104.03.25. Wireless telecommunication facilities (communication towers).

About this text

  • As published by Municode, retrieved 2026-11-11
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

A. Purpose. This section is designed and intended to balance the interests of the city's residents, telecommunications providers and telecommunications customers in the siting of wireless telecommunications facilities within the city so as to protect the health, safety and integrity of residential neighborhoods and foster, through appropriate zoning and land use controls, a competitive environment for telecommunications carriers that does not unreasonably discriminate among providers of functionally equivalent personal wireless services and shall not prohibit or have the effect of prohibiting the provision of personal wireless services and so as to promote the city as a proactive city in the availability of personal wireless telecommunications service. To that end, this section shall:

1) Provide for the appropriate location and development of telecommunications facilities in the city.

2) Protect the city's built and natural environment by promoting compatible design standards for telecommunications facilities.

3) Minimize adverse visual impacts of telecommunications facilities through careful design, siting, landscape screening and innovative camouflaging techniques.

4) Avoid potential damage to adjacent properties from tower or antenna failure through engineering and careful siting of telecommunications tower structures and antennas.

5) Maximize use of any new and existing telecommunications towers so as to minimize the need to construct new towers and minimize the total number of towers throughout the city.

6) Maximize and encourage use of alternative telecommunications tower structures as a primary option rather than construction of additional single-use towers.

7) Encourage and promote the location of new wireless telecommunications facilities in areas which are not zoned for residential use.

B. Overall policy and desired goals for telecommunications facilities. In order to ensure that the placement, construction, and modification of wireless telecommunications facilities protects the health, safety, public welfare, environmental features, the nature and character of the community and neighborhood and other aspects of the quality of life specifically listed elsewhere in this section, the city adopts an overall policy with respect to granting a conditional use permit (CUP) for wireless telecommunications facilities for the express purpose of achieving the following goals:

1) Requiring a CUP in accordance with requirements of this section for any new wireless telecommunications facility.

2) Requiring a permit (not a CUP) in accordance with requirements of this section for any new collocation or modification of a wireless telecommunications facility.

3) Promoting and encouraging, wherever possible, the sharing and/or collocation of wireless telecommunications facilities among service providers.

4) Requiring, promoting and encouraging, wherever possible, the placement, height and quantity of wireless telecommunications facilities in such a manner, including but not limited to the use of stealth technology, to minimize adverse aesthetic and visual impacts on the land, property, buildings, and other facilities adjacent to, surrounding, and in generally the same area as the requested location of such wireless telecommunications facilities, which shall mean using the least visually and physically intrusive facility that is not technologically or commercially impracticable under the facts and circumstances.

5) In granting a CUP, the city has found that the facility shall be in the most appropriate site as regards being the least visually intrusive among those available in the city.

C. Exceptions from a conditional use permit for wireless telecommunications facilities.

1) Notwithstanding anything to the contrary in this section, wireless telecommunications facilities that existed on or before the effective date of this UDC shall be allowed to continue as they presently exist, provided however, that any visible modification or substantial change (as defined in this UDC) of an existing wireless telecommunications facility will require the complete facility, including the tower if applicable, and any new installation to comply with this section, as will anything changing the structural load.

2) Any repair and maintenance of a wireless facility not requiring additional construction or site modification does not require an application for a CUP.

3) Notwithstanding any other provisions of this section, the collocation and/or shared use of antennas on existing telecommunication towers or other tall structures or compatible use structures, such as water towers and other towers, that are proven by an applicant to be structurally adequate to accommodate the collocation shall be exempt from the public hearing requirement otherwise required for a tower, and shall be subject only to administrative review by the community development director.

D. Exclusions. The following shall be exempt from this section:

1) Public service facilities owned and operated by the City of Canton.

2) Any facilities expressly exempt from the city's siting, building and permitting authority.

3) Any facilities that are exempted from local regulation by the Federal Communications Commission.

E. Location of wireless telecommunications facilities.

1) Applicants for wireless telecommunications facilities shall locate, site and erect said wireless telecommunications facilities in accordance with the following priorities, "a" being the highest priority and "d" being the lowest priority.

a. On existing towers or other structures without increasing the height of the tower or structure.

b. On properties in areas zoned L-I and SU.

c. On properties in areas zoned GC and O-I.

d. On properties zoned NC and PD—Business/office.

e. On properties zoned CBD and RM-15.

