--- title: Canton Zoning Ordinance, 107.10.03. Application requirements collection: local-codes id: local-code:canton/zoning/107.10.03 cite_as: Canton, Ga., Zoning Ordinance § 107.10.03 canonical_url: https://georgiacommons.org/code/local/canton/zoning/107.10.03 md_url: https://georgiacommons.org/code/local/canton/zoning/107.10.03.md text_url: https://georgiacommons.org/code/local/canton/zoning/107.10.03/text source_url: https://library.municode.com/ga/canton date: 2026-11-11 status: active jurisdiction: city:canton jurisdiction_name: Canton place_fips: "1312988" corpus_version: local-codes-canton-bb716bdc4821 publisher: Georgia Commons, an independent project of Georgia Civic Data. Not the State of Georgia. Not legal advice. up: https://georgiacommons.org/code/local/canton/zoning/~part-iii/~chapter-107.md previous: https://georgiacommons.org/code/local/canton/zoning/107.10.02.md next: https://georgiacommons.org/code/local/canton/zoning/107.10.04.md index: https://georgiacommons.org/code/local/canton.md branch: zoning edition: As published by Municode, retrieved 2026-11-11 edition_date_kind: retrieved source_publisher: Municode version_id: local-code:canton/zoning/107.10.03@2026-11-11-be6c9c045b --- # Canton Zoning Ordinance, 107.10.03. Application requirements > As published by Municode, retrieved 2026-11-11 > The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included. Part of: Part III - DEVELOPMENT CODE / Chapter 107 - TABLE OF CONTENTS A. Site analysis map required. 1) Concurrent with the submission of a site concept plan, the applicant shall prepare and submit a site analysis map. 2) The purpose of the site analysis map is to ensure that the important site features have been adequately identified prior to the creation of the site design, and that the proposed open space will meet the requirements of this section. 3) The preliminary site plan shall include the following features: a. Property boundaries; b. All streams, rivers, lakes, wetlands and other hydrologic features; c. Topographic contours of no less than ten-foot intervals; d. All primary and secondary conservation areas labeled by type, as described in section 107.10.04 below; e. General vegetation characteristics; f. General soil types; g. The planned location of protected open space; h. Existing roads and structures; and i. Potential connections with existing greenspace and trails. B. Open space management plan required. An open space management plan, as described in section 107.10.04 below, shall be prepared and submitted prior to the issuance of a land disturbance permit. C. Instrument of permanent protection required. An instrument of permanent protection, such as a conservation easement or permanent restrictive covenant and as described in section 107.10.04 below, shall be placed on the open space concurrent with the issuance of a land disturbance permit. D. Other requirements. The applicant shall adhere to all other applicable requirements of the underlying zoning and this UDC. ## History (Ord. No. 2014-18, § 2, 8-21-2014)