they are located, such lots must be replatted so as to create one or more lots which conform to the minimum frontage and area requirements of the district. (2) Single lots. When a lot has an area or frontage which does not conform with the requirements of the district in which it is located, but was a lot at the effective date of this ordinance, such a lot may be used for any use allowed in the zoning district in which it is located as long as all other requirements of this ordinance are met. (l) Encroachment on public rights-of-way. No building, structure, service area, required off-street parking, or loading/unloading facility is permitted to encroach on public rights-of-way. (m) Physical design standards. Minimum design standards for driveways, loading areas, and other such physical site improvements are contained in applicable development regulations of Butts County. Consult that document for specific requirements. (n) Off-street parking and service requirements. Minimum standards for off-street parking and service requirements are contained in the Butts County standard for off-street parking and service facilities [See chapter 6]. (o) Other applicable development regulations. Information concerning any other applicable development regulations may be obtained by consulting the zoning administrator. (p) Signs. Signs are permitted on all lots, subject to the regulations contained in the Butts County sign regulations. Sec. 4.01.03. Design standards for structures in rural zoning districts and residential zoning districts. (a) The following additional regulations shall apply in the R-1 district: (1) Minimum roof pitch: 5:12 (five feet of rise for each 12 feet of run). (2) Maximum density: One dwelling per 1.5 gross acres. A minimum of 30 percent of the gross site area shall be preserved as greenspace. (b) The following additional regulations shall apply in the R-2 district: Maximum density: One dwelling per 1.5 gross acres. (c) The following additional regulations shall apply in the R-4 and R-M districts: (1) Maximum density: Eight dwelling units per net acre. (2) Length of townhouse row: More than four attached dwelling units must be arranged in adjacent sets of dwellings, each set having a front foundation line offset by at least ten feet from the foundation line of the adjacent set of dwelling units. (3) Firewalls: All side and rear walls of attached dwelling units which are less than ten feet from the lot line must be firewalls. (See Georgia Building Code for construction standards.) (d) Nonresidential primary use structures in residential zoning districts. In order to ensure that nonresidential uses allowed in residential districts are consistent with the residential nature of the district, where a nonresidential primary use is permitted by this ordinance on a lot zoned R-1, R-2, R-3, R-4 or R-5, such building shall be no larger than 10,000 square feet in area. Sec. 4.01.04. Design standards for structures in commercial, office, and institutional zoning districts. (a) The following additional regulations shall apply in the O-1 district: Side setbacks and rear setbacks are not required adjacent to railroad rights-of-way. (b) The following additional regulations shall apply in the M-1 and M-2 districts: (1) Side setbacks and rear setbacks are not required adjacent to railroad rights-of-way. (2) Outside storage: Outside storage of building materials is the only outside storage permitted and must be completely screened from view from adjacent properties and streets. No other outside storage is permitted. (c) The following additional regulations shall apply in the M-3 district: (1) Side setbacks and rear setbacks are not required adjacent to railroad rights-of-way. (2) Outside storage must be completely screened from view from adjacent properties and streets. (3) Loading docks must be located to the side or rear of the building, unless the loading area is completely screened from the street. (4) The site must be designed to permit onsite maneuvering of all vehicles. No backing in from the street is permitted. (5) All applications for rezoning to M-3 must include the following information: a. Copies of a written description of the proposal designed to provide detailed information about all aspects of the proposed operation and its anticipated impact on the community. The description must include copies of any reports required by the U.S. Environmental Protection Agency or state environmental protection division. The description must also include information regarding minerals, processes (including steps to minimize adverse community impact), products, byproducts, wastes, and any additional information necessary to understand the proposal. Further, this report must address the immediate and anticipated future impacts, if any, of the proposed use on each of the following specific concerns: 1. Noise. 2. Odor. 3. Water quality (surface and sewer). 4. Smoke and particulate matter. 5. Vibrations. 6. Hazardous materials (ignitable, corrosive, explosive, toxic). 7. Radiation. 8. Lighting and glare. 9. Fire hazards. 10. Water usage. 11. Any other concerns identified by the zoning administrator or applicant as pertinent to the proposed use. b. A listing of all federal, state, and local approvals and permits, if any, that will be required by the proposed use and the status of all requests for such approvals or permits. c. Project name. d. Project owner. e. Location of all proposed structures. f. Proposed buffers and/or screening. Sec. 4.01.05. Structure numbering. (a) Designation of street names and numbers. Streets now being maintained by the county and other public agencies within the unincorporated county shall in the future be named and numbered as now designated on the official map and official index of the county as amended by each implementing resolution. Every other street within the unincorporated county shown on the official index shall hereafter be referred to as designated on the official index for structure numbering purposes. (b) Designation of structure numbers. The emergency management director shall keep a record of all numbers assigned under this section. Such records may be maintained in data processing storage systems if so desired. Structure numbers for dwelling units, places of business, industrial locations and all other structures and uses requiring same shall be assigned by: (1) The emergency management director in conjunction with the United States Postal Service during the implementation stage of the system; and (2) The emergency management director following the implementation phase of the system. (c) Posting of designated structure numbers. The owner, occupant or person in charge of any dwelling unit, structure or use to which a number has been assigned shall be notified in writing by the implementing agency of the number assigned to the same. Within 60 days after receipt of such written notification, the owner, occupant or person in charge of any dwelling unit, structure or use to which a number has been assigned shall cause the same to be posted in either one or two locations depending on the following conditions: (1) If the mailbox is located on the same side of the street and adjacent to the driveway or curb cut, the number shall be affixed to the mailbox in letters two inches in height or larger and of a color contrasting with the color of the mailbox. This section does not preclude an individual from also numbering the front entrance of the structure if so desired. (2) If the mailbox is not on the same side of the street and adjacent to the driveway or curb cut, the number shall be posted at two locations: a. On the mailbox as prescribed by U.S. Postal Service regulations; and b. Either on the structure front if visible from the street or on an aboveground sign attached to a post or other object at the driveway or curb cut. The numbers shall be two inches in height or larger and of a color contrasting with the color of the background. This section does not preclude an individual from also numbering the front entrance of his structure if so desired. (3) In the case that a building is served by two or more driveways or curb cuts, the number shall be assigned and posted to the front entrance or driveway. (4) It shall be the duty of the owner, occupant or person in charge of the dwelling unit, structure or use, upon affixing the new number, to remove any different number which might be mistaken for or confused with the number assigned to the structure. (5) In such cases where the assigned number cannot be posted as required above, the number shall be posted as prescribed by the emergency management director after consultation with the owner. (d) Types of numbers. Two types of numbers are used under this section: (1) A primary number to be assigned to each street frontage of each parcel of land, whether or not the parcel is occupied. The primary number is required to be posted only if the parcel is occupied by a dwelling unit, structure or active use and the owner, occupant or person in charge is notified under section 4.01.05(c). Other primary numbers are reserved for future development of the numbered parcels and will be assigned at the time of development. (2) Secondary numbers may be used when a number of units, structures and uses coexist on the same parcel of land. Examples of parcels requiring secondary numbers include apartment projects, condominium projects, manufactured home developments, office parks, recreational vehicle parks, recreational areas, shopping centers and other uses where the use of secondary numbers would clarify the location of a unit or use for public safety purposes. To provide secondary numbers, the emergency management director shall work with the owner, manager, or person in charge of the project to determine a logical numbering system under the following guidelines: a. Existing numbered units and uses shall retain the present set of addresses with only the primary number being changed if the primary number is not in sequence with the overall system. b. Buildings on a single parcel with more than one and less than five units may be given a number designation as requested by the owner. c. A single building on a single parcel of land and with five or more units may be given numerical designations such as Suite 5, Apartment 5, etc., if so desired. d. Multiple buildings on the same parcel of land may be given secondary numbers consisting of number designations if the buildings are accessed from a main entrance to the project. Generally, the number designations should increase in a clockwise direction from the main entrance. e. Manufactured home developments, recreational vehicle parks, and similar uses shall be given number designations for lots or sections and number designations for individual lots or sites. (e) Implementation in stages. Because of the large and complex nature of the county and the existing numbering system now in place in some portions of the unincorporated county, this section shall be implemented in stages covering small sections of the entire area by the adoption of implementation resolutions for each section of the county. It shall be the policy of the county not to change existing numbered addresses if the existing system follows a logical and expandable order. (f) Exempt and excluded structures. Those structures that do not present a significant danger to human life if destroyed by fire or other events shall be excluded from the provisions of this section. The following structures shall be excluded from the provisions of this section: (1) Agricultural buildings not requiring a separate mailing address such as a barn, poultry house, outbuilding or equipment storage buildings. Buildings used as dwelling units, offices, or the normal work station of an employee shall not be exempt from the provisions of this section. (2) Storage and accessory buildings for the use of the occupant of another building on the property. Buildings used as dwelling units, offices, or the normal work station of an employee, or requiring a separate mailing address, shall not be exempt. (g) New structure and lots. (1) Structure numbers will be assigned to each new lot, tract or building site on the original drawings of a final subdivision plat or other plan requiring the approval of the building inspector or by the planning and development department. (2) No building, electrical, plumbing or mechanical permit for any new, remodeled or repaired structure will be issued by the building inspector following the implementation of this section in the affected area of the county until the owner, developer or builder has procured from the emergency management director the official structure number or numbers. Final approval for a certificate of occupancy of any principal building erected or repaired, or use requiring such number, shall be withheld until permanent and proper numbers have been displayed in accordance with the standards of this section. (h) Utility company compliance. Following the implementation of this section in any area of the county, all utility services regulated by the Georgia Public Service Commission or any utility cooperative service organization shall withhold service from any building until the owner or other requesting party has furnished the utility with a valid structure number. Sec. 4.02.00. Site design standards for I-75 Corridor Overlay District. Sec. 4.02.01. Purpose and intent. (a) Attractive and integrated architectural and site design features tend to improve an area's image, raise overall property values, attract new businesses and residents, and improve the quality of life. There is a positive return on investment for providing attractive design features, for both government and property owners, and can provide similar enhancements to public safety, community health, and well-being. (b) This article establishes an overlay district for a defined area in the Interstate 75 corridor for the purposes of controlling land uses, setting standards and requirements for development, and providing for improved architecture and site design. (c) This article also identifies future road corridors in the overlay district. In addition, the overlay reserves land needed for future roads to provide a basis for provisioning of transportation facilities along with new development by designating corridors where the construction and improvement of transportation facilities are expected. Moreover, the overlay restricts the construction or expansion of permanent structures in the intended right-of-way of planned roads and protects the rights of landowners whose land is reserved. (d) This article helps to ensure road and highway access to foster economic development by predetermining appropriate routes of access to state routes and the county road system for properties within and near the corridor in a manner that protects private property rights, ensures public safety, and provides reasonable access and connectivity according to locally-determined standards. Sec. 4.02.02. Map of overlay district boundaries. The map entitled "Interstate 75 Corridor Overlay District, Butts County, Georgia," which is hereby made a part of this ordinance, is hereby adopted. Sec. 4.02.03. Relationship to zoning districts. This article establishes regulations that are in addition to the regulations of the underlying zoning district. Zoning districts listed in chapter 2, established in this ordinance, and as applied by the official zoning map, shall continue to apply, except as specifically modified by this article. This article imposes more restrictions on land uses than the rights conferred by underlying zoning and more land development standards than are applied outside the overlay district. Sec. 4.02.04. Relationship to environmental and watershed overlay districts. Overlay districts listed in chapter 3, established in this ordinance, shall continue to apply, to the extent they involve property in this overlay district, unless specifically stated otherwise in this article. Sec. 4.02.05. Establishment of subareas. (a) Character of subareas. Within the overlay, there are distinct subareas that have different aims and requirements. The three subareas are: (1) Industry/commerce. Focuses on light industrial uses and supporting commercial uses adjacent to the I-75 highway. (2) Mixed-use. Focuses on walkable commercial, retail, and some residential as a local and regional destination. (3) Rural neighborhood. Similar to traditional neighborhood design, rural neighborhood focuses on walkable smaller neighborhoods but does not include a mix of uses. (4) Refer to the map "Interstate 75 Corridor Overlay District, Butts County, Georgia" for a determination of the applicable subarea. (b) Definitions. The phrase "non-industrial areas" as it is used in this article refers to mixed-use and rural neighborhood areas within the overlay. "Industrial areas" refers to those designated as part of the industry-commerce area as used in this article. Sec. 4.02.06. Regulation of uses. (a) Restrictions. Notwithstanding the permitted uses and special uses sections of the zoning districts established in this zoning ordinance, the following uses as defined shall not be permitted within the overlay district boundaries: (1) Adult entertainment establishments regulated by the county's adult entertainment ordinance. (2) Bars, taverns, or nightclubs, as defined in section 1.10.00, are prohibited except when located within the same structure of a hotel, motel or restaurant. (3) Reserved. (4) Bulk storage. (5) Composting facilities. (6) Crematories. (7) Extraction activities larger than five acres. (8) Food processing plants. (9) Gas tank sales. (10) Hazardous waste materials handling and storage facilities. (11) Incinerators. (12) Junkyards. (13) Landfill, construction and demolition. (14) Landfill, inert waste. (15) Landfill, sanitary. (16) Materials recovery facilities. (17) Motor vehicle impound lot. (18) Motorized race tracks. (19) Pawn shops. (20) Power plants, private. (21) Recovered materials processing facilities. (22) Recreational vehicle parks, except those that existed on the effective date of this article, which shall not be deemed nonconforming (notwithstanding other provisions of this section). (23) Salvage yards. (24) Slaughterhouses. (25) Solid waste handling facilities. (26) Truck stops; except that a facility with no more than 30 percent of the developed area being committed to the fueling of commercial trucks with diesel fuel will be permitted in the overlay district, on the west side of I-75 only, when it is within a mixed use development (P-M zoning district) of 20 acres of more. (27) Truck, utility trailer, and recreational vehicle rental and leasing (does not prohibit sales) and other similar uses including, but not limited to, those classified under 2007 NAICS Code 532120. (b) Additional permitted uses. Within each of the areas as defined in section 4.02.05, the specified uses are permitted by right in addition to the uses permitted by the underlying zoning. Refer to section 2.02.02 for a table of permitted uses. (1) Industry/commerce area: a. Any permitted use in the M-1 zoning district. b. Hotel. c. Hospital. (2) Mixed-use area: a. Any permitted use in the C-1 zoning district except: Drive-in theater. b. Hospital. c. Hotel. d. Dwelling, apartment. e. Dwelling, condominium. f. Dwelling, garden apartment. g. Dwelling, multiple-family. h. Dwelling, single-family attached. i. Dwelling, townhouse. (3) Rural neighborhood area: a. Dwelling, single-family detached. (c) Land uses that are not permitted by this section, but which lawfully existed at the time this overlay district was first made effective, may continue to exist but shall be considered nonconforming uses. Continuance of such nonconforming uses shall be as regulated in section 9.01.01 of this UDO. (d) Places of worship. Churches, synagogues, and similar places of worship shall not be located within a storefront where other leased spaces may be available for office, retail, and commercial service. Places of worship, where permitted, must have all principal buildings devoted for such uses located at least 300 feet from any property line. The purpose of this regulation is to prevent the location of churches in a way that would hinder the reasonable accommodation of alcoholic beverage service and alcoholic beverage sales within the overlay district. (e) Communication towers. Communication towers, including wireless telecommunications facilities and equipment, shall be set back a minimum of twice the tower's height from the right-of-way of Interstate 75 or other arterial, collector, or local county road. Sec. 4.02.07. General procedures. (a) Rezoning, special uses, and variances processes. If a property must be rezoned, or the development requires a special use or a variance in order to allow the proposed use or development proposal, such rezoning, special use, and variance processes remain independent of the special procedures of this article. (b) Rezoning, special uses, and variances standards for review. When an application for rezoning, special use, or variance is proposed in the overlay district, said application shall be reviewed for compliance with the requirements of this article, and failure to meet the regulations of this article shall be cause to deny such applications. When an application for rezoning, special use, or variance is proposed in the overlay district, said application shall be reviewed for consistency with the site design guidelines or adopted by reference in design guidelines for the overlay district, as applicable. An application for rezoning, special use, or variance pertaining to property within this overlay district should demonstrate compliance with the site design guidelines established in this article. Conditions of approval may be placed on the application to ensure compliance with the requirements or design guidelines of this article. (c) When an application for rezoning, special use, or variance is proposed in the overlay district, and such application requires the submission of architectural renderings or elevations of representative building types, the applicant should demonstrate that the proposed architecture of structures is consistent with the architectural guidelines of this article in addition to any other requirements and guidelines of the underlying zoning district. Inconsistency with such regulations or guidelines can be as a basis for disapproving such a rezoning, special use, or variance. (d) Preliminary plats. Development in this overlay district is subject to the preliminary and final plat requirements of chapter 10 of this UDO, when applicable. The additional requirements, standards, and guidelines for site design established in this article shall be considered during the process of reviewing and approving a preliminary plat. Inconsistency with site design requirements or design guidelines is a basis for the refusal to process the application and to deny the application. (e) Construction plans and land disturbance permits. The county engineer shall review construction plans to ensure that the applicant meets all development-related requirements of this article as a condition of the issuance of a land-disturbance permit. Furthermore, the zoning administrator and development review staff shall ensure that the site design provisions of this article are reflected in construction plans and will be followed. The zoning administrator and development review staff may cite inconsistency with the site design requirements of this article as a basis for disapproving the construction plans and land-disturbance permits. The zoning administrator and development review staff may place conditions of approval on the permit to ensure compliance with the requirements or design requirements of this article. (f) Site plan submittal and review. In order to demonstrate compliance with the standards of this overlay, detailed site plans must be submitted for review. (1) Concept plans shall include the following, as applicable: a. Use and phases of development; b. Lot lines and setbacks; c. Location, shape, size, and height of proposed buildings, common areas, plazas, and other amenities; d. Gross acreage and density; e. Lot sizes, dimensions and square footage; f. Building heights and stories; g. For large residential developments, the floor plan identifier (e.g., name or number); h. Amount of open space; i. Lakes, ponds, streams, floodplains and wetlands; j. Stormwater facilities; k. Recreation facilities; 1. Proposed landscaping, tree save areas; m. Location of off-street or on-street parking; n. Location of streets, widths of rights-of-way, location of stop signs and other traffic control devices; o. Pedestrian circulation plan and illustrations of pedestrian amenities; p. Any other architectural and engineering data as may be required to evaluate the project. (2) In addition to site plans, architectural materials may be required. All application materials for architectural review are outlined in section 4.02.09(d). Sec. 4.02.08. Architectural review. (a) Required. This section outlines an administrative architectural review process. The applicant shall pay for all required fees involved within the architectural review process. The following activities and processes, when proposed within the area that is subject to this article, shall require architectural review: (1) Any principal building which is used or intended to be used for industry, commerce, office, institution, or multi-family residence. (2) Any addition to a principal building of more than 2,000 square feet or ten percent of the base square footage, whichever is lower, to a principal building which is used or intended to be used for industry, commerce, office, institution, or multi-family residence. (3) Entrance monument signs or displays to office parks, commercial and industrial uses, all subdivisions, and planned or condominium developments, including those for detached, single-family dwellings and manufactured homes. (b) Not required. The following accessory and principal buildings, when proposed within the area that is subject to this article, shall not require architectural review as established by this article: (1) Individual, detached single-family dwellings and manufactured homes when located on their own fee-simple lot are specifically exempt from architectural review, as are any customary accessory buildings and structures on the same lot. (2) Buildings related to agriculture or forestry. (3) Any principal building, addition thereto, or accessory building or addition thereto, which is found by the zoning administrator to be consistent with private covenants establishing architectural controls that have been reviewed and accepted by Butts County. (4) Nonconforming land uses that are not permitted by this article to be established in the overlay district, but which existed at the time this overlay district is made effective, may continue to exist without the requirement for an architectural review. (c) Relationship of architectural review to other permit processes. (1) The process of subdivision, as established and regulated by chapter 10 of this UDO, shall remain independent of and unaffected by the architectural review process which shall only occur after approval of a preliminary plat when required. (2) The process of construction plan approval and issuance of land disturbance permits, as established and required by chapter 10 of this UDO, may be concurrent with architectural review. (3) Where no land disturbance permit is required, the process of architectural review shall take place prior to the issuance of a building permit. (4) The process of architectural review shall take place concurrently with site plan review. All application materials required for architectural review are referenced in section 4.02.09(d). Sec. 4.02.09. Process for architectural review. (a) Generally. The county zoning administrator is authorized to distribute application forms and more specific procedures for architectural review which shall be consistent with the requirements of this section. The county architect shall hereafter refer to either an architect employed directly by the county or an architect serving as a consultant to the county for the purpose of architectural review. (b) Pre-application conference. All applicants for architectural review and approval may schedule a free pre-application conference with the county zoning administrator. A pre-application conference is a time where applicants can familiarize themselves with the application requirements and processes and gain preliminary input from staff as to the suitability of the proposed material change in appearance. Upon showing that there is an approved site plan for the property, the applicant may initiate an application for architectural review if architectural review is required. (c) Fee. At the time an application is submitted, the applicant shall submit, and the zoning administrator shall collect on behalf of the county, a fee for architectural review. The fee for architectural review shall be as set forth in a fee schedule adopted by the board of commissioners, as may be amended from time to time. At the discretion of the board, the fee schedule may vary based on the type of building or size of the building as to whether the architectural review is for a single, principal building or for multiple principal buildings, or the complexity of review. Said fee shall be used to offset the administrative costs to the county of processing such applications and shall be set at a level that compensates the services of an architect hired by the county for purposes of architectural review. (d) Application materials for architectural review. All applications for architectural review shall be made as required by the zoning administrator and shall at minimum contain the following information: (1) Elevation drawings. Three color copies of exterior elevation drawings of all four facades of all buildings, drawn to scale and signed by an architect, engineer or other appropriate professional, and one electronic file copy in PDF format. Exterior elevation drawings shall clearly show in sufficient detail the exterior appearance and architectural design of buildings or proposed change(s) to buildings or structures. Each application shall also indicate proposed materials, textures and colors. The zoning administrator may require that the applicant provide samples of materials and colors. (2) Surrounding area. Photographs of all adjacent parcels that clearly show any structures and the character of the land are required to see the character of the site. Photographs shall be submitted in printed copy and in digital form unless otherwise specified by the zoning administrator. (3) Existing structures. All applications involving existing buildings or structures or alteration thereof shall be accompanied by photographs of all sides of the existing building(s) or structure(s) affected and of adjoining properties. Photographs shall be submitted in printed copy and in digital form unless otherwise specified by the zoning administrator. (4) Site plan and landscaping plan. A copy of the proposed site plan and landscape plan shall be included with the submission of elevation drawings. (e) Completeness check. Upon submission of an application for architectural review and payment of the required fee, the zoning administrator shall review the application for completeness. Incomplete applications shall be refused and will not be processed until complete. (f) Authority, review and disposition. The county architect shall have final authority to review and approve, conditionally approve, or disapprove applications for architectural review. Depending on the nature of the application and its complexity, the zoning administrator shall determine whether review is by a consulting architect. The process of architectural review shall not exceed 30 days from the date such application was deemed complete, except by mutual agreement of the zoning administrator and the applicant. (g) Applications for architectural review. The zoning administrator shall consider the appropriateness of the application in the context of the following criteria: (1) Consistency with any adopted design guidelines. (2) Consistency and compatibility of the proposed application with the nature and character of the surrounding area. (3) The general design, character and appropriateness of design, scale of buildings, arrangement, texture, materials, and colors of the structure and the relation of such elements to similar features of structures in the immediate surrounding area, site, and landscaping. (h) Approved applications for architectural review shall bear the signature of the zoning administrator and the county architect, and one copy of the approved and signed plans shall be returned to the applicant; at least one copy of said approved plans shall be maintained in the office of the zoning administrator. If the plans are approved, the signature on the plans by the zoning administrator and the county architect as well as notice, verbal or written, that the plans have been approved and are ready for pick up by the applicant shall be the only notice required. Any applications that are conditionally approved shall require the applicant to submit three copies of the final, as approved plans and elevation drawings. (i) If the application for architectural review is not approved, the zoning administrator shall at the conclusion of the review period submit in writing to the applicant the reasons for disapproval with specific reference to code sections not met, design guidelines not complied with, or inconsistency with the criteria for architectural review for applications specified in this article. In addition, the zoning administrator may submit to the applicant a marked up copy of the plans and elevations submitted, conveying comments on said plans where revisions are needed. (j) Revision and resubmission. At any time after receiving the disapproval of an architectural review application, the applicant may revise and resubmit the application. A resubmittal fee shall be required, and the process shall follow the same time limits and procedures specified in this section for first-time applications. Any applications that are conditionally approved shall require the applicant to submit three copies of the final, as approved plans and elevation drawings. (k) Appeal. The decisions of the zoning administrator shall be final unless an appeal is made by the property owner subject to the provisions set forth in section 10.03.00. (l) Records. The zoning administrator shall keep records of all applications for architectural review, and the zoning administrator shall keep records of the disposition of all applications for architectural review. Such records shall be open to public inspection. (m) Building permit plans for single-family uses shall include: (1) A site plan; (2) Architectural elevations of all four sides of the proposed building indicating exterior treatments; (3) Samples of materials and colors used. (n) Building permits. No building permit shall be issued for a building that would be inconsistent with the requirements of this article. No building permit application required to undergo architectural review as required by this article shall be approved until architectural review has been completed in accordance with the requirements of this article. The chief building official may place conditions of approval on a building permit to ensure compliance with the requirements or design guidelines of this article. Sec. 4.02.10. Future roads. (a) All future roads. (1) In the event that a subdivision or land development proposes to access a substandard road, improvements shall be considered through a development agreement. Substandard roads are defined here as roads that do not meet right-of-way pavement width and/or county road standards. If the abutting substandard road provides the access to the subdivision or land development, the substandard road shall be upgraded to county standards for a local roadway from the subdivision or land development along the route of primary access to the nearest standard paved road. (2) The zoning administrator may require a traffic impact study for land developments or subdivisions that are anticipated to increase traffic volumes by more than ten percent. The study will determine the most appropriate road improvements, including driveway locations, and used as a basis for determining improvements required to the road system. (b) Future roads west of I-75. Due to the industry-commerce land uses programmed for areas west of I-75 in the overlay district, the road network must be laid out to maximize access to both State Highways 16 and 36. All new roads in the overlay district must meet the applicable Butts County or Georgia DOT standards for roadway construction. (c) Parcels adjacent to the eastern side of the I-75 right-of-way. (1) Frontage road east of I-75. In order to maximize visibility of and provide access to the mixed uses planned for areas east of I-75, a frontage road located parallel to I-75 must be constructed when developing properties adjacent to I-75. The minimum required right-of-way for the frontage road shall be 90 feet. The frontage road shall have two lanes plus a center turn lane with low level landscaping on either side and adequate space for a six-foot wide sidewalk on the developed side of the road. The frontage road shall be developed according to the applicable Butts County or Georgia Department of Transportation standards. Intersections with State Highways 16 and 36 must meet minimum Georgia DOT standards for distance from interstate highway interchanges. The exact placement of the frontage road right-of-way will be determined on a parcel by parcel basis as development occurs and funding is available. (2) Land adjacent to the eastern side of the I-75 right-of-way is hereby considered reserved for future intended use as a county frontage road right-of-way. The county shall not issue a subdivision plat, land disturbance, development, building or any other permit for development or building within a frontage road reserve area until the frontage road serving the development is under construction. (3) Each applicant for a permit to develop a parcel existing on the date of adoption of this section, within the area "reserved" for the frontage road, shall design the development proposal or subdivision plat in a manner that will not encroach upon the land designated to accommodate the frontage road. (4) Curb cut distance. A minimum distance of 500 feet shall be established between curb cuts onto the frontage road. New development along the frontage road shall be designed to provide inter-parcel access with adjoining tracts. (5) The frontage road shall be constructed from property line to property line according to applicable county and Georgia Department of Transportation standards. When a development is constructed in phases, only that portion of the frontage road serving the development phase may be required to be constructed concurrent with that phase of development. (6) Temporary turnarounds. Where the end of the frontage road will not connect with the existing road or driveway network, a temporary paved turnaround shall be provided by the developer and in compliance with applicable county and Georgia Department of Transportation standards. (7) Alternative routes. In cases where the applicant determines that such a reservation or right-of-way dedication is not practical or possible, the applicant shall determine and propose an alternative route for the frontage road corridor on the same lot, or on adjacent land owned by the permit applicant if applicable, so that the public purpose of providing a road connection through the lot is met while accommodating the development proposal. (8) Permit required. It shall be unlawful to initiate or carry out development upon land reserved for the frontage road without first securing a permit as required by this section. (9) Hearing on permit. Upon receiving an application for a permit involving reserved land, the zoning administrator shall arrange for the application to be scheduled for public hearing before the Butts County board of commissioners. The applicant shall be notified in writing of the date, time, and place of the hearing, by registered mail at least 15 days prior to the public hearing. The public shall be given notice by publication in a newspaper of general circulation in the county at least 15 days prior to the public hearing of the date, time, place, and nature of the hearing. At the hearing, the applicant or official representative shall have an opportunity to present evidence and argument in support of his or her application, as shall any government or individual that has an interest in the application. (10) Action on permit. Following the public hearing, the board of commissioners may take one of the following actions: a. Approve the permit as proposed, with or without conditions; b. Remove all or part of the reserved land and issue, with or without conditions, the permit authorizing development on the land removed from the corridor; c. Allow the applicant to relocate the reserved land to another part of the same parcel of land for which a permit is requested and issue, with or without conditions, the permit authorizing development on the land outside the reserved land; d. Modify the proposed permit application and issue it for development as modified, with or without conditions, if the development can reasonably be accomplished on the subject parcel without encroaching on the reserved land; or e. Delay action on the permit for a defined period of time not to exceed six months for the purpose of any of the following: 1. Negotiating with the property owner for the purchase of all or a part of the reserved land by the county or other governmental agency; 2. Acquiring the reserved land voluntarily; 3. Acquiring a negative easement over the reserved land that prevents the property owner from building on the reserved land; or 4. Taking the reserved land through eminent domain and the payment of just compensation to the property owner. f. Authority to acquire land for public use. After delaying action on the permit, the county may, but shall not be obligated to, negotiate for the voluntary dedication of the land, enter into an option to purchase, or use its powers of eminent domain and initiate condemnation proceedings subject to applicable state law and the payment of just compensation to the property owner. (11) Final action on permit. If the county delays action on the permit as provided by this section, and the county or other responsible governmental agency fails to arrange for the legal acquisition of all or a part of the reserved land within the specified time period which shall not exceed six months, then the county may approve the permit, with or without conditions, or in the absence of such approval, the permit can be deemed approved as submitted. (12) Inapplicability of reservation provision of development ordinance. In cases where this section applies, the procedures established in this section shall supersede the requirements of section 4.00.02(e), with respect to future major streets. Sec. 4.02.11. Grading and construction of roads. (a) Intent. Land adjacent to the eastern side of the I-75 right-of-way is reserved for the construction of frontage road with 90 feet right-of-way. Such a road is intended to be constructed without cost to the county to access the mixed use properties to be developed in the area. The Butts County subdivision regulations generally prescribe new road standards for the construction of new roads within land that is subdivided for the purpose of accessing property to be developed. The subdivision regulations do not prescribe exact locations for roads. In prescribing the approximate location of the frontage road, the county seeks to maximize the visibility of businesses that will locate in the I-75 corridor to ensure their success. The developers of these properties will thereby benefit from the installation of said frontage road. (b) Development agreement. The board of commissioners may negotiate a development agreement with any development applicant with regard to fire, parks and recreation, police, library services, and the grading and/or installation of road improvements. (c) Negotiating the development agreement. The applicant for development proposal may propose, and the county may agree to, any of the following as appropriate to the specific context: (1) The development applicant may voluntarily agree to pay for the entire cost of grading and provide all of the road improvements; (2) In cases where the full costs of road improvements are not proportional to the amount, type, or intensity of development proposed by the applicant, the applicant may submit a study prepared by a traffic engineer or transportation planner documenting the probable trips generated by the development. The results of the study will be compared to the total capacity of the road improvement, as accepted by the county, in order to arrive at a proportionate share the development would benefit from the proposed road improvement. In such cases, the applicant for development proposal may voluntarily agree to pay the pro-rated share of said road improvements attributed to the subject development as indicated in said study. The county shall reserve the right to require a traffic study completed by the applicant by a traffic engineer; (3) In cases where a developer agrees to provide a proportionate share of the cost of funding the proposed road, and the county has not or cannot secure funding for the remaining share of the costs of improving the proposed road, either through the participation of other developers or through public funds, the board of commissioners is authorized to escrow the funds contributed by the developer as a proportionate share of the total costs of such proposed road improvements in an interest-bearing account to be expended at the discretion of the county. If the county does not encumber for the specific purpose said escrowed funds submitted by the particular land developer within six years of the date such funds are escrowed, the contributor shall be entitled to, and upon written request the county will reimburse to the land developer, the escrowed funds plus that portion of interest in such account attributed to the developer's escrowed funds; (4) In cases where the timing of the road improvement cannot be assured to coincide with the development, and the developer has agreed to provide a proportionate share of the cost of funding the proposed road, the development applicant and the county may agree for the developer to conduct all or a negotiated part of the grading activities necessary for the road improvement, in lieu of escrowed funds for improvement of the proposed road itself; or (5) Any other written arrangement mutually agreed to by the development applicant and the board of commissioners. Sec. 4.02.12. Minimum access and connectivity requirements. (a) Connection to planned road system. It is intended that frontage roads and other local roads in the I-75 overlay district, and connections from development to such frontage roads and local roads, will be planned and coordinated with the road system of the surrounding area and with the plans for future roads in the overlay district. Accordingly, a lot owner may be required, as part of the land development approval process, to connect to an existing or planned frontage road or other part of the public or private street or road access system. (b) Connection to state routes. All commercial driveways onto state routes in the I-75 overlay district are subject to the Georgia Department of Transportation Regulations for Driveway and Encroachment Control or any official revisions thereto. No development permit or land-disturbance permit shall be issued that involves a driveway or other access onto a state route unless a commercial driveway permit or access approval from the Georgia Department of Transportation has been submitted to the zoning administrator. (c) Inter-parcel access. Inter-parcel site access shall be provided to adjacent properties where the board of commissioners has determined that the land uses so connected are compatible. The following figure provides a basic guide for compatible uses, though the ultimate determination is up to the board of commissioners. Where inter-parcel access is required, property owners will be required to grant an access easement across the lot or development site to facilitate the movement of motor vehicles across the lot or development site. Inter-parcel Access Matrix Residential School Retail Office Restaurant Hotel Industrial Uses Residential Yes Yes Yes Yes No No No School Yes Yes Yes No No No No Retail Yes Yes Yes Yes Yes Yes No Office Yes No Yes Yes Yes Yes No Restaurant No No Yes Yes Yes Yes Yes Hotel No No Yes Yes Yes Yes Yes Industrial Uses No No No No Yes Yes Yes (d) Right-of-ways and easements. Prior to development approval, an additional road right-of-way for a county road or private road or an access easement may be required to be dedicated. The location, type, and amount of right-of-way or easement to be dedicated may also be needed at intersections or at other locations fronting the property where turning lanes or road intersection realignments are required for traffic safety and the right-of-way is inadequate to accommodate the road, drainage, and utility, and other improvements are necessitated by the development or called for in the future road plan for the overlay district. (e) Separation of directions of travel. On any two-lane, two-way directional travel road, or other access way, whether public or private, the directions of travel may be separated if necessary to minimize grading requirements, subject to the county's approval. (f) Crossing of streams with road, bridge or driveway access. Where roads, bridges, and driveways must cross streams and tributaries, they shall cross such streams and tributaries at the least sensitive places and while providing the shortest feasible bridge. Sec. 4.02.13. Standards for pedestrian and bicycle infrastructure. Land development or subdivision within the overlay district will be reviewed for conformity with the following standards and adherence to the following principles, which are articulated to ensure safe and convenient pedestrian access within and to/from the land development or subdivision: (a) Pedestrians are a part of everyday roadway environment, and attention must be paid to their presence in rural as well as urban areas. (b) As a general practice, sidewalks should not be constructed along any county road or state highway in the overlay district where future residential development density is expected to be lower than two dwelling units per acre or where industrial development is planned. (c) Sidewalks used for pedestrian access to schools, parks, and shopping areas, and placed along all streets in office, institutional and commercial areas, should be provided along both sides of the road. In residential areas, sidewalks are desirable on both sides of the street but need to be provided on at least one side of all local streets. (d) Sidewalks along streets with curbs and gutters should be separated from the curb by a planting strip of at least two feet along local residential streets and five feet along local collector and commercial streets. Sidewalks along streets without curbs and gutters should be separated by a drainage swale. (e) At street intersections with traffic signalization, crosswalks shall be provided including curb ramps. Crosswalks within the overlay shall be the highly visible "piano key" style with five-inch parallel band pairs two feet apart. All curb ramps in the overlay are required to meet applicable requirements of the Americans with Disabilities Act. (f) Land developers are required to provide pedestrian connections on private properties to sidewalks on public or private roads. (g) Bicycle facilities may be provided by the private developer via incorporation of bicycle paths and/or bicycle lanes internal to the development. Subject to the approval of the zoning administrator, a bicycle lane may be incorporated within the right-of-way of a public road abutting the proposed development. Bicycle paths may be provided within their own dedicated right-of-way. (h) When a bicycle lane, bicycle path, or multi-use trail crosses a road intersection or a railroad, then ramps and adequate warning and safety signing and or striping must be provided subject to the approval of the county engineer utilizing applicable requirements of the Americans with Disabilities Act and county standards. (i) Bicycle lanes on county roads shall be a minimum of four feet in width. On rural roads without curbs and gutters, the shoulders of roads may be paved, designated, and maintained for bicycle travel. (j) Bicycle paths are separate paved trails not attached to the adjacent road. The minimum width for a bicycle path shall be ten feet. The county engineer may reduce this required width to eight feet in instances where he or she finds bicycle traffic and pedestrian use will be light and where the path presents a satisfactory and safe alignment vertically and horizontally. The county engineer may also authorize a reduction of the minimum width for short sections of the bicycle path where necessary to preserve trees, move the bicycle path alignment to avoid hazards, at narrow bridge crossings, or at other places as may be appropriate. When a bicycle path is incorporated into a multiuse trail, the multi-use trail should either be constructed to a width of 12 feet or provided with pullouts or passing areas in frequent places along the length of the multi-use trail to accommodate passing situations for different users traveling at different speeds. (k) Bicycle paths shall have a minimum two-foot wide graded shoulder area on at least one side of the bicycle path in addition to the width requirements mentioned above. Vertical clearance shall be eight feet minimum with ten feet desirable. Sec. 4.02.14. General site design requirements. (a) Buffer along Interstate 75. (1) Properties abutting the west right-of-way of Interstate 75 shall maintain a natural undisturbed buffer not less than 100 feet in width to serve as a visual and acoustical barrier to noise from the I-75 corridor. If 100 feet of undisturbed buffer is unavailable, 50 feet of planted buffer should be used to achieve opacity. (2) Properties abutting the east right-of-way of Interstate 75 shall maintain a landscaped area not less than 30 feet in width that allows view of the businesses located on the frontage road. (b) Buffers standards. Buffers shall contain a minimum of seventy-five percent of evergreen plant materials comprised of diverse array of plant species, and no plant species may account for more than 15 percent of the plant material for the particular categories of canopy shade tree, understory tree, shrub, or ground cover. One tree shall be planted for every 50 linear feet of buffer area. Turf grass shall not be considered as an appropriate buffer material. (c) Supplementing buffers. In those instances where the existing natural vegetation and topography are insufficient to achieve the desired level of screening as required by this section, a planted buffer shall be provided and shall consist of plant material of such growth characteristics as will provide a visual screen having a height of not less than six feet in two years and planted in a minimum of two rows with staggered spacing such that a continuous opaque screen is created within two years of planting. (d) Buffer maintenance. Required buffer strips shall be established and maintained in perpetuity by the owner(s) of the nonresidential land use. The required buffer strip shall not be disturbed by grading, property improvements, or construction activities except where necessary to prevent a nuisance, to remove diseased, misshapen, or dangerous and decayed timbers, or any similar county approved enhancement. Any contemplated disturbance shall first be brought to the attention of the Butts County community development department and formal approval of a permit secured prior to initiating activity within the required buffer areas. (e) Certificate of occupancy. Buffers shall be provided in accordance with the approved plan prior to issuance of a certificate of occupancy. (f) No parking. Buffers shall be prohibited from being used for temporary or permanent parking or loading. (g) Buffers between uses. Refer to the table below for the buffer requirements between different uses within the overlay. Butts I-75 Overlay Required Buffer Chart Industry/ Commerce Industrial Industry/ Commerce Commercial Mixed-Use Commercial Mixed-Use Residential Rural Neighborhood NonOverlay Residential Use Industry/Commerce Industrial — 75 100 100 100 100 Industry/Commerce Commercial — 50 50 75 75 Mixed-Use Commercial — 15 75 75 Mixed-Use Residential — 50 75 Rural Neighborhood — 75 Non-Overlay Residential Use — All distances are measured in feet (h) Development standards. Refer to the table below for the relevant development standards for each subarea within the overlay. Development Standards Industry/ Commerce Mixed-Use Rural Neighborhood Open Space (min % of lot area)* Meet landscaping standards 10% 10% Impervious Surface (% of lot area max) 60% 70% 60% Single-Family Density (units per net site acreage)** N/A N/A 4 Townhouse Density (units per net site acreage)** N/A 8 stand alone 10 mixed use N/A Multi-Family Density (units per net site acreage)** N/A 10 stand alone 12 mixed use N/A Development Standards Industry/ Commerce Mixed-Use Rural Neighborhood Nonresidential or Mixed-Use Density (units per acre) Meet parking ratio Meet parking ratio Meet parking ratio * Open space requirements only apply to developments over 3 acres. ** Net site acreage is defined here as gross area of the site less the areas of the 100-year floodplain, wetlands, road rights-of-way, and open space. (i) Site standards. Refer to the table below for some of the basic building standards for structures within the overlay. Site Standards Industry/ Commerce Mixed-Use Rural Neighborhood Minimum Lot Size Commerce 1 acre Industry 1 acre Townhouse 1/10 acre MultiFamily 1/2 acre Nonresidential 1/2 acre SingleFamily Residential 1/4 acre Minimum Floor Area Per Dwelling Unit (in square feet) — — 750 750 - 1,600 Minimum Lot Width (in feet) 30' 100' 25' 30' — 40' Minimum Front Yard Setback from Right-of-Way of Street for: A: Arterial Streets 100 100 75 75 75 75 B: Collector Streets 80 80 50 50 50 50 C: Other Streets 55 55 50 50 50 50 Minimum Distance between Building and Property Line (in feet) 35 75 10 20 0 20 Minimum Side Setback (in feet) 15' 15' 0' 5' 5' 10' Maximum Building Height (in feet) 35'2 35'1 40'2 40'2 40'2 40'2 Minimum Rear Setback (in feet) 30' 30' 10' 10' 10' 10' 1 This height limit does not apply to projections not intended for human habitation. For buildings and structures with such projections, the minimum required setbacks must be increased one foot for every two feet (or part of two feet) of height greater than 35 feet. 2 This height limit does not apply to projections not intended for human habitation, except for satellite, television, and radio antennas, to which this limit does apply. For buildings and structures with such projections, the minimum required setbacks must be increased one foot for every two feet (or part of two feet) of height greater than the height limit. (j) Nonresidential landscaping standards. Each lot or development shall contain a minimum of 60 tree density units per acre proportional to the lot size. Each item listed below is inclusive to the 60 tree density units per acre. (1) Each lot or development must contain a minimum of one 2.5 inch caliper hardwood tree per 50 feet of roadway, located adjacent to the ROW, and not closer than 15 feet from any structure. (2) The required tree density shall be accomplished with the preservation of trees, tree planting, or a combination of preservation and planting. (k) Residential landscaping standard. Required tree density for residential property development or redevelopment is subject to this section in the R-1, R-2, R-3, and A-R zoning districts and the rural neighborhood overlay subarea. The required tree density shall be accomplished with the preservation of trees, tree planting, or a combination of preservation and planting. (1) Each residential lot one acre or less shall contain a minimum of three one and one-half inch caliper hardwood trees. Each residential lot greater than one acre shall contain a minimum of seven one and one-half inch caliper hardwood trees. No tree shall be planted closer than 15 feet from any structure. Remaining hardwood trees on each lot with a diameter breast height (DBH) of three inches or greater shall be credited as replacement trees. (2) Each residential lot shall contain a minimum of 20 gallons of shrubs per house. Of the 20 gallons, there shall be a minimum of two three-gallon shrubs per house. (3) Balance of lot area is to be seeded, sodded, hydro-seeded or stabilized with other landscape materials. (4) Recommended areas for additional tree preservation and planting include subdivision entrances, contiguous rear/side setbacks outside required drainage easements, external road frontage, stream-side buffers, and stormwater detention facilities. (l) Utilities. All utility lines serving uses proposed or developed within the overlay district, including water, sewer, gas, electric, telephone, data and cable television, shall be installed underground (this excludes high voltage transmission power lines within easements of 100 feet or more). Underground utility trenches must be re-vegetated. Utility boxes and cabinets that are located above ground must be shielded from view with a continual ring of evergreen shrubs expected to reach maturity one foot higher than the height of the box. Any aboveground boxes that cannot be buried shall, in addition to being screened by vegetation, be painted a neutral or earth tone color or otherwise made to blend in with their surroundings. (m) Outdoor lighting. All outdoor lighting hereafter installed shall be full cut-off luminaires, or another luminaire which does not emit any direct light above a horizontal plane through the lowest direct-light-emitting part of the luminaire. Cut-off fixtures are not required for incandescent lighting with an intensity of 160 watts or less. Full cut-off luminaire is defined as outdoor light fixtures shielded or constructed so that no direct light rays are emitted by the installed fixture at angles above the horizontal plane. The following outdoor lighting practices are prohibited: (1) Glass tubes filled with neon, argon, or other gas and used for outdoor lighting, or for the purpose of outlining windows, doors or any other part of a building. (2) Metal halide, and/or quartz lighting, except when the designing engineer deems that color rendering is critical, as may be specifically approved by the zoning administrator as a part of an approved lighting plan for development within a commercial or industrial zoning district. (3) The outdoor use of laser source light, search lights or any similar high intensity light, when used for purposes of advertising, attraction, or entertainment, may be authorized by permit from the zoning administrator for a limited duration only upon a finding that the lighting will not be a nuisance or an unreasonable burden upon the community or the surrounding properties. (4) Lighting underneath the ceiling of a freestanding canopy or accessory structure such as a gasoline pump island that is not recessed into the ceiling of the canopy. Sec. 4.02.15. Industry/commerce site design requirements. The following criteria are required for new construction in the Industry/Commerce area of the overlay: (a) Truck access. Separate entrances must be provided for trucks and all other vehicles to prevent conflicts and accidents. Site access for trucks shall be provided as a separate, well-signed point of ingress and egress. Typically, truck/semi-truck access to the site should be designed with a minimum 30-foot wide driveway and a minimum 45-foot turning radii to allow for sufficient maneuverability (based on Georgia DOT Design Policy Manual for minimum design vehicle with a 62-foot wheelbase). Truck access shall be located with sufficient separation to other vehicle points of access so as to avoid conflicts and congestion on the public right-of-way and on interior drive aisles. Curb cuts are encouraged to be minimized through shared access between neighboring industrial properties. (b) General vehicle access. Site access for general vehicles, including employees and visitors, shall be provided as a separate, well-signed, landscaped point of ingress and egress. Typically, access to the site should be designed with a minimum 20-foot wide driveway. General vehicle access shall be located with sufficient separation from truck points of access to avoid conflicts and congestion on the public right-of-way and on interior drive aisles. The number of curb cuts for each site shall be minimized, and shared access between neighboring industrial properties is encouraged. (c) Internal circulation. Internal circulation should promote safety, efficiency, convenience, and minimize conflict between visitor/employee vehicles and large trucks. Appropriate maneuvering and stacking areas for trucks should be a primary consideration in the overall design of the circulation system. (d) Employee parking. Employee parking shall be located on the side or rear of the site to reduce visual exposure to the public right-of-way. Parking areas shall be located near other vehicle access points to avoid conflicts with trucks and service areas. (e) Visitor parking. A small number of visitor parking spaces may be located toward the front of the site, with convenient access to the primary building. These parking spaces shall be located near general vehicle access points to avoid conflicts with trucks and service areas. Pedestrian walkways shall be clearly identified and connect parking areas to the primary building entrance. (f) Truck parking. Truck parking shall be located at the rear of the site, behind the primary building and not within the required landscaped buffer areas. The dimensional requirements for delivery truck parking spaces shall be 12 feet by 20 feet and 12 feet by 60 feet for semi-trucks. (g) Loading/service areas. Truck drive aisles and service areas shall be separate from visitor and employee drive aisles and be located on the side and/or rear of the site. (h) Fencing. Acceptable fencing materials include painted or coated metal (aluminum, wrought iron, or steel), masonry, or stone. The use of razor or barbed wire is not permitted in areas visible from the public right-of-way. Security fencing when required adjacent to public rights-of-way shall consist of wrought iron, tubular steel, or similar materials. The use of chain-link fence material is not permitted in the front yard of a site but may be used on the sides and rear if it's coated chain-link. Fences shall not exceed a height of six feet along the front and shall be no less than six feet and no more than eight feet on the side and rear. (i) Walls. Walls over three feet in height should include design elements such as textured concrete block, interlocking "diamond" blocks, formed concrete with reveals, or similar effect. (j) Landscaped buffer yard. A minimum landscape strip 20 feet wide is required adjacent to the public ROW. These areas shall incorporate a mix of trees, shrubs, and flowers to provide a multi-layered attractive element that softens the otherwise hard industrial appearance. (k) Foundation planting. A minimum five-foot foundation planting strip adjacent to the base of the main structures facing a public street shall be required. (l) Detention/retention areas. Detention areas may be located within the required landscaped buffer yards as long as the required amount of planting material provided meets the standards for both buffer yards and detention/retention areas. (m) [Street trees.] Street trees shall be required to be planted at no less than 60-foot intervals along the entire property fronting all streets. Street trees may be placed in the right-of-way or at a maximum of ten feet outside the street right-of-way if necessary given available right-of-way and visibility considerations including clear zone requirements. (n) Screening of working areas. Storage areas, trash and recycling dumpsters, mechanical equipment, loading areas, and other work areas should be screened with fencing materials and landscaping where appropriate. (o) Entrance and ground signs. As a matter of safety, entrance and ground signs must respect GDOT clear-zone restrictions. Entrance and ground signs shall be constructed of similar materials and color to that of the primary building and shall be landscaped around the sign base with low-lying shrubs and plants. Lighting of entrance and ground signs shall be external illumination; internally illuminated signs and/or lettering shall be prohibited. (p) Directional signs. Directional signs shall be provided at one per vehicular access point, with a maximum sign area of six square feet and a maximum height of three feet. These signs shall not count against the maximum number of ground signs allowed under the sign regulations of this UDO. Sec. 4.02.16. Industrial architectural requirements. (a) Building materials. The following materials are prohibited on an industrial building facade fronting a county road or state highway: corrugated and/or sheet metal siding; prefabricated steel panels; smooth-face concrete block; untextured tilt-up concrete panels; plywood; vinyl siding; and synthetic stucco. (b) Entrances. Primary building entries shall be oriented toward the predominant public view, readily identifiable, and well defined through the use of projections, recesses, columns, roof structures, or other design elements. (c) Horizontal articulation. Street-facing building facades shall be horizontally divided at least every 20 feet using architectural means such as string courses, recesses, cornice lines, reveals or the like. There must be at least one horizontal division on every building facade. (d) Vertical articulation. Street-facing building facades shall also be vertically divided utilizing major and minor articulations to create visual interest and avoid monotony. Major articulations shall occur at least every 120 feet of horizontal facade length. Major articulations may be accomplished through: a change of facade materials extending from grade through the cornice; physical offsets; and/or similar means intended to convey the impression of separate buildings. Minor articulations shall occur approximately every 60 feet of horizontal facade length and may be accomplished by: the use of pilasters; the use of smaller offsets; or similar means intended to create the appearance of structural bays. (e) Windows. All public street-fronting first stories shall have windows that shall be of clear, unpainted or similarly treated glass to allow views of building interior. (f) Rooftop mechanical equipment. Any mechanical equipment located on the roof of a building shall be as inconspicuous as possible from the right-of-way of the public road or state highway by the building roof, a parapet wall, or by other screen approved by the zoning administrator. In the case of flat roofs, equipment may be located within a roof depression to comply with this requirement. If the elevation of the road or state highway is higher than the building and such screening cannot be accomplished, or in other cases where such screening is not feasible in the zoning administrator's opinion, equipment shall be painted to minimize its visibility. (g) Accessory buildings. Buildings accessory to the primary structure shall be designed to resemble that of the primary building with respect to architecture, materials, color, mass, and scale. Sec. 4.02.17. Mixed-use site design standards. (a) Block size. Mixed-use areas are encouraged to be divided into blocks with a grid street pattern to allow multiple alternative routes for transportation. The maximum block size fronting on State Highways 16 and 36 and the I-75 frontage road, measured from road center line to road center line, shall be 1,000 feet. The maximum block size fronting on collector and local roads, measured from road center line to road center line, shall be 500 feet. (b) Service functions. Service functions such as deliveries or maintenance activities shall be integrated into the circulation pattern in a manner which minimizes conflicts with vehicles and pedestrians. On development sites of 15 acres or more, office and commercial developments shall have service and loading areas separate from main circulation and parking areas. (c) Interconnection. To promote interconnection, cul-de-sacs and other dead-end roads are prohibited; instead, developers are encouraged to create blocks as referenced above. In cases where life safety is concerned, a dead-end may be granted by written approval from the zoning administrator. (d) Sidewalks. Sidewalks at least ten feet in width shall be provided on both sides of the street in Mixed-Use areas, except along the frontage road. In addition, a five foot planting strip shall be provided from the back edge of the curb to the sidewalk. This area shall be landscaped with a mixture of ground cover and street trees. (e) Street trees shall be required to be planted at no less than 50-foot intervals along the entire property fronting all streets. Street trees may be placed in the right-of-way or at a maximum of ten feet outside the street right-of-way if necessary given available right-of-way and visibility considerations including clear zone requirements. (f) Open space. For mixed-use subdivisions of more than three acres, the developer shall set aside ten percent of the land to be used as an amenity area or green space open to the public. This area shall be centrally located to maximize accessibility and shall include pedestrian accommodations such as lighting, benches, and trash and recycling receptacles as appropriate. (g) Off-street parking. Off-street parking shall be provided on every lot on which any permitted or special use is established in