2) If the proposed site is not proposed for the highest priority listed above, then a detailed explanation and justification must be provided as to why a site of any higher priority designations was not selected. The applicant seeking a CUP must satisfactorily demonstrate the reason or reasons why the proposed site was chosen and the reasons why higher priority locations were deemed unfit or undesirable.

3) An applicant may not bypass sites of higher priority by stating the site proposed is the only site leased or selected or because there is an existing lease with a landowner. An application shall address collocation as an option. If such option is not proposed, the applicant must explain to the reasonable satisfaction of the community development director why collocation is commercially impracticable or otherwise impracticable. Agreements between providers limiting or prohibiting collocation shall not be a valid basis for any claim of commercial impracticability or hardship.

4) Notwithstanding that a potential site may be situated in an area of highest priority or highest available priority, the city may disapprove an application for any of the following reasons:

a. Conflict with safety and safety-related codes and requirements;

b. Conflict with the historic nature or character of a neighborhood or district;

c. The use or construction of wireless telecommunications facilities which is contrary to an already stated purpose of a specific zoning or land use designation;

d. The placement and location of wireless telecommunications facilities which would create an unacceptable risk, or the reasonable probability of such, to residents, the public, employees and agents of the city, or employees of the service provider or other service providers;

e. The placement and location of a wireless telecommunications facility would result in a conflict with, compromise in or change of the nature or character of the surrounding area;

f. Conflicts with the provisions of this section;

g. Failure to submit a complete application as required under this section.

F. Preferred location sites.

1) Collocation sites. Any existing wireless telecommunications towers currently in use shall be preferred location sites regardless of the underlying zoning designation of the site; provided, however, that locations which meet this criteria shall be subject to the design and siting components of this section, and collocation sites shall not become an "antenna farm" or otherwise be deemed by the community development director, and the site is not on a property zoned or used for residential purposes.

2) Publicly used structures. Publicly used structures are preferred locations throughout the city because they appear in virtually all neighborhoods, are dispersed throughout the city, and due to their institutional or infrastructure uses are generally similar in appearance to or readily adaptable for telecommunications facilities. Therefore, telecommunications facilities should be less noticeable when placed on publicly used structures than when placed on commercial or residential structures. Publicly used structures include but are not limited to facilities such as police or fire stations, libraries, community centers, civic centers, courthouses, utility structures, water towers, elevated roadways, bridges, flagpoles, schools, hospitals, clock or bell towers, light poles and churches.

3) Industrial and commercial structures. Wholly industrial and commercial structures such as warehouses, factories, retail outlets, supermarkets, banks, garages or service stations shall be preferred locations particularly where existing visual obstructions or clutter on the roof or along a roofline can and will be removed as part of the installation of the telecommunications facility.

G. Collocation.

1) The city, as opposed to the construction of a new tower, requires wireless facilities to be located on existing towers or other suitable structures without increasing the height of the tower or structure, unless such is proven to be technologically impracticable. The applicant shall submit a comprehensive report inventorying all existing towers and antenna, as well as suitable structures, inside the city limits and within one mile of the location of any proposed new tower.

2) An applicant intending to locate on an existing tower or other suitable structure shall be required to document the intent of the existing owner to permit its use by the applicant.

3) Such shared use shall consist only of the minimum antenna array technologically required to provide service primarily and essentially within the city, to the extent practicable, unless good cause is shown.

4) The applicant and owner shall allow other future personal wireless service companies, including public and quasipublic agencies, using functionally equivalent personal wireless technology to collocate an antenna, equipment and facilities on a telecommunications facility unless specific technical constraints prohibit such collocation. The applicant and other personal wireless carriers shall provide a mechanism for the construction and maintenance of shared facilities and infrastructure and shall provide for equitable sharing of cost in accordance with industry standards.

H. Nuisances. Wireless telecommunications facilities, including without limitation power source, ventilation and cooling, shall meet the following requirements:

1) Shall be operated at all times within the limits of the city's noise control ordinance (chapter 30, City of Canton Code of Ordinances, Article II);

2) Shall not be operated so as to cause the generation of heat that adversely affects a building occupant;

and

3) Shall not be maintained or operated in such a manner as to be a nuisance.

I. Removal of antennas and towers.

1) All wireless telecommunications facilities shall be maintained in compliance with standards contained in applicable building and technical codes so as to ensure the structural integrity of such facilities.

