--- title: Canton Zoning Ordinance, 107.03.08. Standards for development collection: local-codes id: local-code:canton/zoning/107.03.08 cite_as: Canton, Ga., Zoning Ordinance ยง 107.03.08 canonical_url: https://georgiacommons.org/code/local/canton/zoning/107.03.08 md_url: https://georgiacommons.org/code/local/canton/zoning/107.03.08.md text_url: https://georgiacommons.org/code/local/canton/zoning/107.03.08/text source_url: https://library.municode.com/ga/canton date: 2026-11-11 status: active jurisdiction: city:canton jurisdiction_name: Canton place_fips: "1312988" corpus_version: local-codes-canton-bb716bdc4821 publisher: Georgia Commons, an independent project of Georgia Civic Data. Not the State of Georgia. Not legal advice. up: https://georgiacommons.org/code/local/canton/zoning/~part-iii/~chapter-107.md previous: https://georgiacommons.org/code/local/canton/zoning/107.03.07.md next: https://georgiacommons.org/code/local/canton/zoning/107.03.09.md index: https://georgiacommons.org/code/local/canton.md branch: zoning edition: As published by Municode, retrieved 2026-11-11 edition_date_kind: retrieved source_publisher: Municode version_id: local-code:canton/zoning/107.03.08@2026-11-11-2252601099 --- # Canton Zoning Ordinance, 107.03.08. Standards for development > As published by Municode, retrieved 2026-11-11 > The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included. Part of: Part III - DEVELOPMENT CODE / Chapter 107 - TABLE OF CONTENTS A. Definition of floodplain boundaries. 1) Studied "A" zones, as identified in the FEMA FIS, shall be used to establish base flood elevations whenever available. 2) For all streams with a drainage area of 100 acres or greater, the future-conditions flood elevations shall be shown on the floodplain management/flood damage prevention plan. If future-conditions elevation data is not available from the city, then it shall be determined by a registered professional engineer using a method approved by FEMA and the city. B. Definition of floodway boundaries. 1) The width of a floodway shall be determined from the FIS or FEMA-approved flood study. 2) For all streams with a drainage area of 100 acres or greater, the regulatory floodway shall be shown on the floodplain management/flood damage prevention plan. If floodway data is not available from the city, then it shall be determined by a registered professional engineer using a method approved by FEMA and the city. C. General standards. 1) No development shall be allowed within the future-conditions floodplain that could result in any of the following: a. Raising the base flood elevation or future-conditions flood elevation equal to or greater than 0.01-foot; b. Reducing the base flood or future-conditions flood storage capacity; c. Changing the flow characteristics as to the depth and velocity of the waters of the base flood or future-conditions flood as they pass both the upstream and the downstream boundaries of the development area; or d. Creating hazardous or erosion-producing velocities, or resulting in excessive sedimentation. 2) Any development within the future-conditions floodplain allowed under subsection 1) above shall also meet the following conditions: a. Compensation for storage capacity shall: i. Occur between the average ground water table elevation and the base flood elevation for the base flood; and ii. Occur between the average ground water table elevation and the future-condition flood elevation for the future-conditions flood; and iii. Lie either within the boundaries of ownership of the property being developed or within the immediate vicinity of the location of the encroachment. b. Acceptable means of providing required compensation include lowering of natural ground elevations within the floodplain, or lowering of adjoining land areas to create additional floodplain storage. In no case shall any required compensation be provided via bottom storage or by excavating below the elevation of the top of the natural (predevelopment) stream channel unless such excavation results from the widening or relocation of the stream channel. c. Cut areas shall be stabilized and graded to a slope of no less than two percent. d. Effective transitions shall be provided such that flow velocities occurring on both upstream and downstream properties are not increased or decreased. e. Verification of no-rise conditions (0.01-foot or less), flood storage volumes, and flow characteristics shall be provided via a step-backwater analysis meeting the requirements of subsection D. below. f. Public utilities and facilities, such as water (see also chapter 110), sanitary sewer (see also chapter 111), gas, and electrical systems, shall be located and constructed to minimize or eliminate infiltration or contamination from flood waters. g. Any significant physical changes to the base flood floodplain shall be submitted as a conditional letter of map revision (CLOMR) or conditional letter of map amendment (CLOMA), whichever is applicable. i. The CLOMR submittal shall be subject to approval by the city using the community consent forms before forwarding the submittal package to FEMA for final approval. ii. The responsibility for forwarding the CLOMR to FEMA and for obtaining the CLOMR approval shall be the responsibility of the applicant. iii. Within six months of the completion of construction, the applicant shall submit to FEMA as-built surveys for a final letter of map revision (LOMR). D. Engineering study requirements for floodplain encroachments. An engineering study is required, as appropriate to the proposed development activities on the site, whenever a development proposes to disturb any land within the future-conditions floodplain, except for a residential single-lot development on streams without established base flood elevations and/or floodways for which the provisions of section 107.03.09.D apply. 1) This study shall be prepared by a currently registered professional engineer in the state and made a part of the application for a permit. 2) This information shall be submitted to and approved by the city prior to the approval of any permit which would authorize the disturbance of land located within the future-conditions floodplain. 3) Such study shall include: a. Description of the extent to which any watercourse or floodplain will be altered or relocated as a result of the proposed development. b. Step-backwater analysis, using a FEMA-approved methodology approved by the City. i. Cross-sections (which may be supplemented by the applicant) and flow information will be obtained whenever available. ii. Computations will be shown duplicating FIS results and will then be rerun with the proposed modifications to determine the new base flood profiles, and future-conditions flood profiles. c. Floodplain storage calculations based on cross-sections (at least one every 100 feet) showing existing and proposed floodplain conditions to show that base flood floodplain and futureconditions floodplain storage capacity would not be diminished by the development. d. A preliminary plat, grading plan, or site plan, as appropriate, which shall clearly define all future-conditions floodplain encroachments. E. Floodway encroachments. Located within areas of special flood hazard are areas designated as floodway. A floodway may be an extremely hazardous area due to velocity flood waters, debris or erosion potential. In addition, floodways must remain free of encroachment in order to allow for the discharge of the base flood without increased flood heights. Therefore the following provisions shall apply: 1) Encroachments are prohibited, including earthen fill, new construction, substantial improvements or other development within the regulatory floodway, except for activities specifically allowed in subsection E.2 below. 2) Encroachments for bridges, culverts, roadways and utilities within the regulatory floodway may be permitted provided it is demonstrated through hydrologic and hydraulic analyses performed in accordance with standard engineering practice that the encroachment shall not result in any increase to the pre-project base flood elevations, floodway elevations, or floodway widths during the base flood discharge. A registered professional engineer must provide supporting technical data and certification thereof. 3) If the applicant proposes to revise the floodway boundaries, no permit authorizing the encroachment into or an alteration of the floodway shall be issued by the city until an affirmative CLOMR is issued by FEMA and no-rise certification is approved by the city. F. Maintenance requirements. 1) The property owner shall be responsible for continuing maintenance as may be needed within an altered or relocated portion of a floodplain on his property so that the flood-carrying or flood-storage capacity is not diminished. 2) The city may direct the property owner (at no cost to the city) to restore the flood-carrying or flood storage capacity of the floodplain if the owner has not performed maintenance as required by the approved floodplain management plan on file with the city. ## History (Ord. No. 2019-1121-03, 11-21-2019)