Byron · Zoning Ordinance
Part III - ADMINISTRATION APPLICATION PROCEDURES FOR ZONING ORDINANCES AND SUBDIVISION REGULATIONS / Article I - PROCEDURE FOR APPLYING FOR A BUILDING PERMIT
Article I. PROCEDURE FOR APPLYING FOR A BUILDING PERMIT
About this text
- As published by Municode, retrieved 2026-11-11
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
The City of Byron shall use the minimum standard codes of construction as adopted by the City of Byron and enumerated in this Code, as well as the City of Byron's administrative procedures for the enforcement of said minimum standard codes when granting a building permit. The zoning enforcement officer may serve as the building official.
In supplement to the requirements set forth in the administrative procedures for the enforcement of the Georgia State Minimum Standard Codes, the procedure for applying for a building permit shall be as follows:
1. The applicant shall complete and submit to the building official the building permit application. The application will contain two physical copies of a scale drawing and one electronic copy, in .pdf format, signed by the property owner, or his/her agent, and illustrating the following:
a. Lot and yard dimensions showing proposed setbacks; and
b. Size, shape, height, uses, and location of all proposed buildings, buildings to be demolished, buildings to be moved to another location, or buildings to be kept;
and
c. Public and private easements; and
d. Street names and street rights-of-way lines; and
e. All watercourses (streams, lakes, ponds, rivers, swamps, etc.); and
f. Fences, existing and proposed; and
g. Any proposed assembly building and commercial building designed to hold more than 300 persons or serve more than 100 persons where alcoholic beverages are served shall have a set of plans with an architect's or engineer's stamp, plus bear the stamp of the state fire marshal's office. All establishments planning to serve food or cook food to be consumed by humans must have a food service permit from the Peach County Health Department. Any mercantile building of 25,000 square feet or more must have approval by the planning commission and city council before a permit can be issued.
2. The zoning enforcement officer will review the application materials for compliance with the zoning ordinance and subdivision regulations.
3. If the zoning enforcement officer or the building official finds the application not in compliance with the codes, administrative procedures, zoning ordinance, or subdivision regulations, the building official shall not issue a permit and shall return the documents to the applicant with their refusal to issue such permit. Such refusal shall, when requested, be in writing and shall contain the reason for refusal. The applicant must correct the deficiency or may appeal to the construction board of adjustment and appeals.
4. If the zoning enforcement officer and the building official find the application in compliance with the codes, administrative procedures, zoning ordinance, and subdivision regulations, then the building permit will be issued to the applicant.
5. An application for a permit for any proposed work shall be deemed to have been abandoned six months after the date of filing for the permit, unless before then a permit has been issued. One or more extensions of time for periods of not more than 90 days each may be allowed by the building official for the application, provided the extension is requested in writing and justifiable cause is demonstrated. Should the applicant fail to commence work on the project for which the permit was issued within six months of the issuance date, or if work on the respective project is suspended for any reason for a period of six months, the respective building permit will become void and of no force or effect.
6. The building official, or his designee, will inspect all completed work for compliance with all applicable codes, the zoning ordinance, and subdivision regulations.
7. If the building official, or his designee, finds the completed work satisfactory, then a certificate of occupancy will be issued.
History
(Ord. No. 2002-10, 6-10-2002; Ord. No. 2019-9, 10-14-2019)