2) If, upon inspection by the community development director, any such telecommunications facility is determined not to comply with the code standards or to constitute a danger to persons or property, upon notice being provided to the owner of the facility and the owner of the property if such owner is different, such owners shall have 30 days to bring such facility into compliance.

3) If such telecommunications facility is not brought into compliance within 30 days, the city may provide notice to the owner requiring the telecommunications facility to be removed. If such telecommunications facility is not removed within 30 days of receipt of such notice, it shall be considered a nuisance, and the city may proceed under the nuisance abatement procedures to remove such facility and place a lien upon the property for the costs of removal.

4) Delay by the city in taking action shall not in any way waive the city's right to take action. The city may pursue all legal remedies available to it to ensure that telecommunications facilities not in compliance with the code standards or which constitute a danger to persons or property are brought into compliance or removed. The city may seek to have the telecommunications facility removed regardless of the owner's or operator's intent to operate the tower or antenna and regardless of any permits, federal, state or otherwise, which may have been granted.

J. Abandoned facilities. Any telecommunications facility that is not operated for a continuous period of 12 months shall be considered abandoned, whether or not the owner or operator intends to make use of it or any part of it.

1) The owner of a telecommunications facility and the owner of the property where the facility is located shall be under a duty to remove the abandoned telecommunications facility.

2) If such antenna and/or tower is not removed within 60 days of receipt of notice from the city notifying the owner of such abandonment, it shall be considered a nuisance, and the city may proceed under the nuisance abatement procedures to remove such tower and/or antenna and place a lien upon the property for the costs of removal.

3) The city may pursue all legal remedies available to it to ensure that abandoned telecommunications facilities are removed.

4) Delay by the city in taking action shall not in any way waive the city's right to take action. The city may seek to have the telecommunications facility removed regardless of the owner's or operator's intent to operate the tower or antenna and regardless of any permits, federal, state or otherwise, which may have been granted.

5) If the owner of an abandoned tower or antenna wishes to use such abandoned tower or antenna, the owner first must apply for and receive all applicable permits and meet all of the conditions of this section as if such tower or antenna were a new tower or antenna.

K. Penalty for violation.

1) Any person who attempts to erect or who erects a telecommunications facility covered by this section without having first obtained the necessary building permit, conditional use permit or variance in the manner provided in this UDC shall be deemed in violation of this section.

2) If any structure is erected, constructed, reconstructed, altered, repaired, converted or maintained in violation of this section or without obtaining the required permits or if any building, structure or land is used in violation of this section, the city attorney, in addition to any other remedies, may institute proceedings to prevent such unlawful erection, construction, reconstruction, alteration, conversion, maintenance or use or to correct or abate such violation. Each and every day such unlawful erection, construction, reconstruction, alteration, conversion, maintenance or use continues may be deemed a separate offense.

L. Permit procedures. Application for a site approval or CUP for any telecommunications facility shall be made to the community development director by the person who will own and operate the telecommunications facility. The information in this subsection shall be submitted when applying for any site approval, CUP or other permit or variance included in this section and must be submitted for an application to be considered complete.

1) Review process.

a. Within 150 calendar days of the date an application for a new wireless telecommunication facility is filed with the community development department, unless another date is specified in a written agreement between the community development director and the applicant, the City of Canton shall:

i. Make its final decision to approve or disapprove the application; and ii. Advise the applicant in writing of its final decision.

b. Within 30 calendar days of the date an application for a new wireless telecommunication facility is filed with the community development department, said department shall determine if it is a complete application and, if it determines the application is not a complete application, notify the applicant in writing of any information required to complete such application. To the extent additional information is required to complete the application, the time required by the applicant to provide such information shall not be counted toward the calendar day review period set forth in subsection a. above.

c. See subsection L.6 below for the review process for applications that do not require a CUP.

2) Basic information. Basic information required on the application for site approval, a conditional use permit or other permit or variance required under this section shall be as follows:

a. Site plan to scale specifying the location of telecommunications facilities, transmission building and/or other accessory uses, access, parking, fences, landscaped areas and adjacent land uses.

Applicants shall submit both a paper location map and a digitized location map in a format compatible with the GIS software currently utilized by the city.

b. Landscape plan to scale indicating size, spacing and type of plantings required in chapter 103 of this UDC, and conforming to the requirements as specified in this UDC.

c. A full description of the environment surrounding the proposed telecommunications facility, including any adjacent residential structures and districts, structures and sites of historic significance, streetscapes or scenic view corridors.

d. A description of anticipated maintenance needs for the telecommunications facility, including frequency of service; personnel needs; equipment needs; and traffic, noise or safety impacts of such maintenance.

