A. Permit application.

1) When required. Any owner, authorized agent, or contractor who desires to construct, enlarge, alter, repair, move, demolish, or change the occupancy of a building or structure, or to erect, install, enlarge, alter, repair, remove, convert or replace any electrical, gas, mechanical, or plumbing system, the installation of which is regulated by the construction codes, or to cause any such work to be done, shall first make application to the building official and obtain the required permit for the work.

2) Exceptions. Permits shall not be required for the following mechanical work:

a. Any portable heating appliance;

b. Any portable ventilation equipment;

c. Any portable cooling unit;

d. Any steam, hot or chilled water piping within any heating or cooling equipment regulated by the construction codes;

e. Replacements of any part which does not alter its approval or make it unsafe;

f. Any portable evaporative cooler;

g. Any self-contained refrigeration system containing ten pounds (4.54 kg.) or less of refrigerant and actuated by motors of one horsepower (746 W) or less.

3) Work authorized. A building, electrical, gas, mechanical or plumbing permit shall carry with it the right to construct or install the work, provided the same are shown on the drawings and set forth in the specifications filed with the application for the permit. Where these are not shown on the drawings and covered by the specifications submitted with the application, separate permits shall be required.

4) Minor repairs. Ordinary minor repairs may be made with the approval of the building official without a permit, provided that such repairs shall not violate any of the provisions of the construction codes.

5) Information required.

a. Each application for a permit, with the required fee, shall be filed with the building official on a form furnished for that purpose, and shall contain a general description of the proposed work and its location.

b. The application shall be signed by the owner, or his/her authorized agent.

c. The building permit application shall indicate the proposed occupancy of all parts of the building and of that portion of the site or lot, if any, not covered by the building or structure, and shall contain such other information as may be required by the building official.

6) Time limitations. The following time limitations shall apply:

a. An application for a permit for any proposed work shall be deemed to have been abandoned six months after the date of filing for the permit, unless before then a permit has been issued.

b. One or more extensions of time for periods of not more than 90 days each may be allowed by the building official for the application provided the extension is requested in writing and justifiable cause is demonstrated.

B. Drawings and specifications.

1) Requirements.

a. When required by the building official, two or more copies of specifications and of drawings drawn to scale with sufficient clarity and detail to indicate the nature and character of the work, shall accompany the application for a permit. Such drawings and specifications shall contain informa tion, in the form of notes or otherwise, as to the quality of materials, where quality is essential to conformity with the construction codes. Such information shall be specific, and the construction codes shall not be cited as a whole or in part, nor shall the term "legal" or its equivalent be used, as a substitute for specific information.

b. All information, drawings, specifications and accompanying data shall bear the name and signature of the person responsible for the design.

2) Additional data.

a. The building official may require details, computations, stress diagrams, and other data necessary to describe the construction or installation and the basis of calculations.

b. All drawings, specifications and accompanying data required by the Building Official to be prepared by an architect or engineer shall be affixed with their official seal and signature.

3) Design professional.

a. The design professional shall be an architect or engineer legally registered under the laws of this state regulating the practice of architecture or engineering and shall affix his official seal to said drawings, specifications and accompanying data, for the following:

i. All group A, E, and I occupancies.

ii. Buildings and structures three stories or more high.

iii. Buildings and structures 5,000 square feet (465 m2 ) or more in area.

b. For all other buildings and structures, the submittal shall bear the certification of the applicant that some specific state law exception permits its preparation by a person not so registered.

c. Exception: Single-family dwellings, regardless of size, shall require neither a registered architect nor engineer, nor a certification that an architect or engineer is not required.

4) Structural and fire resistance integrity. Plans for all buildings shall indicate how required structural and fire resistance integrity will be maintained where a penetration of a required fire resistance wall, floor or partition will be made for electrical, gas, mechanical, plumbing, signal and communication conduits, pipes and systems and also indicate in sufficient detail how the fire integrity will be maintained where required fire resistance floors intersect the exterior walls.

5) Site drawings.

a. Drawings shall show the location of the proposed building or structure and of every existing building or structure on the site or lot.

b. The building official may require a boundary line survey prepared by a qualified surveyor.

