All applications to the building inspector for building permits shall be accompanied by plans in duplicate, drawn to scale, showing:
1. The actual dimensions of the lot to be built upon;
2. The size of the building erected;
3. The location of the building on the lot;
4. The location of existing structures on the lot, if any;
5. The number of dwelling units the building is designed to accommodate;
6. The setbacks lines of buildings on adjoining lots;
7. The layout of off-street parking and loading spaces;
8. Any plans and studies required under the City of Calhoun soil and erosion control ordinance; and
9. Such other information as may be essential for determining whether the provisions of this ordinance are being observed.
11.3.1(a). Stormwater drainage. The building inspector may refuse to issue a building permit should the inspector, after a physical inspection of the lot and construction which is the subject of the permit application, determine
such construction and improvement would materially alter the flow of stormwater drainage and endanger the health, safety, welfare and property of the general public by utilizing
one or more of the following criteria:
1. Obvious physical obstruction of stormwater drainage.
2. The location of the lot in an area historically known to flood with surface water drainage though not in a floodplain.
3. The total area of any residential lot or apartment complex is more than 30 percent covered by impervious improvements such as, but not limited to, roof area, parking lots, driveways, patio areas,
pools, pool decks, etc.
4. Visible signs of erosion upon the subject property or upon properties in the immediate area.
5. Any evidence, physical or historical, that the property or any part thereof is a natural collection area for stormwaters.
6. Failure to have a grant or reservation of easement in writing in recordable form for use of the lot or adjoining property for stormwater drainage.
7. Failure to plan and maintain a buffer area with adequate grass, trees, shrubs, etc. leading to excessive soil erosion and water runoff.
11.3.1(b). Stormwater drainage plan. Any applicant denied a building permit by the building inspector under the provisions of subsection 11.3.1(a) may apply for a reconsideration of said building permit application provided such requested reconsideration is made in writing to the building inspector
and accompanied by a written stormwater drainage plan which as a minimum shall include:
1. A vicinity map indicating a north arrow, scale, boundary lines of the site, and other information necessary to locate the development site.
2. A general description of the topographic and soil conditions of the development site.
3. A narrative description of the stormwater management facilities to be used and their effects on the development and
adjoining properties (piping, retention areas, grass, trees, ground cover, swales, etc.).
4. A general description of the adjacent property and a description of the existing structures, buildings, and other fixed improvements located on surrounding property.
5. A sketch plan to accompany the narrative, which shall contain:
a. A site location drawing of the proposed project indicating the location of the proposed project (buildings, driveways, parking lots, utilities, yards) in relation to existing roadways, jurisdictional boundaries, adjacent properties, drainage areas, easements, rights-of-way;
b. All areas within the site, which will be included in the land disturbing activities, shall be identified, drawn, and the total disturbed area calculated as square feet and percentage of the total site;
c. Anticipated starting and completion dates of the various stages of land disturbing activities and the
expected date the final stabilization will be completed;
d. Stormwater flows, conveyances, and directions will be included in the narrative and sketch plan.
Estimated volumes and velocities shall be shown;
e. How and who will be responsible for operating and maintaining the stormwater management plan in the future;
f. The stormwater management plan shall be certified by the person(s) responsible for the land disturbing activity.