3) In addition, to subsection L.2 above, a report from a qualified, independent engineer licensed in the state shall be submitted documenting the following:

a. Telecommunications facility height and design, including technical, engineering, economic and other pertinent factors governing selection of the proposed design, with the exception that a request for collocation will not require a description or evaluation of the technical, business, or service characteristics of said request.

b. Total anticipated capacity of the telecommunications facility, including number and types of antennas which can be accommodated.

c. Evidence of structural integrity of the tower or structure.

d. Structural failure characteristics of the telecommunications facility and demonstration that the site and setbacks are of adequate size to contain debris.

e. A definition of the area of service to be served by the antenna or tower and whether such antenna or tower is needed for coverage or capacity, and the towers that will be linked for this system, with the exception that a request for collocation will not require a description or evaluation of: the proposed service characteristics; the need for proposed wireless facilities; or the justification of the business decision to collocate wireless facilities.

f. Information showing the proposed facility would provide the needed coverage or capacity including their grid maps of the coverage area associated with the location in the city.

g. The identity of a community liaison officer appointed by the applicant to resolve issues of concern to neighbors and residents relating to the construction and operation of the facility. Include name, address, telephone number, facsimile number and electronic mail address, if applicable.

h. Identification of the geographic service area for the subject installation, including a map showing the site and the nearest or associated telecommunications facility sites within the network.

Describe the distance between the telecommunications facility sites. Describe how this service area fits into and is necessary for the service network.

i. Designation of which location preference, identified in subsections 104.03.25.E and F, the proposed facility is meeting. If the proposed location is not a preferred location or is a disfavored site, describe the following:

i. What publicly used building, collocation site or other preferred location sites are located within the geographic service area. Provide a list, by address with lot and block number noted and map and parcel numbers, and a map at 1:200 scale of all such buildings within the service area;

ii. What good faith efforts and measures were taken to secure each of these preferred location sites;

iii. Why each such site was not technologically, legally or economically feasible and why such efforts were unsuccessful, with the exception that; and

iv. How and why the proposed site is essential to meet service demands for the geographic service area and citywide network.

4) Five-year plan and site inventory. Each application for site approval, a conditional use permit or other permit or variance required under this section shall include a five-year facilities plan and site inventory including the following:

a. A list of all existing, existing to be upgraded or replaced, and proposed telecommunications facility sites within the city limits and within one mile of the city limits and a map showing these sites. The list must include the following information for each site:

i. Street address;

ii. Assessor's block and lot or other applicable ad valorem tax identification number (map and parcel numbers);

iii. Zoning district;

iv. Type of building (commercial, residential, mixed use) and number of stories;

v. The number of antenna and base transceiver stations per site and the location and type of antenna installation (stand alone rooftop, building facade, etc.) and location of the base transceiver station installation;

vi. The height from grade to the top of the antenna installation; and vii. The radio frequency range in megahertz, the wattage output of the equipment and effective radiated power.

b. If the applicant does not know specific future tower and antenna site locations, but does know of areas where telecommunications facilities will be needed within the next five years to provide service, the applicant shall list the assessor's blocks contained within the anticipated geographic service area and identify each geographic service area with a number that will correspond to the future telecommunications facility site.

5) Additional information requirements for towers.

a. If the proposed telecommunications site is zoned GC, PD-Business/Office, NC, O-I, CBD, or RM-15 and there are alternative sites in L-I or SU, the applicant must justify in the CUP application why those alternate sites have not been proposed. Only claims as to undue expense and/or to undue difficulties in entering into a lease agreement will be considered. The city council shall carefully weigh such claims and the evidence presented in favor of them against a project's negative impacts at the proposed site.

b. Applicants must identify all existing towers and all towers for which there are applications currently on file with the community development director. Applicants must provide evidence of the lack of space on all suitable existing towers to locate the proposed antenna and of the lack of space on existing tower sites to construct a tower for the proposed antenna. If collocation on any such towers would result in less visual impact than the visual impact of the proposed tower, applicants must justify why such collocation is not being proposed. If collocation on any such tower would increase negative visual impact, the applicant must so state and demonstrate. Only claims as to undue expense and/or to undue difficulties in entering into a lease agreement will be considered. The city council shall carefully weigh such claims, and the evidence presented in favor of them, against a project's negative impacts at the proposed site.

