Construction of road crossings and utility crossings of the Etowah River Corridor are exempt, provided that construction of such road and utility crossings shall meet all requirements of the Erosion and Sedimentation Control Act of 1975, O.C.G.A. ยง 12-7-1 et seq., and of section 107.09.00 (Soil erosion, sedimentation and pollution control) of this UDC.