accordance with section 6.01.11. (1) One row of angled parking may be located between the street and the primary building. The remaining required parking spaces shall be located to the side and rear of the building. (2) Parking screening. Any parking adjacent to the right-of-way must be screened by opaque shrubbery at least three feet in height when planted or by a masonry wall or fence measuring 36 inches high. Parking lots over 50 spaces must provide pedestrian paths at least five feet wide towards the main entrance of the primary building and pedestrian crossing areas where such paths intersect with vehicular roads. (h) Shared parking. The zoning administrator may approve a reduction in the number of parking spaces required for a specific use where inter-parcel access is provided and a shared parking analysis, which is approved by the zoning administrator, demonstrates that adequate parking will be provided. (1) Per the table below, a shared parking calculation projection shall be provided that demonstrates that each use will have adequate parking provisions at all times. The process for determining the minimum parking requirements for a mixed use development or for contiguous properties containing multiple uses is: a. Determine the minimum number of parking spaces required for each use category. See parking space requirements tables in chapter 6. If the use is undetermined at the time of construction, one space shall be provided for each 300 square feet of floor space. b. Multiply each parking requirement by the corresponding percentage for each of the time periods shown on the table below. Shared Parking Chart WEEKDAYS WEEKENDS Use Daytime 6:00 a.m. - 5:00 p.m. Evening 5:00 p.m. - 6:00 a.m. Daytime 6:00 a.m. - 5:00 p.m. Evening 5:00 p.m. - 6:00 a.m. Residential 0.8 1 0.8 1 Office 1 0.1 0.2 0.05 Retail 0.95 0.85 1 0.7 Hotel 0.6 1 0.6 1 Restaurant 0.75 1 0.6 1 Entertainment 0.5 0.85 0.7 1 Church 0.5 0.5 1 0.6 c. Total the number of parking spaces for each of the time periods (add together the numbers in each column). d. The largest column total is the minimum shared parking requirement for the development or collectively for the contiguous properties. (2) In no case shall parking spaces that are farther than 1,000 feet from a building entrance be counted towards shared parking requirements. (i) Bicycle parking. All nonresidential uses that are required to provide off-street parking spaces for motorized vehicles shall also provide bicycle parking spaces. Uses that require up to 50 off-street parking spaces for motorized vehicles shall provide at least one bicycle rack (two spaces), plus one more bicycle rack for each additional 50 parking spaces required for motorized vehicles. (1) Multi-family residential developments shall provide a minimum of one bicycle rack (two spaces) for up to ten dwelling units and one additional rack per each additional ten dwelling units. (2) Bicycle spaces shall consist of one or more inverted U-racks parallel to one another anchored into concrete 30 inches apart and 30 inches away from nearby walls or obstacles, providing a clear length of at least 83 inches for easy access in and out. Each rack shall count as two bicycle spaces. (3) The zoning administrator may permit other styles of bicycle racks provided they meet similar criteria of durability and security. (4) No single bicycle parking area should exceed ten racks or 20 spaces or impede normal pedestrian flow. (5) It is recommended that the bicycle parking area be located within 100 feet of the facility entrance, preferably visible from that entrance. In no case shall the bicycle parking be further than 200 feet from the entrance. (j) Paths. Surface parking shall provide safe pedestrian passage by incorporating an efficient system of pedestrian paths at least five feet wide. Buildings that locate their parking in front must provide a crosswalk to connect the public sidewalk to the sidewalks adjacent to the building entrance. (k) Parking illumination. Parking lots and structures shall follow basic Illuminating Engineering Society (IES) guidelines by providing even lighting of at least 0.2 foot-candles of horizontal intensity, but no more than four foot-candles (one foot-candle average). Full cutoff luminaires shall be used to prevent wasted light and keep glare from reaching neighboring areas. Parking lot and street light posts shall not exceed a height of 32 feet from finished grade. (l) Location of loading areas. Loading areas shall be located to the rear of the building unless site design precludes a rear location, in which case loading shall be to the side of a building. Loading areas, at the determination of the zoning administrator, shall be permitted within front yards only if undue hardship can be shown. (m) Trash enclosures. Enclosures shall be constructed of sturdy, durable, opaque materials making it so trash receptacles are completely screened from view. These enclosures should be similar to or designed to be compatible with the surrounding architecture. Trash enclosures should include adequate, accessible, and convenient areas for collecting and loading recyclable materials. Space should be provided within enclosures for pallets, skids, cartons, etc., and no overflow of these or other debris shall be allowed in public view. Sec. 4.02.18. Mixed-use architectural requirements. (a) Building materials. The following materials are prohibited from fronting a county road or state highway: corrugated and/or sheet metal siding; prefabricated steel panels; smooth-face, split or ground face concrete block; tilt-up concrete panels; and synthetic stucco. Steel or other metals shall not be used on building exteriors, except as may be necessary for roofing, window trim, gutters, and downspouts. (b) [Entrances.] Primary entrances, and individual tenant space entries, shall be designed to express greater architectural detail through the use of awnings, recessed areas, a change in material, variations of the material patterning, or other similar techniques. (c) Horizontal articulation. Street-facing building facades shall be horizontally divided at least every third floor using architectural means such as string courses, recesses, cornice lines, reveals or the like. There must be at least one horizontal division on every building facade. (d) Vertical articulation. Street-facing building facades shall also be vertically divided utilizing major and minor articulations to create visual interest and avoid monotony. Major articulations shall occur at least every 60 feet of horizontal facade length or at changes between tenants. Major articulations may be accomplished through: A change of facade materials extending from grade through the cornice; physical offsets; and/or similar means intended to convey the impression of separate buildings. Minor articulations shall occur approximately every 30 feet of horizontal facade length and may be accomplished by: the use of pilasters; the use of smaller offsets; or similar means intended to create the appearance of structural bays. (e) Windows. (1) All street-fronting first stories shall have windows that meet the following requirements along the portion of the building fronting a public street or public sidewalk. a. Windows shall be of clear, unpainted or similarly treated glass to allow views of store interior or display windows. b. Windows shall be located along a minimum of 60 percent of the linear measure of street frontage. Windows shall start a maximum of three feet above the sidewalk. c. The maximum facade length without windows shall be 20 feet. d. Glass doors and display cases may count towards window requirements. e. Hospitals, hotels, townhouses, and multi-family residences first stories rewire windows for a minimum 20 percent of first floor facade area, primarily arranged in a grid. (2) All building stories above the first story shall have windows that equal a minimum of 20 percent of the total facade area, with each story being calculated independently. Additionally, all street-facing upper story windows shall be predominately arranged in a grid, subject to individual window variation. (f) Rooftop mechanical equipment. Any mechanical equipment located on the roof of a building shall be as inconspicuous as possible from the right-of-way of the public road or state highway by the building roof, a parapet wall, or by other screen approved by the zoning administrator. In the case of flat roofs, cooling and air handling equipment may be located within a roof depression to comply with this requirement. If the elevation of the road or state highway is higher than the building and such screening cannot be accomplished, or in other cases where such screening is not feasible in the zoning administrator's opinion, equipment shall be painted to minimize its visibility. (g) Entrances. All first story uses shall have a primary pedestrian entrance which faces, is visible from, and is directly accessible from the sidewalk. Sec. 4.02.19. Rural neighborhood site design standards. (a) Block size. Rural neighborhood areas are encouraged to be divided into blocks to allow multiple alternative routes for transportation. The maximum block size, measured from road center line to road center line, shall be 500 feet. (b) Interconnection. To promote interconnection, cul-de-sacs and other dead-end roads are prohibited; instead, developers are encouraged to create blocks as referenced above. In cases where life safety is concerned or undue hardship from crossing a wetland or stream, a dead-end may be granted by written approval from the zoning administrator. (c) Lot size. The rural neighborhood area allows a minimum lot size of 10,890 square feet for single-family houses. (d) Sidewalks. Sidewalks at least five feet in width shall be provided on both sides of the street in rural neighborhood areas. In addition, a four-foot planting strip shall be provided from the back edge of the curb to the sidewalk. This area shall be landscaped with a mixture of ground cover and street trees. (e) Street trees. Appropriate street trees shall be provided within the planting strip every 40 feet on center. (f) Open space. For rural neighborhood subdivisions of more than three acres, the developer shall set aside ten percent of the area in a common area as a park or other public amenity that is located to maximize accessibility by as many residences as possible. Said public amenity shall include pedestrian accommodations such as lighting, benches, and trash and recycling receptacles as appropriate. Sec. 4.02.20. Rural neighborhood architectural standards. (a) Building materials. The following materials are prohibited: Corrugated and/or sheet metal siding; prefabricated steel panels; smooth-face, split or ground face concrete block; tilt-up concrete panels; vinyl siding; exterior insulated finishing systems (EIFS); and synthetic stucco. The following materials are encouraged: brick, stone, and cement board siding. (b) Entry ways. All residential entry ways shall be covered. The actual style of covering (e.g., porch, awning, etc.) can be determined by the architectural style. (c) Chimneys. Chimneys shall be veneered in stone, brick, or stucco. (d) Garages. Garages whether attached or detached shall not face the street; instead, garages shall face the side or rear of the lot. (e) Mechanical equipment. All mechanical equipment, including HVAC and similar systems, shall be screened from street view on three sides by an opaque wall or fence constructed of brick, stucco, split-face block or wood. A vegetative screen is permissible if the screen uses 100 percent evergreen materials at least two plants deep. Sec. 4.02.21. Sign regulations. (a) Interstate signs. Properties within this overlay district that are directly adjacent to the Interstate 75 right-of-way shall be entitled to erect interstate signs, subject to the provisions for interstate signs in the sign regulations of this ordinance. Otherwise, signs within the overlay district are permitted in a manner consistent with the underlying zoning classification, as provided by the sign regulations of this ordinance, and shall also be subject to the following requirements. (b) Monument-style ground signs. For purposes of this section, "monument sign" shall mean a free standing sign permanently secured to the ground with a structural base below the sign face. In residential areas, monument signs may be composed of brick, stone, or other material approved by the zoning administrator. Nonresidential signs shall be consistent with the primary building on the applicable site, where applicable. Monument signs are subject to architectural review in the overlay. (c) Master uniform sign plan. For properties that contain more than two uses, buildings, or tenants constructed or managed as a single development, a master uniform sign plan for the entire property shall be required to be submitted for approval by the zoning administrator. Such plan shall demonstrate the size, location, design, and color of signs on the property. Master uniform sign plans are subject to architectural review and shall at minimum consist of the following: (1) Drawings and specifications to clearly illustrate the location, materials, size, letter style, and color of all signs to be placed as freestanding and building signs within the development. (2) Design standards such that signs of a similar type and function within the development shall have a consistency of size, lettering style, color scheme, and construction materials so as to present a unified design concept while also allowing some differences between tenant types and occupancies. Following approval by the zoning administrator, the requirements of the master uniform sign plan shall be referenced in documents involving the sale, lease, or other transfer of right of occupancy affecting any part of the development. Upon such approval, said master uniform sign plan shall be binding on the owner and any lessees, subtenants, purchasers, or other occupants, until or unless the uniform sign plan is replaced with another approved uniform sign plan. Sec. 4.02.22. Butts County I-75 overlay design guidelines. The design guidelines which shall apply to the use and development of all properties within the Butts County I-75 overlay district is attached as appendix A and incorporated herein. Sec. 4.03.00. Supplemental standards for specific uses. Sec. 4.03.01. Bed and breakfast inn. A structure which is used primarily as an owner-operated business for providing overnight accommodations to the public, even though the owner or manager may live on the premises. The number of guest rooms shall be ten or fewer. The establishment shall not contain restaurant facilities, but may provide food service for transient guests only. The inn may host events such as weddings, small business meetings, etc. Sec. 4.03.02. Campground/recreational vehicle park. (a) In general. (1) All RV parks and campgrounds, as defined in section 4.03.02(b), whether the camp spaces or lots are offered for ownership or rental, are subject to the requirements of this section. (2) Permanent occupancy prohibited. a. No recreational vehicle or tent shall be used as a permanent place of abode, dwelling or business. Continuous occupancy for a combined period of 120 days or more during any calendar year of a recreational vehicle or tent, or of a camp space by the same recreational vehicle or tent, shall constitute permanent place of abode. b. Removing the wheels of a recreational vehicle except for temporary purposes of repair or to attach the recreational vehicle to the ground for permanent stabilizing purposes is prohibited. (3) Development of an RV park or campground shall be based on a site plan meeting all requirements of this section and other relevant requirements of the Unified Development Ordinance, and shall subject to issuance of a development permit in accordance with the provisions and requirements for such permits found in the Unified Development Ordinance. (4) Predevelopment review and approval by the health department must be obtained prior to site plan approval and the issuance of a development permit. (5) Internal roadways and camp spaces within an RV park or campground shall be located outside of any flood hazard area (i.e., the 100-year flood plain). (b) Definitions related to recreational parks and campgrounds. Camp space means a specific and designated portion of the land in an RV park or campground intended for the placement of a single recreational vehicle or tent for the use of its occupants. Campground. See "RV park or campground." Motor vehicle means every vehicle which is self-propelled by a motor or engine and is authorized to operate on public streets and highways. Recreational vehicle means a vehicular type unit primarily designed as temporary living quarters for recreational, camping or travel use which either has its own motive power or is mounted on or towed by another vehicle. Any of the following and similar vehicles are "recreational vehicles": (1) Travel trailer means a vehicular, self-propelled or portable structure built on a chassis, so designed or constructed as to permit occupancy for dwelling or sleeping purposes. a. Dependent trailer means a travel trailer that is dependent upon a service building housing toilet facilities. b. Independent trailer means a travel trailer that has its own holding tank for waste and/or can be connected directly to a sewer connection. (2) House trailer means a trailer or semitrailer that is designed, constructed and equipped as a temporary dwelling and is equipped to be towed as a conveyance on streets and highways. (3) Motor home means every motor vehicle designed, used or maintained primarily for temporary or transient occupancy for travel, recreation and vacation. (4) Truck camper means any structure designed, used or maintained primarily to be loaded on or affixed to a motor vehicle for temporary or transient occupancy for travel, recreation and vacation. (5) Camping trailer means a canvas or folding structure mounted on wheels and designed for travel, recreation and vacation. RV means recreational vehicle. RV park or campground means any privately owned parcel of land that is accessible by motor vehicles and designed, maintained, intended or used for the purpose of supplying temporary accommodations to transients for overnight use by recreational vehicles and/or tents, and permanently designated as a developed camp area set aside for temporary camping purposes for two or more recreational vehicles or tents. Tent means a portable shelter of material stretched and sustained by poles or ropes or other support device, whether placed directly on the ground or elevated above the ground. Trailer, dependent. See under "Recreation vehicle." Trailer, independent. See under "Recreation vehicle." Transient means a temporary occupant of living quarters (such as a motel room, recreational vehicle or tent) while away from their permanent place of residence. (c) Area, density and other park standards. (1) The minimum land area of any RV park or campground shall be five contiguous acres. The maximum land area that can be devoted to an RV park or campground is 20 contiguous acres. (2) An RV park or campground must have at least 100 feet of frontage along a major thoroughfare designated as an arterial or collector road. (3) The overall density of an RV park or campground shall not exceed eight camp spaces per acre outside of any flood hazard area or required buffers. Camp spaces may be clustered within the RV park or campground in order to create open space, natural areas or buffers. (4) Grounds. The unpaved areas of an RV park or campground shall be maintained with grass, trees and/or shrubs to enhance the appearance of the park and to prevent soil erosion or the creation of dust during dry weather. (5) No individual camp space in any RV park or campground may be sold as an individual lot. (6) Lighting. All park roadways, pedestrian walkways and areas around park service buildings shall be illuminated to at least 0.3 foot candles. a. The park street system shall be adequately maintained and lighted by the owner of the RV park or campground. The lighting units shall be so spaced and equipped to provide for the safe movement of pedestrians and vehicle traffic at night. b. Lighting shall be located, aimed and shielded so that it is focused away from adjoining properties and public rights-of-way. Lighting should be focused downward in order to avoid light trespass, glare and light pollution. Levels of illumination must be appropriate for the security of the area without having an adverse impact on adjacent properties. c. No flashing, moving, neon or animated lights shall be allowed. d. Lighting requirements shall apply to all individual camp spaces as well as to the common areas, parking lots, park service buildings and recreation areas. e. Some or all of the lights may be extinguished after the RV park or campground is closed at night. (7) Park boundary treatment. a. An RV park or campground shall be bounded with buffer strip along all of the exterior lot lines of the park. The buffer strip shall meet the buffer standards of the Landscaping, Buffers and Tree Protection [section] of the Unified Development Ordinance. b. The buffer strip along the exterior side and rear lot lines shall be no less than 25 feet wide. c. A buffer of at least 25 feet in width, across which there shall be no right of access other than the approved entrance/exit roadway, shall be provided along the frontage of the RV park or campground. (8) Recreation areas. a. The RV park or campground shall provide at least one residential area. The number of residential areas shall be no less than one per 25 camp spaces or fraction thereof. Each recreation area provided shall contain at least 2,500 square feet and be improved with such recreation facilities as children's play equipment, outdoor cooking facilities, picnic tables or picnic shelters, as appropriate to the nature or operation of the RV park or campground. b. Recreation areas shall be so located as to be free of traffic hazards and shall be equally accessible by all occupants of the park. (d) Minimum setbacks and separations. The size of individual camp spaces shall be adequate to meet all setback and separation requirements of this subsection. The minimum size of a camp space may vary depending on the type and size of the vehicle or tent occupying or intended to occupy such space. (1) All camp spaces and all principal or accessory buildings within the park shall be located no closer than 40 feet to adjoining property lines. (2) Recreational vehicles and other vehicles shall be parked so that the vehicle is no less than ten feet and no more than 20 feet from the edge of any internal roadway giving access to the camp space. (3) Camp spaces shall be so arranged that RVs and tents shall be separated from each other and from other buildings and structures by at least 20 feet, provided further that: a. Any accessory structures or extensions (such as awnings, tie-down lines, and individual storage facilities) and any separate vehicles (such as automobiles, trucks, motorcycles or towing vehicles) shall be considered part of the recreational vehicle or tent for the purpose of measuring separation from other RVs or tents; and b. Separation between RVs and tents and an individual storage structure located on the camp space for use by the occupant of the RV or tent shall be at least eight feet. (e) Access and circulation. (1) Entrances and exits. The entrances and exits to the RV park or campground shall be only from the major thoroughfare on which it fronts. Internal roadways connecting to the major thoroughfare must be designed and constructed to public street standards within the thoroughfare's right-of-way, but shall be maintained as private roadways. (2) Internal streets. a. Access to all camp spaces and all park service buildings shall be from internal roadways within the park and in no case directly from any public road, street or highway. b. All internal roadways shall be private drives and shall be of adequate width to accommodate anticipated traffic. Internal roadways shall meet the following minimum requirements: One-way drive—minimum 12 feet in width; two-way drive—minimum 24 feet in width. (3) Surfacing. All roadways and parking areas within the RV park or campground shall be surfaced with concrete or asphalt, or an equivalent all-weather surfacing approved by the public works director and/or county engineer. (4) Off-street parking. Every RV park and campground shall provide sufficient parking and maneuvering space so that the parking, loading or maneuvering of recreational vehicles shall not necessitate the use of any public street or right-of-way. (5) All road signs and lot identification numbers must be sufficient for and meet the requirements of the county's E-911 system. (f) Park service buildings. Accessory structures and community service facilities may include the following uses: (1) Park manager's permanent residence. (2) Park management office and storage. (3) Community sanitary and laundry facilities. (4) Indoor community recreation center, not exceeding 1,800 square feet of gross floor area. (5) Commercial uses supplying essential goods or services for the use of park occupants, not exceeding 800 square feet of gross floor area. (6) An individual storage structure located on a camp space for use by the occupant of the camp space, not exceeding 320 square feet of gross floor area. Such storage structures shall not be used for temporary or permanent habitation. (7) Such other structures or facilities directly related to and necessary for the proper management, operation or maintenance of the RV park or campground as determined in writing by the zoning administrator prior to installation. (g) Health department requirements. Any RV park or campground must comply with all currently adopted rules and regulations of the Georgia Department of Human Resources regarding "tourist accommodations" and sewage disposal requirements of the Department of Human Resources or Department of Natural Resources (as applicable) or the Department of Environmental Health or Butts County Water and Sewage Authority, as applicable. Such rules and regulations, which may be amended from time to time, may include but are not limited to the following: (1) Water supply. a. The water supply shall comply with all federal, state and local laws and/or ordinances related to safe drinking water. b. Hose used for filling travel trailer water tanks shall be stored under sanitary conditions, used for no other purposes and be so handled that back siphonage cannot occur and that contaminants will not be introduced into the travel trailer's water tank. (2) Toilet facilities. a. Where dependent trailers are located, central toilet facilities shall be provided for each ten camp spaces or fraction thereof, with not less than one commode, one lavatory and one tub or shower head for each sex and separated from the other sex. In addition, at least one urinal shall be provided in each central toilet designated for men. It is not required for independent trailer sites to have access to central toilet facilities. b. Central toilets shall be plainly marked, separate for each sex, lighted at night and located within 200 feet of the camp spaces served. c. Anti-slip tubs, slip strips, appliqués or slip-proof mats shall be provided in each bathing facility and shall be kept clean and in good repair. (3) Sanitary sewage and disposal facilities. a. Connection shall be made to a public sewer whenever possible and feasible as determined by the health department and Butts County Water and Sewage Authority, as applicable. b. Each independent trailer camp space shall be provided with a sewer connection not less than three inches in diameter. Suitable fittings shall be provided at each sewer connection to permit a watertight junction to be made with the travel trailer outlet. Each sewer connection shall be so constructed that it can be closed and when not in use shall be capped to prevent escape of odors. c. Where public sewers are not available, sewage disposal shall be provided to effectively dispose of all water carried wastes in a sanitary manner. No sewage, waste water, or other liquid effluent shall be discharged in such manner as to enter surface or subsurface water except following a treatment process approved prior to construction in conformity with existing state and local laws. Such sewage disposal systems shall be constructed and maintained in a manner to prevent the creation of unsanitary conditions. Existing private sewage disposal systems giving satisfactory service as determined by the health department may be approved by said department. (4) Garbage and refuse disposal. a. All outside refuse or garbage storage containers shall be constructed of durable metal or other approved types of materials, which do not leak and do not absorb liquids and shall be provided with tight-fitting lids or covers and shall, unless kept in a special vermin proof room or enclosure, be kept covered when stored. Each container shall be located within 100 feet of the camp spaces it serves or in a location approved by the health department and shall be cleaned at such frequency as to prevent a nuisance or odor. b. Adequate cleaning facilities shall be provided and each garbage and/or recycling storage room, enclosure or container shall be thoroughly cleaned after the emptying or removal of refuse or garbage. Areas surrounding these rooms, enclosures and containers shall be kept clean and orderly. Liquid waste resulting from the cleaning of containers shall be disposed of as sewage. c. The RV park or campground shall dispose of the refuse in compliance with all federal, state and local laws and/or ordinances. (5) Insect and rodent control. Effective measures, approved by the health department, intended to eliminate the presence of rodents and flies, roaches and other insects on the premises shall be utilized. The premises shall be kept in such condition as to prevent the harborage or feeding of insects or rodents. (6) Laundry rooms. Where laundry facilities are provided, they shall be separate from other facilities, of sound construction and shall be kept clean and in good repair. Laundry rooms for guest use shall be vented to the exterior and shall be well lighted, ventilated and provided with hot and cold water under pressure. Dryers shall be vented to the outside. (h) Electrical service requirements. (1) All utilities, including electrical, shall be underground. Where on-site or offsite conditions require electrical supply lines to be above ground, there shall be no less than 18 feet of vertical clearance and three feet of horizontal clearance in all areas subject to recreational vehicle movement. (2) Any RV park or campground must comply with all requirements of the National Electrical Code regarding recreational vehicle parks which include, but are not limited to, the following: a. Every recreational vehicle site with electrical supply shall be equipped with at least one 20-ampere, 125-volt receptacle. A minimum of five percent of all recreational vehicle sites, with electrical supply, shall each be equipped with a 50-ampere, 125/250-volt receptacle. A minimum of 70 percent of all recreational vehicle sites with electrical supply shall each be equipped with a 30-ampere, 125-volt receptacle. Dedicated tent sites with a 15- or 20-ampere electrical supply shall be permitted to be excluded when determining the percentage of recreational vehicle sites with 30- or 50-ampere receptacles. b. Additional receptacles shall be permitted for the connection of electrical equipment outside the recreational vehicle within the recreational vehicle park. c. All 125-volt, single-phase, 15- and 20-ampere receptacles shall have listed ground-fault circuit-interrupter protection for personnel. d. Location. 1. Where provided on back-in sites, the recreational vehicle site electrical supply equipment shall be located on the left (road) side of the parked vehicle, on a line that is five feet to seven feet from the left edge (driver's side of the parked RV) of the stand and shall be located at any point on this line from the rear of the stand to 15 feet forward of the rear of the stand. 2. For pull-through sites, the electrical supply equipment shall be permitted to be located at any point along the line that is five feet to seven feet from the left edge (driver's side of the parked RV) from 16 feet forward of the rear of the stand to the center point between the two roads that gives access to and egress from the pull-through sites. 3. The left edge (driver's side of the parked RV) of the stand shall be marked. (Ord. of 6-14-2021(1), § 1) Sec. 4.03.03. Garage, repair. A public garage intended to be used to make major commercial automobile, motorcycle, lawn mower, or other motor vehicle repairs; such a use should meet the following development standards as well as all other applicable regulations: (a) All body work and painting must be conducted within a fully enclosed building. (b) No open storage of junked or wrecked vehicles, dismantled parts, or supplies visible beyond the premises is permitted. Sec. 4.03.04. Personal care home. (a) A "personal care home" shall mean a building or group of buildings, a facility, or place in which is provided two or more beds and other facilities and services, including rooms, meals, and personal care for nonfamily ambulatory adults; and it otherwise complies with the rules and regulations contained in chapter 111-8-62: Personal Care Homes (Rules of the Georgia Department of Human Resources). For the purpose of this ordinance, personal care homes are classified as follows: (1) Family personal care home: A home for adults in a family-type residence, noninstitutional in character, which offers care to two through six persons. (2) Group personal care home: A home for adult persons in a residence or other type building(s), noninstitutional in character, which offers care to seven through 15 persons. (3) Congregate personal care home: A home for adults which offers care to 16 or more persons (b) State regulations. All personal care homes must comply with all applicable regulations of the Georgia Healthcare Facilities Regulation, the Georgia Department of Human Resources, the Office of Regulatory Services and/or any other regulatory agency(ies) of the State of Georgia that may be, from time to time, charged with regulatory duties concerning group care homes as well as the office of the State Fire Marshal. All personal care home applicants shall present a current State of Georgia issued permit when first applying for zoning approval. (c) Proximity to other personal care homes: Personal care homes shall not be allowed within 1,000 feet of each other as measured from property lines of each such personal care home as such lines exist based on duly recorded property records of Butts County and not altered to circumvent the requirements of this provision. (d) Owner occupant. All personal care homes shall be owner-occupied and the owneroccupant shall own no less than 50 percent of the premises, be listed on the deed as such, maintain the premises as his/her homestead exempt property, show the premises has his/her residence on all federal income tax returns, bank accounts, state-issued drivers license, and the fire insurance policy. (Ord. of 6-14-2021(3), § 1) Sec. 4.03.05. Commercial race tracks. (a) Race tracks and persons and entities subject to this section. This section shall apply to any commercial race track which, for the purpose of this ordinance, shall be defined as any race track which provides for the racing of motor vehicles of any kind, and at which drivers or racing teams are compensated or awarded prizes, or at which members of the audience must purchase a ticket or pay some other entry fee. The requirements and restrictions of this ordinance shall apply to the operator of any such race track and also drivers of motor vehicles operated at such race tracks. (b) Hours of operation. No commercial race track shall conduct any race except during the hours of 8:00 a.m. to 10:00 p.m. on Sunday through Thursday and 8:00 a.m. to 11:00 p.m. on Fridays and Saturdays, unless other hours are expressly approved by the board of commissioners. No driver of any vehicle raced or intended to be raced at any commercial race track shall operate the vehicle at such race track outside the hours of operation in any race. (c) Noise restriction. It shall be a violation of this ordinance for any person or entity to conduct a race or any other operation at a commercial race track, or operate at a commercial race track a vehicle intended for racing, outside the hours of operation where such activity causes any noise plainly audible outside the boundaries of the property on which the commercial race track is located. For the purposes of this provision, if the operator of the commercial race track allows racing vehicles to remain on the premises and to be operated in any manner (including driving, revving the engine, spinning the tires or any other use of the vehicle) which causes noise in violation of this subsection, the operator of the commercial race track will be deemed to be operating the commercial race track in violation of this subsection. Sec. 4.03.06. Shooting range, indoor. These are facilities where firing ranges are located only inside buildings. In order for an indoor shooting range to be established in Butts County, Georgia, it must comply with the following requirements: (a) Buildings housing firing ranges must be constructed to prevent the escape of bullets and also constructed with sound-proofing or setbacks such that no sound of the discharge of firearms is audible at the property line. (b) A site plan shall be submitted with the building permit application showing all facilities and construction standards, processes, and materials necessary to comply with the requirements of this definition. Sec. 4.03.07. Shooting range, outdoor. These are any facilities where outdoor firing of firearms is performed on a commercial basis (i.e., requires a fee or membership). In order for an outdoor shooting range to be established in Butts County, Georgia, it must comply with the following requirements: (a) Minimum lot size: 100 acres. (b) A 200-foot vegetated buffer shall be required for all sides of the property abutting residential or commercial zones. (c) Firing ranges for rifles and pistols should be oriented so that firing is not directed towards any residential property within 2,000 yards from the firing line that is touching an arc width of 20 degrees, centered on the axis of firing (that is, within ten degrees of either side of said axis); ranges for shotgun use, including sporting clays, skeet, trap and five stands are not subject to this requirement. (d) All portions of any firing range (for pistol and rifle ranges, this is defined as the area from the firing line to the target backstop or berm, for the width of the shooting lanes; for ranges for shotgun use, including sporting clays, skeet, trap and five stands, this is defined as the area from the firing stations to a distance 100 yards from the firing stations in the direction of fire) must be located at least 1,000 feet from all property lines. (e) Hours of firing shall be limited to between 10:00 a.m. and 6:00 p.m., Monday to Saturday. No firing is permitted on Sunday. (f) A site plan shall be submitted with the special use application showing all facilities and ranges, the direction of firing, all residential property within 2,000 yards of the property boundaries, and all buffers and distances. Sec. 4.03.08. Fences and screening of junkyards and related uses. Junkyards, salvage yards and recycling centers shall be fenced and screened from view from public roads and adjacent properties in the following manner: (a) Fencing. Commercial grade fencing at least eight feet in height measured from the ground shall fully secure all portions of the property in which junk, salvage or recyclable materials are stored or processed. The fencing shall be shown on any initial application for a junkyard, salvage yard or recycling center. (b) Screening. A screen shall be in place which completely screens all portions of the property in which junk, salvage or recyclable materials are stored or processed from the public right-of-way and adjacent properties. Screen may be accomplished by opaque fencing or vegetation; however, the screen must fully and effectively conceal such portions of the property and any junk or salvage or recyclable materials on a year-round basis. A plan for screening shall be submitted to the community development department accompanied by an application for an initial permit and shall be in sufficient detail to demonstrate compliance with said permit. Sec. 4.03.09. Kennel. The housing for four or more dogs, cats, or other domestic animals for the purpose of providing an income or revenue. Kennels of a commercial nature must meet the following development standards: All structures must be set back 200 feet from all property lines. Sec. 4.03.10. Landfills and solid waste disposal facilities. (a) Permitted landfills/disposal facilities are classified into three types: (1) Inert waste landfills; (2) Construction and demolition (C&D) landfills; and (3) Municipal solid waste (MSW) landfills. Each type of landfill is defined below. Landfills are permitted as a special use in the M-3 district. Landfills that are not permitted in any district include hazardous waste landfills. In the event a solid waste disposal facility is sought to be constructed that is not covered specifically herein, the zoning administrator shall make a determination as to what use it is most closely related to and apply the relevant regulations. This section incorporates by reference the definitions contained in O.C.G.A. § 12-8-22 and the regulations of the Georgia Department of Natural Resources pertaining to solid waste management. (b) Types of disposal facilities. (1) Inert waste landfill means a disposal facility accepting only wastes that will not or are not likely to cause production of leachate of environmental concern. Such wastes are limited to earth and earth-like products, concrete, cured asphalt, rocks, bricks, yard trimmings, stumps, limbs, and leaves. This definition excludes industrial and demolition waste not specifically listed above. (2) Construction/demolition waste landfill means a disposal facility accepting only waste building materials and rubble resulting from construction, remodeling, repair, and demolition operations on pavements, houses, commercial buildings and other structures. Such wastes include, but are not limited to, wood, bricks, metal, concrete, wall board, paper, cardboard, inert waste landfill material, and other nonputrescible wastes which have a low potential for groundwater contamination. (3) Municipal solid waste landfill means any facility or location where the final disposal of any amount of municipal solid waste occurs, whether or not mixed with or including commercial or industrial solid waste, and includes, but is not limited to, municipal solid waste landfills and municipal solid waste thermal treatment technology facilities. "Municipal solid waste" means any solid waste derived from households, including garbage, trash, and sanitary waste in septic tanks and means solid waste from single-family and multi-family residences, hotels and motels, bunkhouses, campgrounds, picnic grounds, and day use recreation areas. The term includes yard trimmings, construction or demolition waste, and commercial solid waste but does not include solid waste from mining, agricultural, or silvicultural operations or industrial processes or operations. (4) Hazardous waste disposal facility. Hazardous waste landfills are prohibited, and hazardous waste (which means any solid waste which has been defined as hazardous waste in regulations promulgated by the board of natural resources) may not be disposed of in inert, construction/demolition, or solid waste landfills. (c) Regulations applying to C&D and MSW landfills/disposal facilities. (1) Any C&D or MSW landfill/disposal facility must be located on a minimum of 250 acres. The landfill "cell" area (that is, holding actual waste) may not exceed 30 percent of the total acreage, with landfill operations areas (i.e., "cells" plus scales, offices, storage, other buildings, etc.) not exceeding 40 percent. No landfill cell may exceed 60 feet in height from the original grade, when fully filled and covered. No more than ten acres of the property can be active landfill cell at any one time. (2) All landfill cell areas and landfill operations areas must be surrounded by a chain-link fence at least six feet high and topped with anti-climbing devices. (3) All C&D and MSW landfills must be surrounded by a buffer at least 1,000 feet thick, located on the landfill property. The buffer must be sufficiently vegetated to be completely opaque and prevent viewing of any landfill cell at all times of the year from adjacent properties. (4) No landfill cell may be located within 2,000 feet of any residential dwelling or drinking-water well existing at the time of application for the permit. No landfill cell may be located within 250 feet of a wetland, groundwater recharge area, lake or other body of water, floodplain, stream or river. (d) Regulations applying to inert landfills. (1) Any inert landfill must be located on a minimum of 50 acres. The landfill "cell" area (actual waste disposal area) may not approach within 100 feet of the property line. No landfill cell may exceed 30 feet in height from the original grade, when fully filled and covered. (2) All landfill cell areas and landfill operations areas must be surrounded by a chain-link fence at least six feet high and topped with anti-climbing devices. (3) All inert landfills must be surrounded by a vegetated buffer at least 100 feet thick, located on the landfill property. The buffer must be sufficiently vegetated to be completely opaque and prevent viewing of any landfill cell at all times of the year from adjacent properties. (e) Regulations applying to all landfills and disposal facilities. (1) All lights at landfill/disposal facilities shall be downward firing and shielded. Unless the board of commissioners specifically approves otherwise, hours of operation of any landfill shall be no greater than 8:00 a.m. to 5:00 p.m. Monday to Friday, 8:00 a.m. to 4:00 p.m. Saturday, and no operation allowed on Sunday. (2) A landfill/disposal facility shall only be permitted where all county roads used for access have been built to a standard sufficient to withstand the projected number of trips per day at maximum weight for the vehicles expected. If a landfill is proposed adjacent to county roads that are not sufficient, according to the county engineer, to withstand the loads, or were not designed for such loads, the landfill owner may pay to bring such roads up to standard from the entrance(s) of the landfill to the nearest county or state road of sufficient strength; or the landfill shall be denied. Truck traffic shall be restricted to roads of sufficient strength. (f) An application for a special use permit for a landfill shall also submit the following information, and any other information required by the ordinances of the county: (1) A topographic site plan showing the proposed landfill, all surrounding uses in a one-half-mile radius from the boundaries of the subject property, the zoning on all adjacent parcels, the location of the landfill cells, all buffers and fences, highlighting land sloping 25 percent or more, and showing such other information as may be required by the zoning administrator. (2) Proximity to airports, private airstrips and similar uses within ten miles shall be indicated. Proximity to national historic sites within five miles shall be indicated. (3) A report from a geologist of the soil conditions on the landfill, discussing the topography (especially any steep slopes), the substrata, and any geologic hazards or relevant conditions on the property, as well as giving an opinion as to the property's suitability for the type of landfill proposed. (4) A site plan prepared by a qualified engineer depicting all floodplains, streams and rivers, watershed areas, wetlands, and groundwater recharge areas within one-half mile of the subject property (including on the subject property), as well as showing the location of the landfill and the landfill cells to those features, showing all buffers and setbacks. The plan shall also depict all water wells within one-half mile of the landfill cells. (5) A plan showing access, ingress and egress, including mechanisms to keep dust down and dirt off county roads. All access roads to landfill cells must be paved, and a truck cleaning station must be used at any exit. An estimate of daily truck traffic shall be provided, and entrances shall be located to minimize traffic hazards, with accel/decel lanes provided. (6) A traffic plan showing ingress and egress, number of trips per day, vehicle type, and maximum weight of vehicles expected. (7) A determination of plan consistency obtained under the solid waste management plan for Butts County demonstrating that the landfill is consistent with the plan. (g) In addition to the special use criteria in this code and the standards for the exercise of the zoning power, in considering a special use application for a landfill, the following additional criteria shall also apply: (1) Is the property and general area suitable for a landfill, considering geography, wetlands, streams and rivers, watersheds, groundwater recharge areas, adjacent uses and zoning, airports, national historic sites, jurisdictional boundaries and similar criteria? (2) Do the property and site plan meet all the buffer requirements relating to landfills? (3) Will the landfill have any negative impacts on the adjacent properties? (4) Are access, ingress and egress adequately provided for, considering the volume of traffic expected? (5) Is the use consistent with the future land use map, the Butts County comprehensive planning, the pattern of development in the area, and the solid waste management plan? Sec. 4.03.11. Nursing home. A facility which admits patients on medical referral only and for whom arrangements have been made for continuous medical supervision. It maintains the services and facilities for skilled nursing care, rehabilitative nursing care, and has a satisfactory agreement with a physician and dentist who will be available for any medical and/or dental emergency and who will be responsible for the general medical and dental supervision of the home. It otherwise complies with the rules and regulations contained in chapter 290-5-8: Nursing Homes (Rules of the Georgia Department of Human Resources). Nursing homes must meet the following development standards: (a) Must be located on an arterial street/road. (b) All buildings must be placed at least 50 feet from any property lines. (c) A buffer must be maintained along the side and rear property lines. Sec. 4.03.12. Club or lodge. Club or lodge establishments shall meet the following development standards: (a) Must be located on an arterial street/road. (b) All buildings must be placed at least 50 feet from any property lines. (c) A buffer must be maintained along the side and rear property lines. Sec. 4.03.13. Gas station. Gas stations shall meet the following development standards: (a) All structures, including underground storage tanks, must be placed at least 30 feet from any property line. (b) Curb cuts must be located at least 15 feet from the intersection of street lines. (c) No outside storage is permitted. Sec. 4.03.14. Golf course. Golf courses—public or private—shall meet the following development standards: (a) It must be for daytime use only. (b) All buildings, greens, and fairways must be set back at least 100 feet from any property line. Sec. 4.03.15. Hospital. Hospitals shall meet the following development standards: (a) Must be located on an arterial street/road. (b) All buildings must be placed at least 50 feet from any property lines. (c) A buffer must be maintained along the side and rear property lines. Sec. 4.03.16. Immediate family member housing. In the A-R district only, additional housing is permitted to be established for the immediate family of the owner of the subject property when the following standards are met: (a) The parent tract must be at least four acres. (b) The deeded lot area for immediate family housing must be a minimum of one acre. (c) Minimum lot frontage of 100 feet. (d) The home may be site-built, industrialized or class "A" manufactured home with a heated floor area of at least 1,200 square feet. (e) Must meet all minimum setbacks in the A-R zone. (f) The recipient of the immediate family lot must be within three steps of consanguinity from the owner of the parent tract and the resident of the parent tract. Sec. 4.03.17. Manufacturing. Manufacturing in connection with the principal retail business or service on the lot shall be permissible in commercial districts, subject to the following standards: (a) Manufacturing area occupies less than 40 percent of the floor area. (b) Manufacturer employs no more than five persons in the manufacturing process. (The intent here is to ensure that activities which are primarily manufacturing in nature are directed away from commercial areas and into manufacturing areas. Establishments with five or fewer manufacturing employees in connection with a commercial activity are considered to be primarily commercial and compatible with a commercial district. Manufacturing activities with more than five employees would be considered large enough to belong in a manufacturing district with other such uses rather than in a commercial district.) Sec. 4.03.18. Nursery school or day care center. Where a nursery school or day care center is operated in an A-R district, it shall meet the following development standards: (a) At least 200 square feet of outdoor play area must be provided. (b) At least 35 square feet of indoor space per child must be provided. (c) Outdoor play areas must be enclosed by a fence at least six feet high. Sec. 4.03.19. Nursery school or kindergarten. Where a nursery school or kindergarten is operated in an R-4 or R-M district, it shall meet the following development standards: (a) Must have at least 150 square feet of outdoor play area for each child. (b) The outdoor play area must be enclosed by a wovenwire fence at least four feet high, the bottom of which must be either flush with the ground or with a masonry footing. Sec. 4.03.20. Recovered materials processing facilities and solid waste handling facilities. (a) Recovered materials processing facilities and solid waste handling facilities (referred to in this section as "facility") are permitted as a special use in the M3 district. (b) Recovered materials means those materials which have known use, reuse, or recycling potential; can be feasibly used, reused or recycled; and have been diverted or removed from the solid waste stream for sale, use, reuse, or recycling, whether or not requiring subsequent separation and processing. Recovered materials processing facility means a facility engaged solely in the storage, processing, and resale or reuse of recovered materials; also known as a "recycling facility." Such definition shall not include a solid waste handling facility; provided, however, any solid waste generated by such facility shall be subject to all applicable laws and regulations relating to such solid waste. Recycling means any process by which materials which would otherwise become solid waste are collected, separated, or processed and reused or returned to use in the form of raw materials or products. Solid waste handling facility means any facility (including a composting facility), the primary purpose of which is the storage, collection, transportation, treatment, utilization, processing, or disposal, or any combination thereof, of solid waste. (c) Any materials recovery facility must be located on a minimum of 250 acres. The active waste handling area (that is, an area for handling, storing, collecting, processing, treating, etc. waste) may not exceed 40 percent of that acreage. (d) The boundary of the facility property (either inside or outside the vegetated buffer) must be surrounded by a wooden privacy fence, at least eight feet high. Any active waste handling area must be surrounded by a chain-link fence at least six feet high and topped with anti-climbing devices. (e) All facilities must be surrounded by a vegetated buffer at least 1,000 feet thick, located on the property. The buffer must be sufficiently vegetated to be completely opaque and prevent viewing of any waste handling area at all times of the year. At least 500 feet of the buffer must be vegetated, even if plantings are required; the planting plan shall be approved by the zoning administrator. (f) No waste handling area (as measured from the chain-link fence boundary) may be located within 2,000 feet of any residential dwelling (so used at the time of the application). Waste handling areas may not be located within 250 feet of a wetland, groundwater recharge area, lake or other body of water, floodplain, stream or river. (g) All lights at a facility shall be downward firing and shielded. Hours of operation of any facility shall be no greater than 8:00 a.m. to 5:00 p.m. Monday to Friday, 8:00 a.m. to 4:00 p.m. Saturday. No operation allowed on Sunday. (h) In addition to the special use criteria in chapter 10, in considering a special use application for a facility, the following additional criteria shall also apply: (1) Is the property and general area suitable for a facility, considering geography, wetlands, streams and rivers, watersheds, groundwater recharge areas, adjacent uses and zoning, airports, national historic sites, jurisdictional boundaries and similar criteria? (2) Do the property and site plan meet all the buffer requirements relating to facilities? (3) Will the facility have any negative impacts on the adjacent properties? (4) Are access, ingress and egress adequately provided for, considering the volume of traffic expected? (5) Is the use consistent with the future land use map, the Butts County Comprehensive Plan, the pattern of development in the area, and the applicable solid waste management plan? (i) When not in operation, vehicles used to haul waste may only be parked at a solid waste handling facility and shall not be parked in any non-manufacturing district. Sec. 4.03.21. Tattoo parlors. Tattoo parlors shall meet the following development standards: (a) It must be located on either an arterial or collector road. (b) It must not be closer than 1,000 feet from any elementary, middle or high school. (c) It must not be closer than 1,000 feet from any kindergarten, pre-school or day care center. (d) It must not be closer than 1,000 feet from any church or church-owned properties. (e) It must not be closer than 1,000 feet from any establishment serving or selling alcoholic beverages. (f) It must not be closer than 1,000 feet from another tattoo parlor. (g) A tattoo license must be applied for and the applicant must meet all licensure requirements. (h) No tattoo parlor shall tattoo any person who is: (1) Younger than 18 years of age; or (2) Under the influence of alcohol or drugs. (i) All tattoo parlors shall have a startup and annual inspection by the board of health. Sec. 4.03.22. Utility substation. Utility substations shall meet the following development standards: (a) Structures must be placed at least 30 feet from all property lines. (b) Structures must be enclosed by a wovenwire fence at least eight feet high with bottom of fence either flush with the ground or with a masonry footing. (c) No vehicles or equipment may be stored on the lot. (d) A buffer must be maintained along the side and rear property lines. Sec. 4.03.23. Manufactured homes. (a) Purpose. The purpose of this ordinance is to ensure that manufactured homes are installed on a site according to applicable federal and manufacturers' requirements; that manufactured homes are architecturally compatible with single-family residences and other land uses in Butts County currently and consistent with the board of commissioners' vision for future development in Butts County; and that pre-owned manufactured homes are in a safe and sound condition when they are relocated into Butts County. (b) Definitions. The following definitions apply to the words used in this section: Applicant means any person seeking to install a pre-owned manufactured home in the unincorporated area of Butts County. Architectural features means ornamental or decorative features attached to or protruding from an exterior wall, including cornices, eaves, gutters, belt courses, sills, lintels, bay windows, chimneys, and decorative ornaments. Bay window means a window assembly whose maximum horizontal projection is not more than two feet from the vertical plane of an exterior wall and is elevated above the floor level of the home. Certificate of occupancy means a document issued by the zoning administrator certifying that a manufactured home is in compliance with applicable requirements set forth by this ordinance and indicating it to be in a condition suitable for residential occupancy. Compatibility, with regard to buildings, means achieving harmony in appearance of architectural features in the same vicinity. Dormer means a window projecting from a roof. Eave means the projecting lower edges of a roof overhanging the wall of a building. Install means to construct a foundation system and to place or erect a manufactured home on such foundation system. Such term includes, without limitation, supporting, blocking, leveling, securing, or anchoring such manufactured home and connecting multiple or expandable sections of such manufactured home. Jurisdiction means the unincorporated area of Butts County, Georgia. Pre-owned manufactured home means any manufactured home that has been previously used as a residential dwelling and has been titled. (c) Installation permit and certificate of occupancy required. (1) No manufactured home shall be installed on any site without first obtaining an installation permit. An installation permit shall not issue unless the zoning administrator determines that: a. The site meets the requirements of this UDO for the location of manufactured housing; b. The manufactured home complies with federal and state requirements applicable to manufactured housing; and c. The manufactured home, once installed, will comply with the provisions of this ordinance. (2) No manufactured home shall be occupied without a certificate of occupancy. The zoning administrator shall not issue a certificate of occupancy for a manufactured home unless it has been installed in compliance with federal and state laws and regulations, manufacturers' instructions, and unless it is in conformity with all the provisions of this ordinance. (d) Installation requirements. (1) Hauling mechanisms removed. The transportation mechanisms, including wheels, axles, and hitch, must be removed prior to occupancy. (2) Installation regulations. The manufactured home shall be installed in accordance with the installation instructions from the manufacturer, as appropriate. (3) Approved septic system. Each manufactured home shall be connected to a public sanitary sewer system, community sewerage system, or on-site septic system with capacity available as approved by the health officer. (4) Foundation. The manufactured home shall be placed on a permanent foundation. (5) Masonry skirting. The entire perimeter area between the bottom of the structure of each manufactured home and the ground, including stairways, shall be underpinned with masonry that completely encloses the perimeter of the undercarriage and attached stairways except for proper ventilation and access openings. (6) Exterior finish. The exterior siding of the manufactured home shall consist of wood, hardboard, or vinyl siding material. (7) Roof pitch and materials. The manufactured home shall have a pitched roof with a slope of at least four feet in height for each 12 feet in width. Roof materials shall be wood shake, tile, metal or asphalt shingle material. (8) Square footage. The manufactured house shall meet the minimum square footage requirement for dwelling units in the applicable zoning district. (9) Porch. A porch or deck shall be provided facing the front yard or street prior to occupancy, with a five-foot minimum depth and a minimum of eight feet in length. A porch or deck that is inset into the structure may meet this requirement. (10) Additional architectural features. The manufactured home shall contain eaves with a minimum projection of six inches, window shutters, and at least one additional architectural feature such as dormers, bay windows, or another architectural feature that will provide equal compatibility with surrounding residences and land uses, as approved by the zoning administrator. (11) Yard. Each newly installed manufactured home shall be located so that there is an unshared yard adjacent to the structure that is at least 5,000 square feet. (12) Buffer. No manufactured home shall be located closer than 30 feet from the property line of an adjacent property having a residential zoning classification. (13) Deck. A deck shall be provided facing the rear or side yard prior to occupancy, with a ten-foot minimum depth and a minimum of 20 feet in length. (e) Legal nonconforming manufactured homes. (1) Legal nonconforming manufactured homes existing prior to the date of this division may remain in use without complying with this division; however, whenever a legal nonconforming manufactured home is replaced with a manufactured home, the replacement home shall comply with this division. Whenever a nonconforming manufactured home falls into such a state of disrepair that the certificate of occupancy is revoked, in order for a certification of occupancy to be reissued, the manufactured home shall be brought into compliance with this division. (2) If a legal nonconforming manufactured home can be classified as a total loss as a result of a natural disaster so declared by the federal, state, or Butts County government, a replacement manufactured home may be applied for and permitted even if the replacement manufactured home is nonconforming in use, size, dimension, installation, or design or located on a nonconforming lot; provided, however, that the following conditions are met: a. The damage occurs from a qualifying natural disaster; b. The replacement manufactured home shall not create a greater nonconformity than that which existed from the original manufactured home; c. The replacement manufactured home is compliant with current building codes (and adopted amendments); d. The replacement manufactured home is constructed to the Federal Manufactured Home Construction and Safety Standards governed by the National Manufactured Housing Construction and Safety Standards Act of 1974, and amended 42 U.S.C. §§ 5401—5445 (the HUD Code); and e. The replacement manufactured home is replaced within 12 months of the qualifying loss unless the owner shows that delay is beyond control of the owner but in no case shall replacement exceed 24 months from the qualifying loss. Prior to installation of and issuance of a certificate of occupancy for a replacement manufactured home, the environmental health division of the Butts County Health Department must have issued permission and shall be connected to a compliant private septic system, or the replacement manufactured home has been approved for and shall be connected to a public sewer system. All other provisions of this division shall apply. (f) Mobile homes. No mobile homes, defined as units constructed prior to June 15, 1976, shall be allowed within the unincorporated area of Butts County. Only manufactured homes constructed to the Federal Manufactured Home Construction and Safety Standards governed by the National Manufactured Housing Construction and Safety Standards Act of 1974, as amended, 42 U.S.C. § 5401 et seq. shall be permitted to be installed or relocated within the jurisdiction. Pre-owned manufactured homes relocated into Butts County must comply with the provisions of this ordinance. (g) Pre-owned manufactured homes. In addition to the other requirements of this ordinance, the relocation and installation of pre-owned manufactured homes shall be subject to the following health and safety standards and conditions and inspection program. (1) Relocation permit. A permit shall be required to locate a pre-owned manufactured home in the jurisdiction. To obtain a relocation permit, applicants shall provide to the zoning administrator: a. An affidavit signed by the applicant that the pre-owned manufactured home meets health and safety standards required by this ordinance; b. Photographs of the interior and exterior of the pre-owned manufactured home providing evidence that the home meets the minimum health and safety standards of this ordinance; and c. The permit and inspection fee required by subsection (4) of this section. (2) Inspection. Upon receipt of a relocation permit, applicants may relocate the manufactured home onto a residential site of the proper zoning classification for the purposes of inspection. Applicant shall arrange for an inspection to be held prior to the installation of the manufactured home. At such time as the zoning administrator certifies that the manufactured home meets the requirements of this ordinance, applicants may install the manufactured home in accordance with the requirements of this ordinance. (3) Certificate of occupancy. A certificate of occupancy shall be issued to the applicant after installation and at such time that the zoning administrator certifies that the requirements of this ordinance have been met. (4) Fee. A permit and inspection fee in an amount set by the board of commissioners shall be charged to the applicant to cover the cost to process the permit application and inspect the pre-owned manufactured home. Such fee shall cover the initial inspection and one follow-up inspection. The applicant shall be charged an additional amount set by the board of commissioners for each additional follow-up inspection that may be necessary. (5) Alternative inspection. At the request of the applicant, the zoning administrator may, at his or her discretion, inspect a pre-owned manufactured home prior to its being relocated if the home is then located at another site within Butts County or within a convenient distance of Butts County. In the event that the zoning administrator travels outside of Butts County to inspect a pre-owned manufactured home, applicant shall pay mileage at the then-applicable federal reimbursement rate from the office of the zoning administrator, to the site of the inspection, and back to the office of the zoning administrator. (6) Rehabilitation. At the request of the applicant, and where the zoning administrator finds that rehabilitation of a pre-owned manufactured home that does not meet the health and safety standard of this ordinance can be accomplished in a reasonably short period of time and without causing any detriment to the neighborhood where the preowned manufactured home will be relocated in the jurisdiction, the zoning administrator may issue the relocation permit and delay inspection for a period of up to 45 days to allow for rehabilitation after the pre-owned manufactured home has been relocated into the county. The zoning administrator shall not grant such request unless the applicant presents satisfactory evidence of a feasible rehabilitation plan. The pre-owned manufactured home shall not be connected to utilities until the inspection is performed and a certificate of occupancy is issued. (h) Minimum health and safety standards. All pre-owned manufactured homes shall comply with the following health and safety standards before being issued a certificate of occupancy by the zoning administrator: (1) HUD Code. Every pre-owned manufactured home located in the jurisdiction shall be in compliance with the Federal Manufactured Housing Construction and Safety Standards Act, 42 U.S.C. §§ 5401—5445 (the HUD Code) and shall not have been altered in such a way that the home no longer meets the HUD Code. (2) Interior condition. Every floor, interior wall, and ceiling of a pre-owned manufactured home shall be in sound condition. Doors and windows shall be operable, watertight and in good working condition. The floor system shall be in sound condition and free of warping, holes, water damage, or deterioration. (3) Exterior condition. The exterior of all pre-owned manufactured homes shall be free of loose or rotting boards or timbers and any other conditions that might admit rain or moisture to the interior portions of the walls or to occupied spaces. The exterior siding shall be free of rot and rust. Roofs shall be structurally sound and have no obvious defects that might admit rain or cause moisture to collect on the interior portion of the home. (4) Sanitary facilities. Every plumbing fixture, water, and waste pipe of a pre-owned manufactured home shall be in a sanitary working condition when properly connected and shall be free from leaks and obstructions. Each home shall contain a kitchen sink. Each bathroom shall contain a lavatory and water closet. At least one bathroom shall contain a tub and/or shower facilities. Each of these fixtures shall be checked upon being connected to ensure they are in good working condition. (5) Heating systems. Heating shall be safe and in working condition. Unvented heaters shall be prohibited. (6) Electrical systems. Electrical systems (switches, receptacles, fixtures, etc.) shall be properly installed and wired and shall be in working condition. Distribution panels shall be in compliance with the approved listing, complete with required breakers, with all unused openings covered with solid covers approved and listed for that purpose. The home shall be subject to an electrical continuity test to assure that all metallic parts are properly bonded. (7) Hot water supply. Each home shall contain a water heater in safe and working condition. (8) Egress windows. Each bedroom of a manufactured home shall have at least one operable window of sufficient size to allow egress if necessary, which shall have a net clear opening