c. In all zones, applicants must demonstrate that they cannot provide personal wireless communication service without the use of a telecommunications tower.

d. The applicant shall quantify the additional tower capacity anticipated, including the approximate number and types of antennas. The applicant shall provide a drawing for each tower showing existing and proposed antenna locations. The applicant shall also describe any limitations on the ability of the tower to accommodate other uses, e.g., radio frequency interference, mass height, frequency or other characteristics. The applicant shall describe the technical options available to overcome those limitations and reasons why the technical options considered were not chosen to be incorporated.

e. The applicant must provide a utilities inventory showing the locations of all water, sewer, drainage and power lines impacting the proposed tower site.

6) Expedited review for building permits only (collocation or modification). When a telecommunications facility does not require a CUP and requires only a site and design review before it may be erected, the community development director will render a decision in accordance with the following:

a. For a proposed collocation or modification that does not increase the overall height or width of the structure to which the wireless facilities are to be attached and does not increase the dimensions of the equipment compound initially approved by the city, the following process applies:

i. The community development director shall approve or disapprove the application and also advise the applicant in writing of his or her final decision within 90 calendar days of the date an application for modification or collocation is field with the community development department, unless another date is specified in a written agreement between the community development director and the applicant. To the maximum extent practical, the community development department shall render decisions within 15 business days after receipt of a complete application.

ii. Within 30 calendar days of the date an application for modification or collocation of wireless facilities is filed with the community development department, said department shall determine if is a complete application and, if it determines the application is not a complete application, notify the applicant in writing of any information required to complete such application. To the extent additional information is required to complete the application, the time required by the applicant to provide such information shall not be counted toward a maximum 90-day review period set forth in subsection a. above.

b. For a proposed modification of an existing base station or tower that does not "substantially change" (see glossary for definition) the physical dimensions of such tower or base station, the following process applies:

i. Within 60 days of the date on which an applicant submits a request seeking approval under this section, the community development director shall approve the application unless it determines that the application is not covered by this subsection.

ii. The 60-day period begins to run when the application is filed, and may be tolled only by mutual agreement or in cases where the community development department determines that the application is incomplete. The timeframe for review is not tolled by a moratorium on the review of applications.

iii. To toll the timeframe for incompleteness, the community development department must provide written notice to the applicant within 30 days of receipt of the application, clearly and specifically delineating all missing documents or information. Such delineated information does not require documentation intended to illustrate the need for such wireless facilities or to justify the business decision to modify such wireless facilities.

iv. The timeframe for review begins running again when the applicant makes a supplemental submission in response to the community development department's notice of incompleteness.

v. Following a supplemental submission, community development department will have ten days to notify the applicant that the supplemental submission did not provide the information identified in the original notice delineating missing information. The timeframe is tolled in the case of second or subsequent notices pursuant to the procedures identified in section.

Second or subsequent notices of incompleteness may not specify missing documents or information that were not delineated in the original notice of incompleteness.

7) Conditional use permits and variances.

a. A request for a CUP pursuant to this section shall be initiated by application to the community development director and handled in accordance with the cup provision in chapter 105 of this UDC and in accordance with the Permit Procedures requirements of section 104.03.25.L. City council may issue a CUP under this section provided it shall have determined that all of the applicable requirements in chapter 105 have been satisfied and, further, that the benefits of and need for the proposed tower are greater than any possible depreciating effects and damage to the neighboring properties.

b. A request for a variance shall be initiated by application to the community development director and handled in accordance with the variance provision of chapter 105 of this UDC. The board of zoning appeals may issue a variance under this section provided it shall have determined that all of the application requirements in chapter 105 have been satisfied and, further, that the benefits of and need for the proposed tower are greater than any possible depreciating effects and damage to the neighboring properties.

c. In granting a CUP or variance, the city council or board of zoning appeals may impose additional conditions to the extent determined necessary to buffer or otherwise minimize adverse effects of the proposed tower or antenna on surrounding properties.

