A. Stormwater management facilities shall be provided for all developments subject to this section. 1) Storm drain systems shall be designed to capture stormwater from streets, driveways, parking areas, building roofs and other impervious surfaces. 2) Unless otherwise required by the community development director, the drainage for the site shall be directed to flow to streets or other approved collector systems. B. The overall drainage system shall be completed and made operational at the earliest possible time during construction. C. Stormwater facilities shall be designed to divert surface water away from cut faces or sloping surfaces of a fill. When this is not possible, interceptor ditches shall be installed above all cut/fill slopes and the intercepted water conveyed to a stable channel or natural drainage way with adequate capacity. Alternatively, berms at the top of slopes may be used to screen developments, vary the profile and ensure drainage will be directed away from slopes. D. Existing natural drainage systems should be utilized, as much as possible, in their natural state. 1) Alterations of major natural drainageways shall be prohibited except for approved road crossings and drainage structures. 2) Natural drainageways shall be riprapped or otherwise stabilized below drainage and culvert discharge points for a distance sufficient to convey the discharge without channel erosion. E. Flow-retarding devices and detention ponds shall be used where required to minimize increases in runoff volume and peak flow rate due to development.