that is a minimum of five square feet in area, 24 inches in height, and 20 inches in width. The opening shall have a sill height of not more than 44 inches above the floor. The opening shall be operational from the inside of the room without the use of keys, tools or special knowledge. (9) Ventilation. The kitchen in the home shall have at least one operating window or other ventilation device. (10) Smoke detectors. Each pre-owned manufactured home shall contain one operable battery-powered smoke detector in each bedroom and in the kitchen, which must be installed in accordance with the manufacturers' recommendations. (11) State law and regulations. Each pre-owned manufactured home shall be installed in compliance with the requirements of Georgia law, O.C.G.A. § 8-2-160 et seq., and the rules and regulations adopted pursuant to that law, as they may be amended from time to time. (i) Enforcement. (1) Permanent connection to utilities shall not be approved until the zoning administrator has issued a certificate of occupancy. (2) Owners of pre-owned manufactured homes that are not in compliance with this ordinance upon a third inspection shall have their permit revoked and shall be required to remove the home from the jurisdiction at their own expense. (3) Failure to remove a pre-owned manufactured home from the jurisdiction upon failure to receive a certificate of occupancy shall be punishable by a fine of $100.00. Each day any violation under this ordinance continues shall be considered a separate offense. (Ord. of 3-27-2023, § 1; Ord. No. CR2026-04-030, § 1, 4-13-2026) Sec. 4.03.24. Batching plants. Batching plants locates in the M-1 zoning district shall have the following buffers: (1) There shall be an opaque natural or landscaped vegetative buffer at least 50 feet wide along the boundary of the property adjacent to any residential zoned property; (2) There shall be a 20-foot wide landscaped buffer strip along any portion of the property adjacent to a public road or adjacent to and boundary of the property adjacent to any property zoned for commercial or office-institutional uses. (3) No batching facilities or product storage shall be located within 300 feet of the property boundary adjacent to a residentially-zoned property or 100 feet of the property boundary adjacent to a property zoned commercial or office institutional uses; this setback area may be used for office, parking, utilities and stormwater management purposes. (4) Batching plant operations shall have procedures in place to control dust from the operation from leaving the property. Sec. 4.03.25. Marinas. (a) Signage. All marina facilities with one or more boat launching ramps must provide appropriate wake signage and education signage in order to maintain the safety of boaters in and around the marina. (b) Discharge of sewage from vessels. All marina operators shall advise all tenants that it is illegal to discharge treated or untreated sewage from vessels into the waters of Lake Jackson and the location of the nearest public sewage pump-out facility. (c) Petroleum products. Petroleum products is any petroleum based liquid, including, but not limited to, waste oil, new oil, anti-freeze, engine coolant, and waste gasoline and shall not be discharged into the waters of Lake Jackson, a storm drain, sewage treatment system, package plant or onto the open ground or any other surface waters. Care must be taken in handling these products and spills cleaned up promptly at the time detected. All permitted facilities shall maintain a supply of petroleum absorbent material and "spill dry" in a readily accessible location. (d) Waste oil. Waste oil includes waste engine oil, transmission fluid, hydraulic oil and gear oil. Waste oil must be stored in a nonleaking container clearly marked "waste oil," placed on an impervious surface, and covered in a manner that will prevent rain water from entering the container. Oil spills must be prevented from leaving the area by means of a berm or raining structure. Waste oil must be removed from the site by a permitted waste oil transporter and receipts and records shall be retained for inspection. (e) New oil. New oil includes new engine oil, transmission fluid, hydraulic oil and gear oil. These petroleum products must be kept in a clearly marked nonleaking container placed on an impervious surface with a surrounding berm or retaining structure, and covered in a manner that will prevent rain water from entering the container. Leaking containers must be emptied promptly upon detection, either by transferring the product to a nonleaking container or by disposing of it in the "waste oil" container. (f) Anti-freeze engine coolant. Anti-freeze is considered a hazardous product and when drained from an engine, it must be stored in a clearly marked container placed on an impervious surface with a surrounding berm or retaining structured, and covered to prevent rain water from entering the container. It must be removed from the site by a permitted liquid waste transporter, and receipts and records must be retained for inspection. (g) Waste gasoline. Waste gasoline must be stored in a nonleaking container, placed on an impervious surface with a surrounding berm or retaining structure and covered to prevent rainwater from entering the container. The container must be clearly labeled "waste gasoline" and the storage location must conform to local fire codes. Whenever possible, waste gasoline shall be filtered and used as a fuel. Waste gasoline shall not be discharged to the ground, storm sewers or to surface waters of the county. (h) Action plan. All marine facilities with fueling operations must have a written action plan to deal with large petroleum product spills. This plan must include, at a minimum, the names and telephone numbers of all agencies involved with fuel spills and a private cleanup contractor who can be contacted and hired in the event of a major spill. (i) Engine and parts storage. Engines and engine parts must be stored on a covered, impervious surface. Care must be taken to prevent oil and grease from leaking onto the open ground. (j) Engine and parts washing. Parts washing may not be done over open ground. Parts washing must be done in a container or parts washer. The parts must be rinsed or air dried over the parts cleaning container. The dirty parts washing fluid must be recycled or disposed of by a licensed waste hauler. The preferred disposal method is by a permitted-parts washing contractor who brings new fluid and takes away the sludge and dirty fluid. (k) Disposal of solid waste. Disposal or discharge of all solid waste in the waters of Butts County is prohibited. All facilities shall provide an adequate number of leak proof containers for the disposal of solid waste and garbage. (l) Hazardous waste management. Any hazardous wastes not already covered in this section must be disposed of properly. It is the responsibility of the marina owner to be aware of the quantity of hazardous waste generated at the marina and its EPA classification. Marina must comply with all EPA requirements of its classification. Marina should provide convenient containers for the disposal of small quantities of hazardous waste generated by marina patrons. (m) Boat cleaning in the water. Pressure washing should not be used for boat cleaning in the water. In the water hull scraping and any other abrasive process is discouraged. Detergents containing ammonia, sodium hypochlorite, chlorinate solvents, petroleum distillates, lye, or any traditional "sudsing" detergents that must be rinsed off are prohibited. Boaters should be encouraged to use biodegradable and phosphate-free soaps and detergents. (n) Fire safety. Smoking should be prohibited near fueling operations. Marina should have an evacuation plan for people and boats in case of fire. Ensure that marina is up to date on all local fire department regulations. (Ord. of 5-24-2021, § 1.C.) Sec. 4.04.00. Conventional subdivision design standards. Sec. 4.04.01. Generally. (a) The purposes of the subdivision design standards are: (1) To encourage economically sound and stable development of land; (2) To assure the provision of required streets, utilities, and other facilities and services; (3) To assure the adequate provision of safe and convenient traffic access and circulation, both vehicular and pedestrian; (4) To assure the provision of needed public open spaces and building sites through the dedication or reservation of land for recreational, educational, and other public purposes; and (5) To assure that land is developed in conformity with the Butts County comprehensive plan. (b) At the discretion of the property owner and applicant, subdivision design may be proposed in compliance with alternative design standards. (1) Clustering, through the application of conservation subdivision standards, is permitted, as provided in section 4.05.00. (2) Within a mixed use (MU) district, alternative residential subdivision design standards are permissible, as provided in this ordinance. Sec. 4.04.02. General design standards for subdivisions. (a) All development shall be on a designated, platted, and recorded lot that meets all standards set forth in this UDO. (b) The standards for design and layout of conventional subdivisions are contained in this section. The standards for the design and installation of public improvements and infrastructure for subdivisions and all other developments are contained in chapter 6. (c) A subdivision shall have at least two entrances if the subdivision is planned to have 75 or more lots. (d) Submittal and procedural requirements regarding preliminary plats and final plats are set forth in chapter 10. (e) General requirements for potable water system. (1) Water mains properly connected with a county approved public water supply system shall be constructed in such a manner to adequately serve all lots shown on the subdivision plat for both residential use and fire protection. (2) All subdivisions shall be required to connect to a county approved public water system when said water system is within 200 feet radius of the property line of a lot created by a new subdivision development. (3) The subdividing of property resulting in the creation of no more than one additional lot, parcel, or tract of land shall be allowed to utilize a domestic primary water supply (on-site well water) in accordance with the rules and regulations of the state department of community health, environmental health division. The subdividing of property resulting in the creation of more than one additional lot, parcel, or tract of land shall be required to utilize a county approved public water system. (4) All public water facilities shall be installed subject to the policies and procedures of the applicable water and sewer utility provider. (f) General requirements for public sewer system. (1) When the subdivision is located within the service area of a public sewerage system, sanitary sewers shall be installed to serve all lots with connection to the public system. (2) All subdivisions shall be required to connect to a county approved public sewer system when said sewer system is within 200 feet radius of the property line of a lot created by a new subdivision development. (3) Where sanitary sewer service is not available, all lots without connection to the public system shall be developed with a private septic tank system or decentralized wastewater management system consistent with the zoning and minimum lot area requirements of this UDO or other such larger lot area requirement as may be required by the board of health at the time of preliminary plat. (4) The standards for a public sewer system are set forth in chapter 6. (g) General requirements for all other utilities. The applicant shall make the necessary arrangements with the appropriate utility companies for the installation of utilities to assure that all lots have adequate gas, if available, electrical, cable, and telephone communication services. Sec. 4.04.03. Design standards for blocks, easements, and lots. (a) Subdivision blocks shall be sufficient to provide for two tiers of lots. The length, width, and shapes of blocks shall be determined with regard to: (1) Applicable dimensional requirements of lots; (2) Applicable provision of required yards; (3) Provision of adequate sites to accommodate required parking, as set forth in section 6.01.11; (4) Protection of natural features and environmentally sensitive lands, as set forth in chapter 3; and (5) Provision of sites that are appropriate for the topographic conditions, natural conditions, and man-made features. (b) Side lot lines shall be at right angles to straight lines and radial to curved street right-of-way lines. (c) Except where expressly permitted, each lot shall have frontage on and access to an existing or proposed paved public street. (d) Rights-of-way for pedestrian crosswalks may be required in order to provide direct pedestrian access to schools, shopping centers, and parks. Such rights-of-way shall comply with the standards set forth in chapter 6. (e) Easements. (1) All lots within a subdivision shall provide easements, as required, for stormwater drainage, water systems, sanitary sewer systems, gas lines, electric lines, cables, telephone lines, and utility poles. Standards for such utility easements are set forth in chapter 6. (2) Where a subdivision is traversed by a river, stream, watercourse, or drainage way, there shall be provided a drainage easement along each side of the watercourse. The easement, an undisturbed buffer, shall be at a width specified in chapter 3. Sec. 4.05.00. Alternative subdivision design standards. Sec. 4.05.01. Conservation subdivision (CS). (a) Generally. (1) The intent of the conservation subdivision (CS) is to provide for flexibility of design in order to promote environmentally sensitive and efficient uses of the land. (2) The number of residential dwelling units shall not exceed the number of such units permissible by the zoning district in which the CS is located. (3) All requirements set forth in section 4.04.00 regarding conventional subdivisions for provision of public improvements and infrastructure shall apply to conservation subdivisions except where specifically modified in this section. (4) Where there is conflict between the standards and requirements set forth in this section for the CS and the standards and requirements in section 4.04.00 regarding a conventional subdivision, the standards of this section shall apply. The standards set forth in this section are intended to replace the standards in section 4.04.00 regarding the design of subdivisions. (5) No building permits and no public improvements or services shall be authorized or installed for any CS until approval has been granted for the subdivision plat. Procedures for application, review, and approval of preliminary and final plats, and acceptance of public improvements, are set forth in chapter 10. (6) In addition to other application requirements, an application for CS approval shall include the following: a. Site analysis map depicting significant site features, consistent with the requirements of chapter 3 for the protection of natural resources and environmentally sensitive lands; b. Plan for management of open space and common facilities; and c. Legal instrument for permanent protection of designated open space. (b) Applicability. The CS development alternative shall be applied only to land in the A-R, R-1, and R-2 zoning districts. The number of dwelling units permissible in a CS development shall not exceed the number of dwelling units that are permissible in the underlying zoning district. (c) Purpose. (1) Promote the preservation of open space in environmentally sensitive areas, provide for open space connectivity, and provide for wildlife habitat and corridors within the region; (2) Preserve in perpetuity unique or sensitive natural resources such as groundwater recharge areas, floodplains, wetlands, streams, woodlands, and wildlife habitat; (3) Preserve important historic and archaeological sites; (4) Permit clustering of houses and structures on less environmentally sensitive soils, which will reduce the amount of infrastructure, including paved surfaces and utility easements, necessary for residential development; and (5) Reduce erosion and sedimentation by minimizing land disturbance and removal of vegetation in residential development. (d) Minimum requirements for water and sewer. The CS shall have access to, or propose to install, a central sanitary sewer system that meets the requirements of Butts County, the board of health and EPD. As an alternative, a shared drain field may be proposed whereby two or more lots have septic tanks which flow to a drain field in a designated common area or open space. Shared drain fields shall only be allowable when approved by the board of health. A homeowner's or property owner's association shall be required for management and maintenance of the common drain field. (e) The tract of land to be subdivided may be held in single or multiple ownership. If held in multiple ownership, however, the site shall be developed according to a single development plan. A legal instrument shall be required to designate the authority and responsibility for open space and other common areas. (f) The CS shall meet the following design requirements: (1) Minimum land area of ten acres; (2) Designation of open space pursuant to section 4.05.01(h); (3) Maximum number of dwelling units limited to the number of dwelling units permitted by the underlying zoning district (A-R, R-1 or R-2); (4) Clustering of residential development on remaining land after designation of protected open space (see section 4.05.01(g)); (5) Location of dwellings and driveways to ensure minimal visual impact and to avoid interruption of views of open fields, pastures, or other agricultural areas; (6) Limiting impervious surface area to a maximum of three percent within designated open space areas and to a maximum of 60 percent of residential development areas (including lots, driveways, and roads); and (7) Meet the following standards presented in Table 4.05.01(f) for lots and building placement: Table 4.05.01(f). Dimensional Standards for Lots and Building Locations in Conservation Subdivisions Requirement Standard Minimum road frontage 60 Setbacks: Front, measured from public right-of-way 20 Side, measured from property line 8 Rear, measured from property line 25 Minimum lot area No less than 50% of the underlying zoning district requirement (g) Open space standards. (1) All open space shall be permanently protected through a legal instrument of permanent protection approved by the board of commissioners. (2) The minimum open space requirement shall be 40 percent of the gross tract area or the sum of primary conservation areas (see section 4.05.01(h)), whichever is greater. (3) At least 75 percent of the open space shall be in one contiguous tract. (4) The open space shall adjoin any neighboring areas of protected open space, other protected areas, and non-protected natural areas that would be candidates for inclusion as part of a future area of protected open space. (5) Open space shall be directly accessible to the majority of lots within the subdivision. Non-adjoining lots shall be provided with safe, convenient access to the open space. (h) Designation of open space. (1) Primary conservation areas are required to be included within the open space. The following comprise primary conservation areas: a. The 100-year floodplain (see section 3.01.00); b. Watershed protection areas (see section 3.03.00); c. Groundwater protection areas (see section 3.04.00); d. Riparian buffer zone areas (see section 3.05.00); Wetlands that meet the definition used by the U.S. Army Corps of Engineers pursuant to the Clean Water Act (see section 3.06.00); e. Populations of endangered or threatened species, or habitat for such species; and f. Archaeological sites, cemeteries, and burial grounds. (2) Secondary conservation areas shall be included within the open space, to the maximum extent feasible, in order to protect the following features: a. Important historic sites; b. Existing healthy, native forests of at least one acre contiguous area; c. Other significant natural features and scenic vistas such as ridge lines, peaks, and rock outcroppings, particularly those that can be seen from public roads; d. Prime agricultural lands of at least five acres contiguous area; e. Existing trails that connect the tract to neighboring areas; and f. Views from major and minor arterial roadways. (i) Permitted uses of open space may include the following: (1) Conservation of natural, archeological, or historical resources; (2) Meadows, woodlands, wetlands, wildlife corridors, game preserves, or similar conservation-oriented areas; (3) Unpaved walking or bicycle trails or paths; (4) Passive recreation areas, such as open fields; (5) Active recreation areas, such as playgrounds or playing fields which meet the following standards: a. Such areas do not exceed ten percent of the total open space; and b. Such areas are located outside any primary conservation areas. (6) Agriculture, horticulture, silviculture, equestrian, or pasture uses, provided that all applicable best management practices are used to minimize environmental impacts, and such activities are not conducted within primary conservation areas unless otherwise permitted by chapter 3 of this UDO; (7) Easements for drainage, access, and underground utility lines; and (8) Landscaped areas around stormwater management facilities and community wastewater disposal systems, provided that the stormwater management facilities or wastewater disposal system is located outside of primary conservation areas. A retention or detention pond shall not be considered part of the open space. (j) Prohibited uses of open space. (1) Golf courses; (2) Roads, parking lots, and impervious surfaces except as provided for in this section. Sec. 4.06.00. Standards for mixed use (MU) district—P-M planned development. Sec. 4.06.01. Purpose. (a) P-M zoning districts are intended to: (1) Encourage the development of large tracts of land as planned neighborhoods or communities. (2) Encourage flexible and creative concepts in site planning. (3) Preserve the natural amenities of the land by encouraging scenic and functional open areas within residential areas. (4) Create a more desirable environment than would be possible through the strict application of minimum requirements of other sections of this ordinance. (5) Provide for efficient use of land resulting in smaller networks of utilities and streets as well as lower development and housing costs. (6) Provide an environment of stable character which is compatible with surrounding residential areas. (b) Within the planned area, a variety of land uses may be permitted in an orderly relation to one another and to existing land uses. This may be accomplished through the application of sound comprehensive planning principles. (c) P-M districts are allowed only where public water and sewage is available. Sec. 4.06.02. Determining if an area is suitable for inclusion within a P-M district. The standards for the exercise of the zoning power, as well as data submitted with the development plan of the applicant for a planned development, must be thoroughly considered by the planning and zoning commission as well as the board of commissioners when determining in which zoning district an area of land is to be placed. This will ensure that rational comprehensive planning principles encourage the development and preservation of land use patterns that provide healthful and safe living conditions for the residents of Butts County. Sec. 4.06.03. Boundaries of P-M districts. The official map (section 2.01.01 of this ordinance) shows the boundaries of all P-M districts within Butts County. Sec. 4.06.04. Permitted uses. Permitted uses in the P-M districts shall be as shown in the approved development plan. Sec. 4.06.05. Plan review and approval procedures. (a) Pre-application conference. Prior to filing a formal application for a P-M, the applicant may confer with the zoning administrator in order to review the general character of the plan (on the basis of tentative land use sketch) and to obtain information on development standards and ordinances affecting the proposed project. (b) Submission of application for P-M approval. (1) The applicant must file a proposed development plan with the zoning administrator. This application must be supported by a development plan and a written summary of intent. The relationship between the proposed development and the surrounding area, both existing and proposed, must be shown. The following information must be presented with the development plan: a. A general location map. b. Existing topographic conditions, including contour intervals of no more than five feet based on field surveys or photogrammetric methods. c. The existing and proposed land uses and the approximate location of all buildings and structures. d. The approximate location of existing and proposed streets. e. The approximate location of all existing and proposed utilities, including a preliminary utility and drainage plan. f. The present zoning pattern in the area. g. A legal description of the subject property. h. The location and use of existing and proposed public, semipublic, and community facilities such as schools, parks, and open areas on the site. This includes areas proposed to be dedicated or reserved for community or public use. i. Elevations of representative building types; however, this is not required for single-family detached dwellings. (2) If a proposed development creates special problems or involves unusual circumstances, additional information may be required in order to properly evaluate the proposal. Such additional information includes, but is not limited to, the following: a. An off-street parking and loading plan. b. An economic feasibility report or market analysis. c. A traffic study of the area and a circulation plan within the proposed development as well as to and from existing streets. (3) The written summary of intent submitted with the development plan must include the following information: a. A statement of the present ownership of all land within the proposed development. b. An explanation of the character of the proposed development; this includes a summary of acres, numbers and types of dwelling units, and gross density by type of land use. c. A general statement of the proposed development schedule. d. Agreements, provisions, and covenants which govern the use, maintenance, and protection of the development and any common or open areas. (c) Review and approval of P-M application. (1) An application for approval of a P-M district is treated administratively as an application for an amendment to this ordinance (rezoning). This is because P-M districts are created only upon request of a developer, whose application materials demonstrate a firm commitment to construction of a well-designed P-M district. Upon approval of the P-M district, existing zoning must be changed to a P-M zone, which is an amendment to the ordinance. The amendment procedures contained in section 10.02.03 must be followed in granting the amendment to permit the P-M district, with the exception of the 30-day time limit on planning and zoning commission recommendations. Since review of the development plan is much more complex than the review for other rezoning applications in which simple development standards are specified, the time allowed for the planning and zoning commission to send the written record of comments received at the public hearing, along with its recommendations on the proposed, to the board of commissioners is 60 days. (2) The zoning administrator will turn over the application materials to the planning and zoning commission for its recommendations. The planning and zoning commission will thoroughly study the materials and make written recommendations to the board of commissioners, stating the reasons for its recommendations within 60 days after the public hearing. (3) The power to approve an amendment creating a P-M district rests with the board of commissioners. After conducting a public hearing and considering recommendations from the planning and zoning commission, the board of commissioners will then make an official decision on the proposed P-M district. The board of commissioners may approve, disapprove, or conditionally approve the development plan. (4) If the development plan is approved as submitted, the official map will be changed to indicate the P-M district. If the plan is approved with modifications, the applicant shall have ten days following the public meeting at which the plan is approved with modifications to withdraw the application. If the applicant does not provide the zoning administrator with written notice that the application is withdrawn within that period, the official zoning map will then be changed to reflect the rezoning of the property to a P-M zoning classification. The site plan and supporting information of any approved plan will be identified and permanently filed with the zoning administrator. Any development of the subject property must comply with the approved development plan. (5) The official map will then be changed. The site plan and supporting information of any approved plan will be properly identified and permanently filed with the zoning administrator. (6) No building permits will be issued by the zoning administrator until the development plan has been approved by the board of commissioners. (d) Issuance of building permits. The zoning administrator will issue building permits for buildings and structures in the area covered by the approved development plan if the proposed buildings and structures are in conformity with the approved development plan, the development schedule, final plat, and all other applicable regulations. (See chapter 10.) (e) Revision of development plan after approval of plan. (1) Minor modifications. a. The zoning administrator is authorized to approve minor changes in any previously approved development plan subject to the limitations in this subsection. b. Minor modifications to an approved development plan for a P-M district may include, but are not limited to, refinements to the location of permitted uses provided such changes do not materially vary from the overall development concepts or nature of the approved development when compared with the approved development plan. c. Minor modifications to an approved preliminary plan for a development within the P-M district may include, but are not limited to, minor shifting of the location of streets, public or private ways, utility easements, parks or other public open spaces, or other incidental features of the plan, provided that such changes meet all the following: 1. Do not increase densities. 2. Do not change the outside boundaries of the development tract. 3. Do not affect the form of ownership, control or maintenance of common areas. (2) Major modification. a. Any modification of an approved P-M district development plan requested by an owner or developer that does not qualify as a minor modification shall be a major modification. b. Major modifications in an approved P-M district development plan or a development within the P-M district shall constitute a new application and shall require re-advertisement of public hearing dates and re-hearing by the board of commissioners. In such case, the zoning administrator shall require the applicant to pay an additional fee commensurate with a new application. (f) Initiation of rezoning back to original district. Construction of the planned development must begin within one year of the approval of the P-M district. If no construction has begun by then, or if the applicant fails to maintain the approved development schedule, approval of the development plan will lapse. At its discretion and for good cause, the board of commissioners may extend the period for beginning construction of any phase of the project for one additional year. If approval of the development plan lapses under this provision, the planning and zoning commission may initiate zoning amendment proceedings to restore the previous zoning to the subject property. Sec. 4.06.06. Development standards for P-M districts. In addition to the development standards pertaining to subdivision plat approval, the following standards are required within P-M districts: (a) Development plan. An approved development plan must be carried out (see section 4.06.05). (b) Density controls. The maximum number of dwelling units per acre in residential areas of a planned development must not exceed 5.5 dwelling units per net acre of residential development within the P-M district. (Net residential acreage refers only to land devoted primarily to residential purposes, exclusive of other uses, such as common open space, streets, and lakes. Gross acreage of residential development refers to land devoted primarily to residential purposes as well as open spaces, including private lakes within the P-M district held under individual, common, or collective ownership for the use of residents of the residential development. Gross acreage for residential development does not include areas reserved or dedicated for street rights-of-way.) (c) Deviation from required densities. (1) The board of commissioners may allow higher net or gross residential densities, as well as a higher density of a particular residential use, as long as the applicant can show that such a higher density will not be detrimental to the surrounding neighborhood. (2) The board of commissioners will consider a deviation from the specified maximum density only upon a favorable recommendation from the planning and zoning commission. (d) Dimensional and bulk regulations. The location of all proposed buildings and structures must be shown on the approved development plan; minimum lot sizes, setback lines, lot coverages, and floor areas shown on the development plan must be adhered to. The proposed location and arrangement of structures must not be detrimental to existing or proposed adjacent dwellings or to the development of the neighborhood. (e) Perimeter requirements. The board of commissioners may impose additional setbacks to protect the privacy of adjoining uses. (f) Control of area after completion. After completion of a planned development, the use of land and the construction, modification, or alteration of any buildings or structures within the P-M district must conform to the approved development plan. If community needs are found to be changing in the future and a revision of the approved development plan is thought to be needed, procedures contained in paragraph (e) of section 4.06.05 must be followed. (g) Public water and sewage service required. All buildings within P-M districts must be served by public water and sewage lines. Where such lines do not already exist, the developer is responsible for installation of them. (h) Development standards shown in approved development plan. Other development standards shown in an approved development plan apply only to the development shown on the specific development plan. Such development standards must be maintained. (See section 4.06.05 for related details.) (i) Design standards for all P-M developments. (1) General. Condition of soil, groundwater level, drainage, and ground slope must not create hazards to the property or to the health or safety of residents. The site must not be exposed to objectionable smoke, noise, odors, or other adverse conditions; no part subject to flooding or erosion can be used for any purpose that would expose people or property to danger. (2) Soil and ground cover. Exposed ground surfaces throughout the development must be protected with a vegetative growth that prevents soil erosion, standing puddles, and dust. If this is not possible, such areas may be covered with a solid material such as stone or may be paved. (3) Site drainage. The ground surfaces throughout the development must be equipped to drain all surface water in a safe, efficient manner, either through grading or installation of drains. (4) Required buffer. A buffer is required along all lot lines of the development. This is in addition to common open space. Sec. 4.07.00. Standards for mixed use (MU) district—P-R planned development— Residential. Sec. 4.07.01. Purpose and intent. P-R zoning districts are intended to achieve the following purposes, intentions and objectives: (a) Flexibility. Allow and encourage more unique, flexible, creative and imaginative arrangements in residential development than are permitted through conventional land use requirements for suburban residential subdivisions. That flexibility is intended to be promoted primarily (but not exclusively) through the application of conservation subdivision principles in land subdivision and development as articulated in this article. Through allowances for clustering of residential lots and other flexible, innovative development arrangements, smaller networks of utilities and streets are possible which can thereby lower development and housing costs. (b) Planned and coordinated development. Allow and encourage the development of tracts of land as single developments that are planned neighborhoods or communities, including civic and semi-public uses (e.g., schools, playgrounds, meeting halls, etc.) that help to make up a community; this objective is achieved through some flexibility in permitted uses and a minimum land area for rezoning to and development of this zoning district. (c) Preservation of green spaces. Preserve the natural amenities of the land through maintenance of conservation areas, open spaces, and green spaces within developments. Areas considered natural amenities include, but are not limited to, floodplains, wetlands, steep slopes, rolling hills, open fields, and active farmland. This objective is achieved through the application of minimum open space requirements for planned residential developments and conservation subdivision principles in land subdivision and development. (d) Density bonus as an inducement. Provide for slightly higher gross residential development densities as an inducement to develop in a manner consistent with the comprehensive plan and this article. (e) Adequate public facilities and development agreements. Ensure that residential development within this zoning district is adequately served by public facilities and services needed for the type of development at the time development impacts occur. To implement this objective, this article provides a mechanism for negotiating development agreements (and/or the applicant's agreement to conditions of rezoning) for future public facilities, or land for future facilities, where additional facilities, not otherwise available but needed to serve the development proposed, are provided by the developer. (f) Direct the location of residential development in accordance with the comprehensive plan. Implement the residential growth goals, strategies, and recommendations of the Butts County comprehensive plan. It is specifically the intent of this article to prevent this zoning district from being used or applied in areas outside those properties designated as "Tier 1, Existing Urban or Suburban" and "Tier 2, 2007-2015 Development Areas" as shown on the map titled "Growth Phasing Program" in the adopted Butts County comprehensive plan. (g) Establish parameters for maintaining rural character. Even though the P-R zoning district is intended to allow for residential development at suburban and urban densities in appropriate locations, it is also a major goal of the county's comprehensive plan to preserve and retain rural character, even in these areas. Therefore, this ordinance establishes guidelines and recommendations for the preservation and retention of rural character. This objective is achieved by requiring the adherence of development proposals with principles of conservation subdivision design and land development and guidelines for maintaining rural character. (h) Coordinated and compatible design of buildings. Ensure that the designs of building forms are interrelated and architecturally harmonious and maintain compatibility with surrounding land uses and, where evident, rural character. This objective is achieved through the submission and review of architectural elevations for typical buildings in the planned residential development, the submission and review of a detailed site plan at the time of rezoning, and through the application of guidelines as specified in this article. (i) Encourage broader mixes of housing types. In the areas designated as "Tier 1, Existing Urban or Suburban" and "Tier 2, 2007-2015 Development Areas" as shown on the map titled "Growth Phasing Program" in the adopted Butts County comprehensive plan, encourage a broader mix of residential housing types, including detached and attached dwellings, than would normally be constructed in conventional residential subdivisions. (j) Specify additional application requirements. Establish application requirements that are more rigorous than rezoning applications and special use applications but no more onerous than is necessary to enable thorough analyses of the development proposal's consistency with the objectives and requirements of this article. Sec. 4.07.02. Definitions. For purposes of this article, the following terms are defined. The fact that these definitions are provided in this article shall not prevent the zoning administrator from applying the definitions in this section to other articles of this ordinance where the context is appropriate in his or her opinion. Conservation areas, primary means areas set aside for permanent protection, including the following: (1) Contiguous areas of at least 5,000 square feet having slopes over 25 percent; (2) The 100-year floodplain; (3) Buffer zones along all perennial and intermittent streams; (4) Wetlands that meet the definition used by the U.S. Army Corps of Engineers pursuant to the Clean Water Act; (5) Populations of endangered or threatened species, or habitat for such species; and (6) Archaeological sites, cemeteries and burial grounds. Conservation areas, secondary means areas that should be included within the open space of a P-R zoning district or conservation subdivision to the maximum extent feasible, including the following: (1) Historic sites; (2) Existing healthy, native forests of at least one acre contiguous area; (3) Other significant natural features and scenic viewsheds such as ridge lines, peaks and rock outcroppings, particularly those that can be seen from public roads; (4) Existing trails that connect a conservation subdivision to neighboring areas. Sec. 4.07.03. Permitted uses. Permitted uses within P-R zoning districts shall be limited to the uses specified in this section: (a) Accessory building, structure, or use incidental to one or more permitted principal uses. (b) Church, synagogue, chapel, or other place of religious worship. (c) Club or lodge, nonprofit. (d) Conservation area. (e) Dwelling, single-family detached. (f) Dwelling, two-family. (g) The following dwelling types may be permitted subject to the limitation that no more than 40 percent of the total housing units shown in the approved development plan shall consist of any one type or combination of the specified dwelling types. Additional limitations on these types of dwellings may be imposed as conditions of zoning. (1) Dwelling, apartment. (2) Dwelling, cluster. (3) Dwelling, condominium. (4) Dwelling, garden apartment. (5) Dwelling, multiple-family. (6) Dwelling, patio. (7) Dwelling, single-family attached. (8) Dwelling, townhouse. (h) Golf course, planned as an integral part of the planned residential development. (i) Home occupation. Type I and Type II as defined in section 5.01.00 of this ordinance. Type II home occupations are subject to approval as a special use. (j) Intermediate care home, nursing home, or personal care home. (k) Nursery school or day care center. (l) Public building, structure, or use. (m) Recreation area owned, operated, and maintained by the owner(s) of the permitted use, exclusively for the use of residents and their guests. (n) Private school, college or university. (o) Office, enclosed retail trade establishment, or personal service establishment, but only in P-R zoning districts that have at least 200 dwelling units. The amount of land in a P-R zoning district devoted to offices, retail trade establishments, and personal service establishments, or some combination thereof, shall not exceed ten percent of the total site area of the P-R development nor 100 square feet of gross building space per dwelling unit provided in the P-R development. Sec. 4.07.04. Dimensional requirements. All development in P-R zoning districts shall meet the requirements of this section. (a) Minimum open space requirements. Each P-R zoning district established shall have at minimum 30 percent of the gross land area of the P-R development as open space. (b) Base residential densities.The following base residential densities cannot be exceeded (i.e., below the minimum or above the maximum established in the table below), except by residential density bonus as provided in this article: Method of Sewage Disposal Base (Maximum) Dwelling Units Per Acre Residential, served by septic tank or other on-site sewage management system 1.3 units per acre Residential, served by public sanitary 3.0 units per acre (c) Residential density bonus.No density bonus shall be authorized or approved that exceeds the maximums in the table below: Method of Sewage Disposal Maximum Density Bonus (In Addition to Base Density Permitted) (Dwelling Units Per Acre) Residential, served by septic tank or other on-site sewage management system 0.4 units per acre Residential, served by public sanitary 2.0 units per acre A particular P-R development can receive the maximum permitted density bonus, or it may receive a partial density bonus. The amount of density bonus must be approved by the zoning administrator and the planning commission. Method of Sewage Disposal Criteria for Granting a Density Bonus Residential, served by septic tank or other on-site sewage management system Residential, served by public sanitary sewer Open space retention of five percent or more than the minimum requirement, or higher quality open space than would be required otherwise 0.1 0.5 Scenic views are identified by a landscape architect and preserved in the development plan 0.05 0.25 Method of Sewage Disposal Criteria for Granting a Density Bonus Residential, served by septic tank or other on-site sewage management system Residential, served by public sanitary sewer Use of environmental practices to improve water quality such as treated stormwater, porous pavements, filtering systems, and low-impact development 0.1 0.5 Dedication of land for community facilities. The applicant proposes and conveys to the county or other appropriate entity land for future public facilities and services beyond those required to meet facility adequacy 0.2 0.75 Minimum heated floor area of 2,000 square feet or more 0.1 0.25 Siding materials consist of brick, cementitious fiber board (hardi-board or hardiplank), stucco, exterior insulation and finish system, decorative block, and/or wood-based materials 0.05 0.25 Poured wall foundations 0.05 0.25 (d) Maximum height limitations. The following maximum heights are established for types of land uses: Land Use Maximum Height (Feet) Residential dwellings, detached 40 Offices, and all attached and multi-family residential types 45 Institutions, retail and service commercial 50 (e) Additional requirements. The P-R development must meet the following: (1) Property within 200 feet of a local, collector, or arterial road abutting the P-R development shall remain in its natural state, except for approved access and utility crossings. Where sparsely vegetated, landscaping using native landscape material is shown on a plan approved by the zoning administrator and installed. (2) Tree preservation. The P-R development preserves significant trees, especially deciduous trees of at least eight inches caliper or coniferous trees of at least 15 feet in height, excluding diseased trees that are likely to die. Trees preserved may be located within open spaces or developed areas of the P-R development. Sec. 4.07.05. Application requirements. Applicants proposing a P-R zoning district shall make application to the zoning administrator which shall include at minimum the specifications of this section. Such requirements are in addition to and do not replace basic application requirements for rezoning as specified in this ordinance. (a) Site analysis map. The applicant shall prepare and submit a site analysis map. The purpose of the site analysis map is to ensure that the important site features have been adequately identified prior to the creation of the subdivision or development and that the proposed open space will meet the requirements of this article. The site analysis map shall include the following features: (1) Property boundaries; (2) All streams, rivers, lakes, wetlands and other hydrologic features; (3) Topographic contours of no less than ten-foot intervals; (4) All primary and secondary conservation areas labeled by type, as defined in this article; (5) General vegetation characteristics, including the delineation of deciduous trees of at least eight inches caliper or coniferous trees of at least 15 feet in height; (6) General soil types; (7) The planned location of protected open space; (8) Existing roads and structures; and (9) Potential connections with existing greenspace and trails. (b) Development plan. Applications shall include a development plan which, unless specifically approved otherwise by the board of commissioners, shall be a condition of P-R rezoning approval and must be followed. (c) Land uses and development summary. The application shall include a list of all land uses proposed to be included in the P-R zoning district with the following information: (1) The total land area devoted to each of the land uses proposed. (2) The percentage of the total land area within the P-R zoning district devoted to each proposed land use. (3) The number of residential units by type and density. (4) The total square footage of buildings devoted to nonresidential uses. (5) Development schedule indicating the approximate dates for beginning and completing the project, or each phase if the development is to be phased, and the extent of development and types of land uses in each phase. (d) Dimensional requirements and comparison. The rezoning applicant shall submit with the application all dimensional requirements that are proposed to apply within the P-R zoning district for each land use, including, but not limited to, minimum lot sizes; minimum lot widths; maximum lot coverage; front, side and rear yards and building setbacks; and maximum heights. Such dimensional requirements shall be presented in a table on the development plan or in the written text accompanying the application that shows the proposed lot, height, coverage and other dimensional standards in relation to the dimensional requirements for the zoning district or districts in which the subject property is located at the time the zoning request is made. (e) Description of characteristics of improvements. The application shall contain descriptions of improvements to be constructed within the P-R zoning district, such as, but not limited to, street types, right-of-way widths, pavement widths, sidewalk locations and dimensions, and other improvements. Such proposed improvements shall be presented in a table in the written text accompanying the application that shows the proposed improvements in comparison with improvements that would be required otherwise without approval of a P-R zoning district. (f) Open space management plan. As a part of the application, an open space management plan shall be submitted which, unless specifically approved otherwise by the board of commissioners, shall be considered and become a condition of P-R rezoning approval. The applicant must identify the owner of the open space who is responsible for maintaining the open space and facilities located thereon. Open space within P-R zoning districts may be used for any of the following: (1) Conservation of natural, archeological or historical resources; (2) Meadows, woodlands, wetlands, wildlife corridors, game preserves, or similar conservation-oriented areas; (3) Walking or bicycle trails; (4) Passive recreation areas; (5) Agriculture, horticulture, silviculture or pasture uses, provided that all applicable best management practices are used to minimize environmental impacts, and such activities are not conducted within primary conservation areas; (6) Nonstructural stormwater management practices; (7) Easements for drainage, access, and underground utility lines; or (8) Other conservation-oriented uses compatible with the purposes of this article. (g) Instrument of permanent protection. As a part of the P-R rezoning application, or no later than prior to the issuance of a development permit, the applicant shall ensure that open space proposed in the P-R zoning district will be permanently protected through an instrument such as a conservation easement, fee-simple ownership, or permanent restrictive covenant. If a homeowners' association is the owner, membership in the association shall be mandatory and automatic for all homeowners of the subdivision and their successors. If a homeowners' association is the owner, the homeowners' association shall have lien authority to ensure the collection of dues from all members. The responsibility for maintaining the open space and any facilities located thereon shall be borne by the owner. The open space within a conservation subdivision shall be protected in perpetuity by a binding legal instrument that is recorded prior to any vesting deed for property or lots within said subdivision. The instrument shall be a permanent conservation easement in favor of either: (1) A land trust or similar conservation-oriented non-profit organization with legal authority to accept such easements; or (2) A governmental entity with an interest in pursuing goals compatible with the purposes of this article. If the entity accepting the easement is not the Butts County board of commissioners, then a third right of enforcement favoring the Butts County board of commissioners shall be included in the easement. The instrument for permanent protection shall include clear restrictions on the use of the open space, consistent with the requirements of this article, as well as any further restrictions the applicant chooses to place on the use of the open space. (h) Private restrictions. P-R zoning districts that have proposed commonly-owned facilities and space shall have private restrictions and covenants established which shall be subject to the approval of the county attorney and zoning administrator. The applicant for P-R rezoning involving commonly-owned facilities and space shall submit, along with the development plan application, a declaration of covenants, conditions and restrictions, articles of incorporation and by-laws for the property owners or homeowners' association. The declaration shall confer membership to the owner of property subject to assessment by the association, provide for voting rights in the association with suggestions for the division of power between the developer and the property owners, and provide for maintenance assessments, among other things. (i) Architectural elevations. Applications shall include perspective front, side and rear elevation drawings of representative building types, including details for typical detached single-family dwellings and their typical accessory buildings. These drawings shall indicate general architectural characteristics. If the P-R rezoning is approved, architectural elevations submitted as part of the application shall be considered binding unless specifically noted otherwise in the approval. (j) Facility impact analysis. The applicant shall submit an analysis of the public's ability to serve the proposed development with sheriff, police, fire protection, schools, water, sewer, roads, recreation facilities, solid waste collection and disposal, libraries, and other public facilities and services. The subdivider or land developer shall construct such oversized improvements and utilities that the county determines are necessary, provided that the subdivider or land developer shall not be obligated for the additional cost of improvements and utilities that are not uniquely required for that development, and provided the subdivider agrees to a proposal by the county to share in the cost arrangements for over-sizing improvements and utilities. A formula may be developed by the county to provide for a sharing of the cost of other improvements needed to serve the subdivision or land development when certain of the improvements are necessary to serve future subdivisions or developments in the vicinity. (k) Development agreement. Where the fiscal impact analysis submitted with the application notes possible future deficiencies in county facilities or services if the planned residential development is approved and constructed, or where desirable for other reasons, the applicant shall submit a draft "development agreement," specifying, among other components, provisions regarding developer-funding infrastructure to mitigate the facility deficiencies identified in the fiscal impact analysis. The zoning administrator, and other county staff as appropriate, will participate in the process of drafting the specific provisions of the development agreement with the applicant. It is intended that the draft development agreement will be generally accepted by appropriate county staff and be a part of the application prior to determining the application complete and processing the P-R rezoning application for public hearings. That intent shall not preclude changes and refinement of the development agreement during the public hearing process, as may be necessary to respond to recommendations of the planning commission, additional suggestions by staff, or to meet the approval of the Butts County board of commissioners. (l) Consistency with watershed water supply protection districts. Where a development is proposed in a watershed water supply district, excepting the Ocmulgee River Watershed District, the requirements of those districts shall be applicable to the proposed P-R development, unless the applicant submits a plan and studies, to the satisfaction of the zoning administrator, demonstrating that the impact of the development on water quality will be less than that which would have occurred under the standard requirements of the watershed water supply district. Additional approval processes may be necessary. Sec. 4.07.06. Procedures. (a) Pre-application conference. Prior to filing an application for a P-R zoning district, the applicant may confer with the zoning administrator in order to review the general character and certain specific elements of the proposal. Upon learning of a pending application for P-R rezoning, or at the most expedient time before accepting a P-R rezoning application as complete, the zoning administrator may schedule a pre-application conference with the applicant, who should provide and present at the pre-application conference all preliminary materials such as, but not limited to, a basic sketch plan of the development, general intentions for land uses, boundary surveys of the site to be rezoned, and notes regarding any prior discussions about utility, facility, service, and other infrastructure availability and/or deficiencies. The zoning administrator may request that other appropriate staff attend the preapplication conference, which may include, but are not necessarily limited to, the following: Butts County public works; Butts County administration; Butts County board of education; and the Butts County water and sewer authority. Fire department personnel also should be in attendance to conduct a review for public safety of the road plan. At the pre-application conference, the applicant will receive general instruction and suggestions on filing the complete rezoning application, including suggested components of a "development agreement" as defined by this article. Any information or suggestions provided by county or agency officials shall not be binding or interpreted as providing approval or commitment of Butts County or the agencies represented with regard to the development proposal. (b) Recommendation and approval authority. All applications for P-R rezoning shall be subject to the public hearing and notice requirements specified in chapter 10. All applications for P-R rezoning shall be processed and considered by the planning commission and decided upon by the board of commissioners the same as any other applications for rezoning. (c) Revisions. Amendments to approved P-R zoning districts and development plans shall be permitted but governed by the procedures and provisions for changing the official zoning map. (d) Preliminary plat. If the applicant does not simultaneously seek and receive approval of the preliminary plat at the time of P-R rezoning approval, then the applicant shall be required to submit a preliminary plat application. (e) Development permit. Upon approval of a P-R rezoning application by the board of commissioners, and preliminary plat approval by the planning commission, the land developer may apply for development permit approval. Excavation, grading or land disturbance applications shall only be approved for development that has been approved in accordance with the provisions of this article. (f) Final plat. The applicant shall submit a final plat for approval in accordance with chapter 10 of this UDO. (g) Building permits and certificates of occupancy. No building permit or certificate of occupancy shall be issued for a building, structure, or use that has not been approved in accordance with the provisions of this article. The zoning administrator shall authorize the issuance of building permits for buildings and structures in the area covered by the approved P-R rezoning development plan if they are in substantial conformity with the approved development plan, after improvements are installed in accordance with applicable improvement requirements, and if found to be in conformance with all other applicable regulations. The zoning administrator shall authorize the issuance of a certificate of occupancy for any completed building structure or use located in the area covered by the P-R zoning district if it conforms to the requirements of the approved planned residential development and all other applicable regulations. After completion of a development in the P-R zoning district, the use of land and construction, modification or alteration of any buildings, structures or uses within the area covered by said development shall be regulated by the approved development plan for the P-R zoning district. Sec. 4.07.07. Criteria for approval. In addition to the standards applicable to other zoning decisions, the county shall consider the following criteria in reviewing an application for a P-R zoning district: (a) Comprehensive plan. Whether the application is consistent with the comprehensive plan of the county. (b) Architectural compatibility. The extent to which the proposed site development features and architectural features of buildings within the proposed development are harmonious, compatible with adjacent and nearby existing development, and consistent with the guidelines for preserving rural character, if made applicable by this article. (c) Facility adequacy. Development within this zoning district is adequately served by public facilities and services needed for the type of development at the time development impacts occur. If such facilities and services are inadequate, as shown in the fiscal impact analysis submitted with the application or as determined independently by the county, a development agreement that mitigates facility or infrastructure deficiencies by the developer is considered adequate and is approved by the board of commissioners. (d) Open space adequacy. The adequacy of open spaces that are provided. Conformance with the open space requirements of this article is required. In addition, approval or denial of a P-R rezoning application and development plan shall be based on the extent to which the application and plan meet the following open space planning criteria: (1) Primary conservation areas are required to be included within the protected open space, unless the applicant demonstrates that this provision would constitute an unusual hardship and be counter to the purposes of this article. (2) A sufficient amount of secondary conservation areas are protected as permanent open space, as opposed to being devoted to lots and other uses. (3) The configuration of the open space tract is contiguous and undivided, or open space is provided in relatively undivided tracts that cannot reasonably be reconfigured into one contiguous, undivided tract. (e) Rural cluster siting criteria. Residential development shall be clustered or sited so as to minimize disruption of rural character. In such areas, the following additional criteria shall be adhered to: (1) A rural cluster subdivision may contain one or more residential clusters grouped into compact neighborhoods. (2) To the maximum practicable extent, existing historic rural features shall be preserved as part of the cluster development. These features include, but are not limited to, rock walls, fences, functional and structurally safe farm buildings, and landscape features. (3) Buildings shall be clustered or sited in the most accessible, least visually prominent, and most geologically stable portion or portions of the site. (4) Rural clusters shall be limited to locations that minimize the visual impact from adjacent lands and view corridors. Placing buildings so that vegetation, rock outcroppings, depressions in topography, or other natural features will screen them where they exist shall minimize the prominence of construction. In wooded or forested areas, the planning commission may require the scattering of buildings so as to save trees and minimize visual impacts. (5) Cluster lots shall be sited to minimize conflicts between housing and adjacent agriculturally-zoned property. (6) Cluster lots should border on open space on at least one side and have access to any core open spaces in the rural cluster. (f) Soil suitability for septic tanks and drain fields. When the P-R zoning district will not be served by public sanitary sewer or a community sewerage system, it is generally the intent that each lot has at least one-half acre of suitable soil for a septic tank drain field and that each lot has sufficient area for a replacement drain field, as may be more specifically determined by the Butts County health department depending on the specific nature of the development proposal, such as the number of bedrooms in dwellings, the types of amenities provided, and any other variables that would affect the sizing of septic tanks and placement of drain fields. Failure of the development proposal to meet this criterion may be cause to disapprove the P-R rezoning. (g) Access, safety, and convenience of school children. The development plan adequately considers the needs of school-age students with respect to access to bus stops within, adjacent to, or nearby the P-R development. Such considerations include safe and adequate sidewalks or paths from residential areas to places where the county schools' buses will stop to pick up and drop off students, lighting of the school bus stops during hours of darkness, and shelter or other safety and convenience considerations. Failure of the development proposal to meet this criterion may be cause to disapprove the PR rezoning. (h) Reducing wild land fire hazards. The development proposal should incorporate design considerations and/or regulations that mitigate structure ignition hazards consistent with recommendations of the National Fire Protection Association (NFPA) 1144, "Standard for Reducing Structure Ignition Hazards from Wildland Fire," 2008 or future edition, or similar acceptable publication or best practices. Failure of the development proposal to meet this criterion may be cause to disapprove the P-R rezoning. Sec. 4.07.08. Guidelines for preserving rural character. (a) Location of dwellings and other buildings. Siting dwellings and other buildings is one of the most important considerations, and therefore, this aspect receives particular attention. Areas of the open countryside are less able to absorb development without significant impact upon existing scenic and rural amenities. Consistent: Dwelling is located close to the road (or at the edge of fields) to allow continued use of land for crops and pasture. Future development should respect the established pattern of crop lands, pasture and the rural, open space character of the area. Woodlands are preserved. Above left (consistent): Building is sited within or adjacent to existing vegetation that partially screens the building. Above right (inconsistent): Building is sited near top of ridge or hill and is too visible, and non-native landscaping has been introduced. Below (inconsistent): New house is sited in a visually prominent location in the center of the site with no regard for existing conditions. Consistent: New houses sited as not to compete with older structures in established settlement pattern. Propose a site and design structure that will minimize the visual impact of buildings and site on the natural landscape. In cases where there are practical reasons why a visible location must be selected, it will need to be justified and an explanation given as to why sites that are less visible cannot be utilized. In addition, approval of building locations on visually prominent sites requires mitigation of visual impacts through buffering or screening, additional (or different) architectural treatments, or other appropriate measures. Below (consistent): The lots are clustered near existing dwelling(s), buildings are set back from open fields adjacent to road, and existing hedge rows and tree lines are maintained. (b) Excavation and grading. Dwelling and building sites should be chosen that require the least amount of excavation and grading (e.g., cut and fill). Excessive excavation unnecessarily disturbs the natural contours of the land and can result in negative visual impacts and unnatural-looking sites. Inconsistent: Grading does not respect existing contours and does not blend into the landform. Avoid severe cutting, filling, padding, or terracing for home or building sites. Projects involving more than one use or phase should be phased into workable units in a way that minimizes the amount of soil disturbance at any given point in time. When grading must occur, it should blend with the natural landform as much as possible. Grading to form level pads and building sites is strongly discouraged, and when required, such grading should be minimized. (c) Rural road design. Roads shall meet the standards established in section 6.01.06 of this ordinance. Access from a public road through a site should follow or have due regard for the contours of the site. One-way streets shall be permitted and encouraged where appropriate for the terrain and where public safety would not be jeopardized. For instance, a two-way road may have the directions of flow split into one-way pairs that differ in elevation, circumnavigate difficult terrain, or avoid tree clearance. (d) Access from dwellings and building sites onto public roads. Any new driveway or public or private road entrance should be carefully located considering the view from the public road. For all rural cross-section streets, public or private, ditches are essential for proper drainage and shall be designed and provided to handle total volume and velocity of water for the particular road location. The following standards for ditches shall be followed: (1) Swales must be able to be designed to: a. Convey a 25-year storm event. b. Incorporate freeboard equivalent to 20 percent of the design depth with a one-foot minimum measured to the road shoulder. c. Be constructed using the following types of cross-sections: 1. Parabolic; 2. Trapezoidal with a minimum two-foot bottom; 3. No "V" shaped cross-section. d. Limit velocities to or below the maximum contained in the Manual for Erosion and Sediment Control in Georgia, latest edition, for proposed channel liner. e. Have side slopes of 3H:1V, horizontal to vertical, or flatter and meet the following additional standards: 1. Slopes must be able to be maintained by the property owner with standard mechanized equipment. 2. Channel liners: i. Grassing if velocity is less than 2.0 f.p.s. Must be maintained until 100 percent of the development site has 70 percent permanent grassing established. ii. Sod if velocity is less than 5.0 f.p.s. Sod is recommended for all vegetated channel lining. iii. Rip rap is required if velocity is between 5.0 and 10.0 f.p.s. Design must be consistent with the Manual for Erosion and Sediment Control in Georgia, latest edition. iv. Concrete is not allowed for side ditches. v. Methods to reduce velocity should be used. vi. For a velocity over 10.0 f.p.s., side ditches are not allowed. (2) Driveway culvert designs shall be included as part of the construction drawings. The following standards shall apply: a. Culverts must be designed for a 25-year storm event. b. The minimum pipe size shall be 15 inches in diameter. c. Culverts must have end treatments: 1. Flared end sections are preferred. 2. Precast winged headwalls shall not be allowed. 3. Alternative end treatments must be approved by the Butts County public works director or designee. d. Culverts must have storm drain outlet protection compliant with the standards established in the Manual for Erosion and Sediment Control in Georgia, latest edition. e. A minimum of one and one-half feet of cover under the driveway shall be provided. f. Culverts shall be designed to minimize exit velocities. (3) Cross drains must be designed to: a. Accommodate a 100-year storm event. b. Have a minimum pipe size no less than 18 inches in diameter. c. Have an end treatment meeting the following specifications: 1. Flared end sections are preferred. 