6) Foundation surveys.

a. For all newly constructed buildings or additions, the permit applicant shall provide a foundation (footings) survey signed by a registered land surveyor showing:

i. The foundation (footing) location, ii. The outer perimeter of the proposed structure, iii. Building setbacks to property lines, iv. Any easements,

v. Any zoning setback and buffer dimensions, vi. Any existing structures on site, and vii. Any buffers of the waters of the State of Georgia.

7) The survey shall be submitted for approval to the city prior to scheduling of any further construction inspections on site.

8) Hazardous occupancies. The building official may require the following:

a. General site plan. A general site plan drawn at a legible scale which shall include, but not be limited to the location of:

i. All buildings, ii. Permanent access ways, iii. Evacuation routes, iv. Parking lots,

v. Internal roads, vi. Chemical loading areas, vii. Equipment cleaning areas, viii. Storm and sanitary sewer accesses, ix. Emergency equipment,

x. Adjacent property uses, and xi. Exterior storage facilities (exterior storage areas shall be identified with the hazard classes and the maximum quantities per hazard class of hazardous materials stored).

b. Building floor plan. A building floor plan drawn to a legible scale, which shall include, but not be limited to, all hazardous materials storage facilities within the building and shall indicate rooms, doorways, corridors, exits, fire rated assemblies with their hourly rating, location of liquid tight rooms, and evacuation routes. Each hazardous materials storage facility shall be identified on the plan with the hazard classes and quantity range per hazard class or the hazardous materials stored.

C. Examination of documents.

1) Plan review. The building official shall examine or cause to be examined each application for a permit and the accompanying documents, consisting of drawings, specifications, computations, and additional data, and shall ascertain by such examinations whether the construction indicated and described is in accordance with the requirements of the construction codes and all other pertinent laws or ordinances.

D. Issuing permits.

1) Action on permits.

a. The building official shall act upon an application for a permit without unreasonable or unnecessary delay.

b. If the building official is satisfied that the work described in an application for a permit and the contract documents filed therewith conform to the requirements of the construction codes and other pertinent laws and ordinances, he shall issue a permit to the applicant.

2) Refusal to issue permit.

a. If the application for a permit and the accompanying contract documents describing the work do not conform to the requirements of the construction codes or other pertinent laws or ordinances, the building official shall not issue a permit, but shall return the contract documents to the applicant with his refusal to issue such permit.

b. Such refusal shall, when requested, be in writing and shall contain the reason for refusal.

3) Public right-of-way. A permit shall not be given by the building official for the construction of any building, or for the alteration of any building where said building is to be changed and such change will affect the exterior walls, bays, balconies, or other appendages or projections fronting on any street, alley or public lane, or for the placing on any lot or premises of any building or structure removed from another lot or premises, unless the applicant has made application at the office of the city engineer for the lines of the public street on which he/she proposes to build, erect or locate said building; and it shall be the duty of the building official to see that the street lines are not encroached upon except as provided for in chapter 22 of the Standard Building Code.

E. Contractor responsibilities.

1) It shall be the duty of every contractor who shall make contracts for the installation or repairs of building, structure, electrical, gas, mechanical, sprinkler or plumbing systems, for which a permit is required, to comply with state or local rules and regulations concerning licensing which the applicable governing authority may have adopted.

2) In such case that the state requires a contractor to have obtained a state license before they are permitted to perform work, the contractor shall supply the local government with a copy of their license before receiving a permit for work to be performed.

F. Conditions of the permit.

1) Permit intent.

a. A permit issued shall be construed to be a license to proceed with the work and not as authority to violate, cancel, alter, or set aside any of the provisions of the construction codes, nor shall issuance of a permit prevent the building official from thereafter requiring a correction of errors in plans, construction, or violations of the construction codes.

b. Every permit issued shall become invalid unless the work authorized by such permit is commenced within six months after its issuance, or if the work authorized by such permit is suspended or abandoned for a period of 12 months after the time the work is commenced. One or more extensions of time, for periods not more than 90 days each, may be allowed for the permit, in accordance with the following requirements:

i. The extension shall be requested in writing and justifiable cause demonstrated.

ii. Extensions shall be granted by the building official.

