Skip to content
Georgia Commons
Menu

Canton · Zoning Ordinance

Part III - DEVELOPMENT CODE / Chapter 107 - TABLE OF CONTENTS

107.11.06. Standards.

About this text

  • As published by Municode, retrieved 2026-11-11
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

All mass grading and clearing on lots shall conform to the following standards and provisions unless where otherwise recommended in an approved soil engineering, engineering geology, hydrology, or tree protection plan where the alternate procedures will be equal or superior in achieving the purposes of this UDC. In addition, the following standards and provisions shall be the governing criteria for the issuance or denial of mass grading and clearing permits under this UDC.

A. Grading regulations.

1) Mass grading operations shall be conducted so as to expose the smallest practical area of soil.

2) The grading shall not create or contribute to landslides, accelerated soil creep, settlement and subsidence or hazards associated with strong ground motion and soil liquefaction.

3) The proposal shall contain reasonable provisions for the preservation of natural land and water features, vegetation, drainage and other indigenous natural features of the site.

4) The grading shall not create or contribute to flooding, erosion, or increased turbidity, siltation or other forms of pollution in a watercourse.

5) The grading shall be undertaken in such a manner as to preserve and enhance the City of Canton's aesthetic character. Vegetative screens or buffer strips shall be maintained or reestablished in a timely manner with approved plantings consistent with this UDC.

6) Development shall be initiated or a vegetative screen or buffer established within 12 months of the date of initiation of mass grading or clearing activities, except in regard to those activities exempt in this UDC.

7) Mass grading shall not occur on areas larger than 50 contiguous acres.

8) Mass grading activities shall be done in accordance with all applicable federal, state, and local laws, rules, and regulations, including those pertaining to air and water pollution, and noise control.

9) The faces of all slopes shall be prepared and maintained to control erosion. Devices or procedures for erosion protection shall be installed within one week of the initiation of mass grading operations and shall be maintained in operable condition by the owner during the duration of the activity for which the permit was issued.

B. Clear cutting and cuts regulations.

1) Cut slopes shall be no steeper than two-to-one (2:1).

2) The ground surface shall be prepared to receive fill by removing vegetation, nonapproved fill, topsoil, and other unsuitable materials as determined by the community development director and, where the slopes are five-to-one (5:1) or steeper, by the excavation of relatively level steps into the slope, on which the fill is to be placed.

3) Fill slopes shall not be constructed on natural slopes which are steeper than two-to-one (2:1).

4) When the owner of any parcel shall raise, lower, or alter the level of existing grade of a site by a fill or excavation, he or she shall at his or her own expense protect all adjoining property from encroachment by such fill or from danger of collapse due to such excavation either by erection of engineered retaining wall or by sloping the sides of such fill or excavation entirely within the confines of the site in a manner approved by the community development director.

5) Clear cutting shall not occur on areas larger than 50 contiguous acres.

6) Clear cutting shall not occur 30 feet beyond the building footprint.

7) Cut and fill slopes shall be provided with surface and subsurface drainage as necessary to retain slope stability.

8) The faces of all slopes shall be prepared and maintained to control erosion. Devices or procedures for erosion protection shall be installed within one week of the initiation of clear cutting or cut operations and shall be maintained in operable condition by the owner during the duration of the activity for which the permit was issued.

C. Approval. A mass grading or clearing permit application shall be approved by the community development director if it meets the requirements of this UDC.

D. Appeals. Any person or persons aggrieved by a permit application denial of the community director may file a notice of appeal in accordance with chapter 105 of this UDC.

History

The history line the source prints at the end of the section.

(Ord. No. 2014-18, § 2, 8-21-2014)

Read this code where it is posted (Municode) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:canton/zoning/107.11.06@2026-11-11-2590ac82e3

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.

Canton Zoning Ordinance, 107.11.06. Standards | Georgia Commons