2. Precast winged headwalls are allowed under site-specific conditions as determined by the county engineer or designee. d. Include storm drain outlet protection compliant with the standards established in the Manual for Erosion and Sediment Control in Georgia, latest edition. e. Provide a minimum of one and one-half feet of cover under the driveway. f. Minimize exit velocities. g. Allow reviewer to verify the impact of a 100-year storm event with the inclusion of the following standards: 1. Headwater/pipe diameter, HW/d, shall be less than 2d. 2. A minimum freeboard of one foot as measured from the road shoulder elevation shall be maintained. (e) Lighting. In the interest of preserving the rural atmosphere of the night sky in rural areas, street lighting along streets in new subdivisions or land developments is discouraged. If desired by a developer, streetlights must meet the approval of the zoning administrator for rural compatibility. (f) Roof materials. Consistent: Standing seam metal roof preferred; corrugated sheet metal acceptable on farm outbuildings; tar paper and asphalt shingles acceptable; cedar or other wood shake shingles preferred over tar paper and asphalt shingles. (g) Architecture and exterior building materials. Architecture and building types should be compatible with existing buildings in the area (see illustration, below), including stone chimneys, front (shed) porches, steep gabled roofs, and wood siding. If a dwelling or building is to be composed of building materials that are incompatible with the established building materials and architectural features, it can significantly change the character of the rural setting. In such instances where building materials that are incompatible or not consistent with the provisions of the design and character of the district must be used, the dwelling or building should not face or be located within 50 feet of the public road right-of-way. Consistent: Steep or moderately steep gabled roof pitches; roof materials are asphalt composition shingle, wood shake, or standing seam metal; front porch is provided; base exterior is stone and siding is wood (hardi plank); chimney is provided; structural (timber) elements exposed at front porch entrance; house is sited below ridgeline; garage also has steep gabled roof and does not dominate view. The use of natural materials for engineered structures is also encouraged, where appropriate. For instance, wood, stone, or dyed/textured concrete should be used for new guardrails, curbing, culverts and walls. (h) Garages and accessory buildings and structures. Garages (i.e., freestanding accessory buildings and structures for storage of vehicles) should complement the architectural style of the principal dwelling or building. They should not be visually prominent when viewed from the public road. Carport structures if composed of pre-fabricated metal shall not be located in a visible location in the front yard of a dwelling or building, or if they must be located in a visible area, they must be screened with native vegetation. Oversized accessory buildings for recreational vehicles, boats, and storage cannot be sited within front yards, and if provided, they shall be located as far to the rear of the lot as possible. (i) Landscaping. Native species should be preserved, where possible, and when landscaping is added, only native (indigenous to the region or area) species of trees, shrubs, vines, and other vegetation should be used. When new landscaping is introduced, trees and shrubs should be planted in groups and irregular patterns, not in rows. Home sites should have carefully defined construction limits (building envelopes). Native vegetation must be left undisturbed outside building envelopes and areas for driveways, or where vegetation must be removed, it shall be replaced with native species. The introduction of new, sodded yards is discouraged in front yards, and a more natural appearance of native vegetation is sought. Use plant materials that blend with the environment. Landscape schemes that are rough, natural, and/or subdued in character are encouraged. Extensive areas of exotic plants and sod are discouraged where they would be visible from the public right-of-way. (j) Fences and walls. If fences are to be provided in the front yard of a dwelling or building, they must be composed of wood materials. Examples of acceptable wood materials for fences in front yards are shown below. Sec. 4.08.00. Standards for R-5 manufactured housing communities. Sec. 4.08.01. General provisions. (a) R-5 zoning districts are intended to provide areas where stable communities for affordable housing can be located and efficiently developed in a manner compatible with surrounding residential areas while preserving the natural amenities of the land. (b) R-5 districts are allowed only where public water and sewer are available. All dwellings must be served by public water and sewage and sewage lines. Where such lines do not already exist, the developer is responsible for installation of them. Sec. 4.08.02. Permitted uses. The following are permitted as principal uses in R-5 districts: (a) Planned manufactured home community. (b) Recreation area owned, operated, and maintained by the owner(s) of the permitted use, exclusively for the use of residents and their guests. (c) Utility substation meeting the following development standards: (1) Structures must be placed at least 30 feet from all property lines. (2) Structures must be enclosed by a wovenwire fence at least eight feet high with the bottom of the fence either flush with the ground or with a masonry footing. (3) No vehicles or equipment may be stored on the lot. (4) A buffer must be maintained along the side and rear property lines. Sec. 4.08.03. Plan review and approval procedures. (a) Pre-application conference. Prior to filing a formal application for an R-5 district, the applicant may confer with the zoning administrator in order to review the general character of the plan (on the basis of tentative land use sketch, if available) and to obtain information on development standards and ordinances affecting the proposed project. (b) Submission of application for R-5 district approval. (1) The applicant must file a proposed development plan with the zoning administrator. This application must be supported by a development plan and a written summary of intent. The relationship between the proposed development and the surrounding area, both existing and proposed, must be shown. The following information must be presented with the development plan: a. A general location map. b. Existing topographic conditions, including contour intervals of no more than five feet based on field surveys or photogrammetric methods. c. The existing and proposed land uses and the approximate location of all buildings and structures. d. The approximate location of existing and proposed streets. e. The approximate location of all existing and proposed utilities, including a preliminary utility and drainage plan. f. The present zoning pattern in the area. g. A legal description of the subject property. h. The location and use of existing and proposed public, semipublic, and community facilities such as schools, parks, and open areas on the site. This includes areas proposed to be dedicated or reserved for community or public use. (2) If a proposed development creates special problems or involves unusual circumstances, additional information may be required in order to evaluate the proposal. Such additional information includes, but is not limited to, the following: a. An off-street parking and loading plan. b. An economic feasibility report or market analysis. c. A traffic study of the area and a circulation plan within the proposed development as well as to and from existing streets adjacent to the site. (3) The written summary of intent submitted with the development plan must include the following information: a. A statement of the present ownership of all land within the proposed development. b. An explanation of the character of the proposed development. This includes a summary of acres, number and types of dwelling units. c. A general statement of the proposed development schedule. d. Agreements, provisions, and covenants which govern the use, maintenance, and protection of the development and any common or open areas. (c) Review and approval of R-5 district application. (1) An application for approval of an R-5 district requires rezoning and shall be processed in the same manner provided by this ordinance for rezoning applications. (2) The zoning administrator will turn over the application materials to the planning and zoning commission for its recommendations. (3) The power to approve an amendment creating an R-5 district rests with the board of commissioners. After conducting the public hearing and considering recommendations from the planning and zoning commission, the board of commissioners will then make an official decision on the proposed R-5 district. The board of commissioners may approve, disapprove, or conditionally approve the development plan. (4) If the development plan is approved as submitted, the official map will be changed to indicate the R-5 district. If the plan is approved with modifications, the applicant shall have ten days following the public meeting at which the plan is approved with modifications to withdraw the application. If the applicant does not provide the zoning administrator with written notice that the application is withdrawn within that period, the official zoning map will then be changed to reflect the rezoning of the property to an R-5 zoning classification. The site plan and supporting information of any approved plan will be identified and permanently filed with the zoning administrator. Any development of the subject property must comply with the approved development plan. (d) Issuance of building permits. The zoning administrator will issue building permits for buildings and structures in the area covered by the approved development plan if the proposed buildings and structures are in conformity with the approved development plan, the development schedule, and all other applicable regulations. (e) Revision of development plan after approval of plan. (1) Minor extensions, alterations, or modifications of existing buildings or structures may be permitted after review and approval by the planning and zoning commission; such changes must be consistent with the purposes and intent of the development plan. (2) Any major or substantial change in the approved development plan which affects the intent and character of the development, the density of land use pattern, the location or dimensions of streets, or similar substantial changes must be reviewed and approved by the board of commissioners after receipt of recommendations from the planning and zoning commission and shall be subject to the same procedures as a rezoning application. (f) Initiation of rezoning back to original district. Construction of the planned development must begin within one year of the approval of the R-5 district. If no construction has begun by then, or if the applicant fails to maintain the approved development schedule, approval of the development plan will lapse. At its discretion, the board of commissioners may extend the period for beginning construction of any phase of the project for one additional year. If approval of the development plan lapses under this provision, the planning and zoning commission may initiate zoning amendment proceedings to restore the previous zoning to the subject property. Sec. 4.08.04. Development standards for R-5 districts. In addition to the development standards contained in section 4.01.02 of this ordinance, the following standards are required within R-5 districts: (a) Minimum standards applicable to the development as a whole: (1) Minimum development area: 12 acres. (2) Minimum development width: 150 feet for the entire development. (3) Minimum front setback as measured from the right-of-way of the road: a. Arterial streets/roads: 75 feet. The front of all buildings must be at least 35 feet from the front property line. b. Collector streets/roads: 50 feet. The front of all buildings must be at least 35 feet from the front property line. c. Other streets/roads: 50 feet. The front of all buildings must be at least 35 feet from the front property line. (4) Maximum building height: 35 feet. This height limit does not apply to projections not intended for human habitation, except for satellite, television, and radio antennas, to which this limit does apply. For buildings and structures with such projections, the minimum required setbacks must be increased one foot for every two feet (or part of two feet) of height greater than 35 feet. (5) Development standards shown in approved development plan. Other development standards shown in an approved development plan apply only to the development shown on the specific development plan. Such development standards must be maintained. (6) General. Condition of soil, groundwater level, drainage, and ground slope must not create hazards to the property or to the health or safety of residents. The site must not be exposed to objectionable smoke, noise, odors, or other adverse conditions; no part subject to flooding or erosion can be used for any purpose that would expose people or property to danger. (7) Soil and ground cover. Exposed ground surfaces throughout the development must be protected with a vegetative growth that prevents soil erosion, standing puddles, and dust. If this is not possible, such areas may be covered with a solid material such as stone or may be paved. (8) Site drainage. The ground surfaces throughout the development must be equipped to drain all surface water in a safe, efficient manner, either through grading or installation of drains. (9) All internal streets must be paved with a material and thickness which meets the standards specified in chapter 6. Minimum required pavement width is as follows: a. No on-street parking: 20 feet. b. Parking one side: 28 feet. c. Parking both sides: 36 feet. (10) Dead-end streets. All dead-end streets must have a turnaround at the closed end, with an outside paved diameter of at least 80 feet. (11) Street lighting. Outdoor lighting is required which will provide the following average maintained levels of illumination for the safe movement of pedestrians and vehicles at night: a. All parts of the street system of the development: Ten footcandle. b. Potentially hazardous locations, such as major street intersections, steps, and stepped ramps. Individually lighted, with a minimum of 20 footcandle. (12) Street construction and design. a. Grades. Minimum permitted grade for streets is ten percent. Short runs with a maximum grade of 15 percent may be permitted upon specific approval of the zoning administrator if traffic safety is ensured by adequate leveling areas and avoidance of lateral curves. b. Offset intersecting streets (street jogs) and reverse curves. Offset intersecting streets must be offset at the centerlines at least 150 feet. Reverse curves must be connected by a straight section that is at least 150 feet long. (13) Paved parking areas. a. Paved off-street parking areas must be provided for the use of residents. At least two spaces for each dwelling unit must be furnished. In a planned manufactured home community, resident parking must be furnished at the manufactured home space which it serves. b. Paved parking areas for guests may be either on-street, in a separate off-street lot, or a combination of both. At least 0.2 paved guest parking spaces per dwelling unit must be furnished. c. See chapter 6 for required parking space design standards. (14) Walks. a. General requirements. All developments must have safe, convenient, all-season pedestrian access of adequate width for intended use. Walks must be durable and convenient to maintain. Sudden changes in alignment and gradient should be avoided. b. Common walk system. Common walks, where provided, should be at least three and one-half feet wide. c. Individual walks. All manufactured home spaces must be connected either to common walks, paved streets, paved driveways, or parking spaces adjacent to paved streets. Such individual walks must have a minimum width of two feet. (15) Service buildings and other such facilities. Service buildings, recreation buildings and other such facilities of the development must meet the requirements of applicable codes and development regulations adopted by Butts County. (16) Each development shall have a reserved greenspace for the use of the residents and their guests which shall be of a size adequate to provide recreational opportunities for the anticipated number of residents and which shall in no case be less than 20 percent of the development area. (b) Each manufactured home within the development shall be located on a separate lot, which shall be subject to the following minimum standards: (1) Minimum floor area per manufactured home: 750 square feet. (2) Minimum front setback: 35 feet. (3) Minimum side setback for lots within development: 20 feet. (4) Minimum rear setback: 30 feet. (5) Minimum manufactured home lot area: 7,500 square feet. (6) All manufactured homes must be installed in accordance with the Georgia State Manufactured Housing Code. Sec. 4.09.00. Landscaping, buffers and tree protection. Sec. 4.09.01. Purpose. The purpose of this section is to provide requirements for the landscaping of developments in industrial, commercial, office-institutional, multi-family residential, new residential subdivisions, and manufactured home zoning districts, in order to enrich the urbanized and natural environment of Butts County. It is the intent and purpose of this landscape section to reduce the adverse visual, environmental, and aesthetic effects of development in order to: (a) Minimize the rate of stormwater runoff; (b) Maximize the capability of groundwater recharge in urban or suburban areas; (c) Increase air filtration and the removal of particulate and gaseous pollutants through plant materials; (d) Provide shade and noise attenuation; (e) Filter and reduce the glare of headlights and reflected sunlight from parked automobiles onto the public street rights-of-way; (f) Improve the appearance of parking areas and vehicular surface areas; and (g) Minimize the visual blight created by large expanses of paved surface area. Sec. 4.09.02. Landscape plans. A landscape plan shall be submitted upon application for a development permit. The plan shall include sufficient information to determine whether the proposed landscape improvements are in conformity with this section, including the following: (a) Identification of all trees, natural features and man-made structures that will be retained upon the site; (b) A description of proposed landscaping improvements and plantings, including the species, size, quantity and location of trees, shrubs and other landscaping materials; (c) Identification of all proposed structures, vehicle use areas, sidewalks, wheel stops or curbs, walls and fences; and (d) A depiction of adjoining streets and parcels sufficient to identify the same and to demonstrate the relationship between the development and the same. Sec. 4.09.03. General landscape standards. (a) Minimum specifications for plant materials. (1) All plant material shall be nursery grown, number 1 grade, meet current American Nursery and Landscape Association Standards, and installed according to accepted planting procedures. (2) Shrubs shall be a minimum one-gallon container size. (3) All landscaped areas and buffers shall be sodded or covered with ground cover. (4) All plant species shall be native to this region or appropriate for the region (generally, consistent with the "7b" Plant Hardiness Zone as defined by the Cooperative Extension, University of Georgia College Agricultural and Environmental Sciences). Installation of invasive species and the use of non-urban tolerant species of trees such as Bradford Pear shall be prohibited. (5) Subject to other portions of this section, at least 25 percent of the required trees installed in landscaped buffers, in landscaped parking areas, and to meet tree planting requirements shall be canopy/shade trees. (6) Existing trees, which are two inches DBH (diameter at breast height) or larger, may be counted toward meeting the requirements for landscaped buffers and tree retention. (7) Canopy trees shall not be installed under any overhead utility line, over any buried utilities, or within a utility easement. (8) When possible, the natural topography of the land shall be preserved and natural growth shall not be disturbed beyond that which is necessary to prevent a nuisance, to thin such natural growth where too dense for normal growth, or to remove diseased, misshapen, or dangerous and decayed timbers. (b) Requirements for landscaping. (1) At least 12 percent of the total gross land area of a development site shall be landscaped. The landscaped areas shall be located on the site in such manner as to maximize preservation of existing trees. Landscaped area requirements are in addition to required buffer areas. (2) A perimeter landscape area must be provided within the front and side yard setbacks (as applicable) that abut public rights-of-way. The perimeter landscape area shall be a minimum of ten feet in width and shall provide a minimum of three trees for each 100 linear feet of lot street frontage or major portion thereof, with no less than 50 percent of said trees being canopy/shade trees. (3) Grass or other ground cover shall be placed on all areas within the perimeter landscape areas. Grass shall be planted in all yard areas not occupied by buildings, driveways and vehicle parking areas. If grass areas are seeded, 100 percent cover must be provided within three months. (4) The perimeter of each principal building on a site shall have landscaped area and/or sidewalk not less than ten feet in width. Asphalt paving material shall not be allowed to abut the base or foundation of an exterior wall of a principal building. Portions of buildings intended for vehicle access shall be exempt from this requirement. Buildings in the M-1, M-2 and M-3 zoning districts shall be exempt with the exception that office buildings in said districts shall comply with this section. (5) Trees planted for the purpose of this section must meet the following criteria: a. All tree species shall be native to this region or appropriate for the region (generally, consistent with the "7b" Plant Hardiness Zone as defined by the Cooperative Extension, University of Georgia College Agricultural and Environmental Sciences); b. Shall have a minimum DBH (diameter at breast height) of two inches at time of planting; c. Shall have a minimum matured height of 15 feet; d. Shall be of a heat and drought tolerant species; and e. Shall be considered a mechanically strong tree species appropriate for an urban environment. (6) Installation shall be completed prior to issuance of a certificate of occupancy. (7) Trees, shrubs and ground cover for landscaped and buffer areas shall be consistent with guidelines prepared by the Cooperative Extension, University of Georgia College Agricultural and Environmental Sciences, as follows: Xeriscape: A Guide to Developing a Water-Wise Landscape and Landscape Plants for Georgia. Sec. 4.09.04. Landscape requirements for parking lots. All lots, parcels, or tracts of land, with the exception only of single-family residential lots, for which a parking lot or vehicular use area is established after the adoption of this ordinance shall comply with the following: (a) Perimeter landscaping for parking lots. Parking lots shall have a landscaped perimeter having a minimum width of 15 feet along the entire length of any property line abutting a public or private right-of-way and a minimum width of five feet along all other property lines. There shall be one tree for every 30 feet of lot frontage along any property line abutting a public or private right-of-way and one tree for every 75 feet on all other property lines. Where a buffer is required along any property line, the buffer requirements in section 4.09.05 shall take precedence. (b) Interior landscaping. (1) Parking lots with 20 or more parking spaces shall provide interior landscaping. Interior landscaping shall consist of parking lot islands located at the ends of each single or double parking row and one parking lot island every 12 parking spaces in a row. Said islands shall be a minimum of 160 square feet in area for single parking rows and 320 square feet in area for double parking rows. Single parking row islands shall contain one tree, and double parking row islands shall contain two trees. Said islands shall have additional landscaping consisting of appropriate ground cover or plant materials such as shrubs, mulch, straw, or sod. (2) A minimum of five percent of the total parking lot area shall consist of internal landscaping. (3) Vehicle stops or curbing shall be required along all landscaped areas within a parking lot or vehicular use area. (4) The property owner/developer shall make provisions for sidewalks within required landscaped areas when required. In such cases, additional width of a landscaped area may be required. Sec. 4.09.05. Buffer and open space requirements. (a) The intent of these requirements shall be to enhance the visual and aesthetic appearance of the county. The purpose of these buffer and open space requirements is to: (1) Provide space definition and landscape continuity within the built environment; (2) Provide appropriate screening and relief from traffic, noise, heat, glare, odor, and the spread of dust and debris; (3) Reduce the impact of development on the drainage system and reduce flooding; (4) Provide for a sense of privacy; (5) Provide for reduction or elimination of incompatibility; (6) Reduce the visual impact of unsightly aspects of adjacent development; (7) Provide for the separation of spaces; and (8) Provide for passive recreational areas and pedestrian or multi-use greenways and greenbelts. (b) Location, measurement, and design of buffers. (1) Buffers shall be located on private property on the outer perimeter of a lot, parcel, or tract of land extending to the lot, parcel, or tract boundary line and between the property line and any fence or wall, whether required or voluntary. Buffers shall not occupy any portion of an existing, dedicated, or reserved public or private street, or right-of-way. Structures, including accessory buildings, etc., shall not be allowed in the buffers with the exception of fences and free-standing signs as permitted by this UDO. (2) Excluding buffers required for single-family residential subdivision developments, buffers shall consist of a minimum three trees per 100 linear feet. Buffer yards shall be maintained as green open space, consisting of grass or ground cover, along with required plantings and access drives only. Where such buffers are required, natural existing vegetation and trees shall be preserved when possible and may be substituted for any additional plantings as required here in this section. (3) Buffers required for single-family residential subdivision developments shall remain undisturbed where possible with the exception that utility crossings and access drives may be allowed. Said buffers are intended to protect existing agricultural uses from encroachment by new residential development, preserve open space, protect the natural environment, create greenways, greenbelts and opportunities for multiuse trails, and promote connectivity between such developments throughout the county. (4) Buffers shall be designed to avoid or minimize plantings within drainage, utility, or other easements. (5) Buffers shall be designed taking into consideration the site's soils conditions, topography, and natural resources. Native vegetation shall be used for landscaping and buffering unless the applicant demonstrates that the use of non-native, drought-resistant plants would best serve the site. (6) Buffers on multi-family residential, office, institutional, commercial, or industrial properties shall be established and maintained by the owner of the proposed development site. Buffers on single-family residential properties shall be maintained by the property owner. (7) Required building setbacks may be located in the buffer; however, where the buffer is greater than the setback, these buffer restrictions shall apply. (c) Buffer area standards. Table 4.09.05(c). Buffer Area Standards. Proposed Zoning District Adjacent Zoning District Minimum Buffer Area (in width) M-1, M-2, and M-3 All non-manufacturing districts 50 feet in all yards C-1, C-2, O-1, P-M, and P-R All residential districts 25 feet in side and rear yards Multi-family residential Single-family residential 20 feet in side and rear yards (d) When a single-family residential subdivision development is proposed adjacent to an active agricultural farming or processing operation, the following shall apply: No dwelling constructed on the newly rezoned residential property shall be located less than 500 feet from the closest point of any existing major livestock enclosure or poultry house. (e) In addition to required buffers, R-4 and R-M districts shall provide for common open space areas within the development, to be maintained by the property owner(s), and said areas shall be a minimum of ten percent of the total project area or one-quarter acre, whichever is greater. (f) Single-family residential subdivision development in the R-1, R-2, R-5 and R-M districts shall provide a minimum of 15 percent of gross acreage as common open space, green space, greenways and/or greenbelt buffers, to be maintained by the property owner(s). Buffers required in Table 4.09.05(c) shall be included when meeting the requirements of this section. Sec. 4.09.06. Maintenance requirements. (a) All landscaped areas shall be maintained to ensure that plant materials are healthy and thrive. Any diseased or dead plant materials shall be replaced as soon as reasonably possible based on the growing season, but not later than three months following identification of the need for replacement. (b) All landscaped areas shall be provided with a watering plan, which shall be included with the landscaping plan, sufficient to ensure that plants are established in a healthy growing condition. (c) Where an irrigation system is proposed in a landscaped area, the system shall be shown on the landscaping plan. Where proposed, irrigation systems shall provide an automatic shut-off feature activated during rain events. (d) Necessary trimming and maintenance shall be performed to maintain the health of the plant materials, to provide an aesthetically pleasing appearance, and to assure that the landscaped and buffer areas serve the intended purpose. (e) A landscaping plan, as required by this UDO, shall remain enforceable on a site for the duration of site improvements regardless of a change of property ownership. (f) Maintenance. The owner of each parcel subject to the requirements of this section shall be responsible for the perpetual maintenance and protection of buffers and landscape plantings required thereby. This ordinance requires that diseased, infested, dying, dead or damaged landscaping be replaced. CHAPTER 5 STANDARDS FOR ACCESSORY AND TEMPORARY USES Sec. 5.00.00. Generally. The provisions of chapter 5 apply to accessory uses, accessory structures, and temporary uses. Home occupations are considered accessory uses to residential development. Standards for home occupations are set forth in section 5.01.00. Standards pertaining to accessory structures are set forth in section 5.02.00. Standards for temporary structures and uses are set forth in section 5.03.00. Standards for signs, which may be either accessory structures, or the principal use on a parcel, are provided in section 5.04.00. Standards for wireless communication facilities, which may be located on a lot or parcel with a principal use, or which may be the principal use, are provided in section 5.05.00. Sec. 5.01.00. Home occupations. Sec. 5.01.01. Generally. (a) A home occupation is permissible in a lawfully established dwelling unit in any zoning district where residential uses are permissible. All home occupations shall meet the standards set forth in sections 5.01.02 and 5.01.03. (b) The following and similar uses shall be considered home occupations: (1) Office for professionals, such as attorneys, drafters, realtors, insurance agents, engineers, architects, and other consultants; (2) Instruction or teaching, such as, but not limited to, academic tutoring, performing arts, fine arts, or culinary arts provided that no more than two students are instructed at any one time; (3) Administrative or clerical support services, such as transcription, court reporters, stenographers, notary public, or addressing services; (4) Personal services, such as beauty or barber shop, nail technician, dressmaking or tailoring, provided that the service is limited to one station; (5) Pet grooming; (6) Day care for six or fewer children; (7) Licensed medical practitioner (excluding veterinarians); (8) Manufacturers' representative; and (9) Studios for artists, photographers, or artisans. (c) An interpretation that a use not listed in section 5.01.01(b) is similar shall be based on the tasks and activities normally associated with the proposed use and the similarity of those tasks and activities with the tasks and activities normally associated with a listed use. Sec. 5.01.02. Standards for home occupations, Type I. Type I home occupations are those which meet the following standards, and the representing requirements permit minimal business practices in certain residential zoning districts while maintaining residential character. Type I home occupations shall be permitted uses, consistent with the provisions of 2.02.00, Table of Permitted Uses and Lot Standards, of this ordinance: (a) The use of a dwelling unit for the home occupation shall be clearly incidental and subordinate to the residential use of the property. (b) The home occupation shall not involve the employment of any person other than those residing at the location of the home occupation. (c) At least one person residing on the premises shall be the primary operator of the home occupation. (d) The home occupation shall not involve any exterior storage or display of products, equipment, or materials that can be visible from the street. (e) The home occupation shall not make any use of accessory structures, including detached garages and sheds. (f) The home occupation shall not utilize more than 25 percent of the total floor area of the primary structure. (g) The home occupation shall not require any exterior, structural or aesthetic alterations to the dwelling unit that change the residential character of the dwelling unit. (h) The home occupation shall not require any additional entrances to the dwelling unit. (i) The home occupation shall not require increasing or enhancing the size, capacity, or flow of the water, gas, septic, sewer, or electrical system beyond that which is standard for a residence. (j) The home occupation shall not provide parking for customers or visits for business purposes that require the addition of any off-street parking spaces. (k) The home occupation shall not require the use of commercial vehicles for pickup and deliveries other than from the U.S. Postal Service or other express couriers. (l) No more than one vehicle associated with the home occupation may be parked at the site. Such vehicle is not to exceed one ton carrying capacity and two axles and must be used exclusively by the resident. (m) The following are permitted home occupations provided they do not violate any of the provisions of the previous paragraph: (1) Dressmaking, sewing and tailoring; (2) Studios for painting, sculpturing, writing and other fine arts; (3) Telephone answering and marketing; (4) Home crafts, such as model making, rug weaving, and lapidary work; (5) Instruction or teaching, such as academic tutoring, performing arts, or fine arts limited to one student at any given time; (6) Computer application and internet sales, not including sale of computers; (7) Office space for professionals, such as attorneys, drafters, realtors, insurance agents, engineers, architects, and other consultants; (8) Administrative or clerical support services, such as transcription, court reporters, stenographers, notary public, or addressing services; (9) Repair of clocks, instruments or other small appliances which do not create a nuisance due to noise, vibration, glare, fumes, odors or result in electrical interference; (10) Barbershops and beauty parlors; limited to one operator and station; (11) General construction and maintenance contractors; (12) Lawn care and maintenance providers; (13) Janitorial and cleaning services; (14) Consultants and representatives for the sales industry, having no product displays on site; (15) Pet grooming; (16) Day care for six or fewer children; (17) Licensed medical practitioner (excluding veterinarian). Sec. 5.01.03. Standards for home occupations, Type II. Type II home occupations are those which meet the following standards, and the representing requirements permit reasonable business practices in certain residential districts while maintaining the residential character. Type II home occupations shall be considered special uses, consistent with the provisions of section 5.02.00, Accessory Uses, of this ordinance. (a) The home occupation shall not involve the employment of any more than one person who does not reside at the location of the home occupation. (b) At least one member residing on the premises shall be the primary operator of the business. (c) The home occupation shall not require any exterior storage or display of equipment, materials, or appliances being serviced by the home occupation. (d) No more than 40 percent of the total floor area of any level of the primary structure shall be used for the home occupation. (e) Business practices in accessory structures, such as detached garages and sheds, shall not be permitted. (f) The home occupation shall not require any exterior structural or aesthetic alterations to the dwelling unit that change the residential character of the dwelling unit. (g) The home occupation may have a sign, attached to the primary structure, not exceeding two square feet. (h) The home occupation shall not require increasing or enhancing the size, capacity, or flow of the water, gas, septic, sewer, or electrical system beyond what is standard for a residence. (i) No more than two additional parking spaces shall be added to the lot(s) on which the residence is located. (j) The home occupation shall not require the use of commercial vehicles for pickup and deliveries other than from the U.S. Postal Service or other express couriers. (k) Due to incompatibility with the residential character and qualities of residential zoning districts, no license shall be issued for a home occupation in any of the following trades or businesses: (1) Automotive repair; (2) Firearms and firearms' supplies dealers/sales/service (including gunsmithing); (3) Group assembly or instruction involving more than four persons; (4) Mobile oil change; (5) Pest control services; (6) Septic tank operation or repair; (7) Taxicab/limousine services; (8) Transporting autos for dealerships; (9) Wrecker/towing service. Sec. 5.02.00. Accessory uses and structures. Sec. 5.02.01. Accessory uses permissible in agricultural and residential zoning classifications. (a) The following uses are permitted as accessories in the A-R, R-1, R-2, R-3, R-4, R-5 and R-M zoning classifications: (1) Private garage or carport not to exceed the storage capacity of three automobiles. (2) Structure for the storage of equipment and supplies used in maintaining the principal building and its grounds. (3) Structure for a children's playhouse and the storage of children's play equipment. (4) Private swimming pool and bathhouse or cabana meeting the following development standards: All such swimming pools which are at least three feet deep must be completely enclosed by a fence as specified by the state minimum standard building code. (5) Private tennis court and/or basketball facilities. If lighted, lights must be designed so that they do not intrude upon adjacent lots. Such a court may be surrounded by a fence up to ten feet high. (6) Noncommercial garden, including a greenhouse and other customary garden structures not over eight feet high. (7) Deck, patio, barbecue grill, or other such facility. (8) Fence, wall, exterior lighting fixture, or other general landscaping and site development facility. (9) Antenna: Satellite, television, radio. (10) Temporary building for storage of materials meeting the following development standards: a. Permitted only in conjunction with construction of a building. b. Allowed either on the same lot where construction is taking place or on an adjacent lot. c. Such a use must be terminated upon completion of construction. (11) The parking of one pleasure boat. (12) Signs as permitted by the Butts County sign regulations. (13) In the A-R district only, roadside stands for sale of agricultural products grown on the premises, but not to exceed 500 square feet in floor area. Road-side stands are prohibited as accessory uses in all other districts. (14) Except in R-4, R-5 and R-M districts, accessory dwelling unit meeting the following development standards: a. No more than one is permitted on a lot with another dwelling. b. Shall not be occupied by more than two adult occupants. c. The property has sufficient wastewater capacity as certified by the health department or Butts County, et al., water and sewer authority. d. Shall not exceed 30 percent of the total gross floor area of the primary dwelling, minus square footage associated with storage or utility spaces and similar un-insulated or un-inhabitable areas. e. Two additional parking spaces which may be legally allocated to the accessory unit must be in existence and provided for the accessory unit. In R-4, R-5 and R-M zoning districts, accessory dwelling units shall not be permitted. (b) The following accessory uses are permitted as special uses in agricultural and residential districts: (1) Type II home occupation in A-R, R-1, R-2, R-3, R-4, R-5 and R-M. (2) Manufactured home for temporary hardship meeting the development standards contained in chapter 54 of the Code of Ordinances in A-R, R1, R-2 and R-3, but not in R-4, R-5 or R-M. (c) All accessory uses must meet the following standards: (1) They must be located in the rear or side yard, and not in any front yard. (2) They may not be located closer than eight feet to any property line in AR, R-1, R-2 and R-3 zoning districts, and not closer than five feet to any property line in the R-4, R-5 or R-M districts. (3) Accessory buildings and structures not attached to the principal building must be located at least eight feet from the principal building on the lot in the A-R zoning district, and at least 12 feet from the principal building in R-1, R-2, R-3, R-4, R-5 and R-M districts. (d) All accessory uses not expressly permitted in the particular zoning district are prohibited. (e) Accessory uses shall be permitted prior to the construction of a principal structure only in the following circumstances: (1) A barn or storage building for the storage of tools and equipment primarily intended for use on the subject property. (2) Structures for temporary or transient overnight use by the owner and guests, but not for rent, and which is not a primary residence. Sec. 5.02.02. Accessory uses in the office, commercial and manufacturing zoning classifications. (a) Permitted accessory uses: (1) In the O-1, C-1, C-2, M-1, M-2 and M-3 zoning classifications, the permitted accessory uses will be those determined by the zoning administrator to be customarily appurtenant to the permitted principal use on the property. (2) In the O-1 district, satellite dish antennas and television antennas. (3) In the C-2 district, manufacturing in connection with the principal retail business or service on the lot meeting the following standards: a. Occupies less than 40 percent of the floor area. b. Employs no more than five persons. (The intent here is to ensure that activities which are primarily manufacturing in nature are directed away from commercial areas and into manufacturing areas. Establishments with five or fewer manufacturing employees in connection with a commercial activity are considered to be primarily commercial and compatible with a commercial district. Manufacturing activities with more than five employees would be considered large enough to belong in a manufacturing district with other such uses rather than in a commercial district.) (b) The following accessory uses are permitted as special uses: In the P-R and O-1 district, Type II home occupations. (c) All accessory uses must meet the following standards: (1) They must be located at least eight feet from any property line. (2) Accessory buildings and structures not attached to the principal building must be located at least 12 feet from the principal building on the lot. (d) In the O-1 and C-1 zoning districts, accessory uses must be located in the rear or side yard, and not in any front yard. Sec. 5.02.03. Recreational vehicles. The parking and use of recreational vehicles is permitted in all zoning classifications, subject to the following restrictions: (a) Recreational vehicles shall be parked in side or rear yards whenever possible; where not possible, recreational vehicles shall not be parked on or within 15 feet of the public right-of-way. The provisions of this subsection do not apply to recreational vehicles which are parked in the C-1, C-2, M-1, M-2 & M-3 zoning classifications and not being used for living quarters. (b) Except in the C-1, C-2, M-1, M-2 and M-3 zoning classifications, no lot shall have more than one recreational vehicle parked upon it at one time. (c) Permanent residential use of recreational vehicles is prohibited in all zoning classifications. (1) The use of a recreational vehicle for living quarters for more than 30 days in any calendar year (consecutive or non-consecutive) is deemed to be a permanent residential use, and is prohibited. (2) For the purposes of this ordinance, whenever the vehicle is occupied for a period greater than four hours within a 24-hour period, it will be deemed to be being used for living quarters on that particular day. (3) No lot shall have recreational vehicles parked on the lot for use as living quarters more than 30 days in one calendar year. Sec. 5.02.04. Temporary storage structures. (a) Except as otherwise provided in this ordinance, the temporary storage of structures and materials within temporary structures shall be permitted as an accessory use in the A-R, C-1, C-2, M-1, M-2 and M-3 districts, subject to administrative permit issued by the zoning administrator. (b) Application for administrative permit. (1) An application fee as specified by this ordinance or established by resolution of the Butts County board of commissioners shall apply to each property for which an application is filed. (2) Time for decision. When an application for an administrative permit is received, the zoning administrator shall have 15 business days to make his/her decision to approve or deny the application. (3) Notification. When an administrative permit application is received, the zoning administrator shall notify all adjacent property owners by regular and certified mail giving the adjacent property owners seven business days to respond, comment, etc. All responses, comments, etc. shall be submitted in writing to the zoning administrator. (4) Posting of sign. When an administrative permit application is received, the zoning administrator must post a sign in a conspicuous place on the property. The sign must set forth the fact that a permit for temporary structures has been filed, date to respond and/or comment by, and it must inform the public that additional information may be obtained from the zoning administrator. (c) The following conditions shall apply to any temporary storage of structures and materials within temporary structures under this provision. The administrative permit shall be issued if the zoning administrator finds that the following conditions exist: (1) The property is properly zoned under this provision for such temporary storage of structures and materials within temporary structures; (2) The temporary structures will not be located within any front yard or setback, and where possible, will be restricted to a rear yard rather than a side yard; (3) The location of the temporary structures will not substantially impair or injure any neighboring property; (4) The placement of the temporary structures shall be limited in time, which shall be specified in the permit, and which in no case shall be greater than six months. An applicant may apply for additional periods so long as such application is filed before the expiration of the initial period. The granting of a permit shall not be construed to vest rights to the placement of temporary structures beyond the period for which they are expressly permitted; and (5) Such temporary structures shall not be connected to any utilities and shall not be used for habitation. (6) Whenever all of the foregoing conditions are met, and the proposed temporary structure is 120 square feet or less in area, no permit application shall be required. Sec. 5.02.05. Outside storage. (a) Outside storage shall be allowed in C-1, C-2, M-1, M-2 and M-3 zoning districts only. Outside storage in C-1, C-2, M-1, M-2 and M-3 districts must be located in a side or rear yard and screened from all rights-of-way and residential districts that abut a permitted outside storage area. Such storage shall be screened by a fence, hedge, durable masonry wall, or stand of trees of sufficient opacity to provide a visual blind designed to be compatible with the character of adjoining properties. Said fence or wall shall be a minimum of five feet and a maximum of eight feet in height. Hedges, trees, or comparable natural plantings shall be of a rapid growth evergreen species and be a minimum height of three feet at time of planting (with the exception that specific provisions for outdoor storage associated with uses subject to supplemental standards are set forth in section 4.03.00). (b) Stored materials shall not exceed the height of the fence enclosing the outside storage area. (c) Materials shall not be stored within any required buffer area, stormwater management area, or easement. (d) No vehicle, trailer or manufactured home shall be used as a storage building. This requirement shall apply to all vehicles and trailers, including commercial vehicles, recreational vehicles, panel vans, tractor trailer rigs, and railroad box cars, with the exception that tractor trailer rigs and trailers may be used for temporary storage on properties zoned C-1, C-2, M-1, M-2 and M-3 where there are businesses operating on the same property. Sec. 5.02.06. Dumpsters. (a) Dumpsters shall be screened with a solid masonry wall or opaque fence. The fence shall be a minimum of six feet and a maximum of eight feet in height. (b) A gate shall be provided for access. (c) Dumpsters shall be located on a paved surface of sufficient size to accommodate the dumpster. (d) Dumpsters for food service establishments shall provide a drain. (e) Dumpsters for food service establishments shall provide a grease trap. (f) The dumpster location shall be easily accessible for pick-up. (g) Dumpsters shall be located to the rear of the principal building. A location in the side of the principal building shall be permissible only where rear yard locations cannot provide adequate access for pick-up. (h) Dumpsters shall not be located within any required buffer area, required landscaped area, required parking lot landscaping, or stormwater management area. Sec. 5.02.07. Alternative energy generation devices. (a) Alternative energy generation devices shall be allowed in A-R, R-1, R-2, R-3, R-4, O-1, C-1, C-2, M-1, M-2, and M-3 zoning districts only. Alternative energy devices include wind turbines, solar panels, awnings, shutters and other shade structures marketed for the purpose of reducing energy consumption, and retractable clotheslines. (b) Alternative energy generation devices, excluding solar panels, must be located in the rear yard of the lot on which the principal building is located. Devices affixed to a dwelling or building shall not be visible from the public right-of-way. (c) Wind turbines shall be set back at least a distance equal to the height of the tower on which the turbine is mounted plus 15 feet from any dwelling, zoning district line, or public property. (d) Alternative energy generation devices and maintenance/operation structures (including guy wires) shall comply with the setbacks as required by the zoning district in which the device is to be located. (e) The height applications applicable to buildings in zoning districts in which a tower is located shall not apply to wind turbines. Sec. 5.02.08. Vehicle storage yard. (a) Section specific definitions: Operational means in a condition in which the vehicle may be driven off or, if a trailer, pulled off the premises without the need of any maintenance or repair other than inflating tires or adding electricity or fuel. Vehicle(s) means an automobile, truck or trailer with a chassis on wheels with tires, including the following types of such vehicles: cars, recreational vehicles, pull-behind camping trailers, pull-behind boat trailers (with or without a boat), truck-tractors and semi-trailers. Vehicle storage yard means an enclosed area of land as specified under this section for the temporary parking of operational vehicles. (b) The following conditions must be met for the property to be used as a vehicle storage yard: (1) Road frontage. The property to be used for a vehicle storage yard shall have at least 60 feet of frontage on a county road which shall not be adjacent to or have road frontage on a state highway and shall not be on a no thru truck traffic road. The no thru traffic road list is found in Table 5.02.08(a) and may be amended from time to time. (2) Fencing. The vehicle storage yard shall have a fence at least eight feet in height. The fence shall be masonry, wood, or chain-link as approved by the planning commission or the director, shall be maintained and replaced when in disrepair, and shall be set back from the property line no less than ten feet. (3) Landscaping and screening. The vehicle storage yard shall have a landscaped buffer which shall be planted in such a manner and with such vegetation to screen the fence from all rights-of-way and adjoining properties. Said landscaped buffer shall be planted between the property line and the required fence. Landscaping for screening purposes shall include hedges, trees, or comparable natural plantings as approved by the director that are of a rapid growth species a minimum height of five feet at time of planting and shall be maintained and replaced when the plants die. (4) Surface treatment. Parking and driving surfaces inside and outside the fenced yard must be a paved surface. The surface treatment shall be constructed in accordance with the following minimum standards and subject to inspection and review by the county engineer; compacted soil subgrade; compacted graded aggregate base for storage of automobiles or vehicles similar weight or eight-inch compacted graded aggregate base for vehicles of greater weight such as tractor trailers; two-inch asphalt binder; and 1.5-inch asphalt topping. Table 5.02.08(a). BUTTS COUNTY No Thru Truck Roads CR # Road Name Notes 240 Air Strip Road 276 Ambrose Circle 361 Andrea Circle 254 Anna Lane 033 Apache Road 419 Apple Blossom Lane 142 Archie Ross Lane 248 Arrow Point Road 021 Arthur Smith Road 415 Azalea Trail 325 Bakers Circle 312 Barbour Road 201 Barnes Road 289 Barnetts Bridge Road 144 Beaty Circle 477 Beech Drive 360 Bell Drive 327 Benny Mathis Road 172 Berry Spur 210 Bert Road 444 Bertha Mae White Road 200 Beulah Road 442 Big Buck Court 075 Biles Road 047 Bill Brown Road 476 Birch Court CR # Road Name Notes 067 Blackberry Road 018 Blankenship Road 352 Blenny Run 331 Blue Bird Lane 092 Bob Thomas Road 458 Bob Webb Road 316 Bob White Run 206 Bonnies Way 046 Bradley Road 366 Bridgewater Court 365 Bridgewater Drive 189 Britton Road 160 Brooks Road 296 Brownlee Road 440 Brushy Creek Lane 288 Bucksnort Road From George Wilder Road to the county line 008 Bunch Road 006 Burg Road Oil Buster Brown Road 350 Butler Drive 380 Buttrill Court 209 Buttrill Road 306 Bywater Court 451 Canterbury Court 372 C.B. Drive 078 Cedar Creek Road 347 Cedar Drive 139 Cenie Road 175 Chappel Mill Road 396 Charlie Sheppard Road 031 Cherokee Drive 037 Chickasaw Lane 304 Clearwater Drive 249 Cochran Road 390 Cody Road 287 Collier Road 048 Collins Road 299 Colwell Road 311 Comanche Trail 063 Cook Road CR # Road Name Notes 199 Cooper Road 388 Cork Road 449 Cottonwood Court 448 Cottonwood Trail 291 County Line Road 410 Coyote Trail 270 Creekside Court 443 Creekview Court 355 Crestview Lane 346 Crestview Road 099 Dam Road 123 Darnell Road 109 Dave Bailey Road 382 Dawn Court 188 Dean Patrick Road 225 Deans Lane 321 Deer Creek Circle 389 Deerfield Road 357 Deptula Road 465 Doc Barkley Road 158 Dockside Drive 110 Dodson Road 401 Doe Run Road 370 Dogwood Lane 128 Douglas Creek Road 155 Dove Drive 202 Dub Walker Road 204 Duffey Road 272 Dukes Road 339 Eagle Point Drive 057 Barnhart Road 297 East Ball Road 231 Edwards Road 238 Elizabeth Circle 003 England Chapel Road 194 Evans Road 203 Fairfield Church Road 133 Fawn Road 156 Feather Lane 174 Fenner Road 193 Fill Bridge Road CR # Road Name Notes 020 Fincherville Road 320 Fletcher Lane 447 Forest Court 309 Forrest Road 176 Foster Road 294 Four Points Road 055 Fox Drive 467 Franklin Road 247 Friddell Road 332 Gamer Road 169 George Wilder Road 344 Georges Lane 111 Giles Ferry Road 463 Glavine Street 373 Glen Echo Drive 224 Glenwood Drive 157 Glide Court 074 Godsey Road 267 Goens Road 461 Granite Springs Drive 265 Haley Road 292 Halls Bridge Road 305 Halls Court 025 Hamlin Road 329 Hamm Road 154 Hammond Road 378 Harbour Shores Drive 179 Harkness Road 051 Harris Road 406 Harris Street 005 Hart Road 015 Hasty Road 216 Hawthorne Court 065 Henderson Mill Road 356 Henry Higgins Road 349 Hickory Drive 338 Hickory Point Drive 301 Higgins Road 138 High Falls Road 441 High Ridge Trail 279 Highland Circle CR # Road Name Notes 426 Holly Hill Drive 228 Home Court 377 Honeysuckle Lane 064 Hope McClure Road 229 Hosannah Road 076 Howard Perdue Road 345 Hummingbird Lane 164 Hunt Ridgeway Road 385 Hunters Walk 245 Indian Creek Road 016 Ingram Road 106 Iron Springs Road 019 Issac Head Road 374 Jack Maddox Bridge Road 364 Jackson Road From Dollar General to the county line 062 Jackson Lake Inn Road 367 Jeannettes Lane 068 Jim McMichael Road 343 Jimmys Lane 187 Joe Lane Road 086 Jones Road 286 Katy Lake Road 182 Kermit Williams Road 043 Keys Ferry Road 114 Kimbrough Road 191 Kinard Mill Road 263 King Drive 298 Lake Clark Road 417 Lake Forest Drive 337 Lake Pines Circle 095 Lake Pines Road 341 Lake Shore Drive 253 Lakeview Road 112 Lamars Mill Road 213 Lee Holloway Road 162 Lee Maddox Road 190 Levi Barnes Road 468 Lewis Road 260 Little Road 359 Loblolly Lane CR # Road Name Notes 227 Locust Road 358 Longleaf Drive 024 Lucy Lane 023 Lunsford Road 418 Lynns Court 044 Mabry Road 234 Macedonia Church Road 088 Macks Circle 089 Macks Lane 353 Mallard Trace 433 Maple Valley Drive 239 Marina Circle 273 Martin Road 103 Marvin McEwen Road 261 Mattie Thomason Road 125 Mayfield Road 232 McClendon Spur 117 McCoy Road 397 McDowell Road 314 McGough Road 317 McIntosh Circle 223 Meadowview Drive 226 Melanie Lane 381 Misty Court 383 Moonlight Court 085 Moore Road 186 Moores Nursery Road 069 Morgan Road 041 Morningside Drive 135 Mountain View Road 362 Mt. Pleasant Church Road 136 Mt. Vernon Church Road 153 Nathan Thaxton Road 035 Navajo Road 462 Neagle Street 004 Oak Road 340 Oak Point Drive 257 Oak Ridge Road 147 Old Allen Road 294 Old Bethel Road CR # Road Name Notes 012 Old Biles Road 399 Old Griffin Road 097 Old Hardy Farm Road 250 Old Kersey Road 335 Old Monticello Road 039 Old South River Road 007 Old Thaxton Road 283 Oscar Lane 081 Otha Morgan Road 217 Palmetto Court 218 Panola Road 268 Panther Lane 269 Panther Woods Drive 180 Patillo Road 214 Paul Maddox Road 278 Peachtree Road 013 Pebble Creek Drive 070 Pecan Road 029 Peoples Road 173 Peppy Lane 354 Pine Bluff Trail 236 Pine Street 118 Pine View Road 105 Pittmans Ferry Road 284 Plaza Drive 032 Pocahontas Street 256 Poplar Road 446 Post Oak Drive 244 Potts Trail 036 Powhatan Road 087 Pratt Smith Road 028 Presley Road 322 Price Road 053 Quail Trail 280 Randall Avenue 079 Rays Road 040 Rebon Maddox Road 171 Red Berry Road 050 Reeves Road 196 Ridgeway Road 090 Riley Road CR # Road Name Notes 313 Rising Star Church Road 408 River Point Road 409 River Point Way 212 Rivers Road 333 Riverside Road 060 Roberts Point Road 348 Robin Road 132 Rock Creek Road 402 Rocky Point Road 251 Rosebud Lane 363 Rough Road 170 Roy Bell Road 096 Rufus Adams Road 403 Ryans Court 455 Samuel Barber Road 059 Sanders Road 121 Sandy Creek Road 198 Sandy Plains School Road 100 Scout Island Road 034 Seminole Avenue 310 Sequoia Circle 307 Settle Road 303 Shady Lane 460 Shannon Way 221 Shelnut Road 093 Shiloh Road 165 Short Road 054 Short Bridge Road 098 Sibley Way 416 Sims Road 080 Singley Road 323 Smith Drive 453 Smoltz Court 246 Southern Shores Road 243 Spring Drive 398 St. Marks Church Road 083 Standard Oil Road 237 Stanfield Road 404 Star Lake Drive 094 Stark Road 368 Stephens Point Road CR # Road Name Notes 014 Stony Brook Circle 066 Strickland Pasture Road 152 Sugar Hill Court 151 Sugar Hill Drive 326 Summit View 056 Sunset Cove Road 134 T.W. Leverette Road 334 Tall Pines Road 275 Tara Road 369 Tater Hill Road 084 Taylor Road 328 Thomas Drive 108 Thomas Ferry Road 452 Thornberry Trail 049 Thorpe Road 140 Tobe Moore Road 161 Tom Goddard Road 342 Tommys Lane 131 Torbett Road 195 Towaliga Church Road 387 Trophy Lane 411 Trophy Ridge Road 166 Truck Stop Way From end of pavement to Short Road 407 Turkey Trail 471 Tussahaw Court 277 Tussahaw Inn Road 472 Tussahaw Landing 473 Tussahaw Lane 052 Tussahaw Point Drive 474 Tussahaw Trail 384 Twilight Court 146 Valley Hills Road 124 Vickers Road 324 Villa Drive 308 Vista Road 126 W.F. Smith Street 181 Wallace Road 233 Walt Banks Road 211 Walter Moore Road 030 Walthall Road CR # Road Name Notes 101 Ward Road 026 Washington Road 159 Waterford Drive 168 Waters Edge Lane 116 Watkins Road 145 Watkins Park and Pool Road 393 Weavers Lakefront Road 167 Weaver Pasture Road 129 Welch Road 002 Wells Road 205 West Ball Road 218 Westbrook Court 450 Westeria Way 456 Whipporwill Ridge 423 White Road 475 White Pines Drive 424 White Tail Hills Road 429 Whitehead Way 058 Wilder Road 386 Wilderness Way 071 Wildwood Road 207 William Court 073 Williamson Road 219 Willow Ridge Lane 241 Wilson Road 427 Wilson Foster Road 293 Winding Way 183 Windy Lane From Midway Road to dead end 300 Wolf Creek Road 215 Woodcrest Drive 163 Woodlands Drive 371 Woodward Lane 394 Woody Road 330 Yancey Road (Ord. of 4-12-2021(1), § 1; Ord. of 6-14-2021(2), § 1; Ord. of 6-14-2021(4), § 1) Sec. 5.03.00. Temporary structures and uses. Sec. 5.03.01. Temporary structures and uses during construction. A temporary building or use in connection with a construction project shall be permitted during the construction period. The following standards shall be met by temporary uses established during construction: (a) A building permit shall be required. (b) Temporary offices may be located on a construction site to be used for administrative functions during construction, sales functions or sales offices allowing for the sale, resale, or marketing of dwellings, structures, or property within the development in which it is located, or adjacent developments under the same control. (c) The proposed construction building shall meet tie-down requirements for mobile structures and have a contract for sewage pump-out if approved by the Department of Natural Resources, Environmental Protection Division. Construction buildings, equipment, machinery, and materials shall be removed within 30 days of completion of the construction site for which they are permitted. (d) On-site outdoor storage of equipment and construction materials shall be allowed during the period of construction. (e) Portable toilet facilities shall be provided. (f) Construction and demolition debris dumpsters are allowable and are not required to be screened. (g) On-site temporary use of structures and equipment for the building of roads, public utilities, and government projects shall be allowed. Sec. 5.03.02. Mobile food services. (a) Applicability. Mobile food services are permissible on vacant lots or on lots containing a business in the commercial and industrial zoning districts in accordance with the standards of this section. (b) The applicant shall apply for a temporary use permit, which shall be issued by the zoning administrator upon finding that the requirements of this section have been met. A temporary use permit may be issued for no more than 90 days. (c) The applicant shall have written permission of the property owner to conduct food services. (d) The applicant shall possess a valid occupational license and a valid food service permit from the board of health. (e) Mobile food services shall not be located within: (1) The public right-of-way; (2) Any required setback area or buffer area; (3) Any required parking space; (4) Any driveway or access way, or in such a manner as to block a driveway or access way; or (5) Any designated fire lane or in such a manner as to block a fire lane. (f) Mobile food services shall provide parking spaces: (1) Parking spaces shall be provided in addition to any required parking serving an established use on the lot. (2) Parking spaces shall have a graveled or paved surface. Sec. 5.03.03. Roadside vendors (transient merchants). (a) Applicability. Roadside vendors conducting retail sales are permissible on vacant lots or on lots containing a business in the commercial or industrial zoning districts in accordance with the standards of this section. (b) The applicant shall apply for a temporary use permit, which shall be issued by the zoning administrator upon finding that the requirements of this section have been met. A temporary use permit may be issued for no more than 90 days. (c) The applicant shall have written permission of the property owner to conduct retail sales. (d) The applicant shall possess a valid occupational license. (e) Roadside vendors shall not be located within: (1) The public right-of-way; (2) Any required setback area or required buffer area; (3) Any required parking space; (4) Any driveway or access way, or in such a manner as to block a driveway or access way; or (5) Any designated fire lane or in such a manner as to block a fire lane. (f) Roadside vendors shall provide parking spaces: (1) Parking spaces shall be provided in addition to any required parking serving an established use on the lot. (2) Parking spaces shall have a graveled or paved surface. Sec. 5.03.04. Model homes and sales offices. Model homes are permissible only in conjunction with a new residential development during the period of construction of site improvements and new homes, subject to the following standards: (a) Model homes may be erected or displayed in districts that include residential uses, provided that such models shall not be used for residential purposes, but only for display as a means to sell homes; (b) A model home shall be located on a platted lot meeting all standards of this UDO; (c) A model home shall be located to meet all site design standards of this UDO, except for the modifications specifically enumerated herein; (d) A model home may include a sales office. Hours of sales operations shall not extend beyond 8:00 p.m.; (e) One off-street parking space shall be provided for each employee plus one off-street parking space per model home. In addition, one off-street parking space shall be provided for handicapped parking. These spaces shall be provided on the same lot as the model dwelling unit or on a contiguous lot within the specific project; (f) The model home shall be discontinued as a model unit and sales office when 90 percent of the lots or homes in the residential development have been sold. The model home site shall be redesigned to comply with all site design requirements applicable to the residential development. Such redesign includes, at a minimum, removal of parking in excess of that associated with a single-family home; removal of any signs; and removal of any exterior lighting associated with the model home and sales office. Sec. 5.03.05. Portable outdoor storage containers. Portable outdoor storage containers shall be allowed in all zoning districts on a lot, parcel, or tract of land for a period of time not to exceed 30 days. Sec. 5.04.00. Signs. Sec. 5.04.01. General provisions and definitions. (a) No sign shall be placed or maintained within the county except in conformity with this sign ordinance. (b) Notwithstanding any other restrictions in this sign ordinance, any sign, display or device allowed under this ordinance may contain any commercial or non-commercial message, or any political or non-political message; except that such messages cannot depict obscenity, as defined by O.C.G.A. § 16-12-80, nor can they depict sexual conduct or sexually explicit nudity, as defined in O.C.G.A. § 36-60-3, nor advertise any activity illegal under the laws of Georgia or the United States. (c) Definitions. As used in this article, the following words have the following meanings. The general definitions and interpretative rules of this UDO shall also be used. To the extent those general rules or definitions conflict with these specific definitions, these definitions shall control. De minimis signs means signs that are one square foot or less in area, so long as they are not joined with other signs to express a single message. De minimis signs may be placed in any zoning classification and do not count against the maximum number or area of signs allowed on the lot on which the de minimis sign is located. Entrance sign means a sign erected at the entrance to a development or subdivision. Ground sign means a sign that is anchored to the ground and is wholly independent of a building for support. Freestanding signs are included in this definition, as are signs on poles, frames, or other mounting structures other than buildings. Sign face means the actual message-carrying portion of the sign that can be used to display content, including any area that can display or does display words, pictures or other communicative elements of the sign, including the background color. Sign structure includes all the elements of the sign, including its supporting structure, sign face, base, lights and every portion of the sign. Temporary signs means signs which are made of fabric, cardboard, paper, plastic or similar degradable materials, which are not permanently affixed to the ground or a structure, and which are displayed for a period of no longer than 60 days within a calendar year and no more than 30 consecutive days. One temporary sign is permitted on each lot in the county at a time, regardless of zoning classification; such temporary sign shall be no larger than ten square feet. Wall sign means a sign that is fastened directly to or is placed or painted directly upon the exterior wall of a building, with the sign face parallel to the wall, and extending from the surface of the wall no more than 24 inches. Window sign means a sign mounted inside of a structure and designed to be seen from outside of the structure through a window. Sec. 5.04.02. Permitted signs by zoning district. (a) If not otherwise stated, any sign not specifically permitted in a zoning district as provided under this section shall be prohibited. These regulations apply to signs located on any lot or development, except that any sign not visible from the outside of a structure or to passing members of the public is not restricted or regulated by this article. (1) Sign height: Sign height is measured from grade to the highest portion of the sign structure. (2) Sign face area: The area of a sign is calculated by determining the area of the smallest square or rectangle which encloses the sign face and the structure surrounding the sign face. For example, the pole or base would not be included, but any frame holding the sign face in place would be counted. See examples, below. However, this example is not a substantive regulation as to permissible types of signs. (b) Signs permitted in A-R, R-1, R-2, R-3, R-4, R-5, R-M and P-R zoning districts: (1) Ground signs: Two double-faced signs per lot. No single sign face may exceed 32 square feet. Height is limited to five feet. (2) Window signs: Two per dwelling, total of up to eight square feet of window signs. (3) Wall signs: Not permitted. (4) Entrance signs: Two per subdivision development, maximum area of each sign is 32 square feet. Entrance signs may only be single-sided, unless only one is erected, in which case it can be double-sided. Entrance signs are only permitted at the entrance to a subdivision development. Entrance signs must be set back from the right-of-way a distance equal to their height plus one foot for safety reasons, and cannot block traffic sight lines. Maximum height is six feet. (c) Signs permitted in the O-1, C-1, C-2, and P-M zoning districts: (1) Ground signs: Two double-faced signs per lot. Except in the C-2 zoning district, no sign face may exceed 100 square feet. In the C-2 zoning district, no sign face may exceed 300 square feet, and the total square footage of all ground sign faces on a lot shall not exceed 600 square feet. Maximum height for all ground signs shall be the same as the maximum height for the district. (2) Window signs: Total signage not to exceed 25 percent of the area of windows facing road frontage. (3) Wall signs: Up to four signs per lot, with no sign face larger than 