A. Generally. An approved tree protection/landscape plan must be implemented prior to the issuance of a certificate of occupancy. B. Inspections. In addition to unscheduled inspections conducted by the director during construction to ensure compliance with the approved tree protection plan, the following inspection process shall apply: 1) When the developer/owner has installed the required landscaping improvement, he/she shall request an inspection by the director. 2) If the director approves the installation, the two-year maintenance bond shall be submitted. 3) If the director does not approve the landscape implementation, he/she shall submit a report stating his/her reasons for disapproval so that the developer may make the necessary corrections. After the corrections have been made, a reinspection shall be requested. C. Bond release. At 45 days prior to the expiration of the two-year landscape maintenance period, the director shall inspect the site and shall make a determination of whether or not the required trees and landscaping are healthy and have a reasonable chance of surviving to maturity. Upon such finding, the bond shall be released at the two-year expiration date. In absence of such finding, the bond shall not be released and the owner of the property shall be notified to replace the unhealthy trees and landscaping or take other appropriate action as approved by the director. Upon failure of the owner to comply with the director decision regarding such trees, the city shall use the bond to the extent necessary to bring the property into compliance. The final inspection shall be scheduled within ten working days' notice. D. Maintenance. Trees, which are used to meet the density requirements, shall be fully maintained after the date of final landscape establishment inspection by the property owner. Failure to maintain the required tree density factor at any time during the life of the project shall be a violation of this section. Trees which have been used to meet the tree density requirements shall not be removed at any time without approval of the director. Removal of such trees shall result in replacement of like kind and size by the property owner. E. Enforcement. It shall be the duty of the director to enforce the provisions and requirements of this section. The director shall conduct periodic inspections of the site before work begins and during clearing, construction, and post construction phases of development in order to ensure compliance with these regulations and the intent of this section. Tree protection must remain in functioning condition throughout all phases of development. In the event of failure to comply with and/or to maintain approved tree protection measures the Director shall have the authority to revoke, suspend, or void any land disturbance permit and shall have the authority to suspend all work on a site or a portion thereof.