M. Basic requirements.

1) Building codes and safety standards.

a. To ensure the structural integrity of telecommunications facilities, the owner of a telecommunications facility shall ensure that it is maintained in compliance with standards contained in applicable local building codes and the applicable standards for such telecommunications facilities, as amended from time to time.

b. Owners of telecommunications facilities shall conduct periodic inspections of such facilities at least once every year to ensure structural integrity and condition of screening and/or camouflaging. Inspections shall be conducted by a qualified, independent engineer licensed to practice in the state. The results of such inspection shall be provided to the community development director.

2) Regulatory compliance.

a. To the extent that the holder of a CUP for wireless telecommunications facilities has not received relief, or is otherwise exempt, from appropriate state and/or federal agency rules or regulations, then the holder of such a CUP shall adhere to, and comply with, all applicable rules, regulations, standards, and provisions of any state or federal agency including, but not limited to, the Federal Aviation Administration (FAA) and the Federal Communications Commission (FCC). Specifically included in this requirement are any rules and regulations regarding height, lighting, security, electrical and RF emission standards.

b. To the extent that applicable rules, regulations, standards, and provisions of any state or federal agency including, but not limited to, the FAA and the FCC, and specifically including any rules and regulations regarding height, lighting, and security are changed and/or are modified during the duration of a conditional use permit for wireless telecommunications facilities, then the holder of such a CUP shall conform the permitted wireless telecommunications facilities to the applicable changed and/or modified rule, regulation, standard, or provision within a maximum of 24 months of the effective date of the applicable changed and/or modified rule, regulation, standard, or provision, or sooner as may be required by the issuing entity.

3) Height.

a. All new towers shall be of the monopole type, unless such is able to be proven to be technologically impracticable. No new towers of a lattice or guyed type shall be permitted, unless relief is otherwise expressly granted.

b. The applicant shall submit documentation justifying the technical need by the service provider for the total height of any tower, facility and/or antenna requested and the basis therefore. To enable verification of the need for the requested height, documentation in the form of propagation studies must include all backup data used to produce the studies at the height requested and at a minimum of ten feet lower height. Such documentation will be analyzed in the context of the justification of the height needed to provide service primarily and essentially within the city, to the extent practicable, unless good cause is shown.

c. The maximum permitted total height of a new tower shall be 120 feet above pre-construction ground level, unless it can be proven that such height would prohibit or have the effect of prohibiting the provision of service in the intended service area. The one 120-foot maximum permitted height is not as-of-right height, but rather the maximum permitted height, absent proof of the technological need for a greater height.

d. Notwithstanding the 120-foot maximum permitted height, telecommunications towers and facilities shall be no taller than the minimum height technologically necessary to enable the provision of wireless service coverage or capacity as needed within the city and only within the city.

e. Spacing or the distance between towers shall be such that the service may be provided without exceeding the maximum permitted height.

4) Security. All wireless telecommunications facilities shall be equipped with an appropriate anticlimbing device or other similar protective device to prevent unauthorized access to the telecommunications facility.

5) Lighting.

a. No illumination is allowed on wireless telecommunications facilities unless required by the FCC, FAA or other state or federal agency or competent jurisdiction or unless necessary for air traffic safety.

b. If lighting is required or necessary, the community development director may review the available lighting alternative and approve the design that would cause the least disturbance to the surrounding uses and views.

6) Advertising. No advertising is permitted on telecommunications facilities. However, a whip antenna may be allowed on any legally permitted permanent billboard or outdoor advertising sign as long as the other requirements of this section are met.

7) Visual impact.

a. Wireless telecommunications facilities shall either maintain a galvanized steel finish or, subject to any applicable standards of the FAA or other applicable federal or state agency, be painted a neutral color or painted and/or textured to match the existing structure so as to reduce visual obtrusiveness.

b. If an antenna is installed on a structure other than a tower, the antenna and associated electrical and mechanical equipment must be of a neutral color that is identical to or closely comparable with the color of the supporting structure so as to make the antenna and related equipment as visually unobtrusive as possible. Roof-mounted antennas shall be made visually unobtrusive by screening to match existing air conditioning units, stairs, elevator towers or other background.

c. Where feasible, telecommunications facilities should be placed directly above, below or incorporated with vertical design elements of a building to help in camouflaging.

d. Telecommunications facilities shall not be placed in a direct line of sight with historic or scenic view corridors as designated by city council or by any state or federal law or agency.

e. Any equipment shelter or cabinet that supports telecommunications facilities must be concealed from public view or made compatible with the architecture of the surrounding structures or placed underground. Equipment shelters or cabinets shall be screened from public view by using landscaping or materials and colors consistent with the surrounding backdrop. The shelter or cabinet must be regularly maintained, in accordance with section 104.03.25.N.1.