50 square feet, and a maximum of 125 square feet per lot. (4) Entrance signs: Two per lot or, in the P-M district, per development. The maximum area of each sign is 50 square feet. Entrance signs may only be single-sided, unless only one is erected, in which case it can be double-sided. Entrance signs are only permitted at the entrance to the planned center. Entrance signs must be set back from the right-of-way a distance equal to their height plus one foot for safety reasons, and cannot block traffic sight lines. The maximum height of entrance signs is six feet. (d) Signs permitted in the M-1, M-2 and M-3 zoning districts, for individual uses: (1) Ground signs: Two double-faced signs per lot. No sign face may be larger than 50 square feet. The maximum height for each sign is the maximum height for structures in the district. (2) Window signs: Total signage not to exceed 25 percent of the area of windows facing road frontage. (3) Wall signs: Up to four signs per lot, with no sign face larger than 100 square feet, and a maximum of 250 square feet per lot. (4) Entrance signs: Two per lot, maximum area of each sign is 50 square feet. Entrance signs may only be single-sided, unless only one is erected, in which case it can be double-sided. Entrance signs are only permitted at the entrance to the lot. Entrance signs must be set back from the right-of-way a distance equal to their height plus one foot for safety reasons, and cannot block traffic sight lines. Maximum height is ten feet. Sec. 5.04.03. Regulations for signs. (a) Location and setback. (1) The property owner must give permission for all sign placement on the owner's property. Private individuals and entities are not permitted to erect signs on the county's rights-of-way. (2) All signs must comply with all side and rear setbacks of the underlying zoning district. (3) Signs can be located in front setback areas, but no portion of a sign or sign structure erected on private property shall encroach on or overhang the public right-of-way or any other person's property. (4) Entrance signs must be set back from the right-of-way a distance equal to their height plus one foot for sight distance requirements and must comply with any applicable provision in the Manual on Uniform Traffic Control Devices, latest edition. (5) Distances are measured from the closest portion of the sign (whether that be the base, sign face, or the sign structure) to the right-of-way, curb or pavement. (b) Illumination. (1) Signs cannot be illuminated in the A-R, R-1, R-2, R-3, R-4, R-5, R-M or P-R districts. Only one sign may be illuminated in developments in the P-M zoning classification. (2) Flashing, blinking or otherwise varying illumination is not permitted in any zoning district, except as provided below in subsection (c). Multiple-message signs. No external or internal illumination that causes confusion with or distraction from any traffic signal or safety device shall be permitted in any zoning district. (3) All externally-illuminated signs shall utilize low wattage luminaries, mounted in fixtures designed to direct the light and eliminate light trespass, such as light shining into residences or other neighboring structures. (4) All internally-illuminated signs shall utilize low wattage luminaries designed to reduce light glow. (5) All illuminated signs over ten feet in height shall be internally illuminated or illuminated by external lighting fixtures located above the sign area, firing downward, and not directed towards passing motorists. (c) Multiple-message signs. (1) Multiple-message signs are those which change the message or copy on the sign face mechanically or electronically by movement or rotation of panels or slates, or by changing electronic display on the sign face. (2) Multiple-message signs are prohibited in the A-R, R-1, R-2, R-3, R-4, R-5, R-M or P-R zoning districts. Multiple-message signs are permitted in the O-1, C-1, C-2, M-1, M-2 and M-3 zoning districts, except that they shall not be permitted within 1,000 feet of any railroad crossings. (3) No multiple-message sign may change its message or copy, or any pictures or images that are part of the message, more frequently than once every ten seconds. (4) When the message of a multiple-message sign is changed mechanically, it shall be accomplished in three seconds or less. When the message of a multiple-message sign is changed in an electronic manner, through the use of light emitting diodes, back lighting or other light source, the transition shall occur within two seconds. (5) When any multiple-message sign is located within 150 feet of any residential district, the display of multiple messages shall discontinue between the hours of 11:00 p.m. and 6:00 a.m., and the sign shall be static and not display more than one message during that period. (6) Multiple-message signs which are illuminated or which use electronic lighting to display messages shall be subject to the restrictions and limitations applicable to illumination in this ordinance. (7) There shall be located no more than one multiple-message sign per lot, and such sign shall be permitted only on a ground sign or freestanding structure which is a permitted sign in the lot's zoning classification, and not on any wall sign or window sign. (d) Interstate signs. (1) Notwithstanding the other provisions of this ordinance, owners of properties directly adjacent to the Interstate 75 right-of-way in the county shall be entitled to erect interstate signs in a manner consistent with the following provisions. These provisions may allow for larger signs facing Interstate 75 in recognition of the greater distance from the signs to the travelling public, the wider rights-of-way, and greater speed of travel along Interstate 75. Whenever a property owner erects a sign pursuant to this subsection, that sign shall be counted against the number of signs available under the underlying zoning district according to this article. (2) All signs located on lots facing or designed to be visible from the Interstate 75 right-of-way shall conform with O.C.G.A. § 32-6-70 et seq. (the Georgia Outdoor Advertising Code) and shall meet all federal and state requirements necessary to obtain a permit under such code. In instances where the sign controls of this article are more strict, such regulations shall apply. (3) Interstate signs shall meet the following requirements: a. Uniform size. The outside measurements of all sign faces shall be 12 feet in height and 50 feet in length, with or without trim. b. Illumination. All illuminated signs shall use base-mounted fluorescent or mercury vapor lights and shall be activated by photo-electric cells. Additional lighting including, but not limited to, neon, animation and running lights is prohibited. c. Height above interstate grade. All sign faces shall be a minimum of ten feet above adjacent interstate pavement measuring from the lower portion of the sign face. Signs shall not exceed 30 feet in height. Two signs in the same location (back-to-back) or V-formation shall be the same height above the interstate's surface. d. Extrusions. Extrusions beyond the face of the sign, excluding aprons, are prohibited. e. Number of signs per location. No more than two interstate sign faces per lot, and each sign face shall face a different direction of interstate travel. The sign faces may be mounted back-to-back on the same sign structure, in a V-formation, or on separate sign structures. f. Spacing. Interstate sign structures shall be no less than 500 feet apart, measuring from the two closest points. g. Distance of structures from property or right-of-way line. Interstate sign structures shall be no less than ten feet from any property or right-of-way line. Sec. 5.04.04. Safety and construction standards. (a) Official confusion. Signs which contain or are in imitation of an official traffic sign or signal, or can be confused with an official traffic sign, are prohibited. (b) Fire safety. No sign or sign structure may be erected or maintained which obstructs any fire escape, ventilation, or door; nor shall any sign or sign structure be attached to a fire escape. (c) Corner visibility. No sign or sign structure above a height of three feet shall be maintained within 15 feet of the intersection of the right-of-way lines of two streets, or of a street intersection with a railroad right-of-way. (d) Traffic visibility and safety. No sign shall obstruct the traffic sight line or the view of vehicles entering the roadway (i.e., the view of oncoming traffic by vehicles attempting to enter the road, or vice versa). No sign shall be erected on any traffic island. (e) Good repair. All signs, together with all their supports, braces, guys, and anchors, shall be kept in good repair and shall be structurally sound. (f) Removal of signs. The county may remove a sign in violation of this ordinance, without giving notice to any party, if said sign is upon the public right-of-way or upon other public property; or said sign poses an immediate safety threat to the life or health of any members of the public. Sec. 5.04.05. Prohibited signs. The following types of signs are prohibited in every zoning district: (a) Roof signs (which means signs mounted above a roof or projecting above the roof-line of a structure). (b) Rotating signs (which includes any sign designed to revolve, rotate, or otherwise turn, in whole or in part, by means of electrical power). (c) Portable signs (which means signs which are attached to vehicles, trailers, movable structures, or attached to sign structures which are not permanently anchored into the ground, or any sign which may be transported or is designed to be transported). Such signs include, but are not limited to, printed banners or billboards attached to vehicles and trailers; portable signs do not include signs or messages that are painted on or permanently affixed to vehicles that are licensed, tagged and operable. (d) Moving signs, or signs with moving parts. This includes, but is not limited to, animated signs involving motion or sound; signs with moving words; signs with waiving elements, whether motorized or wind-powered; or similar moving signs. Sec. 5.04.06. Continuance of nonconforming signs. Invariably, at the time a sign ordinance is adopted or amended, certain signs which lawfully existed prior to the adoption or amendment will not conform to specified regulations and development standards. These are known as nonconforming signs, and in order to feasibly adopt the ordinance and so as not to cause undue economic hardship on owners of nonconforming signs, these signs are allowed to continue under special conditions as outlined in the following subsections of this section: (a) Where a nonconforming sign has ceased to be used for more than six months or has changed to a permitted or conforming sign, further use of the sign must be in conformance with the standards and requirements of this ordinance. (b) A nonconforming sign must not be extended or altered unless the extension or alteration is in conformance with the requirements of this ordinance. (c) A nonconforming sign which is altered or extended must meet applicable county building codes and development regulations. When an applicant seeks a sign permit for the extension or alteration of a nonconforming sign, the zoning administrator will inspect the sign and determine what (if anything) is needed to bring the sign into conformance with applicable building codes and development regulations. Upon determining that the sign meets applicable building codes and development regulations, he will issue the sign permit for the nonconforming sign. (d) If a nonconforming sign suffers damage which does not exceed 50 percent of its assessed valuation, the sign may be reconstructed and reused as before if done within 12 months from the time such damage occurred. If such damage is greater than 50 percent of its assessed valuation, such a sign may only be reconstructed and used in conformity with the standards and requirements of this ordinance. Sec. 5.04.07. Permits, inspections, etc. (a) Permit required. Except as otherwise provided herein, it shall be unlawful for any person to erect, construct, enlarge, move, or convert any sign in the county or cause the same to be done without first obtaining a sign permit from the zoning administrator. These directives shall not be construed to require any permit for change of copy on any sign, replacement of the sign face, nor for the repainting, cleaning, or other normal maintenance or repair of a sign or sign structure for which a permit has previously been issued, so long as the sign structure is not modified or enlarged in any way. No permit or fee shall be required for signs having no electrical connection and a sign face less than 32 square feet in area. (b) Application. Sign permits may be applied for by the owner of the property upon which the sign will be located, or by that person or entity's authorized agent. In order to obtain a permit to erect, alter or relocate any sign under the provisions of this ordinance, an applicant therefor shall submit to the zoning administrator a sign permit application which shall set forth in writing a complete description of the proposed sign including: (1) The name, address, and telephone number of the owner or persons entitled to possession of the sign and of the sign contractor or erector; (2) The name, address and telephone number of the owner or lessee of the lot on which the sign is located if different from those designated above; (3) The location by street address and parcel number of the proposed sign structure; (4) A drawing of the proposed sign showing dimensions and construction specifications, prepared and signed by an architect or engineer licensed by the state of Georgia; (5) Where the sign construction requires an electrical connection, the electrical contractor shall obtain an electrical permit; (6) Each applicant shall present to the zoning administrator on request a certificate of liability insurance prior to the issuance of a sign permit; and (7) Where the application is for a multiple-message sign using electronic lighting as part of the display on the sign face, a copy of the sign manufacturer's specifications for luminosity shall be attached to the application. (c) Issuance of permit if application in order. It shall be the duty of the zoning administrator, upon receipt of a completed application for a sign permit, to examine such plans and specifications and other data and, if the proposed structure is in compliance with the requirements of this section and all other applicable provisions of this ordinance, to issue, within five working days from date of filing, to the applicant a written permit evidencing the applicant's compliance therewith. Sign permits shall be issued in the name of the property owner upon which the sign is to be located. Issuance of the permit shall in no way prevent the zoning administrator from later declaring said sign to be nonconforming if the permit is obtained based on false information submitted by the applicant. (d) Permit duration. A sign permit shall become null and void if the construction of the sign for which the permit was issued has not begun within a period of six months after the date of issuance and completed within 12 months after date of issuance. (e) Work on illegal signs. No person shall erect or assist in the erection, construction, maintenance, alteration, relocation, repair or painting of, or do any work upon any sign for which a permit has not been obtained where required. Any such sign shall be illegal, and the zoning administrator may order the owner to remove the same immediately. If the owner fails to remove the same within 30 days, the zoning administrator shall proceed in accordance with this ordinance. (f) Inspection. All signs for which a permit is required by this ordinance are subject to inspection by the zoning administrator. (g) Revocation. The zoning administrator is hereby authorized to revoke any permit upon failure of the holder thereof to comply with the provisions of this section within 30 days after notification in writing. (h) Permit fees. Before any permit is issued under the provisions of this section, the applicant shall pay a fee in the amount of $50.00. Sec. 5.04.08. Sign and sign structure maintenance. (a) Signs and sign structures shall be maintained in good repair, structurally sound, with proper anchorage capable of supporting the imposed loads, so as not to pose a threat to the public health, safety or welfare. All structural members shall be maintained free from deterioration and shall be capable of safely supporting the imposed dead and live loads. (b) All exterior surfaces shall be maintained in good condition. Exterior wood surfaces, other than decay-resistant woods, shall be protected from the elements and decay by painting or other protective covering or treatment. Peeling, flaking and chipped paint shall be eliminated and surfaces repainted. When required, all exposed surfaces of metal or wood shall be protected from the elements and against decay or rust by periodic application of weather-coating materials, such as paint or similar surface treatment. Sign faces shall be maintained in good repair and shall have neatly painted, posted or otherwise maintained display surfaces, free of defects such as holes, tears, cracks, breaks or missing portions, which are plainly visible from the public right-of-way. (c) When a sign or sign structure is found to be in need of maintenance, a notice of violation shall be issued to the property owner which shall describe the maintenance issue and provide a reasonable amount of time to repair the violation. (d) If, after receiving the notice of violation, the property owner fails to remedy the maintenance issue within the time provided, it shall be a violation of this ordinance, subject to citation. The county may also institute the appropriate proceeding at law or in equity to restrain, correct or abate such violation or to require the removal of the sign or sign structure where appropriate. The reasonable cost of any action taken by the county or its agents to remedy the maintenance issue shall be charged against the real estate upon which the structure is located and shall constitute a lien upon such real estate. Sec. 5.05.00. Telecommunication towers. Sec. 5.05.01. Requirements. Towers may be permitted in zoning districts pursuant to those additional restrictions listed herein: (a) General requirements. (1) A special land use permit granted by the board of commissioners shall be required for the construction of all new communications towers within the county after the following factors are considered: a. The proposed height of the tower. b. Proximity to residential structures and residential district boundaries. c. Nature of uses on adjacent and nearby properties. d. Surrounding topography, tree coverage and foliage. e. Design of the tower, with particular reference to design characteristics which have the effect of reducing or eliminating visual obtrusiveness. (2) All permit applications submitted to the community development department shall include a complete inventory of the applicant's existing towers and receivers/transmitters located within Butts County including each asset's location, height and collocation usage or capabilities. The community development department shall utilize such information to promote collocation alternatives for other applicants. (3) All applicants must demonstrate that no existing tower or structure can accommodate the proposed antenna(s). Evidence of an engineering nature shall be documented by the submission of a certification by a qualified engineer. Such evidence may consist of the following: a. No existing towers or structures are located within the geographic area required to meet the applicant's engineering requirements. b. No existing structure is of sufficient height to meet the applicant's engineering requirements. c. No existing tower or structure has sufficient structural strength to support the applicant's proposed antenna(s) and related equipment. d. The applicant's proposed antenna(s) would cause electromagnetic interference with the antenna(s) on the existing tower or structure. e. The fees or costs required to share the existing tower or structure or to adapt the existing tower or structure for shared use are unreasonable. Costs exceeding new tower development are presumed unreasonable. f. Such other limiting factor(s) as may be demonstrated by the applicant. (4) At the time of filing the application for a tower, the applicant shall provide the federal statutory provision under which approval is sought, a site plan and information regarding tower location, accessory structures, neighboring uses and proposed landscaping. Documentation must be submitted and certified by a qualified engineer delineating coverage and propagation zones, tower design and collocation capabilities. (5) All collocation applications shall be ruled upon within 90 days of the filing of a completed application; all other applications shall be ruled upon within 150 days of a completed application. Applications which are not completed at the time of filing shall not be accepted, and county staff shall review the application to verify completeness within 30 days from the filing of the application. In the event that an application is determined to not be complete within the initial 30-day period after filing, county staff shall promptly notify the applicant, and the time for issuance of the decision shall be tolled for the time period between such notification to the applicant and the date the applicant files materials which complete the application. The time periods within this subparagraph may be extended by the mutual consent of the county and the applicant. (6) In granting a special land use permit, the board of commissioners may impose additional conditions to the extent determined necessary to minimize adverse effects on adjoining property. (7) In any case where an application is denied, the county shall issue a written decision which lists the reasons and evidence in the record supporting such denial. (b) Standards. (1) All towers must be set back a distance of twice the full height of the tower from any residentially-zoned property or structure used for residential purposes. This condition shall not apply in areas zoned heavy industry district. (2) All towers shall be separated from each other by a distance of at least 1,000 feet. (3) All new self-supporting towers which do not incorporate alternative design features must be designed and built in a manner that allows at least one other entity to collocate on the structure. (4) All towers and their related structures shall maximize the use of building materials, colors, textures, screening and landscaping that effectively blend the tower facilities within the surrounding natural setting and built environment. Towers shall be painted so as to reduce their visual obtrusiveness, subject to any applicable standards of the Federal Aviation Administration (FAA). (5) Any tower which directly abuts a residentially-zoned property shall have a minimum 50-foot landscaped buffer with a solid fence or wall no less than six feet in height. (6) All landscaping plans shall be prepared by a registered landscape architect. For each 30 linear feet of perimeter fencing, no less than two trees and two shrubs shall be installed. (7) Towers shall be enclosed by security fencing not less than six feet in height and shall be equipped with an appropriate anti-climbing device; provided, however, that such requirements may be waived for alternative design mounting structures. (8) Lattice and guy-wire supported structures are permitted only within heavy industrial districts. (9) All towers must meet or exceed current standards and regulations of the Federal Communications Commission (FCC) and FAA. (10) Subsequent to commission approval, but prior to the issuance of any building permits, compliance with section 106 of the Natural Historic Preservation Act shall be demonstrated. (11) Tower heights shall be measured from the existing ground base level to the highest point on the tower or other structure, even if said highest point is an antenna, and limited to the following: Zoning District Single User Two Users* Three Users* AR 75' 125' 150' R-1 50' 90' 120' R-2 50' 90' 120' R-3 50' 90' 120' R-4 50' 90' 120' R-5 50' 90' 120' P-R 50' 90' 120' P-M 50' 90' 120' C-1 50' 90' 120' C-2 50' 90' 120' O-1 50' 90' 120' M-1 75' 125' 150' M-2 75' 125' 150' M-3 75' 125' 200' * Refers to the number of separate entities collocating on the same structure. (c) Administrative approval. (1) The addition of transmitting and/or receiving whip antennas and panels may be approved administratively by the zoning administrator so long as any such addition does not add more than ten feet in height to an existing structure more than 50 feet in height, or more than five feet in height to an existing structure less than 50 feet in height but greater than 20 feet in height and all necessary building permits are obtained. Such acceptable structures include buildings, signs, light poles, water towers, and other freestanding nonresidential structures. Antennas attached to existing structures, along with supporting electrical and mechanical equipment, shall be of a color identical to, or closely compatible with, that of the supporting structure. (2) The zoning administrator may administratively approve alternative mounting structures such as fake trees, clock towers, bell steeples, light standards, and similar alternative mounting structures, provided such alternative structure is determined by the director to satisfy such factors set forth in subsection (a). These structures shall also be exempt from the additional separation and setback requirements pertaining to towers. (3) The zoning administrator may administratively approve the shared use of an existing tower or structure by another provider, including the placement of additional accessory buildings or other supporting equipment. The director may administratively waive district setback requirements by up to 50 percent to accommodate the placement of such additional buildings or other supporting equipment in order to encourage the shared use of existing infrastructure. (4) The addition of antennas to an existing tower structure is exempted from all setback requirements which pertain to residentially-zoned or used properties. (d) Removal of antennas and/or towers. All towers shall be maintained in compliance with standards contained in applicable building and technical codes so as to ensure the structural integrity of such towers. If upon inspection by the building inspection division of the community development department, such tower is determined not to comply with the code standards and to constitute a danger to persons or property, then upon written notice by certified mail, return receipt requested, or by personal service being provided to the owner of the tower, the owner shall have 30 days to bring such tower into compliance. (e) Exceptions. (1) Antennas or towers located on publicly-owned property or owned by governmental bodies shall be exempt from the requirements of this ordinance provided a license or lease authorizing such antenna or tower has been approved by the appropriate governing body. (2) A tower under 70 feet in height owned and operated by a federally-licensed amateur radio station operator shall be exempted from these requirements. However, the owner or operator of such tower shall be required to comply with all applicable local, state, and federal codes. CHAPTER 6 INFRASTRUCTURE IMPROVEMENTS Sec. 6.00.00. Generally. The purpose of this chapter is to establish standards and requirements for the provision of infrastructure by all development. This chapter contains requirements for the transportation system, set forth in section 6.01.00, including placement of underground utilities, access, streets, off-street parking and clear visibility at intersections. Butts County Board of Health requirements are set forth in section 6.02.00. Requirements for utilities are set forth in section 6.03.00, including potable water and sanitary sewer. Requirements for drainage and stormwater management are set forth in section 6.04.00. Sec. 6.01.00. Transportation and parking facilities. Sec. 6.01.01. Generally. (a) Acceptance of official county road map. The Butts County Road Classification Map, as now or hereafter amended, is hereby accepted. (b) No person shall do any paving work, or any other related or similar roadwork, on, or adjacent to, a county road without a permit. (c) All transportation system design, street design, and construction for non-local roadways shall comply with Georgia Department of Transportation (GDOT) requirements. The latest edition of the GDOT manual, "Standard Specifications, Construction of Roads and Bridges," shall apply. (d) Where conflict arises between GDOT standards and this section concerning non-local roadways, the stricter standard shall apply. Design of local roadways shall be governed by the policies as stated within the UDO; however, construction methods/practices of said roadways shall be governed by the stricter of the GDOT standards and the UDO. (e) All materials, equipment, labor and other matters related to street construction shall be provided by the applicant. The following is a summary of the improvements required: (1) All streets, roads, and alleys shall be graded to their full width right-of-way by the applicant so that the pavements and sidewalks, when installed in the future, can be constructed on the same level plane. The preparation of the right-of-way before grading is started, and the construction of cuts and fills, shall be accomplished according to the specifications of the county (see subsections 6.01.07(i) and (k)). (2) Two copies of an as-built subgrade centerline profile shall be submitted to the county. The profile shall include both proposed and as-built centerline elevations at every even station. No curb and gutter or waterlines shall be installed prior to subgrade approval. (3) An adequate drainage system, including necessary curbs, pipes, culverts, headwalls, intersectional drains, drop inlets, bridges, swale ditches, and detention areas, shall be provided for the proper drainage of all surface water. The drainage system shall be designed by a registered professional engineer, licensed in the state of Georgia. (4) After preparation of the subgrade, the roadbed shall have base material and paving applied according to county specifications (see subsections 6.01.07(i) and (k)). (f) Installation of underground public utility lines. The following minimum specifications shall govern the installation of underground public utility lines on county road rights-of-way. They are the minimum specifications for installation of underground utilities including lines for electricity, water, natural gas, telephone, cable television, and street lights on county road rights-of-way: (1) All of the above shall be located a minimum of two feet from the edge of the pavement (with curb and gutter) and shall be located a minimum of four feet below the existing grade and/or edge of pavement, whichever is lower. (2) Public utility lines shall be located underground along all new roads, and, at the discretion of the public works director, on all existing roads when serving new construction, excluding single-lot residential development. (3) Paved roads shall be bored rather than cut for the installation of utilities. The cutting of all paved county roads shall require the approval of the public works director prior to the cut being made. (4) Any paved road which is saw cut to a width of more than 12 inches shall be filled with a compacted base material to within eight inches of the riding surface and with concrete to within two inches of the riding surface. The remaining two inches shall be filled with asphaltic concrete to allow for a smooth riding surface. (5) Any paved road which is saw cut to a width of 12 inches or less shall be filled with a compacted base material to within two inches of the riding surface. The remaining two inches shall be filled with asphaltic concrete to allow for a smooth riding surface. (6) Any dirt road which is cut shall be filled with a compacted base material. (g) Private roads may be allowed only by authorization from the board of commissioners. Any such roads must be designed and constructed in accordance with all applicable county ordinances and specifications. Verification must be provided by the owner/developer at their own expense to satisfy the county engineer. Sec. 6.01.02. Naming of public roads. (a) New roads. Prior to new roads being accepted into the county road system by the board of commissioners, the proposed road name shall be reviewed and approved by the county's technical review committee, which shall be a standing committee of the county department heads or their representative and be chaired by the director of the Butts County EMA-911, to ensure that the road name will not cause confusion with other roads. Roads that are obviously in alignment with roads within the same subdivision development should be given the same name. The names of new roads should not duplicate or closely approximate those of the existing roads in the county. (b) Name changes. Before the name of any county road may be changed from the current official name, the request shall be presented to the county's technical review committee to ensure that the proposed name will not cause confusion with other roads. If the proposed name is approved by the technical review committee, then the board of commissioners shall hold a public hearing for determination of whether to change the road name. A notice shall be published in the legal organ of the county once a week for three weeks stating the name of the road to be changed, the general location of the road, the proposed new name and the date, time and location of the hearing. The cost of the advertising shall be paid by the proponents of the name change. Sec. 6.01.03. Utility facilities and equipment. (a) Purpose. This section is enacted to more efficiently provide for the safety of persons and vehicles traveling on the county roads of Butts County, as allowed under O.C.G.A. § 32-4-42(6). (b) Basis for ordering removal, relocation of facilities; failure to comply, removal by county: (1) When the board of commissioners reasonably determines that any pipe, main, conduit, cable, wire, pole, tower or other signal and equipment, facilities or appliances of any utility in, on, along, over or under the public roads of the county should be removed or relocated because it has become an obstruction or interference with the use and safe operation of a county road, or will become an obstruction or interference with the use and safe operation of a contemplated county road or project, a written notice shall be directed to the utility company, giving at least 60 days notice in which to make such change as is necessary for removal or relocation as may be necessary. (2) If the utility does not thereafter begin removal within a reasonable time sufficient to allow for engineering and other procedures reasonably necessary to the removal and relocation of the utility facility, the board of commissioners may give the utility a final notice directing that such removal shall commence not later than ten days from receipt of such final notice. (3) If such removal has not begun, or if such removal has begun and the relocation has not been completed within a reasonable time, the county may remove or relocate the same with its own employees, or by contracted labor, tools, equipment, supervision or other necessary services or materials and whatever else is necessary to accomplish the removal or relocation, and the expense thereof shall be charged to the utility. (4) Such expense shall be certified to the county attorney, who shall have the authority to proceed with suit against the utility for same if payment or arrangements to make payment are not made within 60 days. (c) Compensation of utility upon relocation. Nothing in this section shall be construed so as to deprive any utility, relocated from a location in which it owned a property interest, of compensation for such property interest. Sec. 6.01.04. Right-of-way protection. (a) Purpose and intent. The purpose of this section is to provide procedures, rules and regulations governing persons, firms, businesses, companies, municipalities, utilities and corporations engaged in any activity involving the utilization of county road rights-of-way in Butts County and to provide for the issuance of permits to protect the citizens, the environment, county infrastructure, and to assure the public's safety. (b) Permits. No person shall engage in any activity upon, across, or through the rights-of-way of roads in Butts County without first securing a permit to conduct such operations in Butts County. (1) Exception. The placement of mailboxes for the delivery of items from the U.S. Postal Service shall be exempt from the requirement for a permit, subject to the following standards: a. Said mailboxes shall be constructed or designed in such a way that the design allows for the unit to break away upon impact. b. It shall be the responsibility of the owner of the mailbox to maintain and repair those portions of the public rights-of-way impacted or damaged through the delivery of mail by vehicular traffic. (2) Any person seeking a permit shall apply in person or through an authorized agent at the Butts County Public Works Department and shall provide the following information for each permit requested in subsections a. and b. below. a. Timber operations. 1. No timber operation shall commence in Butts County, whether or not over, upon, across, or through county rights-of-way, without first having obtained Georgia Department of Revenue form PT 283T, completing sections A, B, C, and G of said form, and submitting "Sellers Copy for Tax Assessor" to the Butts County Public Works Department as an accompaniment to the permit application. 2. Timber operations that do not access or utilize county roads or rights-ofway shall be exempt from the requirements of subsection a.10. of this section only. All other provisions of this section shall be applicable. 3. The name and address of the owner of the property on which the timber operator will engage in timber operations. 4. The location of the property on which the timber operator will engage in timber operations. 5. The roads in Butts County upon which timber trucks will travel. 6. The date cutting operations are expected to commence and end. 7. The name and address of all persons in a supervisory capacity engaged in the timber operation at the location for which the permit is requested. 8. If the timber operator intends to engage independent contractors to haul the timber, then the name, address, SSN or E.I.N. of each independent contractor. 9. If the timber operator is engaged in hauling only, then the name, address, SSN or E.I.N. of the timber operator for whom he will be hauling. 10. A surety bond made payable to Butts County indemnifying the county for any damage caused by the timber operator from its timber operations in Butts County. 11. In addition to the provisions of this section, the applicant for a permit will comply with all state and federal regulations pertaining to timber operations. 12. Timber operations occurring on two acres or less and being done primarily for the purpose of building construction or lot maintenance may be exempted from the requirements of subsections a.1. and 10. upon the inspection and approval of the public works director. b. Utility providers. 1. The location of the property on which the utility provider will engage in operations. 2. The date utility operations are expected to commence and end. 3. The name and address of all persons in a supervisory capacity engaged in the utility operation at the location for which the permit is requested. (c) Issuance of permit. (1) A permit will be issued to the applicant without charge when all required information and surety bonds as required for the issuance of the permit have been provided. (2) Permits will not be issued for signage, advertisements, or notices of any kind upon the rights-of-way of county roads, and the unauthorized placement of such shall be unlawful. Any unauthorized items placed upon the rights-of-way in Butts County shall be considered littering, and Butts County, its officers and employees shall be empowered to remove and destroy such items. (3) All permits shall be conspicuously posted, clearly visible, and located upon the public right-of-way abutting the property upon which the permitted activity is taking place. (d) Public nuisance. (1) No person shall allow dirt, mud, gravel or other debris from adjoining land or resulting from any activity to accumulate upon the rights-of-way of any public road to such an extent that it becomes a nuisance or a hazard to persons traveling upon said roads, or that it creates an unsightly condition upon the public rights-of-way. (2) No person shall allow dirt, mud or other debris resulting from any activity to accumulate in ditches and drainage areas on public rights-of-way to such an extent that the usual flow of water or run-off is stopped, disturbed, changed or interrupted. (3) No person shall create any other type of public nuisance that interferes with or in any way damages the public rights-of-way in Butts County. (4) No person shall park or leave unattended a truck or other motor vehicle or trailer upon the rights-of-way of any county road. (5) No activity, whether permitted by this section or any other section, shall commence operation or continue to operate without first installing and maintaining, when necessary, a temporary drive cut and culvert to access property and installing and maintaining soil erosion and sedimentation controls sufficient to prevent dirt, mud, gravel or other debris from accumulating in the county drainage ditches or on county roads. (6) No timber operator shall commence timber operations until he has first posted or caused to be posted along the public road onto which the timber operator will enter from his timber operations at least the following signs: One sign in each direction located 500 feet from the entrance which states "Slow, Trucks Entering Highway," one sign in each direction located 1,000 feet from the entrance stating "Warning: Logging Operation Ahead." Each such sign shall be in accordance with the MUTCD and not less than 36 inches by 36 inches, orange in color and posted at least three feet from the edge of the surface of said road. (7) No permitted activity shall continue in operation if the permittee fails to keep county roads free from dirt, mud, gravel or other debris resulting from the activity being performed. (8) Immediately upon the completion of the permitted activity, an inspection shall take place by the public works director to ensure that all county rights-of-way have been restored to their original condition. Failure to ensure restoration shall result in the forfeiture of the surety bond. (9) In addition to any other penalty provided for under the provisions of this section, or under the provisions of any state or federal law, any person in violation of this section shall reimburse the county for any and all costs and expenses incurred in abating said nuisance. Sec. 6.01.05. Access. (a) Except where expressly permitted, access to every subdivision shall be provided over a public street. All proposed streets shall be continuous and in alignment with existing, planned or platted streets. (b) Emergency vehicle access shall be provided to all lots within a subdivision. All subdivisions resulting in the creation of 75 or more lots shall be provided with a minimum of two points of ingress/egress from the existing street system. Where the property configura-tion prohibits or makes impractical the installation of two entrances, this provision may be waived by the board of commissioners after review and recommendation by the planning and zoning commission. In such cases, a widened entrance to provide additional public access for public safety purposes shall be designed and constructed subject to approval by the county engineer. The requirement for access shall not be satisfied by a stub-out to a future, planned, or platted street that has not been constructed unless approved by the board of commissioners. (c) Access points, whether private commercial/industrial drives or county roadways, shall line up directly across from one another when possible. For driveways/roadways that require an offset, the spacing between driveways/roadways, whether on the same or opposite side of the intersecting roadway, shall be required to have the minimum centerline to centerline spacing as follows, based on the speed limit of the main road: (1) Thirty miles per hour (or less)—125 feet. (2) Thirty-five miles per hour—150 feet. (3) Forty miles per hour—185 feet. (4) Forty-five miles per hour—230 feet. (5) Fifty miles per hour—275 feet. (6) Fifty-five miles per hour—350 feet. For intersecting roadways that are not classified as collector or above and have posted speed limits of 30 miles per hour or less, private commercial/industrial driveways may be allowed to have a reduced offset requirement if approved by the county engineer. (d) Where access to a subdivision is on a state route, the Georgia DOT shall approve all access and egress locations and designs. (e) For subdivisions located on a state route or local arterial road, all residential lots shall take direct access only from within the subdivision. (f) Limitations on residential curb cuts. Within any residential zoning district (see section 6.01.05(c) for other driveway spacing requirements) where the lowering or cutting away of any curbs for purposes of ingress and egress is required, such curb cut shall be subject to the following provisions: (1) Any parcel of property with frontage of less than 100 feet on any one street shall be allowed only one combined entrance and exit. (2) Any parcel of property with frontage of 100 feet to 200 feet on any one street shall be allowed no more than two combined entrances and exits. (3) Any parcel of property with frontage of more than 200 feet on any one street shall be permitted additional entrances or exits after showing of actual requirements of convenience and necessity and upon approval of the county engineer. (4) At street intersections, no curb cut/driveway shall be located within 50 feet of the intersections of two curb lines or such lines extended, or within 15 feet of the intersection of two property lines extended. When a culvert is required, it shall receive approval from the county engineer. (5) The distance between any two curb cuts on the same side of the street and located on one property shall not be less than ten feet. Curb cut distance shall be measured between the points of tangency of the curb return radii and the established curb line of the abutting street. (6) All driveways shall be constructed so as to be at least two feet from any property line. (7) The maximum width of any driveway shall not exceed 40 feet measured at the right-of-way line. (8) The maximum width of any curb cut including curb returns shall not exceed 50 feet. (9) The sum of the two curb return radii for any one curb cut shall not exceed 15 feet. (g) Interparcel access. New development in commercial, office, institutional and mixed use zoning districts that contains or is intended to contain more than one building or use on site shall provide access so that automobile trips between and among such buildings or uses can be accomplished without using the highway or major street. New developments and substantial improvements to existing developments shall provide for pedestrian and automobile access connections between adjacent properties under different ownership when the uses of the properties are of such compatibility that patrons may frequent both buildings and/or uses in the same vehicle trip, unless the zoning administrator determines otherwise. Sec. 6.01.06. Design and construction standards for streets. (a) Location. (1) The location, arrangement, extent, width, and grade of all streets shall conform to the comprehensive plan and the transportation system plan, and shall be considered in relation to existing and planned streets, topographical conditions, public safety and convenience, and proposed use of land to be served by the streets. The layout of a subdivision shall conform to the requirements and design principles described in this UDO. (2) The location of all streets and roads shall conform to the comprehensive plan and the transportation system plan. Provision shall be made in developments for the construction of streets at locations shown in the comprehensive plan and transportation system plan. (3) Whenever a tract to be subdivided includes any part of a major arterial, minor arterial, major collector, or minor collector street designated on the comprehensive plan or transportation system plan, such part of said street shall be installed by the applicant in the location and at the full width indicated by the functional classification for right-of-way and pavement widths indicated in this UDO. (b) Design and construction standards for curb and gutter. (1) Curbs shall be required in all residential subdivisions, except for those located in A-R zoning. If curb and gutter is not constructed pursuant to this provision, then the road base shall be extended one foot beyond the edge of pavement and the shoulders shall extend eight feet from the edge of pavement to a standard ditch or swale section on each side of the road. (2) Curbs shall be required for streets in commercial and industrial subdivisions. (3) Curbs in all subdivisions shall be L-back curbs 24 inches in overall width, six inches thick, and shall have an 18-inch gutter. Rollback curbs may be installed in the R-5 or P-R zoning districts with county engineer approval. (4) Curbs and gutters immediately adjacent to the major travel lane along roadways with a posted speed limit of 45 miles per hour or greater shall be L-back curbs 30 inches in overall width, six inches thick, and shall have a 24-inch gutter. Curbs and gutters shall be per GDOT Standard 9032B. (5) All curbs shall be constructed of Portland cement concrete. (6) Curbs shall be designed to provide handicapped access at street intersections wherever sidewalks are constructed. (c) Street grade standards. (1) Grades on major and minor arterials shall not exceed five percent, and grades on local residential streets shall not exceed 12 percent. (2) All changes in grade shall be connected by vertical curves which adhere to the design criteria as set forth by the latest edition of AASHTO Guide, A Policy on Geometric Design of Highways and Streets. (d) Radius of horizontal curves. The radius of horizontal curves on local residential streets within a subdivision shall be no less than 200 feet. The horizontal radius for collector and arterial streets or any streets with a design speed of more than 25 miles per hour shall comply with the latest edition of the American Association of State Highway and Transportation Officials (AASHTO) standards. The radius of horizontal curves on local commercial and industrial streets within a subdivision shall be no less than 300 feet. (e) Street intersection standards. (1) Street intersections shall be as nearly at right angles as possible. (2) In residential subdivisions, no intersection shall be at an angle of less than 80 degrees or more than 100 degrees. (3) Street intersections in commercial and industrial subdivisions shall be at an angle of not less than 90 degrees, if at all possible. At the county engineer's discretion, street intersection angle may be allowed to be between 80 degrees and 100 degrees. (4) The minimum curb radius at street intersections shall not be less than 25 feet in residential subdivisions. For streets/roadways to have a dual lane exit, the exit curb radius shall not be less than 75 feet. Where a county collector or an arterial roadway intersects with another county collector or arterial roadway, the minimum radii at the intersection shall be 50 feet. (5) The minimum curb radius of street intersections for industrial and commercial subdivisions shall be 50 feet. For commercial/industrial streets/roadways to have a dual lane exit, the exit curb radius shall not be less than 75 feet. (6) Pedestrian ramps shall be designed for all intersections in accordance with standard drawings for subdivisions and residential developments designed to include sidewalks and shall meet the minimum standards of the Georgia Accessibility Code, Chapter 120-3-20 of The Rules and Regulations of The Georgia Safety Fire Commissioner. The curb shall be de-pressed to accommodate future installations at the same time as the curb. (7) Interior subdivision street intersections shall have a minimum centerline offset of at least 125 feet when not aligned directly across from one another. See subsection 6.01.05(c) for requirements of intersection offsets on roadways with posted speed limits over 30 miles per hour. (f) Minimum tangent lengths. The minimum tangent lengths on roadways with superelevation shall be governed by the minimum runoff and runout lengths necessary to adequately transition the superelevation rates required for the curvature based on the design speed and maximum allowable superelevation rate of the roadway. Design speeds, typical sections of roadway, maximum superelevation rates, and other roadway design items are to be set by the county engineer on an individual roadway basis. The minimum tangent length on commercial and industrial subdivision streets is 100 feet. (g) Dead end street. Local streets designed to have one end permanently closed and not connected with any existing street, proposed future street, or not intended to extend to the property line of an adjacent tract shall be no longer than 1,000 feet unless necessary due to the topographic or other physical conditions of the property. (1) Permanent dead-end streets shall be joined by a cul-de-sac with a paved turnaround having an outside diameter of 80 feet (40-foot radius) and a right-of-way of at least 110 feet diameter. (2) Stub streets which are intended to provide access for future development within a tract of land or adjacent tracts shall be required to have a temporary turnaround area having a diameter of at least 80 feet, consisting of six inches of graded aggregate base. (3) For subdivisions with a temporary turnaround, it shall be required of the applicant to provide a letter of credit equal to the cost of permanent cul-de-sac construction, in accordance with the standards of section 10.02.12. (h) Alleys. Alleys may be provided at the rear of lots in residential, commercial, and industrial subdivisions. (i) Right-of-way and pavement width standards. Table 6.01.06(i). Right-of-way and Pavement Width Standards Street Type Minimum Required Right-of-Way (feet) Required Pavement Width (feet) With Curbs Without Curbs Major arterial 100* 52-53† 48* Minor arterial 80* 28-29† 24* Collector 80* 28-29† 24* Local street Residential 50 26 Prohibited Industrial 60 30 Prohibited Commercial 60 28 Prohibited Cul-de-sac Residential 80 80 Prohibited Commercial/ industrial 110 110 Prohibited Alleys 0 20 20 * The county may require additional right-of-way and pavement widths in specific situations. Roadways with medians and/or additional laneage will require extra right-of-way and pavement widths. † Roadways with posted speed limits of 40 miles per hour or 45 miles per hour will require 30-inch curb and gutter. (j) Additional street system requirements for major subdivisions or commercial/industrial development. (1) Private streets are permissible with board of commissioner approval and shall meet and adhere to all county standards. Every subdivision with private streets shall have a mandatory homeowners' association. (2) Subdivisions that adjoin existing streets shall dedicate additional right-of-way if needed to meet the minimum street right-of-way requirements. (3) Any subdivision or development which has an entrance onto a state highway, major arterial, minor arterial, or collector county road shall provide lanes for deceleration, ingress, and egress. Design requirements of the GDOT shall be met on state roads, and design requirements of the county engineer shall be met on county roads. (4) Any subdivision or development which has an entrance onto a major arterial, minor arterial, or collector roadway shall be required to design and construct a left turn lane improvement if the criteria is met as stipulated in Chapter 4 of the GDOT Regulation for Driveway and Encroachment Control. The developer will also be responsible for acquisition of right-of-way as well as for the relocation of utilities. (5) The names of proposed streets shall not duplicate existing street names, irrespective of the use of the word "street," "avenue," "boulevard," "drive," "place," "court," etc., in the naming of the street. Sec. 6.01.07. Construction requirements for residential and nonresidential subdivision streets. The grading, base, and pavement for street construction shall be as follows: (a) Grading. All streets shall be graded to the elevations shown on the approved construction plans. (1) The contractor may begin clearing and grubbing the project after: a. A development permit has been issued by the county; b. A pre-construction conference has been held, the public works director or designee duly notified; and c. All required erosion control measures have been installed and approved. (2) Clearing and grubbing. a. All trees, stumps, logs, roots, grass, weeds, poles, and other objectionable matter shall be cleared and grubbed from within the construction limits of the project. b. A 30-foot undisturbed buffer shall be maintained on all property lines prior to submission of construction plans. c. No rubbish or other material resulting from the clearing and grubbing of the roadway shall be buried at the site. d. If burning is permitted, all burn pits shall be located outside of the roadway construction limits. After burning, the pit shall be cleared out. A county inspection is required prior to backfilling and must be shown on the final plat. (3) Excavation. a. All grading operations shall be planned and executed by the contractor in such a manner as to provide suitable subgrade material for the roadway with the top 12 inches compacted to 100 percent maximum dry density, 95 percent below the top. b. In areas where the material in place is not suitable for subgrades, these areas shall be undercut a minimum of 12 inches and backfilled with suitable material. c. All rock and boulders in the roadbed shall be excavated and the space backfilled to the correct grade with suitable material. d. Any stones, broken rock, or boulders resulting from the grading of the roadway may not be placed in any roadway fill area except when approved by the division director or designee and then under his supervision. e. During the construction of the roadway on a day-to-day basis, the roadbed edges shall be kept lower than the center, and the grading shall be done so that the surfaces of the excavated areas and fill shall be kept reasonably smooth and well drained. Adequate surface ditches shall be cut at the tops of cut slopes, extending to each end of the cuts in order to carry the water from the side hill. Side ditches or gutters emptying from cuts to fill areas shall be turned outward so as to prevent erosion of the fill slopes. (4) Placement of fill. a. Fill construction shall not begin until all clearing and grubbing of the fill area has been completed. b. All depressions in the ground shall be filled level with the adjacent surface using suitable material and compacted to the approximate density of the surrounding soil before placement of the fill begins. c. The entire area upon which fill is to be placed shall be plowed, scarified, and finely broken up to a depth of a minimum of six inches. d. Before the placement of fill material begins, all loosened soil shall be compacted the approximate density of the underlying soil. e. Where a depth of fill and surfacing is three feet or less, the original ground shall be compacted a minimum 12 inches deep to at least 95 percent of the maximum laboratory dry density as determined from representative samples of the material being compacted. f. In areas where layers of organic or other unstable materials exist, the existing ground shall be excavated, for the full width of the fill area, to an underlying stable material. The subgrade thus created shall then be compacted to the approximate density of the underlying material. g. All fill material shall be deposited and spread in uniform horizontal layers, not more than six inches thick, for the full width of the fill area, and these layers shall be kept uniform by the use of graders, bulldozers or other approved equipment. h. Each layer shall be compacted within the range of optimum moisture content necessary to achieve the compaction required. Material containing too much water shall be dried to the correct moisture content. If the material is too dry, water shall be added and uniformly mixed with the soil before it is compacted. i. Fills shall be compacted to at least 95 percent of the maximum dry density to within the top 12 inches of the fill. The top 12 inches of the fill shall be compacted to at least 100 percent of the maximum dry density. j. The entire roadbed shall be scarified and compacted with a sheep's foot or other approved rollers. k. While the work is in progress, contractor shall maintain the surface in a manner so that the excavation, fills, subgrade, base course, and ditches always present a smooth and even surface. l. The contractor shall have available on the job at all times at least one motor patrol grader with adequate power to blade and maintain the roadbed. Suitable scarifiers shall also be available for use whenever necessary. (5) Final finishing of roadway. a. After all excavation has been completed and all fills have been placed, the entire road bed surface shall be finally shaped with a grading machine, supplemented with hand work whenever required, to secure a smooth surface and uniform cross-section. b. Slopes of cuts and fills shall also be carefully shaped to the true section specified. c. When final shaping is finished, the road surface shall conform accurately to the line, grade and cross section shown on the plans, and no roots, sod, grass, stones, or other unsuitable material shall remain in the top 12 inches of the finished roadbed. d. All ditches and drains shall be opened to effectively drain the roadway. (b) Placement of curb and gutter. (1) After sanitary sewer lines have been installed, all storm drainage in place, and the final finishing of the roadway has been approved by the division director or designee, and the centerline profile has been approved, the installation of the concrete curb and gutter may begin. (2) All concrete curb and gutter shall be in accordance with section 6.01.06(b). (3) Any curb and gutter which does not conform to a true section, texture, line, and grade shall be removed and replaced as directed by the division director or designee. (4) Water lines shall be installed after installation of the curb and gutter. (c) Subgrade. (1) Before placing any pavement base, the entire surface of the subgrade shall be plowed, harrowed, and mixed to a depth of at least six inches. If a subgrade stabilization material is required, it shall be incorporated into the subgrade at this time. (2) After the material has been thoroughly mixed, the subgrade shall be brought into a proper line and grade and compacted to 100 percent of maximum dry density just prior to placing the base material. (3) The centerline profile shall conform to the established elevations with an acceptable tolerance of one-half inch. (4) The acceptance crown tolerance shall be one-half inch. (d) Base construction. (1) The division director or designee shall be notified 24 hours prior to the placing of any base material. (2) The division director or designee may authorize the placing of the base material after all equipment necessary for the proper construction of the road base is on the project and the subgrade has been brought to the proper line, grade and crown, and compacted to the required density. (3) The division director or designee shall check the completed base course after the base material has been placed and compacted to the required density. All areas found to be deficient shall be marked and corrected before any asphalt pavement is placed. Areas where the crown is found to exceed that which is specified, or the exposed edge of the concrete gutter is less than the minimum depth required, shall be reshaped and rolled to obtain the required crosssection. (4) After the compacted material has been approved, field tests shall be taken by the field contractor and development inspector, or by a professional engineer as directed by the public works director or designee to determine the thickness of the constructed base course. Tests shall be taken at 400 feet intervals alternating between each lane and center of roadway. Measurements shall be taken per GDOT-42, Method of Test for Measurement of Thickness of Bases and Subbases. Areas found to be deficient in thickness shall be corrected as directed by the division director or designee. No asphalt course shall be placed until deficiencies in base have been adequately addressed. (5) A copy of all delivery tickets for the graded aggregate base material shall be furnished prior to placing any asphaltic concrete paving material. A shortage in the base material used shall require that the asphaltic concrete surface course thickness be increased. (6) All work and materials shall be in accordance with the pertinent Graded Aggregate Construction sections of the Georgia Department of Transportation "Standard Specifications," latest edition. (e) Soil cement. A soil cement base may be used to improve the subgrade with approval by the county engineer but shall not be used as a substitute for base construction. Soil testing and mix design must be performed by the developer and approved by the county engineer. (f) Paving. (1) The contractor shall begin the construction of the asphaltic concrete pavement upon approval of the road base by the division director or designee. (2) All asphaltic concrete material and construction shall be in accordance with the "hot mix asphaltic concrete construction" sections of the Georgia Department of Transportation "Standard Specifications," latest edition. (3) The public works director or designee shall check the cross section of the finished pavement. Any area found to be deficient shall be marked and a record of deficiencies made by the division director or designee. (4) If, in the opinion of the public works director or designee, the extent of deficiencies will impair the performance of the pavement, he shall direct that an overlay of a minimum thickness of one inch be placed before the roadway is opened to traffic. (5) A copy of the delivery tickets for the asphaltic concrete material used shall be furnished to the division director or designee at the time of completion of the work. If the delivery tickets indicate a shortage in the material used from the quantity estimated, the division director or designee may require a minimum one-inch overlay of the streets. (6) As mentioned in subsection 6.01.07(d)(4), the GAB (base) thickness is to be measured and accepted by the county prior to placement of any asphalt course. The applicant shall have core tests made to verify the thickness and compaction of the asphalt pavement course. The minimum core diameter shall be such that compaction of the sample can be determined in the lab and subsequent data supplied to the division director or designee. The compaction of the course shall be required to meet GDOT specifications per the asphalt mix placed. If a two-course asphalt section is required, the cores for the binder layer shall be cut, reviewed, and approved by the division director or designee prior to placement of the topping lift. Also, in the event that a two-course asphalt section is required, the cores for the topping lift, if between one and one-half inch and one and one-quarter inch in thickness, shall be made to determine the thickness only. All cores shall be made on 400 feet intervals, alternating between each lane and center of roadway. If these cores indicate a deficiency in thickness or compaction of the asphalt pavement, an overlay shall be required when the following deficiencies occur: a. When the number of cores deficient in thickness within the allowable one-quarter of an inch tolerance, or deficient in compaction, exceeds 35 percent of the total cores taken on one street. b. When two or more consecutive tests show a deficiency of more than one-quarter of an inch allowable tolerance or a deficiency in compaction. When a core shows a deficiency in excess of the allowable tolerance or compaction, additional cores shall be taken to delineate the area of the deficient thickness/compaction. (7) The applicant shall correct any deficiency with an overlay extending a minimum of 150 feet beyond the outer limits of the deficient area for the full width of the street. Smooth, neat joints shall be saw cut normal to the roadway for full depth of asphalt pavement, removing the original pavement for a minimum of ten feet at each end of the overlay. The thickness of the overlay shall be determined by the depth of the deficient area and shall not be less than one and one-quarter inch in compacted thickness. The type of material used in the overlay shall be specified by the division director or designee. G. Shoulder and drainage improvements. After the paving has been inspected and approved, the pavement edges or behind the curb and gutter shall be backfilled and compacted and the ditches and back slopes properly graded, shaped, seeded and mulched. An 80 percent stand of grass shall be obtained. All swales and ditches excavated below required depth shall be backfilled and compacted to 95 percent of maximum dry density. (h) Compliance with minimum standards. Road design and construction for residential subdivisions shall comply with the minimum standards shown below in subsection 6.01.07(i). Acceleration and deceleration lane construction shall comply with the standards set forth in subsection 6.01.07(k). For roadways with more than 150 lots of contributing traffic, a pavement design is to be done and submitted to the county engineer for review. The GDOT Asphalt Pavement Design program is an accepted method for the pavement design submittal for roadways with more than 150 lots of contributing traffic. (i) Table of residential subdivision street roadway standards. Table 6.01.07(i). Residential Subdivision Street Roadway Standards Roadway Standards Specifications Surface topping (plant mix) for roadways with 0 to 75 lots contributing traffic 2-inch 12.5 mm superpave mix with hydrated lime (Level 1), 220 pounds per square yard Surface topping (plant mix) for roadways with more than 75 lots contributing traffic 1-inch 12.5 mm superpave mix with hydrated lime (Level 1), 165 pounds per square yard Tack coat 0.04—0.06 GAL/square yard Asphalt (binder course) for roadways with more than 75 lots contributing traffic 2-inch 12.5 mm superpave mix or 19 mm superpave mix with hydrated lime (Level 1), 220 pounds per square yard Prime application to base course 0.20—0.25 GAL/square yard Curbs/shoulder and ditch construction 24-inch x 6-inch concrete "L" back curb 18-inch gutter; 6 inches high, 6-inch curb width Base construction 6-inch base (graded aggregate); 100 percent dry density compaction Roadway Standards Specifications Subgrade Top 12-inch subgrade compacted to 100 percent dry density Street width 26 feet back of curb to back of curb Asphalt pavement width 22 feet Street grade 12 percent maximum on subdivision streets; 4 percent maximum grade at intersections—100 feet from curb line Turnaround area 40 feet radius cul-de-sac pavement; 80 feet diameter Intersections 25 feet pavement radius at intersection within subdivision; 25 feet pavement radius required where intersecting existing county or state roads. 