A. This work shall consist of constructing a base of mineral aggregate on a prepared subgrade in accordance with these specifications and in reasonable close conformity with the lines, grades, thickness and typical cross-sections shown on the plans or established by the city engineer. B. All equipment necessary for the proper construction of the base shall be on the project and in satisfactory condition before construction will be permitted to begin. C. No graded aggregate base shall be placed on muddy or frozen subgrade. D. The materials shall be spread uniformly to the proper depth to obtain the specified thickness. Graded aggregate materials containing frost or frozen particles shall not be placed. E. The moisture content of the mixture of materials at the time of compaction shall be uniformly distributed and shall be adequate to allow compaction to the specified density. After the material placed has been shaped to line, grade and cross-section, it shall be rolled until the course has been uniformly compacted to at least 100 percent of the maximum dry density when group 2 aggregate in used, or to at least 98 percent of maximum dry density when group 1 aggregate is used. Compaction tests shall be taken at an interval not exceeding one per 1,000 feet per two lanes of road way with a minimum of one test per street. F. The compacted base shall have sufficient stability to support construction equipment without pumping regardless of compaction. If the base material becomes unstable as a result of too much moisture, the base material and the underlying subgrade if necessary shall be dried and reworked to a moisture content that will provide stability and compaction. G. At all places not accessible to the roller, the required compaction shall be secured by means of approved mechanical tampers. The same density requirements as stated above apply. H. The finished surface of the base shall be checked by a system of ordinates measured from a stringline. Ordinates measured from the bottom of the stringline to the surface shall not exceed one-quarter-inch at any point. Any variations found in excess of these requirements shall be immediately corrected. I. The base shall be maintained and cured for a minimum of 24 hours during the compaction testing, proof-rolling, and priming process before any pavement can be placed. J. This maintenance shall consist of such additional wetting, rolling and blading as may be necessary to maintain true grade, crown and cross-section. This preservation does not relieve the contractor of his responsibility to maintain the work until final acceptance. K. Depth checks shall be taken at random locations at 500-foot intervals along each road. The thickness of the base shall be determined by making as many checks as necessary to determine the average thickness. L. Any area deficient in thickness by more than one-half-inch shall be corrected by adding additional quantities of the same materials and scarified and rebuilt to the design thickness. M. When graded aggregate base is used under asphaltic concrete less than five inches, bituminous prime shall be applied. N. Test results shall be reported immediately after results are obtained to the city engineer. O. No asphalt material shall be placed on the graded aggregate base until passing results and depth checks are reported to the city engineer. P. The theoretical maximum dry density shall be established Using Test Method GDT-49 of the Georgia DOT Sampling, Testing and Inspection Manual. Q. Graded aggregate base shall meet the requirements of Georgia DOT specification #815 and produced from an approved DOT source. R. Non-compliance in graded aggregate base may be corrected by scarifying in asphalt screenings (when too coarse) or coarse aggregate (when too fine). The scarifying operations produce a uniformly graded lift in compliance with all specification requirements and reasonably close to the theoretical density gradation. The lift thickness and compaction requirements are maintained. The scarifying operation should be accomplished without soil contamination. The blend materials are to be acquired from the same source as the base material. All areas that have been blended to produce specification compliance will be verified through additional project testing before placing asphalt. S. If the contractor and/or materials supplier is unable to meet all of the above, areas of non-compliance should be removed and replaced with acceptable materials. T. Graded aggregated base must pass proof rolling prior to placement of asphalt. U. A job mix formula for each type of asphaltic concrete mixture to be used shall be submitted for approval in writing to the city engineer. All proposed job mix formulas shall be submitted one week prior to beginning mixing operation. The contractor may, at any time after construction has started, request that the job mix formula be revised as necessary and submit a revised formula for consideration. V. Asphalt plants shall be on the Georgia Department of Transportation's approved list. W. All equipment for transporting and construction of hot mix asphaltic concrete shall be approved by the city inspector. The equipment shall be in satisfactory mechanical condition and capable of its intended function at all times during productions and placement operations. The contractor shall provide sufficient hand tools and power equipment for cleaning the roadway surface prior to the placement of the bituminous tack coat. X. The bituminous pavers used for placement of hot mix asphaltic concrete shall be capable of spreading and finishing all courses to the indicated widths and depths, true to line, grade, and cross-section, and shall be capable of striking a smooth finish, uniform in density and texture. Y. The compaction equipment must be in good mechanical condition and capable of compacting the mixture to the required density. The number, type, size, operation, and condition of the compaction equipment shall be subject to the approval of the city engineer. Z. Trucks used for hauling bituminous mixture shall have tight, clean smooth beds. An approved releasing agent from the approved qualified product list of the Georgia Department of Transportation may be used in the beds of