Cairo · Zoning Ordinance
Part II - CODE OF ORDINANCES / Chapter 22 - ZONING / Article VI - SIGNS AND MURALS
Sec. 22-402. Construction standards.
About this text
- As published by Municode, retrieved 2026-11-11
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
(a) All signs for which a permit is required under this article shall be constructed and maintained in accordance with the provisions of the city building code.
(b) Signs for which a permit is not required under this article that are constructed of degradable material may be posted for a maximum of sixty (60) days unless replaced with another sign of the same material. Any such replacement signs may be posted for a maximum of sixty (60) days.
History
(Ord. No. 755, § 1, 2-10-14)
Read this code where it is posted (Municode) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.