75 feet exit curb radius when designing a dual lane exit. Right-of-way 50 feet right-of-way minimum for local streets (additional right-of-way and/or slope easements may be required for cut and fill areas); 110 feet diameter right-of-way for culde-sac. A 5-foot utility easement is required along all street rights-of-way. Fill areas and back slopes 2:1 maximum slope allowed (2:1 or flatter) Storm sewers and cross drains See section 6.04.03 and 6.04.04 for pipe specifications and minimum requirements for pipe types listed. Pipe location and size approved by development plan review and stormwater management. Grassed areas See Soil Erosion, Sedimentation and Pollution Control Ordinance Core testing Core samples shall be taken as directed (at applicant's expense) to determine thickness of base and pavement. See sections 6.01.07(d)(4) and 6.01.07(f)(6). Letter of credit or bond 2-year maintenance letter of credit or bond on all improvements within public right-of-way (streets, sidewalks, storm sewer, catch basins, cross drains) and stormwater detention facilities; on phased developments, certain sections may require a renewed letter of credit or bond if used for construction access to newer phases (see section 10.02.12). (j) Design and construction requirements. The design and construction requirements for subdivision developments for industrial, commercial, or office use and urban streets which are to be county arterial roads shall: (1) Be required to have concrete curb and gutter along each side in accordance with section 6.01.06(b). (2) Comply with the minimum standards shown below in subsection 6.01.07(k). (k) Table of industrial, commercial, and office subdivision street construction standards. Table 6.01.07(k). Industrial, Commercial, and Office Subdivision Street Construction Standards Roadway Standards Specifications Surface topping plant mix 1-inch 12.5 mm superpave mix with hydrated lime (Level 1) asphalt topping, 165 pounds per square yard Tack coat 0.04—-0.06 GAL/YD Binder (office and commercial) 3-inch 19 mm superpave mix with hydrated lime (Level 1), 330 pounds per square yard Binder (industrial) 4-inch 25 mm superpave mix with hydrated lime (Level 1), 440 pounds per square yard or 2 2-inch lifts of 19 mm superpave mix with hydrated lime (Level 1), 220 pounds per square yard, per lift Curb and gutter required 24 x 6-inch concrete "L" back curb; 18-inch gutter; 6-inch high; 6-inch curb width Base construction (office and commercial) 8-inch base (graded aggregate), compacted to 100 percent maximum dry density Base construction (industrial) 10-inch base (graded aggregate), compacted to 100 percent maximum dry density. To be on decel/accel also for industrial. Street width (office and commercial) 28 feet back of curb to back of curb Street width (industrial) 30 feet back of curb to back of curb Asphalt pavement width (office and commercial) 24 feet Asphalt pavement width (industrial) 26 feet Street grade 8 percent maximum on industrial/commercial streets; 2 percent maximum grade at intersections; 100 feet from curb line Turnaround area 55 feet radius cul-de-sac pavement; 110 feet diameter Intersections 50 feet pavement radius at intersections; 50 feet straight section from curved streets required; 75 feet exit curb radius when designing a dual lane exit Driveway entrances GDOT specifications Right-of-way 60 feet right-of-way minimum; additional right-of-way or slope easement may be required for cut and fill areas; 150 feet diameter right-of-way for cul-de-sac. A 5-foot utility easement is required along all street rights-of-way. Fill areas and back slopes 2:1 maximum slope allowed Roadway Standards Specifications Storm sewers and cross drains See sections 6.04.03 and 6.04.04 for pipe specifications and minimum requirements for pipe types listed. Pipe location and size approved by development plan review and stormwater management. Grassed areas Shall comply with the Soil Erosion, Sedimentation and Pollution Control Ordinance Core testing Core samples shall be taken as directed (at applicant's expense) to determine thickness of base and pavement. See subsections 6.01.07(d)(4) and 6.01.07(f)(6). Maintenance letter of credit or bond 3-year maintenance letter of credit or bond on all improvements within public right-of-way (streets, sidewalks, storm sewer, catch basins, cross drains) and stormwater detention facilities. On phased developments, certain sections may require a renewed letter of credit or bond if used for construction access to newer phases (see section 10.02.12). Sec. 6.01.08. Improvements to existing streets and rights-of-way for residential, commercial and/or industrial developments. (a) Existing unpaved road. Any unpaved road upon which a development has frontage and access shall be widened and paved, according to the functional class of the road, as set forth in subsection 6.01.07(i) along the frontage* of the development to the nearest intersection with a paved county road. The minimum right-of-way required according to subsection 6.01.06(i) shall be dedicated along the entire frontage of the development back to the nearest intersection in which the roadway is to be improved. In addition to the design, construction, and right-of-way acquisition, the developer shall also be responsible for relocation of utilities. Where a development has frontage, but does not provide access to an unpaved road, the developer shall preserve right-of-way along the development's frontage for future improvements to the roadway. (b) Existing paved road. Any existing paved county road upon which a development has frontage and access and which is deficient relative to county specifications (see Tables 6.01.07(i) and (k)) shall be widened and resurfaced from the limit of the frontage back to the nearest roadway meeting Butts County standards as determined by the county engineer for the entire frontage of the development. The minimum right-of-way required according to subsection 6.01.06(i) shall be dedicated along the entire frontage of the development. * In instances where improving a roadway to the limits of the frontage causes for an undesirable termination point for the improved roadway (i.e., alignment issues, topographic issues, etc.), the improvement shall be required to be further extended in order to provide for an acceptable tie-in to the existing roadway. Sec. 6.01.09. Visibility at intersections. (a) Corner lots. On corner lots within all zoning districts, no fence, shrubbery or other obstruction shall be placed within the sight line triangles that blocks or disrupts the line of sight based on a driver eye height of three and one-half feet located 14 feet from edge of travel lane (when there is a deceleration lane, the driver eye height shall be located 14 feet from edge of decel lane) and an object height of three and one-half feet located in the center of each respective lane. The minimum distances required are shown in Table 6.01.09(b). However, street signs, streetlights, mailboxes, or similar shall be permitted within the sight line triangles. (b) Intersection sight distance for all streets. (1) Curb cuts shall be placed so as to provide for the minimum intersection sight distance based on the intersecting road's posted speed limit. The intersection sight distance is measured using a driver eye height of three and one-half feet and an object height of three and one-half feet with the driver eye height being located 14 feet beyond the edge of the travel lane (when there is a deceleration lane, the driver eye height shall be located 14 feet from edge of decel lane) and an object height of three and one-half feet located in the center of each respective oncoming lane. (2) Table of minimum intersection sight distances relative to design speed posted on streets are: Table 6.01.09(b). Intersection Sight Distance for Two-Lane Roadway Speed (mph) 25 30 35 40 45 50 55 Stopping sight distance 280 335 390 445 500 555 610 (c) Stopping sight distance for all streets. (1) Minimum street centerline stopping sight distance shall be designed relative to the design speed of the street and shall be measured above the street centerline using a driver eye height of three and one-half feet and an object height of six inches. (2) Table of minimum centerline stopping sight distances relative to design speed posted on streets are: Table 6.01.09(c). Stopping Sight Distance Speed (mph) 0-25 30 35 40 45 50 55 Centerline sight distance (stopping distance in feet) 150 200 225 275 325 400 450 Minimum crest curve "k" value 20 30 40 60 80 110 150 Minimum sag curve "k" value 26 37 49 64 79 96 115 Note: As info concerning the above minimum crest "k" values, where there is an intersecting street on or near the vertical curve, the minimum "k" value may not provide for the minimum intersection sight distance requirement. If this is the case, the "k" value for the crest curve will need to be increased in order to obtain the minimum intersection sight distance required. Sec. 6.01.10. Street names and signs requirements. (a) Street names. (1) All proposed street names within the county for new roads or roads within commercial, industrial, or residential subdivisions shall be approved by the county's technical review committee during the preliminary plat review process or prior to recording of the road and its right-of-way deed. (2) Any request to change the name of an existing road shall be submitted to the division director or designee for review and approval, with the board of commissioners having final approval of the change. (b) Street signs. (1) All required street name signs, traffic control signs and other traffic control devices shall be installed at the developer's expense. (2) The design and placement of all traffic control devices shall meet the requirements of the Manual On Uniform Traffic Control Devices (MUTCD), latest edition. The design professional shall show the placement of all required traffic control signs and features on the plans for review and approval by the county engineer. (3) If nonstandard signposts, holders, etc. are installed, they will not be maintained by Butts County. Either the developer or a legally established homeowners association will be responsible for the maintenance of these posts, holders, etc. All nonstandard posts, holders, etc. must be approved by the county prior to installation. Sec. 6.01.11. Off-street parking and service facilities standards. (a) General standards for parking space design. (1) The required number of off-street parking spaces must not be reduced below the minimum required number for the use or facility to which they are assigned. (2) Drainage, construction and maintenance. All off-street parking, loading and service areas must be drained so as to prevent damage to abutting properties and/or public streets and must be paved with asphalt or concrete subject to county paving standards and inspection and service by the county engineer; provided however that, in the A-R zoning district, required parking may be gravel or other pervious surface material approved by the county engineer, so long as all required parking and access for disable persons is paved with asphalt or concrete. All such areas must be at all times maintained at the expense of the owners in a clean and orderly condition to not create a nuisance. Outdoor storage yards and interior drives intended for employees only and located in the rear yard that are contained in industrial zoned areas may be surfaced with gravel, with approval by the zoning administrator and county engineer. (3) Separation from walkways, sidewalks and streets. All off-street parking, loading and service areas must be separated from walkways, sidewalks and streets by curbing or other suitable protective device. (4) Parking area design. Automobile parking stalls must have a minimum width of nine feet and length of 18 feet. There must be provided adequate interior driveways to connect each parking space with a public right-of-way. Interior drives must be at least 24 feet wide (two-way traffic) where used with 90-degree angle parking, and at least 14 feet wide (one-way traffic) where used with 45-degree angle parking, and at least 12 feet wide (one-way traffic) where used with one-way-traffic parallel parking. Unless otherwise stated, interior driveways must be at least 12 feet wide for one-way traffic movement and at least 24 feet wide for two-way traffic. (5) Joint parking facilities. Two or more neighboring uses of the same or different types may provide joint parking facilities as long as the number of off-street parking spaces are not less than the sum of the requirements for each individual use. (6) Pavement markings and signs. Each off-street parking space must be clearly marked, and directional arrows or signs must be provided wherever necessary. Markers, striping, directional arrows and signs must be properly maintained so as to ensure their maximum efficiency. (7) Outdoor lighting of off-street parking areas shall be downcast and directed away and shielded from abutting residential districts and all rights-of-way. All free standing outdoor lighting fixtures erected on private property having a non-residential use shall have a maximum height of 45 feet. All free standing outdoor lighting fixtures erected on private property having a residential use shall have a maximum height of 35 feet. (b) Number of parking spaces required. Off-street parking space must be provided and maintained as specified in the following tables. For uses not specifically listed in this section, the parking requirements for the listed use most similar to the unlisted use in question, as determined by the zoning administrator, will apply. Parking requirements by use are as follows: Table 6.01.11(a). Parking Space Requirements Off-Street Parking Requirements by Land Use USE STD USE STD RESIDENTIAL INSTITUTIONAL Dwelling, Single-Family P-1 Child Care—Home and Facility P-4 Dwelling, Two-Family P-1 Church, Synagogue, Place of Worship P-16 Dwelling, Multi-Family P-2 Club P-9 Accessory Apartment P-2 Community Care Home P-6 Housing for the Elderly P-3 Hospital P-5 Family Care—Home P-4 Nursing Home P-5 Child Care—Home P-4 Public Assembly Hall or Area P-16 Dormitory P-6 Elementary or Middle School P-20 Boarding/Rooming House P-7 High School P-21 Other Residential Uses P-1 Academic Institution P-22 Other Institutional Uses P-17 LODGING Bed and Breakfast P-7 TRANSPORTATION/UTILITIES Hotel, Motel P-7 All Transportation/Utility Uses P-15 Inn, Tourist Home P-7 INDUSTRIAL USES COMMERCIAL USES All Industrial Uses P-15 Business Services in C-1 P-11 Business Services Outside C-1 P-12 RECREATIONAL USES Doctor's Office P-18 Theater P-9 Eating and Drinking Establishment P-13 All other Recreational Uses P-8 Funeral Home P-14 Medical Clinic in C-1 P-18 OTHER Medical Clinic Outside C-1 P-19 Agricultural or Forestry Use P-15 Office in C-1 P-11 Agricultural or Forestry Sales P-11 Office Outside C-1 P-12 Animal Care/Veterinarian P-11 Personal Services in C-1 P-11 Animal Exhibit P-17 Personal Services Outside C-1 P-12 Animal Rehabilitation Center P-11 Retail Sales in C-1 P-11 Quarry P-15 Retail Sales Outside C-1 P-12 Stable, Public P-8 Retail Furniture/Carpet P-23 Storage of Quarry, Sand or Gravel Pit Products P-15 Theater P-9 Any other use not otherwise named P-17 Off-Street Parking Requirements by Land Use USE STD USE STD Warehouse P-15 Other Commercial Use P-17 Table 6.01.11(b). Parking Space Requirements Off-Street Parking Standards STD Number of Required Parking Spaces STD Number of Required Parking Spaces P-1 1.5 per dwelling unit P-11 1 per each 400 sq. ft. of net floor area P-2 (a) 1 per dwelling unit for spaces with unobstructed access P-12 1 per each 250 sq. ft. of net floor area P-13 1 per every 3 seats (including bar stool) (b) 2 per dwelling unit for spaces with obstructed access (See Note 2) P-14 1 per each 75 sq. ft. of floor area open to the public in the conduct of business P-3 1 per each 3 dwelling units P-15 1 per each 1.2 employees (See Note 3) P-4 1 per 8 children at peak hour plus 1 per employee (See Note 3) P-16 1 per 4 persons at maximum occupancy capacity of principal P-5 1 per every 2 nonresident employees P-17 1 per 250 sq. ft. floor area plus 2 P-6 1 per 3 beds and 1 per employee (See Note 3) P-18 4 per practitioner at peak hour P-7 1 per lodging unit, hotel/ motel room P-19 5 per practitioner at peak hour P-8 1 per 8 persons (See Note 4) P-20 1.5 per staff at peak hour P-9 1 per 4 seats P-21 1 per 4 students at max. capacity P-10 1 per each 250 sq. ft. of floor area P-22 1 per 2.5 students at max. capacity P-23 3 per 1,000 sq. ft. plus 2 Notes to Table (b): 1. Calculations will be rounded up to the next whole number. 2. The first space of each unit has unobstructed access and the second for each unit is accessed through the first space for that unit. 3. The number of employees is based on the highest average employee occupancy. 4. The number of persons is based on maximum capacity. (c) Number of loading spaces required. Manufacturing, industrial, wholesale and retail operations must provide loading space as follows: (1) Spaces appropriate to functions. Off-street loading spaces must be provided as appropriate to the functions and scope of operation or individual or groups of buildings and uses. The following must be provided as a minimum: a. Retail business: One space, ten feet by 25 feet, for each 3,000 square feet of floor area or any part thereof. b. Manufacturing, wholesale and industry: One space, ten feet by 50 feet, for each 10,000 square feet of floor area or any part thereof. (2) Design of loading spaces. Off-street loading spaces must be designed and constructed so that all maneuvering to park vehicles for loading and unloading can take place entirely within the property lines of the premises. Loading spaces must be provided so as not to interfere with the free, normal movement of vehicles and pedestrians on public rights-of-way. Such space shall have at least 14 feet of vertical clearance. (3) Ingress and egress. Ingress and egress to off-street loading spaces must conform to curb cut requirements specified in this article. (Ord. of 6-14-2021(2), § 2; Ord. of 6-14-2021(4), § 2) Sec. 6.02.00. Board of health requirements. Sec. 6.02.01. General. Reserved. Sec. 6.02.02. Onsite sewage management systems. The rules and regulations of the state Department of Public Health entitled and published as Chapter 511-3-1 Onsite Sewage Management Systems are hereby adopted as written in revised form of January 1, 2014, and as may be hereafter amended. Sec. 6.02.03. Additional requirements for onsite sewage management systems. (a) No building permit shall be issued by the county without the approval of the Butts County Board of Health for a proposed private septic tank or onsite sewage disposal system. (b) Community or shared sewage disposal systems may be approved at the discretion of the board of health. (c) In addition to section 6.02.03(b) above, community or shared sewage disposal systems with a capacity greater than 10,000 gallons per day shall require approval of Georgia EPD. Sec. 6.03.00. Requirements regarding sanitary sewer, potable water, fire protection and other utilities. Sec. 6.03.01. Sanitary sewer. (a) The developer shall be responsible for installing adequate public sanitary sewer facilities when such sewerage lines are available for connection to serve all existing and proposed buildings in the subdivision. (b) Any residential dwelling, commercial establishment or industrial establishment shall be connected to public sewer when sewerage lines are available within 200 feet for connection. Connection shall be at the cost of the property owner and in accordance with the policies and procedures of the applicable water and sewer utility provider. (c) Where public sanitary sewer systems are not available, onsite sewage disposal systems (i.e., septic tank) shall be installed, subject to approval by the board of health and provided that the lots conform to all requirements of this UDO. Sec. 6.03.02. Potable water. (a) If a public water supply is available to a proposed subdivision and connection to it is permitted, water mains, fire hydrants, and stub connections to each lot within the subdivision must be provided as shown on approved construction plans before any building permits shall be issued. (b) All public water facilities shall be installed subject to the policies and procedures of the applicable water and sewer utility provider. (c) If a public water supply is not available, the owner/developer may install a community water system developed according to plans and specifications shown on the approved construction plans and approved by the Environmental Protection Division of the Georgia Department of Natural Resources. (d) No building permit shall be issued by the building inspector without the approval of Butts County Health Department for a proposed private well, if applicable. Sec. 6.03.03. Fire protection. (a) Fire protection. The placement of fire hydrants within a subdivision or parcel of land deemed necessary for the protection of buildings, homes, facilities, or other property types shall be required, with hydrant placement at locations such that each structure is not further than 500 feet from such hydrant. When six-inch public water lines are available within 1,000 feet from any portion of the subdivision, the developer/property owner shall assume all costs of extending such lines to the subdivision such that no structure within the subdivision is more than 500 feet from a hydrant. Refer to the current edition of the International Fire Code, Appendix B, for minimum fire-flow requirements. (b) Location of hydrants. (1) Subdivisions. All fire hydrants will be placed within 500 feet of each structure, as determined by the fire inspector, at the time of plan review for the construction plat. (2) Industry and business. The location, number and distribution of fire hydrants will be determined by the fire inspector, referencing the current edition of the International Fire Code, Appendix C. (c) Water line size. All fire hydrants will be installed on water lines no less than six inches in diameter, unless approved by the fire chief. Fire-flow requirements will dictate the actual water line to be installed. (d) Fire hydrant type. All fire hydrants shall be Mueller brand, Super-Centurion 250, Number A423, three-way hydrants. All shall include two two and one-half inch hose outlets and one pumper hose connection. (e) Inspection. Notification shall be made by the developer to the fire inspector after installation of fire hydrants has been completed. All installations shall meet N.F.P.A. 24 and 25 requirements, with completed inspection and test reports provided to the fire inspector before the final plat is submitted. The fire inspector will inspect the hydrants to ensure proper bury depth, location, and usability. Sec. 6.04.00. Requirements regarding drainage and stormwater management. Sec. 6.04.01. Generally. (a) Intent. The intent of section 6.04.00 is to provide standards and criteria to protect, maintain, and enhance the public health, safety, environment, and general welfare by establishing minimum requirements and procedures to control the adverse effects of increased post-development stormwater runoff and nonpoint source pollution associated with new development and redevelopment. Proper management of post-development stormwater runoff will minimize damage to public and private property and infrastructure, safeguard the public health, safety, environment, and general welfare of the public, and protect water and aquatic resources. (b) Purpose. (1) Require that new developments and redevelopments maintain the pre-development hydrologic response in their post-development state as nearly as practicable in order to reduce flooding, stream bank erosion, nonpoint source pollution, increases in stream temperature, and maintain the integrity of stream channels and aquatic habitats; (2) Establish minimum post-development stormwater management standards and design criteria for the regulation and control of stormwater runoff quantity and quality; (3) Establish design and application criteria for the construction and use of structural stormwater control facilities that can be used to meet the minimum postdevelopment stormwater management standards; (4) Encourage the use of nonstructural stormwater management and stormwater better site design practices, such as the preservation of green space, conservation areas and floodplain to the maximum extent practicable; (5) Coordinate site design plans with other standards in the UDO that address resource protection, erosion control and the connectivity of open space; and (6) Establish provisions for the long-term responsibility for and maintenance of structural stormwater control facilities and nonstructural stormwater management practices to ensure that they continue to function as designed, are maintained, and pose no threat to public safety. (c) Applicability. No owner or developer shall perform any land development activities without first meeting the requirements of this ordinance prior to commencing the proposed activity. The standards and requirements of section 6.04.00 shall be applicable to all land development meeting the standards in subsection 6.04.01(c)(1) through (5), where a development plan, subdivision plat, or an application for a grading or land disturbance permit is required, unless specifically exempt pursuant to paragraph (d), below. (1) New development that involves the creation of 5,000 square feet or more of impervious cover; (2) New development that involves one acre or more; (3) Redevelopment that includes the creation or addition of 5,000 square feet or more of impervious cover; (4) Redevelopment that involves one acre or more; and (5) Land development activities that are smaller than the minimum applicability criteria set forth in paragraphs (c)(1) through (4), above if such activities are part of a larger common plan of development, even though multiple, separate, and distinct land development activities may take place at different times on different schedules. (d) Exempt activities. The following activities are exempt from the requirements of section 6.04.00: (1) An individual single-family residential dwelling unit on a legal lot of record; (2) Additions or modifications to existing single-family or duplex residential structures; and (3) Agricultural or silvicultural land management activities within the A-R zoning districts. Sec. 6.04.02. Stormwater management plan requirements. (a) An application for development activity as defined in subsection 6.04.01(c), above shall be accompanied by a stormwater management plan and an inspection and maintenance agreement regarding ongoing maintenance of the stormwater management facilities. Stormwater management plans should authorize, but not obligate, the county to perform maintenance when the board of commissioners determines that doing so is in the best interest of the public welfare of the county. Where the county is required to maintain stormwater management facilities, it shall be entitled to assess the reasonable cost of such maintenance against the owner of the facility. (b) The stormwater management plan shall detail how post-development stormwater runoff will be controlled or managed and how the proposed project will meet the requirements of section 6.04.00. (c) The stormwater management plan shall be in accordance with the criteria established in section 6.04.00. The plan shall contain the stamp and signature of a professional engineer licensed in the state of Georgia, who must verify that the design of all stormwater management facilities and practices meet/exceed the level of standard practice. (d) The plan shall consist of maps, narrative, and supporting design calculations (hydrologic and hydraulic) for the proposed stormwater management system. (e) The following information is required, at a minimum: (1) Existing conditions hydrologic analysis for stormwater runoff rates, volumes, and velocities, which shall include: a. A topographic map of existing site conditions with the drainage basin boundaries indicated; b. Acreage, soil types and land cover of areas for each subbasin affected by the project; c. All perennial and intermittent streams and other surface water features; d. All existing stormwater conveyances and structural control facilities; e. Direction of flow and exits from the site; f. Analysis of runoff provided by off-site areas upstream of the project site; and g. Methodologies, assumptions, site parameters and supporting design calculations used in analyzing the existing conditions site hydrology. (2) For redevelopment sites, predevelopment conditions shall be modeled using the established guidelines for the portion of the site undergoing land development activities. (3) A post-development hydrologic analysis for stormwater runoff rates, volumes, and velocities, which shall include: a. A topographic map of developed site conditions with the post-development drainage basin boundaries indicated; b. Total area of post-development impervious surfaces and other land cover areas for each subbasin affected by the project; c. Calculations for determining the runoff volumes that need to be addressed for each subbasin for the development project to meet post-development stormwater management performance criteria; d. Location and boundaries of proposed natural feature protection and conservation areas (see chapter 3); e. Documentation and calculations for any applicable site design credits that are being utilized; and f. Methodologies, assumptions, site parameters, and supporting design calculations used in analyzing the existing conditions site hydrology. g. If the land development activity on a redevelopment site constitutes more than 50 percent of the site area for the entire site, then the performance criteria shall be met for the stormwater runoff from the entire site. (4) The description, scaled drawings, and design calculations for the proposed postdevelopment stormwater management system, which shall include: a. A map and/or drawing of the stormwater management facilities, including the location of nonstructural site design features and the placement of existing and proposed structural stormwater controls, including design water surface elevations, storage volumes available from zero to maximum head, location of inlet and outlets, location of bypass and discharge systems, and all orifice/restrictor sizes; b. A narrative describing how the selected structural stormwater controls will be appropriate and effective; c. Cross-section and profile drawings and design details for each of the structural stormwater controls in the system, including supporting calculations to show that the facility is designed according to the applicable design criteria; d. A hydrologic and hydraulic analysis of the stormwater management system for all applicable design storms (two 100-year design storm events); e. Documentation and supporting calculations to show that the stormwater management system adequately meets the post-development stormwater management performance criteria. Note: The outlet structure and outfall discharge pipe for any detention/retention pond shall include an emergency overflow provision that is designed to safely pass the 100-year storm event without overtopping the dam; f. Drawings, design calculations, elevations and hydraulic grade lines for all existing and proposed stormwater conveyance elements including stormwater drains, pipes, culverts, catch basins, channels, swales and areas of overland flow. (5) A downstream peak flow analysis is required, which includes the assumptions, results and supporting calculations to show safe passage of post-development design flows downstream. The analysis of downstream conditions in the report shall address each and every point or area along the project site's boundaries at which runoff will exit the property. The analysis shall focus on the portion of the drainage channel or watercourse immediately downstream from the project. This area shall extend downstream from the project to a point in the drainage basin where the project area is ten percent of the total basin area. In calculating runoff volumes and discharge rates, consideration may need to be given to any planned future upstream land use changes. The analysis shall be in accordance with the stormwater design manual. (6) An erosion and sedimentation control plan that meets the requirements of section 3.08.05(c). (7) The landscaping plan, as required, shall describe how vegetation will be placed within and adjacent to stormwater management facilities. (8) Detailed description of ongoing operations and maintenance procedures for stormwater management facilities and practices to ensure their continued function as designed and constructed or preserved. These plans shall identify the parts or components of a stormwater management facility or practice that need to be regularly or periodically inspected and maintained, and the equipment and skills or training necessary. The plan shall include an inspection and maintenance schedule, maintenance tasks, and responsible parties for maintenance, funding, access, and safety issues. Provisions for the periodic review and evaluation of the effectiveness of the maintenance program and the need for revisions or additional maintenance procedures shall be included in the plan. (9) A minimum 20-foot easement shall be provided to ensure access from a public right-of-way to the stormwater management facilities. Such access shall be sufficient for all necessary equipment for maintenance activities. Depending on the depth of pipe, the drainage easement width may be required to be increased. Upon final inspection and approval, a plat or document indicating that such easements exist shall be recorded and shall remain in effect even with the transfer of title of the property. (10) Fences a minimum of four feet in height will be required around all detention ponds where the depth of water in the pond is greater than three feet. This fencing shall be chain-link or provided alternative material. The fence shall be designed, installed and maintained to allow the free flow of runoff and sediment into the facility. The fence shall include a gate of sufficient size (minimum ten-foot width) to permit entrance of equipment necessary to allow periodic maintenance activities. All fences and gates shall be located within the easement required by section 6.04.02(e)(9). Sec. 6.04.03. Drainage standards for streets—Placement, location and design. (a) The size, length, and location of all surface drainage pipes or structures shall be shown on all preliminary plats. All storm drain pipes or culverts carrying stormwater from the street and adjacent property or through lots in the subdivision shall be extended a minimum of ten feet beyond the rear of the house or structure. Stormwater shall be released into a channel or swale without causing scouring, erosion, or resulting in sedimentation of the receiving channel. The outlet channel shall include structural and vegetative measures to assure nonerosive velocities of stormwater. (b) Installations, backfilling, and compaction around drainage pipes shall be in accordance with GDOT specifications. All pipes shall have a minimum cover of 18 inches from the bottom of the road base, and head walls or inlet basins constructed at the ends of the pipes. (c) The design of drainage structures shall be based on recognized hydrological formulae. Minimum pipe size shall be 18 inches for use within the public right-of-way. (d) Piped collection systems for public streets (catch basins, inlets, cross drains, longitudinal piping) shall be designed for the 50-year storm. (e) Road culverts, which carry live streams and off-site drainage, shall be designed for the 100-year storm. (f) Cross drain pipes within the public rights-of-way shall be designed and constructed at or near a 90-degree angle with the roadway centerline. Where a slight skew is necessary, the pipe shall be placed within an 80- to 100-degree angle with the roadway centerline. (g) Longitudinal pipes along a curved section of roadway shall be located on the inside of the curve to avoid pipe beneath the roadway footprint. In the event that the longitudinal pipe needs to be along the outside of the curve, the pipe shall be wholly located outside the limits of the curb and gutter by use of additional junction boxes. For pipes at a cul-de-sac location, all pipes shall be wholly located outside of the footprint of the curb and gutter that encircles the cul-de-sac. Sec. 6.04.04. Drainage standard for streets—Materials and installation. (a) Standard specifications. (1) All of the materials, methods of the construction, and workmanship for the work covered in reference to stormwater conveyance facility construction shall conform to the most recent Standard Specifications of the Georgia Department of Transportation (Georgia DOT). (2) Allowable pipe material for all applications in drainage easements and public street rights-of-way, except as specified below, are aluminum-coated (Type 2) corrugated steel pipe (ASP), corrugated aluminum alloy pipe, smooth-lined corrugated polyethylene pipe (HDPE), or reinforced concrete pipe (RCP). Allowable pipe materials are indicated by an "X" in Table 6.04.01. (3) For roads constructed with public funds, either wholly or in part, or roads classified as major thoroughfares, materials which meet the Georgia DOT design standards shall be used unless an alternative is specifically approved by Butts County Public Works. (4) Reinforced concrete pipe (RCP) shall be used under non-local roads when the ADT is greater than 15,000 vehicles per day (vpd). Reinforced concrete pipe (RCP) or smooth-lined corrugated high density polyethylene (HDPE) pipe shall be used under non-local roads when the ADT is less than 15,000 vpd. The public works division may approve an alternative pipe material. (b) Minimum pipe and pipe coating requirements. The type of pipe material used shall be in accordance with subsection 6.04.04(a), standard specifications. (1) Reinforced concrete pipe shall be in minimum eight-foot joint lengths. All joints shall be bell and spigot type, with a rubber gasket conforming to ASTM C-443. Pipe shall be manufactured in accordance with AASHTO M-170 and/or ASTM C-76. Class of pipe and wall thickness shall be in accordance with 1030-D, Georgia DOT specification, Table No. 1. (2) Aluminum-coated (Type 2) steel pipe shall comply with AASHTO M-274 for the coating and AASHTO M-36 for the pipe fabrication. Aluminum alloy pipe shall comply with AASHTO M-196 for material and fabrication. (3) Each end of each corrugated metal pipe section, to be joined by a coupling band, shall have a minimum of two annular corrugations. Coupling bands shall be so constructed to lap on an equal portion of each of the pipe sections to be joined. The connecting bands shall have a minimum of two annular corrugations and fully engage, over the entire pipe periphery, one corrugation on each pipe. Bands shall be fabricated from the same material as the pipe. The minimum band gauges for aluminum pipe and aluminized pipe shall be as specified in AASHTO M-196, Section 19, and AASHTO M-36, Section 9, respectively. (4) Gaskets may be required as determined by the county in the field, and shall be either sleeve type or O-ring type and shall meet the requirements for gaskets as specified in AASHTO M-36, Section 9.3. (c) Smooth interior corrugated polyethylene pipe. (1) This specification applies to high density polyethylene corrugated pipe with an integrally formed smooth interior (HDPE). HDPE pipe manufacturers shall be approved by the public works division. (2) This pipe shall conform to the requirements of AASHTO M-294, Type S. (3) Joints shall be as recommended by the manufacturer and approved by the county. Connections shall create a soil tight joint at a minimum and shall use a rubber gasket, which conforms to ASTM F-477. (4) Installation shall be in accordance with ASTM Recommended Practice D2321, AASHTO Section 30, or as specified by the county. Certification from the manufacturer that the product was manufactured, tested, and supplied in accordance with this specification shall be furnished to the county upon request. Table 6.04.01. Allowable Pipe Use Metal Pipe Plastic Pipe Smoothed Lined High Density Reinforced | Aluminized Corrugated Poly- Concrete Type 2 Aluminum Poly- ethylene Pipe Type Pipe Steel Alloy ethylene Type "S" Specifications (See note 1) | ASTM C76, | ASTM A760, | ASTM B744,| AASHTO ASTM AASHTO A929; B745; M252 F-2306; M170 AASHTO AASHTO AASHTO M36, M274 | M196, M197, M294 (see GDT17 note 2) Minimum thickness/class Per GDOT Per GDOT Per GDOT AASHTO AASHTO Std 1030D | Std 1030D | Std 1030D M252 M294 Type Installation Longitudinal X X X xX Cross drains|Cross drain Xx on road|<10 percent w/over 15,000] slope ADT Cross drain Check w/county engineer concerning pipe type to be used when >10 percent x-drain > 10 percent and ADT > 15,000 slope Cross drains|Cross drain Xx X on nonlocal|}<10 percent road_ w/less|slope than 15,000 Cross drain X >10 percent slope Cross drains|Cross drain Xx Xx X on local road|<10 percent (sid road) slope w/less than F Cross drain Xx X 15,000 ADT >10 percent slope Lateral systems Xx Xx Xx Xx Slope drain Xx Xx Xx Perforated underdrain Xx Xx X X Dams H > 9 feet and V > 20 Xx Ac-Ft Perennial streams Xx x Metal Pipe Plastic Pipe Smoothed Lined High Density Reinforced | Aluminized Corrugated Poly- Concrete Type 2 Aluminum Poly- ethylene Pipe Type Pipe Steel Alloy ethylene Type "S" Minimum allowable design 2.5 fps 2.5 fps 2.5 fps — 2.5 fps velocity Maximum allowable design 15 fps 5 fps 15 fps — 15 fps velocity Minimum soil pH/resistiv- — 6/1500 — — — ity ohm/cm Notes: 1) All pipe materials shall meet the minimum requirements of the Georgia Department of Transportation's Standard Specifications Construction of Transportation Systems, most current edition. 2) Allow smoothed-lined HDPE, Type S (AASHTO M294) pipe for storm (longitudinal and cross) and side drain applications through 48-inch diameter so long as roadway's ADT is less than 15,000 vehicles per day. (d) Backfilling. Backfill for CSP, CAP, and HDPE pipe installations shall be constructed using graded aggregate base or crusher run six inches below the bottom of pipe to 12 inches above the pipe crown. Backfill for RCP pipe installations shall be constructed using graded aggregate base or crusher run six inches below the pipe invert to one-quarter of the pipe diameter. Foundation backfill material shall be used for RCP above one-quarter of the pipe diameter (if graded aggregate base is not used above one-quarter of the pipe diameter) as per Type I or Type II, as specified in sections 812.01 and 812.02 respectively, in Georgia DOT Standard Specifications. These materials shall be placed in layers of not more than six inches loose. Compaction of these materials shall be accomplished by hand tamping or machine tamping. Required compaction levels are as follows: (1) Within street right-of-way. Backfill within all street rights-of-way shall be compacted to 95 percent maximum density, tested using the AASHTO Method T-99. (2) In other areas. Backfill in all other areas shall be compacted to 90 percent maximum density, tested using the AASHTO Method T-99. (3) Construction loads and minimum covers. If drainage pipe is installed prior to the completion of grading, a minimum of four feet of fill should be provided where needed to adequately protect the drainage structure during the land development phase, unless the structure itself is designed to withstand the anticipated live load during construction. (e) End finish. (1) Headwalls or other end treatments are required on all culverts and at the outlet of all piped collection systems. Where ends of pipe are located within, or near, the right-of-way and are parallel, or nearly parallel, with the roadway, safety end sections shall be required when the posted speed limit is 35 miles per hour and over. (2) Headwalls are to be precast concrete, stone masonry with reinforced concrete footings, or poured in place, reinforced concrete with reinforced concrete footings. Precast concrete headwalls for corrugated aluminum coated steel pipe or aluminum alloy pipe shall be made with aluminum coated steel or aluminum alloy pipe stubs. (3) End treatments that conform to the slope may be pre-cast concrete end sections, aluminum coated steel or aluminum alloy end sections, masonry, PE end sections, reinforced poured-in-place slope collars, or grouted rip-rap. Concrete and metal flared end sections shall conform to applicable Georgia DOT Standard Drawing 1120, 1122, or Detail D-39. (f) Junction boxes and catch basins. Junction boxes and catch basins shall have metal manhole frames and lids for access. (g) Other structures. Natural bottom arches and box culverts may be used in accordance with the latest standard specifications of the Georgia Department of Transportation. Bottomless culverts shall require that a scour analysis be done by a registered professional engineer in that field to Georgia Department of Transportation Specifications and Standards to ensure the soundness of the proposed structure. Sec. 6.04.05. Driveway culverts. (a) Each site requiring a driveway pipe/culvert for access shall be analyzed for stormwater runoff flow patterns and sized for a minimum 25-year storm event by the design professional. (b) Where a driveway pipe will be used in a stream crossing, the pipe shall be sized for a 100-year storm event by the design professional. (c) The construction plans and the final plat shall show the minimum driveway pipe size required for each lot. (d) Driveway culvert material shall conform to section 6.04.04 above. CHAPTER 7 DEVELOPMENT IMPACT FEE Sec. 7.01.01. Legislative findings. The board of commissioners of Butts County, Georgia, has considered the feasibility of imposing development impact fees and finds, determines and declares that: (a) The Georgia Legislature, through the enactment of the Georgia Development Impact Fee Act, O.C.G.A. §§ 36-71-1 through 36-71-13, has authorized the county to enact development impact fees. (b) The county established a development impact fee advisory committee pursuant to the Georgia Development Impact Fee Act, O.C.G.A. § 36-71-5, and that committee has served in an advisory capacity and assisted and advised the county with regard to the development and adoption of this development impact fee ordinance. (c) The Butts County Comprehensive Plan contains within it Land Use Assumptions, a Capital Improvements Element, and the establishment of level of service standards for capital facilities for the planning horizon to 2027; and the Butts County Comprehensive Plan, including the Amendment to Include a Capital Improvement Element, has been submitted to the McIntosh Trail Regional Development Center and has been determined by the Georgia Department of Community Affairs to be in compliance with the rules of the Georgia Department of Community Affairs, Chapter 110-12-2, Development Impact Fee Compliance Requirements. (d) Butts County must expand its capital facilities in order to maintain level of service standards established in the Butts County Comprehensive Plan if new development is to be accommodated without decreasing current standards. This must be done in order to promote and protect the health, safety, morals, convenience, order, prosperity, and the general welfare of Butts County, Georgia. (e) The imposition of development impact fees is a preferred method of ensuring the availability of capital facilities necessary to accommodate new development. (f) Each of the types of land development described in this ordinance will create a need for the construction, equipping, or expansion of Butts County's capital facilities. (g) The fees established by this ordinance are derived from, are based upon, and do not exceed a proportionate share of the costs of providing additional facilities necessitated by the new land developments for which the fees are levied. Sec. 7.01.02. Short title and applicability. (a) This ordinance shall be known and may be cited as the "The Butts County Development Impact Fee Ordinance." (b) This ordinance shall apply throughout the unincorporated area of Butts County. Butts County may also collect a development impact fee in one or more municipalities in Butts County if agreed to by an intergovernmental agreement between Butts County and a municipality as provided by law. Sec. 7.01.03. Intents and purposes. (a) This ordinance is intended to implement and be consistent with the Butts County Comprehensive Plan last adopted on August 25, 2008, and as it may be amended from time to time, and in accordance with Title 36, Chapter 70 of the Official Code of Georgia annotated and pursuant to the minimum standards and procedures established by the Georgia Department of Community Affairs. (b) The purpose of this ordinance is to regulate the use and development of land so as to assure that new development bears a proportionate share of the cost of capital expenditures necessary to provide certain specified facilities and services in Butts County. (c) This ordinance is intended to comply fully with each and every relevant provision of the Georgia Development Impact Fee Act, O.C.G.A. §§ 36-71-1 through 36-71-13, and shall be interpreted and implemented to so comply. (d) Nothing in this ordinance shall be deemed to prevent or prohibit private development agreements between property owners or developers and Butts County Board of Commissioners. Sec. 7.01.04. Rules of construction. (a) The provisions of this ordinance shall be liberally construed so as to effectively carry out its purpose to promote and protect the health, safety, morals, convenience, order, prosperity, and the general welfare of Butts County, Georgia. (b) For the purposes of administration and enforcement of this ordinance, unless otherwise stated in this ordinance, the following rules of construction shall apply to the text of this ordinance: (1) In case of any difference of meaning or implication between the text of this ordinance and any caption, illustration, summary table, or illustrative table, the text shall control. (2) The word "shall" is always mandatory and not discretionary; the word "may" is permissive. (3) Words used in the present tense shall include the future; and words used in the singular number shall include the plural, and the plural the singular, unless the context clearly indicates the contrary. (4) The phrase "used for" includes "arranged for," "designed for," "maintained for," or "occupied for." (5) The word "person" includes an individual, a corporation, a partnership, an incorporated association, or any other similar entity. (6) Unless the context clearly indicates the contrary, where a regulation involves two or more items, conditions, provisions, or events connected by the conjunction "and," "or," or "either ? or," the conjunction shall be interpreted as follows: a. "And" indicates that all the connected terms, conditions, provisions or events shall apply. b. "Or" indicates that the connected items, conditions, provisions or events may apply singly or in any combination. c. "Either ? or" indicates that the connected items, conditions, provisions or events shall apply singly but not in combination. (7) The word "includes" shall not limit a term to the specific example but is intended to extend its meaning to all other instances or circumstances of like kind or character. (8) "Impact fee administrator" means the county official designated by the Butts County Board of Commissioners to carry out the administration of this ordinance, and unless otherwise designated shall be the county administrator of Butts County. (9) Any road right-of-way used to define the roads impact district boundaries shall be considered to be within any district it bonds for purposes of using impact fee funds. Sec. 7.01.05. Imposition of development impact fees. (a) Any person who, after the effective date of this ordinance, seeks to develop land within the unincorporated area of Butts County, Georgia, by applying for a building permit, is hereby required to pay development impact fees in the manner and amount set forth in this ordinance. (b) No new building permit for any activity requiring payment of a development impact fee pursuant to this ordinance shall be issued unless and until the development impact fee amount as determined by the impact fee administrator has been paid. Sec. 7.01.06. Computation of the amount of development impact fees. (a) The amount of the development impact fees shall be determined by the following fee schedule. Fee Schedule Development Impact Fees, Butts County Land Use Road Library Parks/ Recreation Public Safety Administrative Fee Total Residential (per unit) $ 405.00 $50.00 $240.00 $295.00 $30.00 $1,020.00 Retail/Commercial (per 1,000 sq. ft.) 1,230.00 0 0 420.00 50.00 1,700.00 Hotel/Motel (per room) 690.00 0 0 350.00 30.00 1,070.00 Industrial/ Warehousing (per 1,000 sq. ft.) 850.00 0 0 275.00 35.00 1,160.00 Office/Finance (per 1,000 sq. ft.) 430.00 0 0 350.00 20.00 800.00 Eating/Drinking Establishments (per 1,000 sq. ft.) 835.00 0 0 385.00 30.00 1,250.00 Medical Facilities (per 1,000 sq. ft.) 860.00 0 0 430.00 40.00 1,330.00 (1) If a building permit is requested for mixed uses, then the fee shall be determined through using the above schedules by apportioning the space committed to uses specified on the schedules. (2) If the type of development activity that a building permit is applied for is not specified on the above fee schedules, the impact fee administrator shall use the fee applicable to the most nearly comparable type of land use on the above fee schedules. (b) If an applicant opts not to have the development impact fee determined according to paragraph (a) of this section, then the applicant shall prepare and submit to the impact fee administrator an independent fee calculation study for the land development activity for which a building permit is sought. The documentation submitted shall show the basis upon which the independent fee calculation was made. The impact fee administrator shall consider the documentation submitted by the applicant but is not required to accept such documentation as he/she shall reasonably deem to be inaccurate or not reliable and may, in the alternative, require the applicant to submit additional or different documentation for consideration. If an acceptable independent fee calculation study is not presented, the applicant shall pay development impact fees based upon the schedules shown in paragraph (a) of this section. If an acceptable independent fee calculation study is presented, the impact fee administrator may adjust the fee to that appropriate to the particular development. Determinations made by the impact fee administrator pursuant to this paragraph may be appealed to the board of commissioners by filing a written request with the county administrator within ten calendar days of the impact fee administrator's determination. (c) On the request of an applicant, the impact fee administrator shall certify the development impact fee schedules or development impact fees resulting from an individual assessment, whichever is applicable, and said certification shall establish the applicable development impact fee for a period of 180 days from the date thereof. Sec. 7.01.07. Payment of fee. (a) The applicant shall pay the development impact fee required by this ordinance to the impact fee administrator or his/her designee prior to the issuance of a building permit. However, for an industrial building on property zoned for industrial purposes and where such building has no less than 1,000,000 square feet of enclosed, heated and air-conditioned space, the impact fee administrator or his/her designee may accept from the applicant no less than 50 percent of the total required impact fees at the issuance of the building permit for such building and shall collect the balance of the required impact fee due prior to the issuance of a certificate of occupancy for such building or within 12 months from the issuance of the building permit, whichever occurs first. (b) All funds collected shall be properly identified by and promptly transferred for deposit in the development impact fee trust fund established for each fee charged by this ordinance, to be held in separate accounts as determined in this ordinance and used solely for the purposes specified in this ordinance. (Ord. of 1-24-2022, § 1) Sec. 7.01.08. Service areas established. (a) There is hereby established a service area for Butts County road facilities which shall be the entirety of Butts County; provided, however, that Butts County shall not charge and collect impact fees for development inside an incorporated area of Butts County within the services area, except by intergovernmental agreement with the municipality as provided by law. (b) There is hereby established a service area for Butts County sheriff/court/jail (public safety) facilities which shall be the entirety of Butts County; provided, however, that Butts County shall not charge and collect impact fees for development inside an incorporated area of Butts County within the service area, except by intergovernmental agreement with the municipality as provided by law. (c) There is hereby established a service area for Butts County fire protection and emergency medical services (public safety) which shall be the unincorporated area of Butts County and the City of Jenkinsburg; provided, however, that Butts County shall not charge and collect impact fees for development inside the incorporated area of the City of Jenkinsburg, except by intergovernmental agreement with the City of Jenkinsburg as provided by law. (d) There is hereby established a service area for Butts County library facilities which shall be the entirety of Butts County; provided, however, that Butts County shall not charge and collect impact fees for development inside an incorporated area of Butts County within the service area, except by intergovernmental agreement with the municipality as provided by law. (e) There is hereby established a service area for Butts County parks and recreation which shall be the entirety of Butts County; provided, however, that Butts County shall not charge and collect impact fees for development inside an incorporated area of Butts County within the service area, except by intergovernmental agreement with the municipality as provided by law. Sec. 7.01.09. Impact fee trust funds established. (a) There is hereby established one county road development impact trust fund for the county road system service area established in this ordinance. (b) There is hereby established one sheriff/court/jail (public safety) development impact fee trust fund for the sheriff/court/jail (public safety) service area established in this ordinance. (c) There is hereby established one fire protection and emergency medical services (public safety) development impact fee trust fund for the fire protection and emergency medical services (public safety) service area established in this ordinance. (d) There is hereby established one library development impact fee trust fund for the library service area established in this ordinance. (e) There is hereby established one parks and recreation development impact fee trust fund for the parks and recreation service area established in this ordinance. (f) Development impact fees placed in these funds shall be maintained in interest bearing accounts. (g) All impact fees collected shall be promptly deposited in the trust fund established for that purpose and maintained there, including interest thereon, until withdrawn pursuant to this ordinance. (h) Funds withdrawn from these accounts must be used in accordance with the provisions of section 7.01.10 of this ordinance. Sec. 7.01.10. Use of funds. (a) Funds collected from sheriff/court/jail development impact fees shall be used solely for the purpose of acquiring, equipping, and/or making capital improvements to sheriff, court, and jail facilities under the jurisdiction of Butts County, and related expenses as permitted by the Georgia Development Impact Fee Act, and shall not be used for maintenance or operations. (b) Funds collected from fire department and emergency medical services (public safety) development impact fees shall be used solely for the purpose of acquiring, equipping, and/or making capital improvements to fire department and emergency medical (public safety) facilities under the jurisdiction of Butts County, and related expenses as permitted by the Georgia Development Impact Fee Act, and shall not be used for maintenance or operations. (c) Funds collected from library development impact fees shall be used solely for the purpose of acquiring, equipping, and/or making capital improvements to library facilities under the jurisdiction of Butts County, and related expenses as permitted by the Georgia Development Impact Fee Act, and shall not be used for maintenance or operations. (d) Funds collected from parks and recreation development impact fees shall be used solely for the purpose of acquiring, equipping, and/or making capital improvements to parks and recreation facilities under the jurisdiction of Butts County, and related expenses as permitted by the Georgia Development Impact Fee Act, and shall not be used for maintenance or operations. (e) Funds shall be used exclusively for acquisitions, expansions, or road capital improvements within the development impact fee service area from which the funds were collected. (f) In the event that bonds or similar debt instruments are issued for advanced provision of capital facilities for which development impact fees may be expended, development impact fees may be used to pay debt service on such bonds or similar debt instruments to the extent that the facilities provided are of the type described in this section. (g) In the event a developer enters into an agreement with the county to construct, fund or contribute system improvements such that the amount of the credit created by such construction, funding or contribution is in excess of the development impact fee otherwise due, the developer shall be reimbursed for such excess construction funding or contribution from development impact fees paid by other development located in the service area which is benefited by such improvements. (h) At least once each fiscal period the impact fee administrator shall present to the board of commissioners a report describing the amount of development impact fees collected, encumbered and used, and a proposed capital improvement program for capital facilities that are the subject of this ordinance, assigning funds, including any accrued interest, from the development impact fee trust funds to specific improvement projects and related expenses. Monies, including any accrued interest, not assigned in any fiscal period shall be retained in the appropriate development impact fee trust fund until the next fiscal period except as provided by the refund provisions of this ordinance. (i) Funds may be used to provide refunds as described in section 7.01.11. (j) Funds shall be considered expended on a first in, first out basis. Sec. 7.01.11. Refund of fees paid. (a) If a building permit expires without commencement of construction, then the feepayor shall be entitled to a refund, without interest, of the development impact fee paid as a condition for its issuance except that the county shall retain three percent of the fee to offset a portion of the costs of collection and refund. The feepayor must submit an application for such a refund to the impact fee administrator within 30 days of the expiration of the permit. (b) In the event that development impact fees have not been expended or encumbered by six years from the date the development impact fee was paid, the impact fee administrator shall provide written notice of entitlement to a refund to feepayors or their successors in interest. (c) If funds not expended or encumbered following six years from the date the police protection development impact fee was paid, upon application of the then current landowner, they must be returned to such feepayor with interest that is a pro rata share of the interest earned by the fund, provided that the feepayor submits an application for the refund to the impact fee administrator within one year of the expiration of the six-year period or the publication of the notice of entitlement, whichever is later. Refunds shall be made to the feepayor within 60 days after it is determined that a sufficient proof of claim for a refund has been made. Sec. 7.01.12. Exemptions and credits. (a) The following shall be exempted from payment of the development impact fee: (1) Alterations, repairs or expansion of an existing one or two-family dwelling. (2) The construction of accessory buildings or structures. (3) The replacement of a building or structure with a new building or structure of the same size and use. (4) Upon the expiration of a lawfully issued building permit, the person or entity to whom the permit was issued shall have a period of 30 days, as measured from the date that official written notice of the expiration was provided, within which to renew the building permit without payment of any fees otherwise due under the impact fee ordinance. If a building permit is renewed or issued after the expiration of said 30-day period, then all fees due under the impact fee ordinance must be paid as a condition of the issuance of the building permit. Any claim of exemption must be made no later than the time of application for a building permit. Any claim not so made shall be deemed waived. (b) Credits. (1) Land and/or capital improvements may be offered by the applicant as total or partial payment of one or more of the required development impact fees. The applicant must request a development impact fee credit. If the impact fee administrator accepts such an offer, the credit shall be determined and provided in the following manner: a. Credit for the dedication of land shall be valued at: 1. One hundred fifteen percent of the most recent assessed value by the property appraiser; or 2. By fair market value established by private appraisers acceptable to the county. Credit for the dedication of land shall be provided when the property has been conveyed at no charge to, and accepted by, the county in a manner satisfactory to the impact fee administrator. b. Applicants for credit for construction of improvements shall submit acceptable engineering drawings and specifications and construction cost estimates to the impact fee administrator. The impact fee administrator shall determine credit for construction based upon either these cost estimates or upon alternative engineering criteria and construction cost estimates if the impact fee administrator determines that such estimates submitted by the applicant are either unreliable or inaccurate. The impact fee administrator shall provide the applicant with a letter or certificate setting forth the dollar amount of the credit, the reason for the credit, and the legal description or other adequate description of the project or development to which the credit may be applied. The applicant must sign and date a duplicate copy of such letter or certificate indicating his/her agreement to the terms of the letter or certificate and return such signed document to the impact fee administrator before credit will be given. The failure of the applicant to sign, date, and return such document within 60 days shall nullify the credit. c. Except as provided in subparagraph d., credit against development impact fees otherwise due will not be provided until: 1. The construction is completed and accepted by the county; and 2. A suitable maintenance and warranty bond is received and approved by the impact fee administrator, when applicable. d. Credit may be provided before completion of specified improvements if adequate assurances are given by the applicant that the standards set out above will be met and if the applicant posts security as provided below for the costs of such construction. Security in the form of a performance bond, irrevocable letter of credit, or escrow agreement shall be posted with and approved by the impact fee administrator in an amount determined by the impact fee administrator. If the construction project will not be constructed within one year of the acceptance of the offer by the impact fee administrator, the amount of the security shall be increased by ten percent compounded, for each year of the life of the security. (2) In no circumstance shall credit for private park and/or recreation facilities exceed 50 percent of the park and recreation development impact fees otherwise due. An applicant requesting credit must show that: a. The private park and/or recreation facility for which credit is sought serves a public recreational need; and b. The private park and/or recreation facility for which credit is sought is consistent with the Capital Improvement Element of Butts County's Comprehensive Plan. (3) Any claim for credit must be made no later than the time of application for a building permit. Any claim not so made shall be deemed waived. (4) Credits shall not be transferable from one project or development to another unless so provided in a development impact fee credit agreement. (c) Upon application, the board of commissioners may exempt all or part of a particular development project from development impact fees if the board finds that the following conditions are met: (1) Such project is determined to create extraordinary economic development and employment growth or affordable housing; (2) The public policy which supports the exemption is contained within the Butts County Comprehensive Plan; and, (3) The exempt development project's proportionate share of the system improvement is funded through a revenue source other than development impact fees. Sec. 7.01.13. Appeals. (a) Any applicant or feepayor aggrieved by a decision of the impact fee administrator made pursuant to this ordinance shall have the right to appeal to the Butts County Board of Commissioners. Prior to any such appeal, the aggrieved applicant or feepayor shall file a request for reconsideration with the impact fee administrator who shall act upon such request within 15 days. (b) All appeals shall be taken within 15 days of the impact fee administrator's decision on the request for reconsideration by filing with the impact fee administrator a notice of appeal specifying the grounds therefor. The impact fee administrator shall forthwith transmit to the Butts County Board of Commissioners all papers constituting the record upon which the action appealed from is taken. The Butts County Board of Commissioners shall thereafter establish a reasonable date and time for a hearing on the appeal, give due notice thereof, and decide the same within a reasonable period of time following the hearing. Any applicant or feepayor taking an appeal shall have the right to appear at the hearing to present evidence and may be represented by counsel. (c) An applicant may pay a development impact fee under protest to obtain a building permit and, by making such payment, shall not be estopped from: (1) Exercising the right of appeal provided for in this section; or (2) Receiving a refund of any amount deemed to have been illegally collected. Sec. 7.01.14. Review. The fees contained in this ordinance shall be reviewed by the Butts County Board of Commissioners at least once every two years. CHAPTER 8 ADMINISTRATIVE OFFICIALS AND BOARDS Sec. 8.00.00. Generally. The administrative offices and boards described in chapter 8 are established for the purpose of implementing the provisions of the UDO. The committees, boards, and commissions described in this chapter shall have the powers and duties described necessary to achieve the purpose of this UDO. Sec. 8.01.00. Administrative officials. Sec. 8.01.01. Zoning administrator. The zoning administrator has the power and duty to provide the following services related to this ordinance: (a) Provide initial information about this ordinance upon request. (b) Advise how to contact members of the planning and zoning commission, the board of appeals, the board of commissioners, or other officials as may be appropriate for services provided by those bodies or officials. (c) Maintain official maps on public display. (d) Determine in which zoning district a parcel of land lies. (e) Issue building permits under procedures outlined in section 10.02.01 of this ordinance. (f) Issue certificates of occupancy under procedures outlined in section 10.02.02 of this ordinance. (g) Offer practical suggestions on how to comply with the requirements of this ordinance. (h) Maintain complete records concerning this ordinance and related matters and make such records available to the public upon request. (i) Supervise all professional and clerical personnel employed in connection with the performance of the functions of the zoning administrator. (j) Serve as administrative secretary to the planning and zoning commission and the board of appeals. (k) Issue certificates of zoning compliance for all permitted uses as well as for variances or other applicable procedures which are granted by the board of appeals. (l) Collect data and keep informed as to the best zoning practices in order that s/he may be qualified to make recommendations to the planning and zoning commission and the board of commissioners concerning amendments to this ordinance. (m) Make recommendations in regards to requests for variances and other zoning decisions to the board of zoning appeals, planning commission and board of commissioners. Sec. 8.02.00. Planning commission. Sec. 8.02.01. Establishment. The Butts County Planning and Zoning Commission was first established as a joint board of Butts County and the City of Jackson. It is hereby re-established as a five-member county commission appointed and approved by the board of commissioners. Vacancies shall be filled for unexpired terms in the same manner as initial appointments. Members are removable for cause by the board of commissioners upon written charges and after public hearing. No members of the planning and zoning commission shall hold any elected public office. Terms of appointment shall be set by the board of commissioners according to an approved schedule. Meeting organization and parliamentary procedure shall be carried out as established in the by-laws adopted by the planning and zoning commission. Sec. 8.02.02. Powers and duties. The planning and zoning commission has the power and duty to provide the following services related to this ordinance: (a) Advise the board of commissioners on applications for amendment to this ordinance by examining amendment applications and providing written recommendations with reasons for the recommendations to the board of commissioners. (b) Dispense general information about this ordinance to the public upon request. (c) Propose amendments to this ordinance. (d) Maintain and update the Butts County Comprehensive Plan so that it may provide a current data base with which decisions on proposed amendments to this ordinance may be made that utilize sound planning principles. (e) Carry out an ongoing comprehensive planning program which, like the comprehensive plan, will provide current data on which decisions regarding this ordinance may be based that utilize sound planning principles. (f) Maintain and update the Butts County Land Use Plan so that it may provide a current data base with which decisions on proposed amendments to this ordinance may be made that utilize sound planning principles. (g) Advise the board of commissioners on matters of zoning and annexation, as appropriate. Sec. 8.02.03. Meetings, rules and procedures, and records. (a) The planning commission shall make its own by-laws and rules of procedure; provided, however, such by-laws and rules of procedure shall not control over any conflicting ordinances of the county or state law. (b) The planning commission shall set a regular monthly meeting time. All meetings of the planning commission at which official action is taken shall be open to the public, and all records of the planning commission shall be public records. (c) To the extent the planning commission is specifically authorized to render any quasi-judicial decision as defined below, the planning commission