2) Permit issued on basis of an affidavit. Whenever a permit is issued in reliance upon an affidavit or whenever the work to be covered by a permit involves installation under conditions which, in the opinion of the building official, are hazardous or complex, the building official shall require that the architect or engineer who signed the affidavit or prepared the drawings or computations shall supervise such work.

In addition, the following requirements shall apply:

a. Such architect or engineer shall be responsible for conformity with the permit, provide copies of inspection reports as inspections are performed, and upon completion make and file with the building official written affidavit that the work has been done in conformity with the reviewed plans and with the structural provisions of the construction codes.

b. In the event such architect or engineer is not available, the owner shall employ in his stead a competent person or agency whose qualifications are reviewed by the building official.

3) Plans. When the building official issues a permit, he/she shall enforce, in writing or by stamp, all sets of plans "reviewed for code compliance." One set of drawings so reviewed shall be retained by the building official and the other sets shall be returned to the applicant. One copy of the permitted drawings shall be kept at the site of work and shall be open to inspection by the building official or his/her authorized representative.

G. Fees.

1) Prescribed fees.A permit shall not be issued until the fees prescribed by the governing body have been paid. Nor shall an amendment to a permit be released until the additional fee, if required has been paid.

2) Work commencing before permit issuance. Any person who commences any work on a building, structure, electrical, gas, mechanical or plumbing, etc. system before obtaining the necessary permits, shall be subject to a penalty of 100 percent of the usual permit fee in addition to the required permit fees.

3) Accounting. The building official shall keep a permanent and accurate accounting of all permit fees collected the names of all persons upon whose account the same was paid, along with the date and amount thereof.

4) Schedule of permit fees. On all buildings, structures, electrical, plumbing, mechanical and gas systems or alterations requiring a permit, a fee for each permit shall be paid as required at the time of filing application, in accordance with the fee schedules as set by the governing body.

5) Building permit valuations.

a. If, in the opinion of the building official, the valuation of building, alteration, structure, electrical, gas, mechanical or plumbing systems appears to be underestimated on the application, permit shall be denied, unless the applicant can show detailed estimates to meet the approval of the building official.

b. Permit valuations shall include total cost, such as electrical, gas, mechanical, plumbing equipment and other systems, including materials and labor and shall be based on the approved index of the City of Canton.

H. Inspections.

1) Existing building inspections. Before issuing a permit the building official may examine or cause to be examined any building, electrical, gas, mechanical or plumbing systems for which an application has been received for a permit to enlarge, alter, repair, move, demolish, install, or change the occupancy.

a. The building official shall inspect all buildings, structures, electrical, gas, mechanical and plumbing systems, from time to time, during and upon completion of the work for which a permit was issued.

b. The building official shall make a record of every such examination and inspection and of all violations of the construction codes.

2) Manufacturers and fabricators. When deemed necessary by the building official he shall make, or cause to be made, an inspection of materials or assemblies at the point of manufacture or fabrication.

A record shall be made of every such examination and inspection and of all violations of the construction codes.

3) Inspection service.

a. The building official may make, or cause to be made, the inspections required by subsection H.6 below.

b. The building official may accept third party inspections. The contractor may proceed with these only with prior approval and must use a company approved by the City of Canton. A certificate called for by any provision of the construction codes shall not be based on such reports unless the same are in writing and certified by a responsible officer of such service.

4) Inspections prior to issuance of certificate of occupancy or completion. The building official shall inspect or cause to be inspected at various intervals all construction or work for which a permit is required, and a final inspection shall be made of every building, structure, electrical, gas, mechanical or plumbing system upon completion, prior to the issuance of the certificate of occupancy or completion.

5) Posting of permit. Work requiring a permit shall not commence until the permit holder or his/her agent posts the permit card in a conspicuous place on the premises and in accordance with the following additional requirements:

a. The permit shall be protected from the weather and located in such position as to permit the building official or representative to conveniently make the required entries thereon.

b. This permit card shall be maintained in such position by the permit holder until the certificate of occupancy or completion is issued by the building official.