8) Landscaping. Landscaping shall be used to effectively screen the view of the telecommunications facility from adjacent public ways, public property and residential property.

a. Native vegetation on the site shall be preserved to the greatest practical extent. The applicant shall provide a site plan showing existing significant vegetation to be removed and vegetation to be replanted to replace that lost. The site plan/landscape plan shall be approved by the community development director prior to any land disturbance.

b. The community development director may waive or modify the landscaping requirement where lesser requirements are desirable for adequate visibility for security purposes; for continued operation of existing bona fide agricultural or forest uses such as farms, nurseries and tree farms;

or where an antenna is placed on an existing structure. In certain locations where the visual impact of the tower would be minimal, such as remote agricultural or rural locations or developed heavy industrial areas, the landscaping requirement may be modified or waived by the community development director.

9) Maintenance impacts.

a. Equipment at a transmission facility shall be automated to the greatest extent possible to reduce traffic and congestion.

b. Where the site abuts or has access to a collector or local street, access for maintenance vehicles shall be exclusively by means of the collector or local street.

10) Principal, accessory and joint uses.

a. Accessory structures used in direct support of a telecommunications facility shall be allowed, but not be used for offices, vehicle storage or other outdoor storage. Mobile or immobile equipment not used in direct support of a telecommunications facility shall not be stored or placed on the site of the telecommunications facility.

b. Telecommunications facilities may be located on sites containing another principal use in the same buildable area.

11) Lot size and setbacks. The following setback requirements shall apply to all telecommunications facilities; provided, however, that the community development director may reduce the standard setback requirements of this subsection if the goals of this section would be better served thereby:

a. Telecommunications towers must be set back a distance equal to the height of the tower from any off-site residential structure.

b. Towers, guy wires and accessory facilities must satisfy the minimum zoning district setback requirements.

c. Telecommunications facilities must be set back from any property line a sufficient distance to protect adjoining property from the potential impact of telecommunications facility failure by being large enough to accommodate such failure on the site, based on the engineer's analysis required in section 104.03.25.M.

d. For an antenna attached to the roof or a supporting structure on a rooftop, a one-to-one (1:1) setback ratio (example: Aten-foot high antenna and supporting structure requires a ten-foot setback from the edge of the roof) shall be maintained unless an alternative placement is shown to reduce visual impact.

12) Additional requirements for towers.

a. Telecommunications facility site location and development shall preserve the preexisting character of the surrounding buildings and land uses and the zone district as much as possible. Personal wireless telecommunications towers shall be integrated through location and design to blend in with existing characteristics of the site to the extent practical.

b. Existing on-site vegetation shall be preserved or improved, and disturbance of the existing topography shall be minimized, unless such disturbance would result in less visual impact of the site to the surrounding area.

c. At a tower site, the design of the buildings and related structures shall, to the extent possible, use materials, colors, textures, screening and landscaping that will blend the tower and related facilities to the natural setting and built environment.

d. Towers shall not be located any closer than 1,500 feet from an existing tower unless technologically required or visually preferable per subsection i. of this subsection.

e. When a tower is adjacent to a residential use, it must be set back from the nearest residential lot line a distance at least equal to its total height.

f. In no case shall a tower be located in the required front yard, back yard or side yard in a zoning district.

g. Towers shall not be sited where they will negatively affect historic or scenic view corridors as designated by city council or any state or federal law or agency or where they will create visual clutter.

h. Towers shall be enclosed by decay-resistant security fencing, not less than six feet in height, and shall be equipped with an appropriate anticlimbing device or other similar protective device designed to prevent tower access, in accordance with section 104.02.01B.9.

i. Placement of more than one tower on a lot may be allowed provided all setback, design and landscape requirements are met as to each tower. Structures may be located as close to each other as technically feasible, provided tower failure characteristics of the towers on the site will not lead to multiple failures if one fails.

History

The history line the source prints at the end of the section.

(Ord. No. 2014-18, § 2, 8-21-2014; Ord. No. 2021-0415-01, 4-15-2021)

Read this code where it is posted (Municode) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:canton/zoning/104.03.25@2026-11-11-144ab39620

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.

Canton Zoning Ordinance, 104.03.25. Wireless telecommunication facilities (communication towers) | Georgia Commons