shall hold a public hearing before making any such quasi-judicial decisions. Such hearing shall be preceded by the county providing publication of a public hearing notice within a newspaper of general circulation in the county no less than 30 days prior to the hearing, and a notice of the hearing shall be mailed at least 30 days prior to the public hearing to the owner of the property that is the subject of the proposed action. Such notices shall include the application number (if any number is assigned), date, time, location, and purpose of the public hearing. Quasijudicial decisions means to exercise delegated, quasi-judicial zoning powers including hearing appeals on administrative decisions and rendering decisions on applications for variances, special administrative permits, special exceptions, conditional use permits, or other similar permits pursuant to standards for the exercise of such quasi-judicial authority adopted by the county. (Ord. No. CR202334, § 1, 6-26-2023) Sec. 8.03.00. Board of zoning appeals. Sec. 8.03.01. Established. The Butts County Board of Zoning Appeals, herein referred to as the Board of Zoning Appeals or BZA, is hereby established. Sec. 8.03.02. Powers and duties. The board of appeals has the power and duty to provide the following services: (a) Authorize variances according to procedures specified in section 9.02.01 and 10.03.00. (b) Accept applications for appeal of administrative decisions according to procedures specified in section 10.03.00. (c) Accept applications for appeal of an action of the historic preservation commission (where one exists) and render official decisions on them. Sec. 8.03.03. Meetings, rules and procedures, and records. (a) The board of zoning appeals ("BZA") shall elect a chairman and a vice-chairman from its members who shall serve for one year or until reelected or until their successors are elected. The BZA shall adopt rules and by-laws in accordance with the provisions of this chapter and of the Zoning Procedures Law, O.C.G.A. Title 36, Chapter 66. (b) Meetings of the BZA shall be held at the call of the chairman and at such other times as the BZA may determine. No action may be taken without the approval of a quorum of the BZA. A quorum shall consist of three members of the BZA. The chairman or, in his absence, the vice-chairman, may administer oaths and compel the attendance of witnesses by subpoena. (c) The BZA shall keep minutes of its proceedings, showing the vote of each member upon each question or, if absent or failing to vote, indicating such fact, and shall keep records of its examinations and other official actions, all of which shall be immediately filed in the department of planning and development and shall be a public record. (d) All meetings of the BZA shall be open to the public and shall comply with O.C.G.A. § 50-14-1 et seq. (e) To the extent the BZA is specifically authorized to render any quasi-judicial decision as defined below, the BZA shall hold a public hearing before making any such quasi-judicial decisions. Such hearing shall be preceded by the county providing publication of a public hearing notice within a newspaper of general circulation in the county no less than 30 days prior to the hearing, and a notice of the hearing shall be mailed at least 30 days prior to the public hearing to the owner of the property that is the subject of the proposed action. Such notices shall include the application number (if any number is assigned), date, time, location, and purpose of the public hearing. Quasi-judicial decisions means to exercise of delegated, quasi-judicial zoning powers including hearing appeals on administrative decisions and rendering decisions on applications for variances, special administrative permits, special exceptions, conditional use permits, or other similar permits pursuant to standards for the exercise of such quasi-judicial authority adopted by the county. (Ord. No. CR202334, §§ 2, 3, 6-26-2023) Sec. 8.04.00. Board of commissioners. Sec. 8.04.01. Powers and duties. The board of commissioners has the power and duty to provide the following services related to this ordinance: (a) Accept applications for amendment of this ordinance and render official decisions on them after referring them to the planning and zoning commission for review and recommendations. (b) Propose amendments to this ordinance. (c) Issue zoning decisions, and exercise the zoning power, consistently with the standards for the exercise of the zoning power, the Zoning Procedures Law, and the policies and procedures for conduct of public hearings. (d) Perform all duties and exercise all powers conferred on the board by law. CHAPTER 9 NONCONFORMITIES AND VARIANCES Sec. 9.01.00. Nonconforming lots, structures, and uses. Sec. 9.01.01. Generally. Invariably, at the time a land use and development control ordinance is adopted or amended, certain uses which lawfully existed prior to the adoption or amendment will not conform to the regulations and standards for the districts in which they are located. These are known as nonconforming uses, and in order to feasibly adopt the ordinance, and so as not to cause undue economic hardship on owners of nonconforming uses, these uses are allowed to continue under special conditions as outlined in the following parts of this section: (a) Where a nonconforming use of a building or lot has ceased for more than six months or has changed to a permitted or conforming use, further use of the building or lot must be in conformance with the standards and requirements for the district in which it is located. (b) A nonconforming use must not be extended or altered unless the extension or alteration is in conformance with the requirements of this ordinance. (c) A nonconforming use which is altered or extended must meet applicable Butts County building codes and development regulations. When an applicant seeks a building permit for the extension or alteration of a nonconforming use, the zoning administrator will inspect the unit and determine what (if anything) is needed to bring the unit into conformance with applicable building codes and development regulations. Upon determining that the unit meets applicable building codes and development regulations, s/he will issue the building permit for the nonconforming use. (d) If a nonconforming residential building or structure suffers damage, the building or structure may be reconstructed and reused as before if completed within 12 months from the time such damage occurred; a damaged residential building or structure may be reconstructed to its original size and dimensions, even if nonconforming under this ordinance, provided that the residence must be rebuilt within 12 months in conformity with the building code requirements in effect at the time of reconstruction. (e) A use which is nonconforming only with respect to screening or buffer requirements must provide required screens or buffers within a period of three years from the effective date of this ordinance. This time period is to allow for the growth of natural vegetative buffers. Sec. 9.01.02. Nonconforming lots of record. (a) Any lot of record for which a plat or legal description has been legally recorded in the office of the clerk of superior court of Butts County at the time of adoption of this UDO and was in compliance with all county zoning regulations at the time of recording but which fails to comply with the dimensional requirements or lot area requirements for the district in which it is located may, if vacant, be used for any of the uses permitted within the district by this UDO, provided that: (1) The minimum requirements of the district for front, side, and rear yard, open space, height, and floor area shall be complied with; and (2) The lot is approved by the board of health for the use of a private waste water system. (b) No permit for the use of any lot which is substandard in terms of the provisions of this UDO shall be issued unless said lot was legally and properly recorded prior to the passage of this UDO. In all cases, construction on any substandard lot of record after the adoption of this UDO shall be required to meet all requirements of the district in which it is located. (c) No lot, even though it may consist of one or more adjacent lots of record, shall be reduced in size so that the lot frontage or depth; front, side or rear yard; lot area; or other requirements of this UDO are not maintained. This requirement shall not apply when a portion of a lot is required for public purposes. (d) Permitted modification of setback requirements. When a building is proposed on a lot and when on either or both lots which adjoin such lot at the street right-of-way line there exists a principal building which does not conform to the setback requirements of this UDO, the required setback for such building shall be as follows: (1) Where only one said adjoining lot contains a principal building with a nonconforming setback, the setback shall be the computed average of the normal setback requirement and the nonconforming setback; or (2) Where both adjoining lots contain a principal building each with a nonconforming setback, the minimum setback shall be the computed average of the two nonconforming setbacks. Sec. 9.02.00. Variances. Sec. 9.02.01. Variances. (a) A variance is a permit, issued by the board of zoning appeals ("BZA"), which allows use of a parcel of land in a way that does not meet certain requirements for the district in which the property is located. A variance may be granted only in an individual case where an extreme hardship would result if all of the requirements of this section were applied stringently to a particular piece of property. The hardship must be proven by showing that reasonable use of the land is not possible if all of the requirements of this section are to be met. The hardship cannot be self-created, such as: (1) A lot purchased with knowledge of an existing restriction; (2) A claim of hardship in terms of prospective sales; or (3) An expressed economic need requiring a variance, when such a need can be met in other ways which would not require a variance. (b) Relief from the hardship (i.e., granting the variance) must not cause substantial detriment to the public good or impair the purposes of this ordinance. (c) When a variance is issued, the spirit of this ordinance must be observed and the public safety and welfare secured. A variance may be granted only for permitted uses in the zoning district in which the property in question is located. (For example, a two-family dwelling would not be allowed to be placed in an R-1 district under a variance.) (d) The developer or owner wishing to request a variance must have at least 51 percent ownership of the subject property or be the duly authorized agent of such a person, possessing notarized authorization in writing, under the owner's signature. The planning and zoning commission or board of commissioners may also propose a variance. However, the power to approve a variance rests with the board of appeals. (e) Application for a variance may be made with the zoning administrator. The zoning administrator will take the required information and transmit it to the board of appeals for its consideration. (f) When an application for a variance is received, the BZA will set a time and place for a public hearing on the variance. Notice of the hearing must be published in a newspaper of general circulation in Butts County at least 30 days before the hearing. Such notice will state the application number (if any number is assigned), owner's name, property location, its area, time, place and subject of the hearing. At least 30 days before the public hearing, notice of the time, place, and subject of the hearing will be sent in writing by U.S. mail to the owner whose property or interest is the subject of such hearing appellant or petitioner in writing by U.S. mail to her/his last known address. Copies of all such letters will be maintained in the applicant's file for permanent record. (g) The board of appeals will make a decision concerning the variance and record the decision in the minutes for that meeting. (h) The variance issued by the board of appeals must specify which requirements are to be varied from. It must specify alternative requirements to be met, replacing the requirements varied from. (i) The board of appeals may establish performance bonds to ensure compliance with any requirements it has set for granting a variance. Where a variance is granted for a construction activity requiring a building permit, the building permit must be obtained and construction must begin within six months of the issuance of the variance. Otherwise, the variance expires after six months. (j) The decision of the BZA on the application for a variance may be appealed on points of law to the Butts County Superior Court pursuant to the procedures of subsection 10.03.02(a). (Ord. No. CR202334, § 4, 6-26-2023) Sec. 9.02.02. Administrative variances. (a) Authority. The zoning administrator shall have the power to authorize upon application in specific cases such administrative variances from the terms of this UDO as will not be contrary to the public interest where, owing to special conditions, a literal enforcement of the provisions of this UDO will in an individual case result in practical difficulty or unnecessary hardship, so that the spirit of this UDO shall be observed, public safety and welfare secured, and substantial justice done. (b) Provisions that may be administratively varied. The following provisions of this UDO may be administratively varied by the zoning administrator, subject to the specific limitations of this section: (1) Front building setback for a principal building, reduction not to exceed 30 percent of the minimum requirement. (2) Side building setback for a principal building, reduction not to exceed 30 percent of the minimum requirement. (3) Rear building setback for a principal building, reduction not to exceed 30 percent of the minimum requirement. (4) Setback for an accessory building, reduction not to exceed 30 percent of the minimum requirement. (5) Landscape strip minimum widths, reduction not to exceed 20 percent of the minimum required width. For example, if the minimum landscape strip width is ten feet, the zoning administrator may authorize a reduction to no less than eight feet. (6) A reduction in the maximum number of off-street parking spaces required by this ordinance, not to exceed 20 percent. (7) Riparian buffer zone, reduction not to exceed 50 percent of the minimum requirement. (8) Accessory uses in residential zoning districts. Property owners whose property is zoned A-R, R-1, R-2, R-3, R-4, R-5 or R-M and consists of at least five acres may make application to the zoning administrator to locate an accessory use on the property in a location other than the rear setback. Only the zoning administrator can approve or deny the request. Only the property owner is permitted to submit an application and/or appeal the decision of the zoning administrator. (9) Swimming pools may be located in front yards by administrative variance upon a finding that there is no other suitable location for the swimming pool on site and the location of the swimming pool in the proposed location will not be readily visible to the surrounding properties or so close to surrounding properties as to constitute a noise nuisance. (c) Application. An application for variance may be initiated by any person, firm, corporation or agency, provided said individual, firm, corporation or agency is the owner or owner's agent of the property for which the administrative variance is sought. Applications for administrative variance shall require submittal of all application requirements as specified by the zoning administrator. (d) Fees. Application fee as specified by this ordinance or established by resolution of the Butts County Board of Commissioners. (e) Time for decision. When an application for an administrative variance is received, the zoning administrator shall have 15 business days to make his/her decision to approve or deny the application. (f) Notification. When an administrative variance application is received, the zoning administrator shall notify all adjacent property owners by regular and certified mail giving the adjacent property owners seven business days to respond, comment, etc. All responses, comments, etc. shall be submitted in writing to the zoning administrator. (g) Posting of sign. When an administrative variance application is received, the zoning administrator must post a sign in a conspicuous place on the property. The sign must set forth the fact that this is an administrative variance, date to respond and/or comment by, and it must inform the public that additional information may be obtained from the zoning administrator. (h) Criteria for granting administrative variances. The zoning administrator shall not approve an administrative variance application unless the following conditions exist: (1) There are extraordinary and exceptional conditions or practical difficulties pertaining to the particular piece of property in question because of its size, shape or topography that are not applicable to other lands or structures in the same district; (2) A literal interpretation of the provisions of this ordinance would effectively deprive the applicant of rights commonly enjoyed by other properties of the district in which the property is located; (3) Granting the variance requested will not confer upon the property of the applicant any special privileges that are denied to other properties of the district in which the applicant's property is located; (4) The requested variance will be in harmony with the purpose and intent of this ordinance and will not be injurious to the neighborhood or to the general welfare; (5) The special circumstances are not the result of the actions of the applicant; (6) The variance requested is the minimum variance that will make possible the proposed use of the land, building, or structure in the use district proposed; and/or (7) The variance shall not permit a use of land, buildings or structures which is not permitted by right in the zoning district or overlay district involved. CHAPTER 10 ADMINISTRATIVE PROCEDURES Sec. 10.00.00. Generally. Sec. 10.00.01. Purpose. This chapter sets forth the procedures for receiving, reviewing, and rendering decisions on applications for subdivisions, multi-family and nonresidential development, mixed use development, planned developments, rezoning, and all permits. This chapter also sets forth the requirements for appealing decisions and for enforcement. It is the county's intent that the procedures and requirements set forth in this chapter shall be followed in order to seek approval for any development. Note that additional requirements and design criteria are located throughout this UDO in particular sections, regarding particular districts, and in regards to specific uses. Sec. 10.00.02. Approvals required. (a) No building is to be erected, used, occupied, moved, or altered in a manner that does not conform to the requirements specified for the district in which it is located. (b) The only exception to this requirement is that all buildings or uses which lawfully existed at a particular location at the time this ordinance was adopted may be continued as nonconforming uses pursuant to the provisions of chapter 9. Sec. 10.00.03. Expiration of approvals. (a) Any building permit or other permit shall become void if the work authorized by the permit has not begun within six months after the date of issuance of the permit. (b) If construction described in a building permit or other permit is suspended or abandoned after work has commenced, the permit shall expire 12 months after the date that work ceased. (c) The time period for which a permit is valid may be extended for one or more periods of not more than 90 days each where an application for such extension is filed and such extension has been granted in writing by the zoning administrator. Sec. 10.00.04. Fees required. (a) All applications shall be accompanied by payment of application fees, as set forth in the Butts County fee schedule adopted by the board of commissioners. An application shall not be complete until all required fees are paid. Such fees shall include the filing fee, and where notice is required, shall include an additional fee to defray the expense of preparing and mailing such notices. (b) For land clearing permits, a fee in addition to local permitting fees will be assessed pursuant to Georgia statutes. All applicable fees shall be paid prior to issuance of the land disturbance permit. Sec. 10.00.05. Requirements regarding developments of regional impact (DRI). The Georgia Department of Community Affairs (DCA), pursuant to the Georgia Planning Act, has established criteria for the identification of certain large-scale developments, which have the potential to cause land use impacts beyond the boundaries of the respective local government where a project might be proposed. These developments, known as developments of regional impact (DRIs), shall be submitted, based on established DCA standards, procedures, and format, to the Three Rivers Regional Commission for review and recommendation prior to issuance of any local building or development permit, utility tap, or rezoning, whichever occurs first. As such, these requirements establish an official delay in the local permitting and/or review process to allow for compliance with these requirements. Sec. 10.00.06. Procedures for conducting public hearings on zoning decisions. These policies and procedures govern the calling and conducting of public hearings on applications for zoning decisions. The following policies and procedures will be observed in conducting the required public hearing: (a) The hearing will be held in the Butts County administration building or as advertised. Printed copies of these procedures shall be available for public review at the hearing. (b) Written comments on the subject of the hearing may be submitted by any citizen or property owner at any time prior to the adjournment of the hearing. (c) The proponent(s) of the zoning decision shall have a minimum of ten minutes for the presentation of data, evidence and opinions. The length of time for presentations permitted to each speaker will be governed by the chairman of the board of commissioners or his/her designee, depending upon the number of persons present and desiring to speak. Personal remarks will not be tolerated. (d) The opponent(s) of the zoning decision shall have a minimum of ten minutes for the presentation of data, evidence and opinions. The length of time for presentations permitted to each speaker will be governed by the chairman of the board of commissioners or his/her designee, depending upon the number of persons present and desiring to speak, and provided that both proponents and opponents shall have equal opportunity to address the board of commissioners. Personal remarks will not be tolerated. (e) Any person desiring a transcript of the hearing must arrange for a court reporter at their own expense. (f) Cross examination of persons making oral presentations will not be permitted. (g) All questions will be addressed to the chairman or his/her designee then presiding. (h) Standing to challenge a zoning decision is not conferred by being permitted to speak orally at a hearing, nor by being permitted to file a statement or pleadings. Sec. 10.01.00. Application and decision-making requirements. Sec. 10.01.01. Pre-application conference. (a) A pre-application conference is a meeting between an applicant and the zoning administrator for the purposes of: (1) Exchanging information on the potential development of a site; (2) Providing information on permissible uses of the site proposed for development; (3) Providing information to an applicant regarding the design standards set forth in this UDO that are applicable to a potential application; (4) Providing information to an applicant regarding standards of regional, state, or federal agencies that may be applicable to a potential application; (5) Determining the need and requirements for supporting plans, documents, and studies; (6) Providing information to an applicant regarding infrastructure requirements and the construction of required improvements; and (7) Providing information to an applicant regarding the appropriate procedures and schedules for receiving and reviewing applications and rendering decisions regarding a potential application. (b) Prior to the submission of an application for a subdivision plat, development plan, or improvements plan, an applicant may submit a written request for a pre-application conference. (c) A pre-application conference should be held not more than two weeks following the date of submission of the written request for such conference. (d) The pre-application conference may include staff of the building, planning and development office. (e) It is the intent of the board of commissioners that all requirements be identified during the pre-application conference. However, no person may rely upon any comment concerning a proposed development, or any expression of any nature about the proposal, made by a participant at the pre-application conference as a representation or implication that the proposal will be ultimately approved or rejected in any form. (f) A prospective applicant may bring members of his project team, such as, but not limited to, the project engineer, land planner, architect, surveyor, or other person who will assist in the preparation of an application. A prospective applicant may provide an informal sketch plan to aid in the discussion. However, such an informal sketch plan shall not be reviewed in any way for compliance with the standards and requirements of this UDO and shall be used only as an aid to the conduct of the pre-application conference. Sec. 10.01.02. Determination of completeness. All applications shall be complete before acceptance for review and decision making. A determination of completeness is a determination that all required documents and plans have been submitted in sufficient number, and that all fees have been paid. A determination of completeness is not a determination of compliance with substantive standards and criteria. Sec. 10.01.03. Responsibilities for final action. The table below identifies the types of applications and the entity that is responsible for the final decision regarding the application. Table 10.01.03. Types of applications and entity responsible for final decision Type of Application Entity Responsible for Final Decision BPD1 BZA Planning Commission Board of Commissioners Development plans; as-built plans X Amendments to development plans X Administrative waivers X Minor subdivisions X Preliminary plats X Final plats X Variances X Appeal of administrative decisions X Telecommunication towers and antennas X Rezoning, with or without a conceptual development plan; special use permits X Amendments to zoning conditions X Amendment to the UDO X 1 Building, planning and development office. Sec. 10.02.00. Submittal and procedural requirements. Sec. 10.02.01. Building permits. (a) The developer or other person wishing to do any of the following must first apply to the zoning administrator for a building permit: (1) Excavation or filling of a lot for the construction of a building; (2) Erection, movement, extension, or enlargement of a building; (3) Work on an existing building which increases the assessed value $500.00 or more; and/or (4) Installation of a manufactured home or industrialized building. (b) No electricity, water, or sewage hookup will be made available to the site of new construction until a building permit is secured. (c) The building permit must be applied for either by the owner of the land upon which the proposed building or alteration is to be located or by the contractor doing the work. (d) The applicant may obtain a building permit application from the zoning administrator. S/he should complete the application form and submit it to the zoning administrator together with any supporting documentation which the zoning administrator may specify. (e) Before a building permit is issued by the zoning administrator, the Butts County Health Department must approve the proposed water supply and sewage disposal facilities required in connection with the proposed building or structure. In areas served by a public water and sewage system, the health department may elect to waive the requirement for approval. After study of the site of a proposed use, the health department may require for health reasons that all or any portion of the site not be used for the intended purpose. The health department may also set a minimum lot size larger than that required by this ordinance. The Butts County Health Department will either approve or disapprove the water and sewer facilities within 30 days of receipt of the application from the zoning administrator and may provide a written decision, including reasons for the decision. (f) An existing use which is altered or extended must meet applicable Butts County building codes and development regulations. When an applicant seeks a building permit for the extension or alteration of an existing use, the zoning administrator will inspect the use and determine what (if anything) is needed to bring the use into conformance with applicable building codes and development regulations before a building permit may be issued. (g) The zoning administrator is in charge of issuing building permits; however, s/he may delegate the authority to qualified staff. The zoning administrator may contact the applicant at the address shown on the application. The building permit will be issued if, upon review of the application and inspection of the site, the zoning administrator is satisfied that the proposed project will meet the requirements of this ordinance and all other applicable ordinances. The zoning administrator may require the submission of additional materials if s/he feels additional information is needed in order to determine if the proposed project meets the requirements of this ordinance. (h) If the zoning administrator feels that the proposed project as presented in the building permit application will not satisfy the requirements of this ordinance, s/he will not issue a building permit. S/he will notify the applicant within ten days of the submission of the application, stating reasons for the refusal. S/he may provide the reasons for refusal in writing at the request of the applicant. The applicant will then need to confer with the zoning administrator to determine what s/he needs to do in order to comply with the ordinance and be eligible for a building permit. (i) Construction on an approved project must start within six months from the date of issue of the building permit, or the permit will become invalid, and a new one must be applied for if construction of the project is desired at a future date. If construction has begun on an approved project and then ceases before the project is completed, construction must be restarted within 12 months from the time that it was stopped, or the permit will become invalid, and a new one must be applied for if construction of the project is desired to resume at a future date. Records of building permit applications and supporting materials will be maintained by the zoning administrator. (j) All newly constructed buildings, as well as additions, extensions, or enlargements of structures, must comply with all building codes in effect in Butts County. The zoning administrator will explain the procedures and timing of inspections to determine if the work meets applicable codes. Sec. 10.02.02. Certificate of occupancy. (a) A certificate of occupancy is required before a structure for which a building permit has been issued may be occupied or used. The building permit becomes the certificate of occupancy when the zoning administrator signs it in the appropriate space, certifying that to the best of her/his knowledge all requirements of this ordinance have been met. The owner/contractor will then receive the certificate of occupancy to be used as confirmation that s/he has complied with the provisions of this ordinance. (b) The zoning administrator will issue the certificate of occupancy within ten days of receiving the building permit with required certifications if s/he finds that all requirements of this ordinance and all other applicable ordinances have been met. However, if s/he finds that all requirements of such ordinances have not yet been met when the owner/contractor seeks a certificate of occupancy, the zoning administrator will not issue the certificate of occupancy. S/he will notify the owner/contractor within ten days, stating reasons for the refusal. The owner/contractor will then need to confer with the zoning administrator to determine what s/he needs to do in order to comply with the ordinance and be eligible for a certificate of occupancy. Sec. 10.02.03. Amendments to official map/rezoning. (a) If a developer or landowner finds that a proposed new use of her/his land does not meet the requirements of this ordinance, s/he may request that this ordinance be amended to permit her/his proposed use. The developer or owner wishing to request an amendment of the official map must have at least 51 percent ownership of the subject property or be the duly authorized agent of such a person, possessing notarized authorization in writing under the owner's signature. The planning and zoning commission or the board of commissioners may also propose an amendment. However, the power to approve and enact an amendment rests with the board of commissioners. (b) Application for an amendment may be made with the zoning administrator. The zoning administrator will take the required information and transmit it to the planning and zoning commission for its consideration. (c) When an amendment is initiated which involves changing the zoning district of a parcel of land, the zoning administrator must post a sign at least two feet by three feet in size in a conspicuous place on the property at least 15 days, but not more than 45 days, prior to the date of the scheduled public hearing conducted by the board of commissioners. The sign must set forth the fact that it is a zoning notice. It must show the present zoning classification; the proposed zoning classification; the purpose, date, time, and place of the scheduled public hearing; and it must inform the public that additional information may be obtained from the zoning administrator. (d) All applications for amendment must first be reviewed by the planning and zoning commission. The planning and zoning commission will study the proposed amendment and determine if it meets the requirements of this ordinance, as well as other applicable ordinances of Butts County. At this time, the zoning administrator may review the proposed amendment and make written recommendations to the planning and zoning commission. (e) The planning and zoning commission may conduct a public hearing on the amendment. The board of commissioners shall conduct a public hearing. Notice of the public hearing before the board of commissioners must be published in a newspaper of general circulation in Butts County at least 15 days, but not more than 45 days, before the hearing. The time, place and purpose of the hearing; the location of the property; the present zoning classification; and the proposed zoning classification must be indicated in the newspaper notice. (f) After conducting a public hearing and considering recommendations from the planning and zoning commission, the board of commissioners will then make an official decision on the proposed amendment. The decision may or may not concur with the recommendations of the planning and zoning commission or the zoning administrator. (g) Conditional and intermediate zoning. (1) When a parcel of property is placed in a certain zoning district, all permitted uses for that zoning district are allowed on the property as long as the published requirements of this ordinance and other development regulations of Butts County are met. However, in certain situations, only one of the permitted uses for a district may be appropriate for a parcel of property while many of the other uses within the range of those permitted would not be appropriate; or certain design, location, aesthetic, or other standards may be needed to mask otherwise undesirable effects of a permitted use. In such cases, conditional zoning may be granted by the board of commissioners with the consent of the applicant. (2) The following situations are permitted under conditional zoning: a. The use of land may be specifically limited to any one or more of the permitted uses for the zoning district in which the land is placed. b. Special requirements of design, location, aesthetics, or other considerations may be imposed for the uses permitted on the land. c. Any combination of the above two categories of conditions may be imposed. (3) Conditional zoning is attached to a specific lot or group of lots, not to the owner(s). If ownership of the lot(s) changes, continued compliance with the special conditions must be maintained by the new owner(s). (4) Conditional zoning may be proposed by the board of commissioners, the planning and zoning commission, the petitioner for a zoning amendment, or any person who may be affected by the subject property. (5) A tract of land to which special conditions have been attached continues to be subject to all other requirements of this ordinance and other applicable regulations of Butts County which are not in conflict with those special conditions. (6) Whenever a tract of land has had special conditions imposed upon it and a building permit is applied for, plans and specifications which are drawn in compliance with the special conditions must be submitted with the application for a permit. (7) The zoning of any parcel of land which is subject to special conditions will be indicated on the official map by its zoning district designation followed by the letter "C" (for example R-1C). (8) In cases where an applicant seeks rezoning to a classification which the board of commissioners finds to be not appropriate, but where the existing zoning classification does not allow a reasonable use of the property or is too restrictive to the particular property, the board of commissioners may rezone the property to an intermediate classification which allows a reasonable and appropriate use of the property. An intermediate zoning may be assigned without further public notice or hearing beyond that already required by law and this ordinance. A properly placed and advertised public notice of the rezoning application and hearing thereon shall be notice that the board of commissioners may rezone to an intermediate zoning classification between the current zoning classification and the zoning classification sought by the applicant. Conditions may be placed upon the rezoning as well. (h) If the board of commissioners denies a proposed amendment, a minimum period of 12 months must pass before the amendment proposal for the same property is again submitted for consideration. Sec. 10.02.04. Special use permits. (a) Some zoning districts permit certain uses only upon approval of the board of commissioners. These are called special uses. Consideration is given to whether or not the objectives of this ordinance will be hindered in an individual situation. (b) The developer or owner wishing to request a special use must have at least 51 percent ownership of the subject property or be the duly authorized agent of such a person, possessing notarized authorization in writing, under the owner's signature. (c) Application for a special use may be made with the zoning administrator. The zoning administrator will take the required information and transmit it to the planning and zoning commission and the board of commissioners for their consideration. (d) When an application for a special use is received, the planning and zoning commission will set a time and place for a public meeting and/or public hearing on the special use. All applications for special use permits shall receive a public hearing. Such hearing shall be preceded by the county providing publication of a public hearing notice within a newspaper of general circulation in the county at least 30 days prior to the date of the public hearing, and a notice of the hearing shall be mailed at least 30 days prior to the public hearing to the owner of the property that is the subject of the proposed action. Such notices shall include the application number (if any number is assigned), date, time, location, and purpose of the public hearing. (e) The planning and zoning commission will make its recommendation concerning the special use and record the decision in the minutes of the meeting. The planning and zoning commission will then forward its decision to the board of commissioners for their review and consideration before making their determination on the special use. (f) The board of commissioners shall hold a duly-noticed public hearing pursuant to the same procedures used by the planning commission. After conducting such hearing, the board of commissioners may grant, deny, or grant with special conditions the special use permit request. The decision of the board of commissioners on the application for special use may be appealed to the Butts County Superior Court by way of a petition for such review pursuant to O.C.G.A. § 36-66-5.1(a)(2) filed in the court within 30 days of the date of the decision of the board of commissioners. Such appeal will be a record review, and the record shall be certified by the zoning administrator or chairman of the board of commissioners and transmitted to the superior court within 30 days of the service of the appeal pleadings on the county. (g) In addition to the standards for the exercise of the zoning power and specific criteria in this UDO, the planning and zoning commission and board of commissioners will consider the following points in arriving at a decision on the special use: (1) Whether it is contrary to the purpose of this ordinance; (2) Whether it is detrimental to the use or development of adjacent properties, or to the general neighborhood; it must not adversely affect the health or safety of residents or workers; (3) Whether it would constitute a nuisance or hazard because of the number of persons who will attend or use such a facility, vehicular movement, noise or fumes generated, or type of physical activity; (4) Whether it would adversely affect existing uses, and it must be proposed to be placed on a lot of sufficient size to satisfy the space requirements of the use; (5) Whether the public infrastructure of Butts County is sufficient to support the proposed use; (6) How the proposed use would affect the economy of Butts County; (7) How the proposed use would affect the environment of Butts County; and (8) Whether it would meet all other requirements of this ordinance. (h) The board of commissioners may require any additional restrictions and development standards on a special use as may be necessary to protect the health and safety of workers and residents. (i) If the board of commissioners find that any restrictions upon which a special use was granted are not being complied with, they may revoke the permit. Public notice and hearing on the issue of whether the permit should be revoked shall be provided in the same manner as that provided for the consideration of a rezoning application. (Ord. No. CR202334, § 5, 6-26-2023) Sec. 10.02.05. Subdivisions—Generally. (a) When any subdivision of land is proposed, and before any permits for development of the subdivision are granted, the developer or his authorized agent shall apply for and secure approval of the proposed subdivision in accordance with this UDO. (b) Any subdivision of land, including for the purpose of auction, requires approval by the planning department. Prior to subdivision of any property and prior to recording said subdivision with the county clerk's office, the property owner or his or her representative shall first receive written approval from the planning department to ensure the proposed subdivision meets the standards of this UDO. (c) For the purpose of auction, the planning department shall determine the extent of required compliance with the standards of this UDO prior to the sale of a subject property. (d) All fees for subdivision approval shall be established from time to time by resolution of the Butts County Board of Commissioners. Sec. 10.02.06. Subdivision plats. General overview of subdivision plat review and approval procedures. (a) Introduction. The procedure for the formal review and approval of a subdivision plat consists of five stages. These are as follows: (1) Pre-application review; (2) Preliminary plat acceptance by the planning and zoning commission; (3) Construction plan approval by the administrative officer; (4) Final plat acceptance by the planning and zoning commission and approved by the Butts County Board of Commissioners; and (5) Recording and dedication. (b) Minor subdivisions are lot divisions that do not require the installation of streets, utilities, or other public improvements and infrastructure. A proposal to create a minor subdivision shall only require review and approval by the zoning administrator before being recorded in the public records of the clerk of the Butts County superior court. The zoning administrator will approve the minor subdivision if the submitted plat complies with the Georgia statutes pertaining to the recording of plats and all of the substantive requirements of this UDO. (c) Pre-application review stage. Whenever the subdivision of a tract of land is proposed, the subdivider may consult informally with the zoning administrator prior to filing the application for subdivision. The subdivider may submit sketch plans and data showing existing conditions within the site and in its vicinity and the proposed development layout of the subdivision. The purpose of the pre-application review stage is to facilitate the subsequent preparation of plans and plats by clarifying matters relating to the proposed subdivision and the development ordinance. (d) Preliminary plat stage. The subdivider must submit to the planning and zoning commission for approval a preliminary plat of the proposed subdivision prepared in accordance with the provisions of this ordinance. If the proposed subdivision abuts a state highway, a certificate of approval by the Georgia Department of Transportation must accompany the preliminary plat submission. The county health department must have reviewed the project, and a letter of preliminary approval must be obtained by the subdivider. The subdivider must also furnish copies of such a preliminary plat to all utility companies serving the area. Approval of the planning and zoning commission will be indicated on the face of the preliminary plat. (e) Construction plan stage. Prior to making any street improvements or installing any utilities or other improvements, the subdivider must submit to the administrative officer construction plans of the proposed subdivision, prepared in accordance with the provisions of this ordinance. The design presented in the construction plans must be in conformance with the general design information presented in the preliminary plat that was approved by the planning and zoning commission. The construction plans must show all street design profiles, topographic information, utility construction plans, sediment and erosion control plans, and other information as may be required by the administrative officer. The construction plan stage requires the approval of only the administrative officer; however, it is the administrative officer's responsibility to ensure that the plans are reviewed and approved for compliance with technical requirements. (f) Final plat stage. After completion of the physical development, or arrangements for physical development acceptable to the planning and zoning commission, of all or part of the area shown on the preliminary plat as approved by the planning and zoning commission, and before selling any lots, a final plat together with the required certificates must be submitted to the planning and zoning commission and the Butts County Board of Commissioners for approval. The subdivider must also furnish copies of the approved final plat to all utility companies serving the area. (g) Recording and dedication. After the final plat is approved by the Butts County Board of Commissioners, the final plat and appropriate documents become the instrument to be recorded in the office of the clerk of the superior court of Butts County, Georgia. After recording, the appropriate deeds and documents must be presented to the appropriate local government agency for dedication and acceptance. Sec. 10.02.07. Procedures for subdivision preliminary plat. (a) Submission and approval of preliminary plat. (1) Preliminary plat submission. After completing the preliminary review stage, and at the regular time specified by the community development department before the regularly scheduled monthly meeting of the planning and zoning commission at which the subdivider desires planning and zoning commission action, the subdivider must submit the following: a. A letter requesting review and approval of a preliminary plat and giving the name and address of a person to whom the notice of hearing and action on the preliminary plat is to be sent; b. The preliminary plat and supporting data in formats specified by the administrative officer; c. If the subdivision is not to be served by public water and sewage systems, a certificate from the Butts County Health Department approving the proposed water supply and sewage disposal systems; and d. If the proposed subdivision abuts a state highway, a certificate of approval or comparable permission of access for the proposed subdivision by the Georgia Department of Transportation. (2) Additional information. The planning and zoning commission may ask for any additional information it feels is needed to evaluate the preliminary plat. (3) Official date of submission. The official date of submission of the preliminary plat will be the date of the next regularly scheduled monthly meeting of the planning and zoning commission. (4) Preliminary plat review. The administrative officer, or designee, will review the preliminary plat for the planning and zoning commission for conformance to this section and other relevant regulations. The planning and zoning commission will consider the comments or suggestions of the appropriate review agencies requested to review the preliminary plat. The administrative officer, or designee, will indicate on the preliminary plat (or by a written memorandum attached to the preliminary plat) for the planning and zoning commission any comments or suggested changes that are necessary to meet the intent of this section or to serve the best interests of Butts County. (5) Public hearing. Before acting on the preliminary plat, the planning and zoning commission will schedule a public hearing on the preliminary plat. Notice of the hearing must be published in a newspaper of general circulation in Butts County at least 15 days before the hearing. (6) Action of the planning and zoning commission. No more than 45 days after the official date of submission of the preliminary plat, the planning and zoning commission will either approve the plat, conditionally approve the plat (noting the conditions of approval on the plat), or not approve the plat. Action may be taken on the entire preliminary plat or any portion of it. (7) Failure of planning and zoning commission to act. If the planning and zoning commission fails to act within 45 days of the official date of submission of the preliminary plat, the preliminary plat will be deemed to be automatically approved by the planning and zoning commission. (8) Approval of preliminary plat. Approval of a preliminary plat is effective and binding upon the planning and zoning commission for a period of no more than three years. Before the three-year period expires, the subdivider may submit to the planning and zoning commission a request in writing for an extension of time. If the planning and zoning commission grants such an extension, final subdivision construction drawings must be submitted, approved, and work must begin within the limits of the extension. (b) Specifications for preliminary plat. The preliminary plat must meet the minimum standards of design set forth in this section and must include the following: (1) General. a. Title block including proposed name of subdivision and name of former subdivision, if any or all of the proposed subdivision has been previously subdivided. b. Plat key including: 1. Name and address of person in charge of plat preparation; 2. Date of plat preparation with space for revision dates; 3. Graphic scale of one inch equals 200 feet or larger; 4. North point, identified as magnetic, true, or grid north; 5. Area of proposed subdivision in acres; and 6. Appropriate legend of symbols used on plat. c. Location sketch map locating the subdivision in relation to the immediately surrounding area and showing generally: 1. Well-known landmarks such as railroads, highways, bridges, creeks, etc.; 2. Zoning district classification(s) of land to be subdivided and adjoining properties; and 3. Government jurisdictional boundaries and land lot lines, if applicable. d. Entire tract. The subdivider shall submit a preliminary plat of the entire parent tract, even though his present plans may call for the actual development of only a small portion of the property. e. Resubdivision. In the case of resubdivision, a copy of the existing plat with the proposed resubdivision superimposed on it must be provided. f. Elevations. All elevations must refer to mean sea level datum. g. Sheet size must be 34 inches wide and 22 inches long. A margin two inches wide must be on the left side for binding purposes, and margins of one-half inch must be on the other three sides. If the complete plat cannot be shown on one sheet of this size, it may be shown on more than one sheet with an index map on a separate sheet of the same size. h. Text size. To ensure legibility all text must be shown at a minimum font size of ten points. (Ord. No. CR2026-04-031, § 1, 4-13-2026) Sec. 10.02.08. Construction plans. (a) Submission and approval of construction plans. (1) Construction plan submission. After the preliminary plat of the proposed subdivision has been given approval by the planning and zoning commission, the subdivider may submit construction plans to the administrative officer. (2) Format. Five copies of the construction plans must be submitted to the administrative officer. The scale on the construction plans must be at least 100 feet to the inch. (3) Approval of construction plans. Approval of construction plans and issuance of a land disturbance permit constitutes authorization to proceed with the installation of any planned improvements. (b) Specifications for construction plans. The construction plans must conform to all specifications required for the preliminary plat and include the following: (1) Detailed plot or site plans may be required for certain lots. Detailed field run topographic surveys may be required for particular lots having site specific drainage problems. All site plans must be based on a field run topographic survey or aerial survey based on standard photogrammetric methods with a maximum contour interval of two feet, right-of-way, property, and lot boundary lines platted sufficiently to reproduce the subdivision in the field. (2) Provisions for proper drainage. (3) Soil erosion and sediment control plans as are required by local ordinances. (4) Such street profiles, cross sections and details as may be necessary to illustrate proposed street construction standards. (5) Utility plans. (6) Any tree planting plans or other landscaping plans. (7) Stormwater system must be designed to adequately contain runoff and shown on drawings, sections, and profiles, with pipe sizes, elevations at inlets, and outfalls with ditching on property lines where required. Current design standard for stormwater control is based on a 25-year event. A 20-foot easement must be provided for these features. Any specifications and details required by the ordinance shall adhere to the "Manual for Erosion and Sediment Control in Georgia" and exhibited on plans submitted by the subdivider. (8) A bond may be secured by the developer for 100 percent of the estimated cost of the improvements prior to undertaking any site improvements. (9) Certifications: a. The following certifications must be in a form and substance approved by the planning and zoning commission and inscribed directly on the construction plans: 1. Construction plans must bear the seal of a registered professional engineer (PE) or landscape architect (RLA). 2. Certificate or statement of approval of the drainage provisions within the proposed subdivision. b. The following additional certifications must be in a form and substance approved by the administrative officer and inscribed directly on the construction plans or provided as an attachment in a format approved by the administrative officer: 1. Certificates or statements of approval of the sewage disposal system in the proposed subdivision obtained from Butts County, the Butts County Health Department, and the Environmental Protection Division of the Georgia Department of Natural Resources, as applicable. 2. Certificates or statements of approval of the water system in the proposed subdivision obtained from Butts County, the Butts County Health Department, and the Environmental Protection Division of the Georgia Department of Natural Resources, as applicable. 3. Certificate, written permission or approved plans from the Georgia Department of Transportation, if property connects to a state road. Sec. 10.02.09. As-built plans. (a) Submission of as-built plans. (1) As-built plan submission. After the construction of the following structures, the developer shall submit as-built plans to the administrative officer: a. New streets to be dedicated for public use. As-built plans shall show horizontal and vertical alignment. b. Storm drainage infrastructure that is part of a stormwater system being dedicated for public maintenance. As-built plans shall show pipe size, slope, elevation, and construction material and structure type, size and top/bottom elevations. c. Water utility infrastructure that is to be part of the public water system. As-built plans shall show the size, material and location of the water system infrastructure, as well as valves and fire hydrants. d. Sewer system infrastructure that is to be part of a public sewer system. As-built plans shall show size, material, slope and elevation of sewer infrastructure; manholes including tops and inverts and other structures required by the authority providing sewer service. e. Detention ponds. As-built plans shall show size, depth, storage capacity, outlet control structure detail and as-built routing. (2) Five copies of the as-built plans must be submitted to the administrative officer. The scale on the as-built plans must be 50 feet or less to the inch. (3) Certifications: a. As-built plans must bear the seal of a registered professional engineer (PE), surveyor or other professional approved by the zoning administrator as qualified to issue the certification. b. Where the particular infrastructure is for the provision of a service provided by an authority other than Butts County, the as-built plans shall show the infrastructure's approval by such authority. (4) The zoning administrator may waive the requirement for as-built plans upon reasonably finding that such structure is of a size and type that it will not materially impact any public infrastructure or service or impose any significant public maintenance obligation in the event that the owner is unable to maintain it. (b) Approval of as-built plans. Approval of as-built plans shall constitute authorization to proceed with final plat approval and dedication and shall be a pre-requisite to the issuance of certificates of occupancy. Sec. 10.02.10. Procedures for subdivision final plat. (a) Submission and approval of final plat. (1) Final plat submission. After the preliminary plat of the proposed subdivision has been given tentative approval by the planning and zoning commission, construction plans have been approved by the administrative officer, and required improvements have been completed (or arrangements for required improvements acceptable to the administrative officer have been made), the subdivider may, within three years from the date of the preliminary plat approval, apply for final plat approval. The subdivider must submit at the regular time specified by the community development department before the regularly scheduled monthly meeting of the planning and zoning commission at which the subdivider desires planning and zoning commission action, the following: a. A letter requesting review and approval of a final plat and giving the name and address of the person to be notified of the action on the final plat. b. The final plat and other documents as may be identified in electronic formats as specified by the administrative officer. (2) Official date of submission. The official date of submission of the final plat will be the date that all required documents have been received by the administrative officer. (3) Final plat review. The administrative officer will review the final plat for conformance with the tentatively approved preliminary plat as well as with this section and other relevant regulations and shall recommend approval or denial of the final plat to the planning and zoning commission and the Butts County Board of Commissioners. (4) Action of the administrative officer and the Butts County Board of Commissioners. No more than 45 days after the official date of submission of the final plat, the administrative officer will either recommend to the board of commissioners the issuance of a certificate of approval for recording, conditionally approve the plat (noting the conditions of approval on the plat), or disapprove the plat. If the final plat is conditionally approved, once the subdivider has complied, with the conditions indicated, the board of commissioners will issue a certificate of approval on the plat, or disapprove the plat. If the final plat is disapproved, the board of commissioners will notify the subdivider in writing, stating the reasons for disapproval. One copy and the original will be made part of the record of the administrative officer. Action may be taken on the entire plat or any portion of it. (5) Failure of administrative officer to act and the board of commissioners. If the administrative officer and the board of commissioners fail to act within 15 days after receiving an approval recommendation from the administrative officer, the final plat will be automatically approved by the board of commissioners. (6) Approval of final plat. Approval of the final plat authorizes the subdivider to proceed with the recording and dedication procedures. (b) Specifications for final plat. The final plat must meet the minimum standards of design set forth in this section and must include the following: (1) General. a. Title block including: 1. Name and address of owner(s) of record; and 2. Proposed name of subdivision and name of former subdivision, if any or all of the proposed subdivision has been previously subdivided. b. Plat key including: 1. Name and address of person in charge of plat preparation; 2. Date of plat preparation with space for revision dates; 3. Graphic scale of one inch equals 200 feet or larger; 4. North point, identified as magnetic, true, or grid north; 5. Area of proposed subdivision in acres; and 6. Appropriate legend of symbols used on plat. c. Location sketch map locating the subdivision in relation to the immediately surrounding area and showing generally: 1. Well-known landmarks such as railroads, highways, bridges, creeks, etc.; 2. Zoning district classification(s) of land to be subdivided and adjoining properties; and 3. Government jurisdictional boundaries and land lot lines, if applicable. d. Elevations: All elevations must refer to mean sea level datum. e. Sheet size must be no larger than 17 inches wide and 22 inches long. A margin two inches wide must be on the left side for binding purposes, and margins of one-half inch must be on the other three sides. If the complete plat cannot be shown on one sheet of this size, it may be shown on more than one sheet with an index map on a separate sheet of the same size. f. Text size. To ensure legibility, all text must be shown at a minimum font size of ten points. (2) Features of site to be shown on plat. a. Exact boundary lines of the tract, to be indicated by a heavy line, giving distances to the nearest one-tenth foot and angles to the nearest minute, which must be balanced and closed with an error of closure not to exceed one to 5,000. The error of closure must be stated. b. Plot or site plans may be required for certain lots. Field run topographic surveys may be required for particular lots having site specific drainage problems. All commercial site plans must be based on a field run topographic survey with a maximum contour interval of two feet. This specification is not required of rural subdivisions. c. Location of natural features, including streams and watercourses with direction of flow and acreage of the drainage area affecting the proposed subdivision, water bodies, swamps, floodplains, tree line of wooded areas, and orchards and other agricultural groves. d. Location of adjoining property lines and names of owner(s) of record and/or the location of adjoining subdivision lines and names. e. All existing buildings and structures to be maintained within the proposed subdivision. f. Exact locations, widths, and names of all streets and public accessways within and immediately adjoining the platted property. g. Street centerlines showing angles of deflection, angles of intersection, radii, length of tangents and arcs, and degree of curvature with basis of curve data. h. Lot lines with dimensions to the nearest 0.01-foot area, necessary internal angles, arcs, chords, tangents, and radii or rounded corners. i. Lot sizes to the nearest 0.001 of an acre. j. Building setback line with dimensions. k. Lot width at the building line, for each specific lot of which the side lot lines are at angles other than 90 degrees. l. Lots or sites numbered in numerical order and blocks lettered alphabetically. m. Location, dimensions, and purpose of all drainage structures and of any easement, including slope easements, if required, and public service utility right-of-way lines; any areas to be reserved, donated, or dedicated to public use; any sites for other than single-family residential use, with designations stating purpose or proposed use, area, any use limitations; and any areas to be reserved by deed covenants for common use of all property owners. n. Location of any cemeteries. o. Any private covenants to be recorded with the plat attached. p. Any as-built conditions not exhibited in the construction plans. (3) Certifications. a. The following certifications must be in a form and substance approved by the planning and zoning commission and inscribed directly on the final plat: 1. A registered land surveyors certification; 2. An owner's certificate; 3. A certificate of approval for recording by the planning and zoning commission; and 4. A certificate of approval by the Butts County Health Department. b. The following certificates or statements must be attached to the final plat when applicable: 1. Certificate(s) or statement(s) of guaranty to dedicate; and 2. Certificate or statement of approval of streets, whether or not the streets are to be dedicated to the public. (4) Special conditions. A listing of all covenants, deed restrictions, and special conditions shall appear on the final plat to be recorded with the clerk of the superior court and/or filed with the Butts County Community Development Department. (c) Recording and dedication. (1) Recording of final plat. Upon approval of a final plat, the subdivider must submit two copies to the zoning administrator for stamping and have the stamped final plat recorded in the office of the clerk of the superior court of Butts County. The subdivider will be responsible for the payment of the recording fee at the time of recording of the final plat. (2) Dedication of platted streets, other public spaces, and utilities. Final plat approval by the administrative officer does not constitute acceptance of any dedications to the public. After final plat approval by the administrative officer, the subdivider must prepare appropriate documents and plans as constructed, if required, and request Butts County and other appropriate authorities to accept dedicated streets, other public spaces, and utilities. (Ord. No. CR2026-04-031, § 2, 4-13-2026) Sec. 10.02.11. Landscape plans. (a) The landscape plan shall be included as a separate plan sheet along with other plan sheets for other site improvements when an application is made for a development permit. (b) A landscape plan shall be submitted upon application for a development permit. The plan shall include sufficient information to determine whether the proposed landscape improvements are in conformity with this section, including the following: (1) Identification of all trees, natural features and man-made structures that will be retained upon the site; (2) A description of proposed landscaping improvements and plantings, including the species, size, quantity and location of trees, shrubs and other landscaping materials; (3) Identification of all proposed structures, vehicle use areas, sidewalks, wheel stops or curbs, walls and fences; and (4) A depiction of adjoining streets and parcels sufficient to identify the same and to demonstrate the relationship between the development and the same. Sec. 10.02.12. Letters of credit and maintenance bonds. (a) Applicants for developments involving the construction of roads or infrastructure which will be publicly owned or maintained shall be required to obtain and provide to the county letters of credit or maintenance bonds in an amount sufficient to guarantee the maintenance of infrastructure and improvements throughout the construction process and for a reasonable time thereafter. For developments with multiple phases of construction, the zoning administrator shall require that portions of a previously approved phase be placed under an extended letter of credit or maintenance bond if the previously approved phase is used as access for construction traffic for the development of future phases. A plan showing the various streets that will be used as access for the construction traffic through the previously approved phase shall also be provided. The duration of such an extended letter of credit or maintenance bond shall not exceed three years from the date of approval of the final plat for the final phase of the development. A letter of credit or maintenance bond shall be released at the end of a three-year period. Ninety days prior to expiration, a final inspection of all subdivision improvements shall be performed by the county to determine the need for any repairs. If repairs are necessary, the zoning administrator shall provide written notice to the applicant. The zoning administrator may require the letter of credit or maintenance bond to be extended to ensure the completion of repairs started but not completed during the bond period. If the applicant fails to take the necessary action to make repairs within 30 days of notification by the county, the zoning administrator shall authorize the surety or bank issuing the letter of credit or maintenance bond to release to the county all funds. (b) Requirements for irrevocable letters of credit or maintenance bond. (1) The letter of credit or maintenance bond shall be issued from a bank or surety having Georgia offices and shall include local contact name, phone number, and local physical address of the bank. No post office boxes shall be allowed. (2) A letter of credit or maintenance bond from other institutions shall be subject to approval by the zoning administrator who shall be authorized to reject a letter of credit or maintenance bond upon reasonably determining that the obligor or surety is unreliable or there would be practical difficulties in enforcing the obligation of the letter of credit or maintenance bond for other reasons. (3) The letter of credit or maintenance bond shall name the Butts County Board of Commissioners as obligee. (4) The amount of the letter of credit or maintenance bond shall be determined by the county engineer and shall represent the reasonable cost of completion and maintenance of the work to be performed. (c) Time period for a letter of credit or maintenance bond. (1) A letter of credit or maintenance bond for infrastructure and other public improvements shall remain in effect for three years from the date of final plat approval. During the three-year period, it shall be the applicant's responsibility to repair any defects that occur in the streets, drainage systems, stormwater detention systems and any other infrastructure covered by the letter of credit or maintenance bond. (2) The Butts County Board of Commissioners may draw upon this letter of credit or maintenance bond to the amount set forth above upon presentation to the surety company of the following: A letter from the Butts County zoning administrator stating that the principal has failed to meet its obligations with regard to making all of the required repairs and that the cost of the repairs equals or exceeds the amount of the letter of credit or maintenance bond. Sec. 10.02.13. Hearing procedures for certain zoning decisions. Unless otherwise required by ordinances of Butts County, any proposed action that includes zoning decisions for rezoning of property, special use of property, variance or conditions concurrent with a rezoning or special use shall only require one hearing pursuant to O.C.G.A. § 36-66-4(a). (Ord. No. CR202334, § 6, 6-26-2023) Sec. 10.02.14. Procedures for zoning decisions related to amendments from singlefamily to multifamily. (a) Procedures for zoning decisions as defined in O.C.G.A. § 36-66-3(4) that amend zoning classifications or definitions related to single-family residential uses so as to authorize multifamily uses on the subject property pursuant to such classifications or definitions shall be in accordance with the following stated procedures. (1) Notwithstanding any other provisions to the contrary, when a proposed zoning decision relates to an amendment of the zoning ordinance to revise one or more zoning classifications or definitions relating to single-family residential uses of property so as to authorize multifamily uses of property pursuant to such classification or definitions, or to grant blanket permission, under certain or all circumstances, for property owners to deviate from the existing zoning requirements of a singlefamily residential zoning, such zoning decision must be adopted in the following manner: a. The zoning decision shall be adopted at two regular meetings of the board of commissioners making the zoning decision, during a period of not less than 21 days apart; and b. Prior to the first meeting provided for in subparagraph a. of this section, at least two public hearings shall be held on the proposed action. Such public hearings shall be held at least three months and not more than nine months prior to the date of final action on the zoning decision. Furthermore, at least one of the public hearings must be held between the hours of 5:00 p.m. and 8:00 p.m. The hearings required by this subparagraph shall be in addition to any hearing required under section 10.00.06 of this Code. The local government shall give notice of such hearing by: 1. Posting notice on each affected premises in the manner prescribed by subsection 10.02.03(c) of this Code; provided, however, that when more than 500 parcels are affected, in which case posting notice is required every 500 feet in the affected area; and 2. Publishing in a newspaper of general circulation within the territorial boundaries of the county a notice of each hearing at least 15 days and not more than 45 days prior to the date of the hearing. Both the posted notice and the published notice shall include a prominent statement that the proposed zoning decision relates to or will authorize multifamily uses or give blanket permission to the property owner to deviate from the zoning requirements of a single-family residential zoning of property in classification previously relating to single-family residential uses. The published notice shall be at least nine column inches in size and shall not be located in the classified advertising section of the newspaper. The notice shall state that a copy of the proposed amendment is on file in the office of the clerk or the recording officer of the county and in the office of the clerk of the Superior Court of Henry County for the purpose of examination and inspection by the public. The county shall furnish anyone, upon written request, a copy of the proposed amendment, at no cost. (2) The provisions of paragraph (1) of this section shall also apply to any zoning decisions that provide for the abolition of all single-family residential zoning classifications within the territorial boundaries of the county or zoning decisions that result in the rezoning of all property zoned for single-family residential uses within the territorial boundaries of the county to multifamily residential uses of property. (3) This subsection shall not apply to zoning decisions for the rezoning of property from a single-family residential use of property to a multifamily residential use of property when the rezoning is initiated by the owner or authorized agent of the owner of such property. (Ord. No. CR202334, § 7, 6-26-2023) Sec. 10.03.00. Appeals. Sec. 10.03.01. Decisions of administrative officials. The final decisions of administrative officials may be appealed by filing a written notice of appeal with the administrative official within 30 days of the date of the decision. The administrative official shall compile the record and transmit it to the board of zoning appeals within ten business days of the filing of the notice of appeal. The board of zoning appeals shall cause the matter to come on for a hearing at an open meeting held within 60 days of the transmittal of the record, unless the appellant consents to a later meeting. The board of zoning appeals shall follow its by-laws for the conduct of such hearing, but in all cases the appellant shall have notice of the hearing and shall have an opportunity to be heard that is equal to the person speaking in opposition to the appeal. The board of zoning appeals shall issue a decision which either approves, overrules or modifies the appealed decision in a manner that accords with the purpose and intent of this UDO. Sec. 10.03.02. Decisions of the board of zoning appeals. Appeals of quasi-judicial decisions defined by O.C.G.A. § 36-66-3(1.1) shall be appealed pursuant to O.C.G.A. § 36-66-5.1(a)(2) by writ of certiorari to superior court and shall be filed with the Butts County Superior Court within 30 days of the date of the decision to be appealed. (Ord. No. CR202334, § 8, 6-26-2023) Sec. 10.03.03. Decisions of the planning commission. Appeals of final decisions of the planning commission shall be to the Butts County Board of Commissioners. A notice of appeal shall be filed with the zoning administrator within 30 days of the date of the decision appealed. The zoning administrator shall compile the record and cause it to be transmitted to the board of commissioners within ten business days of the filing of the notice of appeal. The board of commissioners shall cause the matter to come on for a hearing at an open meeting held within 60 days of the transmittal of the record, unless the appellant consents to a later meeting. The board of commissioners shall follow the policies and procedures for the conduct of public hearings, but in all cases the appellant shall have notice of the hearing and shall have an opportunity to be heard that is equal to the person speaking in opposition to the appeal. The board of commissioners shall issue a decision which either approves, overrules or modifies the appealed decision in a manner that accords with the purpose and intent of this UDO. Sec. 10.03.04. Decisions of the board of commissioners. (a) Zoning decisions as defined by O.C.G.A. § 36-66-3(4) shall be appealed pursuant to O.C.G.A. § 36-66-5.1(a)(1) by de novo appeal and shall be filed with the Butts County Superior Court within 30 days of the date of the decision to be appealed and in accordance with the provisions of law for such appeals. (b) Quasi-judicial decisions as defined by O.C.G.A. § 36-66-3(1.1) shall be appealed by the filing of a petition for writ of certiorari in the Superior Court of Butts County pursuant to O.C.G.A. § 36-66-5.1(a)(2) and in accordance with the provisions of law for such appeals. (Ord. No. CR202334, § 9, 6-26-2023) Sec. 10.03.05. Certiorari to Butts County Superior Court. (a) In order to comply with O.C.G.A. § 36-66-5.1(c), the chairman of the board of commissioners, chairman of the planning commission, and/or chairman of the board of zoning appeals, as appropriate, is authorized to issue certiorari bonds and certificates of costs upon confirmation with county staff that such approvals are appropriate. (b) For purposes of certiorari proceedings, the chairman of the board of commissioners, chairman of the planning commission, and/or chairman of the board of zoning appeals, as appropriate, is authorized to accept service on behalf of the respondent. The chairman of the board of commissioners is authorized to accept service of process on behalf of Butts County as opposite party. (Ord. No. CR202334, § 10, 6-26-2023) Sec. 10.04.00. Violations, enforcement and penalties. Sec. 10.04.01. Jurisdiction. The jurisdiction for actions brought pursuant to this UDO shall be in the magistrate and superior courts of Butts County. Sec. 10.04.02. Violations. It shall be a violation of this UDO to: (a) Use or develop property without a permit required by this UDO for such use or development; (b) Use or develop any property for use that is not permissible in the applicable zoning district; (c) Use or develop property in violation of the conditions and limitations for such use or development set forth in this UDO or pursuant to permit or other approval; (d) Construct or move any structure in violation of the applicable provisions of this UDO; or (e) Violate any provision of this ordinance, or fail to remedy any violations upon notice. Sec. 10.04.03. Enforcement. (a) The zoning administrator shall be responsible for enforcement of the provisions of this UDO. (b) When a building or other structure has been constructed in violation of this section, the violator may be required to remove the structure at the discretion of the zoning administrator and/or building official. (c) When removal of vegetative cover, excavation, or fill has taken place in violation of this section, the violator may be required to restore the affected land to its original contours and to restore vegetation, as far as practicable, at the discretion of the zoning administrator. (d) The zoning administrator shall have the authority to issue stop-work orders where work is being performed in violation of this ordinance or any permit or approval issued pursuant to this ordinance. Sec. 10.04.04. Penalties. Anyone who violates any of the provisions of this ordinance, upon conviction, will be fined no more than $1,000.00 for each offense unless state law expressly provides otherwise. In addition, s/he must pay all costs and expenses involved in the case. Each day such a violation continues constitutes a separate offense. The owner or tenant of any building, structure, premises, or part thereof, and any architect, builder, contractor, agent, or other person who commits, participates in, assists in, or maintains such a violation, may each be found guilty of a separate offense and suffer the penalties provided here. Sec. 10.04.05. Remedies. If any building or land is used or maintained in violation of this ordinance, the county may initiate legal proceedings to obtain an injunction or any other appropriate remedy to stop the violation or to prevent any act which would constitute such a violation. APPENDIX A I-75 OVERLAY DESIGN GUIDELINES* 1. Introduction overlay. 