6) Required inspections. The building official upon notification from the permit holder or his agent shall make the following inspections and such other inspections as necessary, and shall either release that portion of the construction or shall notify the permit holder or his agent of any violations which must be corrected in order to comply with this UDC:

a. Building.

i. Foundation inspection: To be made after trenches are excavated and forms erected.

ii. Structural sheathing: To be made after all sheathing, panels and exterior structural elements are in place.

iii. Frame inspection: To be made after the roof, all framing, fireblocking and bracing are in place, all concealing wiring, all pipes, chimneys, ducts and vents are complete. All MEP inspections must be approved before a frame inspection is approved.

iv. Final inspection: To be made after the building is completed and ready for occupancy.

b. Electrical.

i. Underground inspection: To be made after trenches or ditches are excavated, conduit or cable installed, and before any backfill is put in place.

ii. Wall rough-in inspection: To be made after the roof, framing and fire blocking are in place and all conduit, wiring and supports are in place and properly connected and prior to the installation of wall membranes.

iii. Ceiling rough-in inspection: To be made after the roof, framing and fire blocking are in place and all conduit, wiring and supports are in place and properly connected and prior to the installation of ceiling membranes.

iv. Final inspection: To be made after the building is complete, all required electrical fixtures are in place and properly connected or protected, and the structure is ready for occupancy.

c. Plumbing.

i. Underground inspection: To be made after trenches or ditches are excavated, piping installed, and before any backfill is put in place.

ii. Wall rough-in inspection: To be made after the roof, framing, fireblocking and bracing are in place and all soil, waste, supply and vent piping is complete, and prior to the installation of wall membranes.

iii. Ceiling rough-in inspection: To be made after the roof, framing and fire blocking are in place and all soil, waste, supply and vent piping is complete, and prior to the installation of ceiling membranes.

iv. Final inspection: To be made after the building is complete, all plumbing fixtures are in place and properly connected, and the structure is ready for occupancy.

v. Note: See section 311 of the Standard Plumbing Code for required tests.

d. Mechanical.

i. Underground inspection: To be made after trenches or ditches are excavated, underground duct and fuel piping installed, and before any backfill is put in place.

ii. Wall rough-in inspection: To be made after the roof, framing, fire blocking and bracing are in place and all ducting, and other concealed components are complete, and prior to the installation of wall membranes.

iii. Ceiling rough-in inspection: To be made after the roof, framing, fire blocking and bracing are in place and all ducting, and other concealed components are complete, and prior to the installation of ceiling membranes.

iv. Final inspection: To be made after the building is complete, the mechanical system is in place and properly connected, and the structure is ready for occupancy.

e. Gas.

i. Rough piping inspection: To be made after all new piping authorized by the permit has been installed, and before any such piping has been covered or concealed or any fixtures or gas appliances have been connected.

ii. Final piping inspection: To be made after all piping authorized by the permit has been installed and after all portions which are to be concealed by plastering or otherwise have been so concealed, and before any fixtures or gas appliances have been connected. This inspection shall include a pressure test.

iii. Final inspection: To be made on all new gas work authorized by the permit and such portions of existing systems as may be affected by new work or any changes in order to insure compliance with all the requirements of the construction codes and to assure that the installation and construction of the gas system is in accordance with reviewed plans.

f. Energy.

i. Foundation inspection: be made before slab concrete is poured in place. To verify that perimeter insulation has been installed correctly on any slab on grade foundations, if required.

ii. Frame inspection: to be made before exterior wall insulation is concealed by wall board to check installation of exterior walls insulation and to inspect that all holes and cracks through the structure envelope have been sealed in an appropriate manner as to restrict air passage.

iii. Final inspection: To be made after the building is completed and ready for occupancy. To verify installation and R-value of ceiling and floor insulation. To verify correct SEER ratings on appliances.

7) Written release.

a. Work shall not be done on any part of a building, structure, electrical, gas, mechanical or plumbing system beyond the point indicated in each successive inspection without first obtaining a written release from the building official.

b. Written release shall be given only after an inspection has been made of each successive step in the construction or installation as indicated by each of the foregoing three inspections.