2. General Requirements—Guidelines that Apply Throughout the Overlay A. Connectivity B. Site Design 3. Industrial Requirements—Guidelines for Industrial Uses A. Site Design B. Building Design 3B.01 Building design. 4. Mixed-Use Requirements A. Site Design B. Building Design 5. Rural Neighborhood A. Site Design B. Building Design ACKNOWLEDGEMENTS Butts County Commissioners Joe Brown, Jr. Jalaludin K. "Keith" Douglas Robert L. Henderson, Sr. Russ Crumbley Ken Rivers Steering Committee Citizen Members: County Staff Members: Sandra Alexander Jeannie Brantley Sandra T. Butterworth Al Jordan Holly Liotta Joe Liotta Andrea Maddox Rusty McKellor Carla Nestor Mike Patterson Rob Ryan Jim White Barbara Wise J. Michael Brewer Christy Williams Prepared by The Collaborative Firm Alex Fite-Wassilak, Designer Jahnee Prince, Vice-President Michael Woodman, Director of Planning Allison Buker, Planning Intern 1. INTRODUCTION An introduction to this guide and how it applies to the Butts County I-75 Overlay District. 10.01 Butts Overlay District Area Map—The different areas that make up the overlay. 10.02 Introduction—A brief introduction to the design guidelines. Introduction The 1-75 corridor of Butts County provides a vital transportation function between Macon and Atlanta. In order to properly prepare for the future development that will occur along the 1-75 corridor, it is vital for Butts County to guide the future development process. The overlay design guidelines indicate ways in which this corridor can function as a gateway and indicate ways future development can contribute towards a larger community with a distinct sense of place. Purpose The purpose of the Butts County 1-75 overlay district design guidelines is to provide for quality future development, also creating a sense of place along either side of the interstate, and promoting economic development in Butts County. This document serves to assist planners, architects, property owners, and developers to building in a certain way that works consistently with surrounding areas that are cohesive with the preferred principles of community design, architecture, landscape architecture, and site planning. Guidelines set forth in this document aim to do the following: % Promote innovative, mixed-use developments that invite business investment to Butts County; % Promote attractive and functional industrial development that leverages the highway access and provides jobs to the county; % Promote the development of new, quality single-family housing and subdivisions that relate to their surroundings; % Provide consistent standards for public areas including sidewalks, streetscaping, lighting, signage, and street furniture; % Establish a high standard for aesthetically pleasing development and redevelopment that is harmonious with the surrounding neighborhoods and other uses; and % Encourage accessibility for vehicles, pedestrians, and bicyclists. Applicability The district applies generally along 1-75 South of the Spalding County line down to the Lamar County line. The individual parcels included can be seen in the map entitled "Butts County 1-75 Overlay District Areas" as Figure 1. Except as otherwise provided, any new structures constructed in the Butts County 1-75 overlay district are subject to the regulations contained herein. Existing structures are subject to these regulations to the extent required by non-conforming structures section. In residential subdivisions where the final plat was recorded prior to the passage of the overlay shall not apply. What is this document for? This document is meant to be a how to guide for implementing the 1-75 overlay. It includes pictures, diagrams, and often more description to make understanding and implementing the rules easy. 10.03 Area explanation—A brief description of each area. In order to develop the 1-75 corridor of Butts County as a vibrant and sustainable development, this document proposes the use of three distinct subareas to create the overlay district. These three subareas are: Mixed use, rural neighborhood, and industry/commerce. Refer to "Butts 1-75 Overlay Area Map" in section 10.01 to determine which parcels belong to each subarea. Section 3 includes the guidelines that refer to industrial areas, section 4 pertains to the mixed use subarea, and section 5 addresses design guidelines for the rural neighborhood subarea. Mixed Use Area A is zoned for a mix of different uses, including residential and commercial uses. These areas are usually close to busy intersections because theses areas are where more walkable commercial and mixed uses may form. Enhanced connectivity and increased intensity is the goal of these areas to help foster mixed uses nodes of activity and development along the corridor. For an example see Figure 2. Rural Neighborhood This area consists primarily of residential uses, including single family lots and subdivisions (Figure 3). Since the overlay area is planned to become a commercial corridor, separation is needed from the highway to keep noise levels for this area to a minimum. This need for separation should be balanced against the benefit that derives from connecting neighborhoods to surrounding compatible uses. Industry/Commerce The northwestern portion of 1-75 is almost exclusively zoned for industrial uses (Figure 4). The proximity between Atlanta and Macon make this area a prime location for new office and industrial developments. Properties here are not intended to serve pedestrians, but design guidelines are in place to promote development of an attractive and functional industrial area that fits in with the rest of the overlay corridor. Definitions ADA compliance means to be up to code with the design, standards, and guidelines associated with the Americans with Disabilities Act (ADA). Articulation means the revealing of how parts of the building fit into the whole by emphasizing each individual part. Commonly this effect can be accomplished through the use of physical offsets, material changes, architectural details, among many other techniques. Berms means a flat strip of land, raised bank, or terrace bordering a river, canal, or roadside. Cheek walls means a wall that is adjacent and connected to a stairwell. Cornice means a horizontal molded projection that is located at the very top of a building or wall. Dentils means a series of closely spaced, small, rectangular blocks placed beneath the cornices. Facade means the plane of the building that faces a public right-of-way, very important for determining the character of the urban space around it. Fenestration means the layout of windows, doors, and other opening along the exterior of a building. Luminaire means a lighting fixture complete with a light source, a reflector for directing the light, an opening for light to pass through, an outer shell for protection, and a connection to a source of power. Offset means a ledge or recess in a wall formed by an adjacent reduction in thickness. Pilaster means a column built into or applied to the face of a wall so that it projects slightly. Pilasters are often used in a decorative fashion. Public right-of-way or ROW means a publicly-owned strip of land set aside for transportation that encompasses public roadways as well as sidewalks and public space adjacent to those roadways. Reveal means a narrow opening, often between two architectural elements, on the surface of a wall showing the wall's thickness. Right-of-way (ROW) means the legal right, established by usage or grant, to pass along a specific route through property belonging to another. Spandrel means the surface area between two adjacent arches and the horizontal cornice above them. Street furniture means a collective term for objects installed on public sections of streets and roads for a variety of purposes, including benches, bike racks, mail boxes, street lamps, traffic lights, traffic signs, bus stops, taxi stands, recycling bins, and waste receptacles. String course means a continuous horizontal band of building material, usually along a wall. Structural bay means an architectural unit defined as the area between the structural supports such as columns or a wall. 2. GENERAL REQUIREMENTS—GUIDELINES THAT APPLY THROUGHOUT THE OVERLAY A. CONNECTIVITY 2A.01 Access and connectivity requirements. The road system should have multiple routes for different options. Connection to planned road system. It is intended that frontage roads and other local roads in the overlay district, and connections from development to such frontage roads and local roads, will be planned and coordinated with the road system of the surrounding area and with the plans for future roads in the overlay district. Accordingly, a lot owner may be required, as part of the land development approval process, to connect to an existing or planned frontage road or other part of the public or private street or road access system. Connection to state routes. All commercial driveways onto state routes in the overlay district are subject to the Georgia Department of Transportation Regulations for Driveway and Encroachment Control or any official revisions thereto. No development permit or land-disturbance permit shall be issued that involves a driveway or other access onto a state route unless a commercial driveway permit or access approval from the Georgia Department of Transportation has been submitted to the zoning administrator. Inter-parcel access. Inter-parcel site access shall be provided to adjacent properties where the board of commissioners has determined that the land uses so connected are compatible. The following figure provides a basic guide for compatible uses, though the ultimate determination is up to the board of commissioners. Where inter-parcel access is required, property owners will be required to grant an access easement across the lot or development site to facilitate the movement of motor vehicles across the lot or development site (see Figure 5 and Figure 6). Right-of-ways and easements. Prior to development approval, an additional road right-ofway for a county road or private road or an access easement may be required to be dedicated. The location, type, and amount of right-of-way or easement to be dedicated may also be needed at intersections or at other locations fronting the property where turning lanes or road intersection realignments are required for traffic safety and the right-of-way is inadequate to accommodate the road, drainage, and utility, and other improvements are necessitated by the development or called for in the future road plan for the overlay district. Separation of directions of travel. On any two-lane, two-way directional travel road, or other access way, whether public or private, the directions of travel may be separated if necessary to minimize grading requirements, subject to the county's approval. Crossing of streams with road, bridge or driveway access. Where roads, bridges, and driveways must cross streams and tributaries, they shall cross such streams and tributaries at the least sensitive places and while providing the shortest feasible bridge. 2A.02 Standards for bicycle and pedestrian infrastructure. Pedestrians and bicyclists should be considered in areas throughout the overlay. Pedestrian accommodation. Pedestrians are a part of everyday roadway environment and attention must be paid to their presence in rural as well as urban areas. Sidewalk density. As a general practice, sidewalks should not be constructed along any county road or state highway in the overlay district where future residential development density is expected to be lower than two dwelling units per acre or where industrial development is planned. Sidewalks on both sides. Sidewalks used for pedestrian access to schools, parks, and shopping areas, and placed along all streets in office, institutional and commercial areas, should be provided along both sides of the road. In residential areas, sidewalks are desirable on both sides of the street but need to be provided on at least one side of all local streets. Planting area. Sidewalks along streets with curbs and gutters should be separated from the curb by a planting strip of at least two feet along local residential streets and five feet along local collector and commercial streets. Sidewalks along streets without curbs and gutters should be separated by a drainage swale (see Figure 7). Curb ramps. At street intersection with traffic signalization, crosswalks shall be provided including curb ramps. Crosswalks within the overlay shall be the highly visible "piano key" style of five-inch parallel band pairs two feet apart. All curb ramps in the overlay are required to meet applicable requirements of the Americans with Disabilities Act (see Figure 8). Connection to public sidewalks. Land developers are required to provide pedestrian connections on private properties to sidewalks on public or private roads. Bicycle lanes. Bicycle facilities may be provided by the private developer via incorporation of bicycle paths and/or bicycle lanes internal to the development. Subject to the approval of the zoning administrator, a bicycle lane may be incorporated within the right-of-way of a public road abutting the proposed development. Bicycle paths may be provided within their own dedicated right-of-way, an example can be seen in Figure 9. Bicycle crossing. When a bicycle lane, bicycle path, or multi-use trail crosses a road intersection or a railroad, then ramps and adequate warning and safety signing and striping must be provided subject to the approval of the county engineer utilizing applicable requirements of the Americans with Disabilities Act and county standards. Bicycle lane standards. Bicycle lanes on county roads shall be a minimum of four feet in width. On rural roads without curbs and gutters, the shoulders of roads may be paved, designated, and maintained for bicycle travel. Bicycle path standards. Bicycle paths are separate paved trails not attached to the adjacent road. The minimum width for a bicycle path shall be ten feet. The county engineer may reduce this required width to eight feet in instances where he or she finds bicycle traffic and pedestrian use will be light and where the path presents a satisfactory and safe alignment vertically and horizontally. The county engineer may also authorize a reduction of the minimum width for short sections of the bicycle path where necessary to preserve trees, move the bicycle path alignment to avoid hazards, at narrow bridge crossings, or at other places as may be appropriate. When a bicycle path is incorporated into a multi-use trail, the multi-use trail should either be constructed to a width of 12 feet or provided with pullouts or passing areas in frequent places along the length of the multi-use trail to accommodate passing situations for different users traveling at different speeds (see Figure 10). Bicycle paths shall have a minimum two-foot wide graded shoulder area on at least one side of the bicycle path in addition to the width requirements mentioned above. Vertical clearance shall be eight feet minimum with ten feet desirable. B. SITE DESIGN 2B.01 Buffer standards. Buffers help ensure different uses in a smaller area. Buffers west of I-75. Properties abutting the west right-of-way of Interstate 75 shall maintain a natural undisturbed buffer not less than 100 feet in width to serve as a visual and acoustical barrier to noise from the I-75 corridor. If 100 feet of undisturbed buffer is unavailable 50 feet of planted buffer should be used to achieve opacity. Buffers east of I-75. Properties abutting the east right-of-way of Interstate 75 shall maintain a landscaped area not less than 30 feet in width that allows view of the businesses located on the frontage road. Buffers standards. Buffers shall contain a minimum of 75 percent of evergreen plant materials comprised of diverse array of plant species and no plant species may account for more than 15 percent of the plant material for the particular categories of canopy shade tree, understory tree, shrub, ground cover (see Figure 12). One tree shall be planted for every 50 linear feet of buffer area. Turf grass shall not be considered as an appropriate buffer material. A mature buffer can be seen in Figure 11. Supplementing buffers. In those instances where the existing natural vegetation and topography are insufficient to achieve the desired level of screening as required by this Section, a planted buffer shall be provided and shall consist of plant material of such growth characteristics as will provide a visual screen having a height of not less than six feet in two years and planted in a minimum of two rows with staggered spacing such that a continuous opaque screen is created within two years of planting. Buffer maintenance. Required buffer strips shall be established and maintained in perpetuity by the owner(s) of the non-residential land use. The required buffer strip shall not be disturbed by grading, property improvements or construction activities except where necessary to prevent a nuisance, to remove diseased, misshapen, or dangerous and decayed timbers, or any similar county approved enhancement. Any contemplated disturbance shall first be brought to the attention of the Butts County community development department and formal approval of a permit secured prior to initiating activity within the required buffer areas. Certificate of occupancy. Buffers shall be provided in accordance with the approved plan prior to issuance of a certificate of occupancy. No parking. Buffers shall be prohibited from being used for temporary or permanent parking or loading. Buffers between uses. Refer to Figure 13 below for the buffer requirements between different uses within the overlay. 2B.02 Retaining walls. Retaining walls when facing a public street should look attractive. Retaining walls. Tall, smooth faced concrete retaining walls are discouraged—walls visible from the right-of-way should be faced with brick, stone, or other architectural treatment and composed of wood material in areas where rural character predominates (see Figure 14). The height and length of retaining walls should be minimized and screened with appropriate landscaping. 2B.03 Development standards. The standards for developing a piece of property in each subarea: Development standards. Refer to Figure 15 below for the relevant development standards for each subarea within the overlay. Site standards. Refer to Figure 16 below for some of the basic building standards for structures within the overlay. 2B.04 Landscaping standards. Landscaping makes: Non-residential landscaping requirement. Each lot or development shall contain a minimum of 60 tree density units per acre proportional to the lot size. Each item listed below is inclusive to the 60 tree density units per acre. • Each lot or development must contain a minimum of one 2.5 inch caliper hardwood tree per 50 feet of roadway, located adjacent to the ROW, and not closer than 15 feet from any structure. • The required tree density shall be accomplished with the preservation of trees, tree planting, or a combination of preservation and planting. Residential landscape requirement. Required tree density for residential property development or redevelopment subject to this section in the R-1, R-2, R-3, A-R zoning districts and the rural neighborhood overlay subarea. The required tree density shall be accomplished with the preservation of trees, tree planting, or a combination of preservation and planting. • Each residential lot one acre or less shall contain a minimum of three 1.5-inch caliper hardwood trees. Each residential lot greater than one acre shall contain a minimum of 7.5-inch caliper hardwood trees. No tree shall be planted closer than 15 feet from any structure. Remaining hardwood trees on each lot with a diameter breast height (DBH) of three inches or greater shall be credited as replacement trees. • Each residential lot shall contain a minimum of 20 gallons of shrubs per house. Of the 20 gallons, there shall be a minimum of two three-gallon shrubs per house. • Balance of lot area is to be seeded, sodded, hydro-seeded or stabilized with other landscape materials. • Recommended areas for additional tree preservation and planning include subdivision entrances, contiguous rear/side setbacks outside required drainage easements, external road frontage, stream-side buffers, and stormwater detention facilities. 2B.05 Utilities and outdoor lighting. How to deal with utility location and lighting outside: Utilities. All utility lines serving uses proposed or developed within the overlay district, including water, sewer, gas, electric, telephone, data and cable television, shall be installed underground (this excludes high voltage transmission power lines within easements of 100 feet or more). Underground utility trenches must be re-vegetated. Utility boxes and cabinets that are located above ground must be shielded from view with a continual ring of evergreen shrubs expected to reach maturity one foot higher than the height of the box. Any above ground boxes that cannot be buried shall, in addition to being screened by vegetation, be painted a neutral or earth tone color or otherwise made to blend in with their surroundings. For an example of a mixed-use area that has buried utilities, see Figure 19. Outdoor lighting. All outdoor lighting hereafter installed, shall be full cut-off luminaires, or another luminaire which does not emit any direct light above a horizontal plane through the lowest direct-light-emitting part of the luminaire. Cut-off fixtures are not required for incandescent lighting with an intensity of 160 watts or less. Full cut-off luminaire is defined as outdoor light fixtures shielded or constructed so that no direct light rays are emitted by the installed fixture at angles above the horizontal plane. Full cut-off luminaires can be seen functioning in Figure 20. The following outdoor lighting practices are prohibited: • Glass tubes filled with neon, argon, or other gas and used for outdoor lighting, or for the purpose of outlining windows, doors or any other part of a building. • Metal halide, and/or quartz lighting, except when the designing engineer deems that color rendering is critical, as may be specifically approved by the zoning administrator as a part of an approved lighting plan for development within a commercial or industrial zoning district. • The outdoor use of laser source light, search lights or any similar high intensity light, when used for purposes of advertising, attraction, or entertainment, may be authorized by permit from the zoning administrator for a limited duration only upon a finding that the lighting will not be a nuisance or an unreasonable burden upon the community or the surrounding properties. • Lighting underneath the ceiling of a freestanding canopy or accessory structure such as a gasoline pump island that is not recessed into the ceiling of the canopy. 2B.06 Stormwater management. Stormwater management techniques should be used to address water runoff and water carried pollutants. Storm water management. Designing man-made lakes and stormwater ponds for maximum habitat value will aid in stormwater run off as well as act as amenities for surrounding development (see Figure 21 and Figure 22). Fenced detention ponds in front yards are not permitted unless the zoning administrator rules that it is necessary. Bio-retention areas. Bioretention areas are similar to buffers but typically utilize low-lying vegetation and are a helpful tool for stormwater management. A bioretention area is a shallow, landscaped depression that receives runoff from impervious surfaces. The layered design of the bioretention area, which consists of an underdrain, a permeable sand/soil mix layer, and a top layer of rock and/or vegetation, filters debris particles, sediment, and other pollutants from runoff, prevents them from draining into a storm sewer system or waterway (see Figure 22). Reduction of impervious surfaces: Evaluate and if appropriate install permeable pavements for overflow and employee parking where possible. Bioretention techniques are strongly encouraged. 3. INDUSTRIAL REQUIREMENTS—GUIDELINES FOR INDUSTRIAL USES A. SITE DESIGN 3A.01 Site arrangement. Industrial sites should be arranged to be both functional and aesthetically pleasing. Please be sure to refer to the "Butts I-75 Overlay Development Standards Table" and to the "Butts I-75 Overlay Site Standard Table." Basic siting guidelines. Industrial park design: Industrial districts are typically laid out in a gridiron of large blocks 1,000 to 2,000 feet long and 600 to 1,000 feet deep. Road rights-of-way should be 80 to 100 feet for major roads and 60 feet for secondary roads. Curve radii need to be large enough to accommodate large trailer trucks There are five main guidelines that help create a well designed and functioning industrial site (see Figure 24 for a diagram). Site access. The site should be designed with separate entrances for trucks and for all other vehicles to prevent conflicts. Trucks should have ample room to maneuver the site. Service spaces. Service areas and employee parking should be located on the sides or rear of the building, largely out of sight from the public right-of-way. Visitor access. Visitors and patrons should have access to convenient parking located towards the front of the site and within easy distance of the main building. Screening. Storage areas, mechanical equipment and work areas should be screened and appropriate buffering should be established between adjacent uses. Aesthetics. The building and landscape should be designed to present its best view to the public. 3A.02 Site access and internal circulation. Site access should be carefully designed to avoid conflicts between trucks and other general vehicles. Truck access. Site access for trucks shall be provided as a separate, well-signed point of ingress and egress. Typically, truck/semi-truck access to the site should be designed with a minimum 30-foot-wide driveway and a minimum 45-foot turning radii to allow for sufficient maneuverability (based on Georgia DOT Design Policy Manual for minimum design vehicle with a 62-foot wheelbase) (see Figure 25). Truck access shall be located with sufficient separation to other vehicle points of access so as to avoid conflicts and congestion on the public ROW and on interior drive aisles. Curb cuts are encouraged to be minimized through shared access between neighboring industrial properties. General vehicle access. Site access for general vehicles, including employees and visitors, shall be provided as a separate, well-signed, landscaped point of ingress and egress. Typically, access to the site should be designed with a minimum 20 foot-wide driveway. General vehicle access shall be located with sufficient separation from truck points of access to avoid conflicts and congestion on the public ROW and on interior drive aisles. The number of curb cuts for each site shall be minimized and shared access between neighboring industrial properties is encouraged. Internal circulation. Internal circulation should promote safety, efficiency, convenience, and minimize conflict between visitor/employee vehicles and large trucks. Appropriate maneuvering and stacking areas for trucks should be a primary consideration in the overall design of the circulation system. 3A.03 Site parking. Parking should be designed to minimize views from the public ROW, while maintaining functionality. Visitor parking. A small number of visitor parking spaces may be located toward the front of the site, with convenient access to the primary building. These parking spaces shall be located near general vehicle access points to avoid conflicts with trucks and service areas. Pedestrian walkways shall be clearly identified and connect parking areas to the primary building entrance. Employee parking. Employee parking shall be located on the side or rear of the site to reduce visual exposure to the public ROW. Parking areas shall be located near other vehicle access points to avoid conflicts with trucks and service areas. Truck parking. Truck parking shall be located at the rear of the site, behind the primary building and not within the required landscaped buffer yards. The dimensional requirements for delivery truck parking spaces shall be 12 feet by 20 feet and 12 feet by 60 feet for semi-trucks. Service areas. Truck drive aisles and service areas shall be separate from visitor and employee drive aisles and be located on the side and/or rear of the site. 3A.04 Site screening and security. Industrial sites need access control but they should also look attractive. Fences and walls. The colors, materials, and appearance of fences and walls should be compatible with the overall design character/style of the development. Acceptable materials include painted or coated metal (aluminum, wrought iron, or steel), masonry, or stone, as shown in Figure 27. The use of razor or barbed wire is not permitted in areas visible from the public right-of-way. Security fencing when required adjacent to public rights-of-way, shall consist of wrought iron, tubular steel, or similar material. The use of chain-link fence material is not permitted in the front yard of a site, but may be used on the sides and rear if it's coated chain-link. Fences shall not exceed a height of six feet along the front and shall be no less than six feet and no more than eight feet on the side and rear. Design elements should be used to break up long expanses of uninterrupted walls, both horizontally and vertically. Walls. Walls over three feet in height should include design elements such as textured concrete block, interlocking "diamond" blocks, formed concrete with reveals, or similar effect. Significant landscaping should be used in combination with fences and walls to visually soften blank surfaces and to deter graffiti (see Figure 28). 3A.05 Landscaping. Industrial areas should have pleasant landscaping. Landscaped buffer yards. A minimum landscape strip 20 feet wide is required adjacent to the public ROW. These areas shall incorporate a mix of trees, shrubs, and flowers to provide a multi-layered attractive element that softens the otherwise hard industrial appearance (see Figure 29). Foundation planting. A minimum five-foot foundation planting strip adjacent to the base of the main structures facing a public street shall be required (see Figure 30). Detention/retention areas. Detention areas may be located within the required landscaped buffer yards as long as the required amount of planting material provided meets the standards for both buffer yards and detention/retention areas. A good example can be seen in Figure 31. Street trees. Street trees shall be required to be planted at no less than 60 feet intervals along the entire property fronting all streets. Street trees may be placed in the right-of-way or, at a maximum of ten feet outside the street right-of-way if necessary given available right-of-way and visibility considerations including clear zone requirements. 3A.06 Screening uses. All working areas should be hidden from view of neighboring properties. Screening of working areas. Storage areas, trash and recycling dumpsters, mechanical equipment, loading areas, and other work areas should be screened with fencing materials and landscaping where appropriate. 3A.07 Signage. Industrial areas should be able to promote themselves in a tasteful way. Entrance and ground signs. Sites with shared access are encouraged to use one entrance sign. As a matter of safety, entrance and ground signs must respect GDOT clear-zone restrictions. Entrance and ground signs shall be constructed of similar materials and color to that of the primary building and shall be landscaped around the sign base with low-lying shrubs and plants (see Figure 33). Lighting of entrance and ground signs shall be external illumination, internally illuminated signs and/or lettering shall be prohibited. Directional signs. Directional signs are encouraged and shall be provided at one per vehicular access point, with a maximum sign area of six square feet and a maximum height of three feet. B. BUILDING DESIGN 3B.01 Building design. Industrial buildings should appear to be more than just a giant box. Building materials. The following materials are prohibited on an industrial building facade fronting a county road or state highway: Corrugated and/or sheet metal siding; prefabricated steel panels; smooth-face concrete block; un-textured tilt-up concrete panels; plywood; vinyl siding; and synthetic stucco. Entrances. Primary building entries shall be oriented toward the predominant public view, readily identifiable, and well defined through the use of projections, recesses, columns, roof structures, or other design elements. Horizontal articulation. Street-facing building facades shall be horizontally divided at least every 20 feet using architectural means such as string courses, recesses, cornice lines, reveals or the like. There must be at least one horizontal division on every building facade. Vertical articulation. Street-facing building facades shall also be vertically divided utilizing major and minor articulations to create visual interest and avoid monotony. Major articulations shall occur at least every 120 feet of horizontal facade length. Major articulations may be accomplished through: A change of facade materials extending from grade through the cornice; physical offsets; and/or similar means intended to convey the impression of separate buildings. Minor articulations shall occur approximately every 60 feet of horizontal facade length and may be accomplished by: The use of pilasters; the use of smaller offsets; or similar means intended to create the appearance of structural bays. See Figure 34 for an industrial example. Windows. All public street-fronting first stories shall have windows that shall be of clear, unpainted or similarly treated glass to allow views of building interior. Rooftop mechanical equipment. Any mechanical equipment located on the roof of a building shall be as inconspicuous as possible from the right-of-way of the public road or state highway by the building roof, a parapet wall or by other screen approved by the zoning administrator. In the case of flat roofs, equipment may be located within a roof depression to comply with this requirement. If the elevation of the road or state highway is higher than the building and such screening cannot be accomplished, or in other cases where such screening is not feasible in the zoning administrator's opinion, equipment shall be painted to minimize its visibility. Accessory buildings. Buildings accessory to the primary structure shall be designed to resemble that of the primary building with respect to architecture, materials, color, mass, and scale. 4. MIXED-USE REQUIREMENTS Guidelines that apply to the mixed use area: A. SITE DESIGN 4A.01 Street and sidewalk requirements. Streets should be designed to allow all users to benefit. Please be sure to refer to the "Butts 1-75 Overlay Development Standards Table" and to the "Butts 1-75 Overlay Site Standard Table." Block size. Mixed-use areas are encouraged to be divided into blocks with a grid street pattern to allow multiple alternatives routes for transportation. The maximum block size fronting on State Highways 16 and 36 and the 1-75 frontage road, measured from road center line to road center line, shall be 1,000 feet. The maximum block size fronting on collector and local roads, measured from road center line to road center line, shall be 500 feet. Service functions. Service functions such as deliveries or maintenance activities shall be integrated into the circulation pattern in a manner which minimizes conflicts with vehicles and pedestrians. On development sites of 15 acres or more, office and commercial developments shall have service and loading areas separate from main circulation and parking areas. Interconnection. To promote interconnection culs-de-sac and other dead-end roads are prohibited, instead developers are encouraged to create blocks as referenced above. In cases where life safety is concerned, a dead-end may be granted by written approval from the zoning administrator. Sidewalks. Sidewalks at least ten feet in width shall be provided on both sides of the street in mixed-use areas, except along the frontage road. In addition, a five-foot planting strip shall be provided from the back edge of the curb to the sidewalk. This area shall be landscaped with a mixture of ground cover and street trees. Street trees. Street trees shall be required to be planted at no less than 50-foot intervals along the entire property fronting all streets. Street trees may be placed in the right-of-way or, at a maximum of ten feet outside the street right-of-way if necessary given available right-of-way and visibility considerations including clear zone requirements. Open space. For fixed-use subdivisions of more than three acres, the developer shall set aside ten percent of the land to be used as an amenity area or green space open to the public. This area shall be centrally located to maximize accessibility and shall include pedestrian accommodations such as lighting, benches, and trash and recycling receptacles as appropriate. An example of a mature park that could result from the open space requirement can be seen in Figure 35. 4A.02 Parking requirements. Parking is necessary, but must be designed for visual interest. Off-street parking. Off-street parking shall be provided on every lot on which any permitted or conditional use is established in accordance with the zoning ordinance. • One row of angled parking may be located between the street and the primary building. The remaining required parking spaces shall be located to the side and rear of the building. • Parking screening. Any parking adjacent to the right-of-way must be screened by opaque shrubbery at least three feet in height when planted or by a masonry wall or fence measuring 36 inches high (see Figure 36). Parking lots over 50 spaces must provide pedestrian paths at least five feet wide towards the main entrance of the primary building and pedestrian crossing areas where such paths intersect with vehicular roads. Shared parking. The zoning administrator may approve a reduction in the number of parking spaces required for a specific use where inter-parcel access is provided and a shared parking analysis, which is approved by the zoning administrator, demonstrates that adequate parking will be provided. • Per the table below, a shared parking calculation projection shall be provided that demonstrates that each use will have adequate parking provisions at all times. The process for determining the minimum parking requirements for a mixed use development or for contiguous properties containing multiple uses is: • Determine the minimum number of parking spaces required for each use category from division XXX of this zoning ordinance. If the use is undetermined at the time of construction, one space shall be provided for each 300 square feet of floor space. • Multiply each parking requirement by the corresponding percentage for each of the time periods shown on Figure 37. • Total the number of parking spaces for each of the time periods (add together the numbers in each column). • The largest column total is the minimum shared parking requirement for the development or collectively for the contiguous properties. • In no case shall parking spaces that are farther than 1,000 feet from a building entrance be counted towards shared parking requirements. 4A.03 Parking landscaping requirements. Streets should be designed to allow all users to benefit. Parking landscaping. All parcels requiring off-street parking spaces shall contain landscaping and planting as follows (these items listed below are inclusive to the 60 tree density units per acre): • One shade tree for each seven spaces around the perimeter of the parking lot. Landscaped area shall be a minimum of ten feet wide. • One shade tree for each seven spaces in the interior of the parking lot. No parking space shall be more than 70 feet from any shade tree. Size of tree islands will be at least ten feet in width, which can be reduced, as determined by the county arborist and engineer, if permeable surfacing is employed. • Each tree shall be at least two-inch caliper and six feet in height at time of planting. • The minimum planting area or pervious area around each tree shall be 100 square feet. • Trees shall be planted in landscaped strips surrounding the perimeter of the parking lot and shall be planted in planting areas or islands internal to the parking lot. An example of an internal island can be seen in Figure 38. Perimeter planting strips shall be a minimum of ten feet wide. • Ground areas shall be sodded, seeded or hydro-seeded with grass and/or planted with shrubs and/or ground cover species, and/or provided with oilier landscaping material or any combination thereof. • Planting areas may be recessed below the grade of parking surfaces with curb breaks on upgrade side of planting areas in order to allow natural irrigation of landscape material and percolation of runoff. • For parking lots with more than three parallel aisles, there shall be a continuous planting area at least eight feet wide and 15 feet long between alternate rows of opposing spaces. An example of this can be seen in Figure 39. • Each lot or development shall contain a minimum of 50 gallons of shrubs per acre. • Balance of lot area is to be seeded, sodded, hydro-seeded, or stabilized with other landscape materials. 4A.04 Bicycle parking. To encourage people out of their cars, bike spaces need to be provided. Bicycle parking. All non-residential uses that are required to provide off-street parking spaces for motorized vehicles shall also provide bicycle parking spaces. Uses that require up to 50 off-street parking spaces for motorized vehicles shall provide at least one bicycle rack (two spaces), plus one more bicycle rack for each additional 50 parking spaces required for motorized vehicles. • Multi-family residential developments shall provide a minimum of one bicycle rack (two spaces) for up to ten dwelling units and one additional rack per each additional ten dwelling units. • Bicycle spaces shall consist of one or more inverted U-racks parallel to one another anchored into concrete 30 inches apart and 30 inches away from nearby walls or obstacles, providing a clear length of at least 83 inches for easy access in and out. Each rack shall count as two bicycle spaces. • The zoning administrator may permit other styles of bicycle racks provided they meet similar criteria of durability and security. • No single bicycle parking area should exceed ten racks or 20 spaces or impede normal pedestrian flow. • It is recommended that the bicycle parking area be located within 100 feet of the facility entrance, preferably visible from that entrance. In no case shall the bicycle parking be further than 200 feet from the entrance. 4A.05 Parking. Parking is necessary, but should be shielded from view and made as visually appealing as possible. Paths. Surface parking shall provide safe pedestrian passage by incorporating an efficient system of pedestrian paths at least five feet wide (see Figure 35). Buildings that locate their parking in front must provide a crosswalk to connect the public sidewalk to the sidewalks adjacent to the building entrance (see Figure 42). Illumination. Parking lots and structures shall follow basic Illuminating Engineering Society (IES) guidelines by providing even lighting of at least 0.2 foot-candles of horizontal intensity, but no more than four foot-candles (one foot-candle average). As seen in Figure 43, full cutoff luminaires shall be used to prevent wasted light, but do no need to dominate the parking lot. Parking lot and street light posts shall not exceed a height of 32 feet from finished grade (see Figure 44). 4A.06 Site design. Parcels with needs for loading zones and dumpster should use proper screening. Location of loading areas. Loading areas shall be located to the rear of the building unless site design precludes a rear location, in which case loading shall be to the side of a building. Loading areas, at the determination of the zoning administrator, shall be permitted within front yards only if undue hardship can be shown. Trash enclosures. Trash enclosures shall be constructed of sturdy, durable, opaque materials making it so trash receptacles are completely screened from view. These enclosures should be similar to or designed to be compatible with the surrounding architecture. Trash enclosures should include adequate, accessible, and convenient areas for collecting and loading recyclable materials. Space should be provided within enclosures for pallets, skids, cartons, etc., and no overflow of these or other debris shall be allowed in public view (see Figure 46 and Figure 47). B. BUILDING DESIGN 4B.01 Mixed-use building requirements. Mixed-use buildings should be particularly pedestrian oriented. Building materials. The following materials are prohibited fronting a county road or state highway: Corrugated and/or sheet metal siding; prefabricated steel panels; smooth-face, split or ground face concrete block; tilt-up concrete panels; and synthetic stucco. Steel or other metals shall not be used on building exteriors, except as may be necessary for roofing, window trim, gutters, and downspouts. Primary entrances. Primary entrances, and individual tenant space entries, shall be designed to express greater architectural detail through the use of awnings, recessed areas, a change in material, variations of the material patterning, or other similar techniques. Horizontal articulation. Street-facing building facades shall be horizontally divided at least every third floor using architectural means such as string courses, recesses, cornice lines, reveals or the like. There must be at least one horizontal division on every building facade. Vertical articulation. Street-facing building facades shall also be vertically divided utilizing major and minor articulations to create visual interest and avoid monotony. Major articulations shall occur at least every 60 feet of horizontal facade length or at changes between tenants. Major articulations may be accomplished through: A change of facade materials extending from grade through the cornice; physical offsets; and/or similar means intended to convey the impression of separate buildings. Minor articulations shall occur approximately every 30 feet of horizontal facade length and may be accomplished by: The use of pilasters; the use of smaller offsets; or similar means intended to create the appearance of structural bays. Effective mixed use buildings should create interest for pedestrians and drivers. Windows. All street-fronting first stories shall have windows that meet the following requirements along the portion of the building fronting a public street or public sidewalk. • Windows shall be of clear, unpainted or similarly treated glass to allow views of store interior or display windows. Figure 51 has appropriate windows for this requirement. • Windows shall be located along a minimum of 60 percent of the linear measure of street frontage. Windows shall start a maximum of three feet above the sidewalk. • The maximum facade length without windows shall be 20 feet. • Glass doors and display cases may count towards window requirements. • Hospitals, hotels, townhouses, and multi-family residences' first stories rewire windows for a minimum 20 percent of first floor facade area, primarily arranged in a grid. • All building stories above the first story shall have windows that equal a minimum of 20 percent of the total facade area, with each story being calculated independently. Additionally, all street-facing upper story windows shall be predominately arranged in a grid, subject to individual window variation. Rooftop mechanical equipment. Any mechanical equipment located on the roof of a building shall be as inconspicuous as possible from the right-of-way of the public road or state highway by the building roof, a parapet wall or by other screen approved by the zoning administrator (see Figure 52). In the case of flat roofs, cooling and air handling equipment may be located within a roof depression to comply with this requirement. If the elevation of the road or state highway is higher than the building and such screening cannot be accomplished, or in other cases where such screening is not feasible in the zoning administrator's opinion, equipment shall be painted to minimize its visibility. Building height and massing. In mixed-use centers, the development of a complex of buildings is preferable to a single large structure because the varied massing provides visual interest and human scale. Additionally, the spaces created between the various buildings provide opportunities for pedestrian plazas, courtyards and other outdoor gathering areas. Buildings should try to maintain harmonious height differences between individual buildings. 4B.02 Standards for building entrances. Buildings should invest in visual appealing and noticeable entrances in order to attract business. Entrances. All first story uses shall have a primary pedestrian entrance, which faces, is visible from, and is directly accessible from the sidewalk (see Figure 53, Figure 54, and Figure 56). Coverings and awnings. Storefront canopies and/or awnings should measure at least five feet in depth extending over the sidewalk. These should be architecturally consistent with the building and roofed with glass, metal, or fabric wholly supported by brackets or cables attached to the building facade. Columns to support canopies are not permitted in the public right-of-way. Awnings and canopies should only include signage when such signage is located within an apron that is less than 12 inches in height and is subject to all other applicable sign requirements of the county. 5. RURAL NEIGHBORHOOD Standards that apply to the rural neighborhood subarea: A. SITE DESIGN 5A.01 Rural site design standards. The rural neighborhood should be walkable and close-knit. Please be sure to refer to the "Butts I-75 Overlay Development Standards Table" and to the "Butts I-75 Overlay Site Standard Table." Block size. Rural neighborhood areas are encouraged to be divided into blocks to allow multiple alternative routes for transportation. The maximum block size, measured from road center line to road center line, shall be 500 feet. Interconnection. To promote interconnection culs-de-sac and other dead-end roads are prohibited, instead developers are encouraged to create blocks as referenced above. In cases where life safety is concerned or undue hardship from crossing a wetland or stream, a dead-end may be granted by written approval from the zoning administrator. Lot size. The rural neighborhood area allows a minimum lot size of 10,890 square feet for single-family houses. Sidewalks. Sidewalks at least five feet in width shall be provided on both sides of the street in rural neighborhood areas. In addition, a four-foot planting strip shall be provided from the back edge of the curb to the sidewalk (see Figure 58). This area shall be landscaped with a mixture of ground cover and street trees. Street trees. Appropriate street trees shall be provided within the planting strip every 40 feet on center. Open space. For rural neighborhood subdivisions of more than three acres, the developer shall set aside ten percent of the area in a common area as a park or other public amenity that is located to maximize accessibility by as many residences as possible. Said public amenity shall include pedestrian accommodations such as lighting, benches, and trash and recycling receptacles as appropriate. An example of a gathering space can be seen in Figure 57. 5A.02 Residential yard standards. Setting clear boundaries and screening mechanical areas can make a neighborhood look much better. Frontage. The use of small walls, fences, or hedges along the property line adjacent to the street are encouraged to physically divide the street from private property (see Figure 59). Walls should be composed of brick or stone of a color and type harmonious with the main building and reach a height of 30 inches, while shrubs should have a minimum mature height of 24 inches and a maximum height of 30 inches. Fences should be wood finished to complement the main building and reach a height of no more than 30 inches. Mechanical equipment. All mechanical equipment, including HVAC and similar systems shall be screened from street level view on three sides by an opaque wall or fence constructed of brick, stucco, split-face block or wood (see Figure 60). A vegetative screen is permissible if the screen uses 100 percent evergreen materials at least two plants deep. B. BUILDING DESIGN 5B.01 Rural building design standards. The rural neighborhood should have appropriately scaled attractive houses. Building materials. The following materials are prohibited: corrugated and/or sheet metal siding; prefabricated steel panels; smooth-face, split or ground face concrete block; tilt-up concrete panels; vinyl siding; exterior insulated finishing systems (EIFS); and synthetic stucco. The following materials are encouraged: brick, stone, stucco, and cement board siding (see Figure 61). Entry ways. All residential entry ways shall be covered. The actual style of covering (e.g., porch, awning, etc.) can be determined by the architectural style (see Figure 62). Chimneys. Chimneys shall be veneered in stone, brick, or stucco. Garages. Garages whether attached or detached shall not face the street; instead garages shall face the side or rear of the lot. Foundation. Brick or stone skirting around the entire foundation is recommended if architecturally appropriate. 5B.02 Towers. Telecommunication towers should be as invisible as possible. Water towers and telecommunication tower placement. Restrict the location of water towers or cell towers from being placed along ridges or in the middle of open fields (see Figure 63 and Figure 64). The base of towers should be screened with opaque fencing and landscaping. General requirements for towers. A special land use permit, granted by the board of commissioners, shall be required for the construction of all new communication towers within the county after the following factors are considered (see Figure 65): • The proposed height of the tower. • Proximity to residential structures and residential district boundaries. • Nature of uses on adjacent and nearby properties. • Surrounding topography, tree coverage and foliage. • Design of the tower, with particular reference to design characteristics which have the effect of reducing or eliminating visual obtrusiveness. 2020 UDO COMPARATIVE TABLE This table gives the location within the Unified Development Code of those ordinances and amendments adopted prior to Supplement No. 7 of this Code. For the location of ordinances adopted subsequent thereto, see the Code Comparative Table immediately following this table. Previous New 100-101, 101-101 1.01.00 100-102, 101-102 1.02.00 100-103, 101-103 1.04.01 100-104, 100-105, 101-104, 101-105 1.05.00 100-106 1.08.00 100-1605 1.09.03 100-201, 101-201 1.09.04 34-212, 34-377, 42-31, 100-202, 100-203, 100-1002, 100- 1102B, 100-1103C, 100-1105B, 100-1202, 101-202, 101- 507B, 102 Section 5 1.10.00 100-410.H.&I 1.11.00 Gordon County 2.00.00 100-1601 2.01.01 100-301.A (AR) 2.01.02 100-301.A (R-1, R-2, R-3, R-4, R-5, RM) 2.01.03 100-301.A (O-1, C-1, C-2) 2.01.04 100-301.A (M-1, M-2, M-3) 2.01.05 100-301.A (P-M, P-R) 2.01.06 100-302 2.01.07 100-1606 2.01.08 100-501 2.02.01 100-501 2.02.02 100-502 2.02.03 Gordon County 3.00.00 42-32 3.01.01 42-33 3.01.02 42-34 3.01.03 42-35 3.01.04 42-36 3.01.05 42-37 3.01.06 42-38 3.01.07 42-39 3.01.08 42-40 3.01.09 42-41 3.01.10 Previous New 42-42 3.01.11 42-66 3.01.12 42-67 3.01.13 42-68 3.01.14 42-91 3.01.15 42-92 3.01.16 42-93 3.01.17 42-94 3.01.18 42-95 3.01.19 42-96 3.01.20 42-97 3.01.21 42-98 3.01.22 Gordon County, 100-301.B 3.02.01 100-1201 3.03.01 100-1203 3.03.02 100-1205 3.03.03 100-1206 3.03.04 100-1207 3.03.05 100-1208 3.03.06 100-1209 3.03.07 100-1210 3.03.08 100-1211 3.03.09 100-1221 3.03.10 100-1222 3.03.11 100-1223 3.03.12 100-1224 3.03.13 100-1225 3.03.14 100-1226 3.03.15 100-1227 3.03.16 100-1228 3.03.17 100-1229 3.03.18 100-1230 3.03.19 100-1231 3.03.20 100-1232 3.03.21 100-1233 3.03.22 100-1234 3.03.23 100-1235 3.03.24 100-1241 3.03.25 100-1242 3.03.26 100-1243 3.03.27 100-1244 3.03.28 Previous New 100-1245 3.03.29 100-1246 3.03.30 100-1247 3.03.31 100-1248 3.03.32 100-1249 3.03.33 100-1250 3.03.34 100-1251 3.03.35 100-1261 3.03.36 100-1262 3.03.37 100-1263 3.03.38 100-1264 3.03.39 100-1265 3.03.40 100-1266 3.03.41 100-1267 3.03.42 100-1268 3.03.43 100-1269 3.03.44 100-1270 3.03.45 100-1271 3.03.46 100-1106 3.03.47 100-1107 3.03.48 100-1102.A 3.04.01 100-1102.C 3.04.02 100-1102.D 3.04.03 100-1102.E 3.04.04 100-1102.F 3.04.05 100-1102.F.8 3.04.06 100-1106 3.04.07 100-1107 3.04.08 100-1103.A 3.05.01 100-1103.B 3.05.02 100-1103.D 3.05.03 100-1103.E 3.05.04 34-376, 100-1105.A 3.06.01 34-378, 100-1105.C 3.06.02 34-379(a), 100-1105.D 3.06.03 34-379(b), 100-1105.E 3.06.04 100-1105.F 3.06.05 34-379(c), (e), (g), (h), (i), 34-381, 100-1105.G 3.06.06 34-383, 100-1106 3.06.07 34-384, 100-1107 3.06.08 34-331 3.07.01 2020 UDO COMPARATIVE TABLE Previous New 34-333 3.07.02 34-334 3.07.03 34-335 3.07.04 34-336 3.07.05 34-337 3.07.06 34-338 3.07.07 34-339 3.07.08 34-211 3.08.01 34-212 3.08.02 34-213 3.08.03 34-214 3.08.04 34-215 3.08.05 34-216 3.08.06 34-217 3.08.07 34-218 3.08.08 34-219 3.08.09 34-220 3.08.10 Henry County 5.03.00 3.09.00 Henry County 5.03.01 3.09.01 Henry County 5.03.02 3.09.02 Henry County 5.03.03 3.09.03 Henry County 5.03.04 3.09.04 Henry County 5.03.05 3.09.05 Henry County 5.03.06 3.09.06 Gordon County 4.00.01 101-501 4.00.02 Gordon County 4.00.03 Gordon County 4.00.04 101-503 4.01.01 100-601 4.01.02 100-602.A, B, C, G 4.01.03 100-602.D, E, F 4.01.04 Gordon County 4.01.05 100-1301 4.02.01 100-1302 4.02.02 100-1304 4.02.03 100-1305 4.02.04 100-1306 4.02.06 100-1307 4.02.07 100-1313 4.02.08 100-1314, 100-1307D 4.02.09 Previous New 100-1308 4.02.10 100-1309 4.02.11 100-1310 4.02.12 100-1311 4.02.13 100-1312 4.02.14 100-1315 4.02.16 100-1315 4.02.18 100-1315 4.02.20 100-1317 4.02.21 100-202 4.03.01 100-202 4.03.02 100-202 4.03.03 100-202 4.03.04 100-202 4.03.06 100-202 4.03.07 100-202, 100-501 4.03.09 Bartow County 4.03.10 100-202, 100-501 4.03.11 100-501 4.03.12 100-501 4.03.13 100-501 4.03.14 100-501 4.03.15 100-501 4.03.16 100-501 4.03.17 100-501 4.03.18 100-501 4.03.19 Bartow County 4.03.20 100-501 4.03.21 100-501 4.03.22 Gordon County 4.04.01 Gordon County 4.04.02 Gordon County 4.04.03 Gordon County 4.05.01 100-901 4.06.01 100-902 4.06.02 100-903 4.06.03 100-904 4.06.04 100-905 4.06.05 100-906 4.06.06 100-1001 4.07.01 100-1002 4.07.02 2020 UDO COMPARATIVE TABLE Previous New 100-1003 4.07.03 100-1004 4.07.04 100-1005 4.07.05 100-1006 4.07.06 100-1007 4.07.07 100-1008 4.07.08 100-801 4.08.01 100-802 4.08.02 100-803 4.08.03 100-804 4.08.04 101-507.A1 4.09.01 101-507.D 4.09.02 101.507.C5 and following + Gordon 4.09.04 4.09.03 Gordon County 4.09.04 Gordon County 4.09.05 Gordon County 4.09.06 Gordon County 5.00.00 Gordon County 5.01.01 100-202 5.01.02 100-202 5.01.03 100-701 5.02.01 100-702 5.02.02 100-703 5.02.03 100-704 5.02.04 Gordon County 5.02.05 Gordon County 5.02.06 Gordon County 5.02.07 Gordon County 5.03.01 Gordon County 5.03.02 Gordon County 5.03.03 Gordon County 5.03.04 Gordon County 5.03.05 100-1501 5.04.01 100-1503 5.04.02 100-1504 5.04.03 100-1505 5.04.04 100-1506 5.04.05 100-1507 5.04.06 100-1508 5.04.07 100-1509 5.04.08 100-1401 5.05.01 Previous New 101-504 6.01.01F 101-504 6.01.03 66-80 6.01.05 101-502 6.01.06 66-76, 66-77, 66-78, 66-79 6.01.11 101.504.D, Ch. 90 is also referenced 6.03.01 101-504.C 6.03.02 101-505 6.04.00 102, section 1 7.01.01 102, section 2 7.01.02 102, section 3 7.01.03 102, section 4 7.01.04 102, section 6 7.01.05 102, section 7 7.01.06 102, section 8 7.01.07 102, section 9 7.01.08 102, section 10 7.01.09 102, section 11 7.01.10 102, section 12 7.01.11 102, section 13 7.01.12 102, section 14 7.01.13 102, section 15 7.01.14 100-1703, 101-602 8.01.01 100-1704 8.02.01 100-1704, 101-604 8.02.02 100-1705 8.03.01 100-1705, 101-605 8.03.02 100-1706, 101-606 8.04.01 100-403 9.01.01 100-407 9.02.01 100-415 9.02.02 Gordon County 10.00.01 100-402 10.00.02 Gordon County 10.00.03 Gordon County 10.00.04 Gordon County 10.00.05 100-410 10.00.06 Gordon County 10.01.01 Gordon County 10.01.02 Gordon County 10.01.03 100-404 10.02.01 2020 UDO COMPARATIVE TABLE Previous New 100-405 10.02.02 100-410 10.02.03 100-408 10.02.03H 100-409 10.02.04 Gordon County 10.02.05 101-403, 101-404 10.02.06 101-405, 101-406 10.02.07 101-407, 101-408 10.02.08 101-409, 101-410, 101-411 10.02.10 101-507.C.4, 101-507.D 10.02.11 100-406, 100-412, 101-412, 101-414 10.03.00 Gordon County 10.04.01 Gordon County 10.04.02 Gordon County 10.04.03 100-413, 101-415 10.04.04 100-414, 101-416 10.04.05 Amendments to February 25, 2016 Code through September 14, 2020: Section Date 6.01.11(B)2 2-13-2017 2.02.03, Footnote (15) 2-13-2017 1.10.00 2-13-2017 4.02.06.A.26 6-12-2017 7.01.12 2-12-2018 3.08.02 10- 1-2018 3.03.43 6-24-2019 2.02.02 6-24-2019 9.02.02 6-24-2019 2.02.02 6- 8-2020 4.03.24 6- 8-2020 2.02.02 9-14-2020 2020 UDO COMPARATIVE TABLE A ACCESS I-75 overlay design guidelines General requirements Connectivity ADMINISTRATION Administrative officials and boards ........................... 8.00.00 et seq. See: ADMINISTRATIVE OFFICIALS AND BOARDS ADMINISTRATIVE PROCEDURES (Cont'd.) AREA (Cont'd.) Butts Overlay District Area Map Development impact fee Protection of natural features and resources ................. 3.01.06 et seq. See: NATURAL FEATURES AND RESOURCES, PROTECTION OF Site design standards Standards for mixed use (MU) district—P-M planned Determining if an area is suitable for inclusion within B BICYCLES I-75 overlay design guidelines General requirements Connectivity Standards for bicycle and pedestrian infrastructure . 2A.02 Mixed-use requirements Site design Site design standards Site design standards for I-75 Corridor Overlay District 4.02.00 Standards for pedestrian and bicycle infrastructure ... 4.02.13 BILLBOARDS. See: SIGNS AND BILLBOARDS BOARDS, COMMISSIONS AND COMMITTEES Administrative officials and boards ........................... 8.03.00 et seq. See: ADMINISTRATIVE OFFICIALS AND BOARDS et seq. See: ADMINISTRATIVE PROCEDURES Infrastructure improvements BONDS, SURETY OR PERFORMANCE Administrative procedures BOUNDARIES Site design standards Site design standards for I-75 Corridor Overlay District 4.02.00 Standards for mixed use (MU) district—P-M planned Section BRIDGES AND CULVERTS Infrastructure improvements CODE OF ORDINANCES (Cont'd.) Infrastructure improvements ................................... 6.00.00 et seq. See: INFRASTRUCTURE IMPROVEMENTS DEVELOPMENT. See: PLANNING AND DEVELOPMENT DISEASE CONTROL. See: HEALTH AND SANITATION DISTRICTS Accessory and temporary uses, standards for Administrative procedures Butts Overlay District Area Map Natural features and resources, protection of Site design standards ............................................ 4.01.00 et seq. See: SITE DESIGN STANDARDS Zoning districts and uses ....................................... 2.00.00 et seq. See: ZONING DISTRICTS AND USES DRAINAGE Infrastructure improvements ................................... 6.04.00 et seq. See: INFRASTRUCTURE IMPROVEMENTS Natural features and resources, protection of Watershed water supply districts Tussahaw Creek and Reservoir Area Watershed District DRIVEWAYS Infrastructure improvements E EASEMENTS Site design standards ENCLOSURES. See: FENCES, WALLS, HEDGES AND ENCLOSURES ENVIRONMENTAL CONCERNS Site design standards Site design standards for I-75 Corridor Overlay District 4.02.00 Relationship to environmental and watershed overlay F FEES, CHARGES AND RATES Administrative procedures