8) Reinforcing steel, structural frames, insulation, plumbing, mechanical, or electrical systems. Reinforcing steel, structural frame, insulation, plumbing, work of any part of any building or structure shall not be covered or concealed without first obtaining a release from the building official.

I. Certificates.

1) Certificate of occupancy.

a. Building occupancy.

i. A new building shall not be occupied or a change made in the occupancy, nature or use of a building or part of a building until after the building official has issued a certificate of occupancy.

ii. A certificate of occupancy shall not be issued until all required electrical, gas, mechanical, plumbing and fire protection systems have been inspected for compliance with the construction codes and other applicable laws and ordinances and released by the building official.

b. Issuing certificate of occupancy. Upon satisfactory completion of construction of a building or structure and installation of electrical, gas, mechanical and plumbing systems in accordance with the construction codes, reviewed plans and specifications, and after the final inspection, the building official shall issue a certificate of occupancy stating the nature of the occupancy permitted, the construction type and the occupant load in accordance with the provisions of the construction codes.

c. Temporary/partial occupancy. The building official may, upon review of the circumstances, issue a temporary/partial certificate of occupancy for a portion of a building which may safely be occupied prior to final completion of the building.

d. Existing building certificate of occupancy.

i. A certificate of occupancy for any existing building may be obtained by applying to the building official and supplying the information and data necessary to determine compliance with the construction codes for the occupancy intended. Where necessary, in the opinion of the building official, two sets of detailed drawings, or a general inspection, or both, may be required.

ii. When, upon examination and inspection, it is found that the existing building conforms to the provisions of the construction codes and other applicable laws and ordinances for such occupancy, a certificate of occupancy shall be issued.

2) Certificate of completion.

a. Upon satisfactory completion of a building, structure, electrical, gas, mechanical or plumbing system, a certificate of completion may be issued.

b. The certificate of completion is proof that a structure or system is complete and for certain types of permits is released for use and may be connected to a utility system.

c. The certificate of completion does not grant authority to occupy or connect a building, such as a shell building, prior to the issuance of a certificate of occupancy.

3) Service utilities.

a. Connection of service utilities. No person shall make connections from a utility, source of energy, fuel or power to any building or system which is regulated by the construction codes for which a permit is required, until released by the building official and a certificate of occupancy or completion is issued.

b. Temporary connection. The building official may authorize the temporary connection of the building or system to the utility source of energy, fuel or power for the purpose of testing building service systems or for use under a temporary certificate of occupancy.

c. Authority to disconnect service utilities. The building official shall have the power to authorize disconnection of utility service to a building, structure or system regulated by the construction codes, in case of emergency where necessary to eliminate an immediate hazard to life or property. The building official shall notify the serving utility, and whenever possible the owner and occupant of the building, structure or service system of the decision to disconnect prior to taking such action. If not notified prior to disconnecting, the owner or occupant of the building, structure or service system shall be notified in writing, as soon as practical thereafter.

J. Floor loads.

1) Occupancy. An existing or new building shall not be occupied for any purpose, which will cause the floors thereof to be loaded beyond their safe capacity.

2) Storage and factory-industrial occupancies. It shall be the responsibility of the owner, agent, proprietor or occupant of group S and group F occupancies, or any occupancy where excessive floor loading is likely to occur, to employ a competent architect or engineer in computing the safe load capacity. All such computations shall be accompanied by an affidavit from the architect or engineer stating the safe allowable floor load on each floor in pounds per square foot uniformly distributed.

3) Signs required. In every building or part of a building used for storage, industrial or hazardous purposes, the safe floor loads shall be marked on plates or approved design which shall be supplied and securely affixed by the owner of the building in a conspicuous place in each story to which they relate. Such plates shall not be removed or defaced, and if lost, removed or defaced, shall be replaced by the owner of the building.

K. Tests.

1) The building official may require tests or test reports as proof of compliance.

2) Required tests are to be made at the expense of the owner or his/her agent, by an approved testing laboratory or other approved agency.

History

The history line the source prints at the end of the section.

(Ord. No. 2014-18, § 2, 8-21-2014)

Read this code where it is posted (Municode) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:canton/zoning/108.04.05@2026-11-11-6a5e6074a9

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.