the transporting vehicles shall prevent the mixture from adhering to the beds. The releasing agent shall not be detrimental to the mixture and shall be applied in such a manner that the excess will be drained from the bed prior to loading. AA. Diesel fuel shall not be allowed in the beds of vehicles transporting asphalt. BB. Each haul vehicle shall use a waterproof cover large enough to extend down over the side and ends of the bed far enough to protect the mixture and shall be securely fastened while in transit. Adequate provisions shall be made to assure the mixture will be delivered to the roadway at a temperature within +/-20 degrees Fahrenheit of that specified on the job mix formula. CC. The city-approved geotech shall test the temperature of the job mix within the first three trucks to ensure that the temperature meets the requirements of this UDC. The geotech shall fax a certified letter stating that the job mix temperature is in compliance with this UDC. DD. Weather limitation. See table 109-4. Table 109-4 Weather Limitation Requirements Lift Thickness (inches) Minimum Temperature 1" or Less 55°F 1.1" to 2" 45°F EE. Cleaning of existing surface. Before beginning the application of any hot mix asphaltic concrete pavement, the existing surface shall be cleaned to the satisfaction of the development inspector. FF. Bituminous tack coat. The application rate shall be approved by the city engineer and will be within the limitation as shown in table 109-5: Table 109-5 Bituminous Tack Coat Application Minimum Maximum .04 .06 GG. Spreading operations. 1) Upon arrival at the point of paving operations the mixture shall be unloaded into the paver hopper from the delivery vehicles and transferred into the spreader. 2) The mixture shall be spread by means of a mechanical spreader, true to line, grade, and cross- section specified and to the loose depth that will result in the specified compacted thickness or the specified rate of spread. HH. Truckloads of mixture that are visually inspected by the city inspector and can reasonably be expected not to meet these specifications, such as a mixture containing segregated material, nonconforming to temperature, a deficiency or excess of asphalt content, or otherwise unsuitable for placing on the roadway shall not be used in the work. Any mixture containing segregated spots, deficiency of excess of asphalt content, or otherwise unsuitable that is placed on the roadway shall be removed and replaced with satisfactory material. II. Rolling operation. 1) The type of equipment used for compacting the material shall be approved by the city inspector. 2) Rolling shall be started as close behind the spreader as possible without excessive distortion and shall be continued until roller marks are no longer visible. 3) The approved compacting equipment shall be used on all subsurface courses. JJ. Plant production, transportation and paving operations shall be so coordinated that a uniform continuity of operation is maintained. KK. One asphalt concrete extraction test per type mix shall be taken at an interval not exceeding 500 tons or one per type mix per day. Extraction test results shall be reported to the city engineer daily. LL. If the acceptance test for asphalt cement content exceeds two-tenths from the approved job mix formula, the contractor will make the necessary adjustment to the mix to bring the asphalt cement back to the approved job mix formula. MM. If the acceptance test for asphaltic concrete "B" exceeds 4.1 on the three-eighths-inch sieve or 3.6 on the no. 8 sieve from the approved job mix formula, the contractor will make the necessary adjustment to the mix to bring the gradation back to the approved job mix formula. NN. If the acceptance test for asphaltic concrete "F" exceeds 3.8 on the no. 4 sieve or 3.2 on the no. 8 sieve from the approved job mix formula, the contractor will make the necessary adjustment to the mix to bring the gradation back to the approved job mix formula. OO. If the acceptance test for asphaltic concrete "E" exceeds 5.6 on the no. three-eighths-inch sieve or 4.8 on the no. 8 sieve from the approved job mix formula, the contractor will make the necessary adjustment to the mix to bring the gradation back to the approved job mix formula. PP. Asphaltic concrete compaction test for each mix shall be taken at an interval not exceeding one per 500 linear feet per travel lane of roadway and in each cul-de-sac with a minimum of one test per street. QQ. The target density will be set at 94 percent of the theoretical voidless mix for 50 blow marshall design. RR. The asphalt shall be rolled and compacted to at least 97.5 percent of the target density. SS. Three asphalt cores will be taken from the first day's production for each type mix to determine if compactions are meeting the 97.5 percent of target density. If the compaction does not equal or exceed 97.5 percent of target density, the contractor will establish a new rolling pattern to achieve the 97.5 percent of target density. TT. Compaction test results shall be reported daily to the city inspector immediately after results are obtained. UU. In the event that a majority of a pavement course is in place and found to be deficient in density, it will be left to the discretion of the city engineer as to what course of action to take in regarding the corrective action. Removal and replacement may be a possible course of action based on city engineer discretion. VV. The thickness of the asphaltic concrete "B" or surface course shall be determined by taking as many cores as necessary to determine the average thickness of the course. A minimum of one core per 500 feet per two lanes of roadway shall be taken randomly for thickness determinations with a minimum of one test per street. WW. Any core found deficient shall be brought up to the required thickness prior to placing any additional layer of material. XX. All asphalt core holes shall be filled and compacted with hot mix asphalt of a similar grade prior to approval of the final plat. See table 109-6. Table 109-6 Asphalt Core Hole Fill/Compaction Course Thickness Specified (inches) Asphaltic Concrete "B" +/- 1 /8" Asphaltic Concrete "E or F" +/- 1 /8" Total Thickness +/- 1 /4" (Ord. No. 2014-18, § 2, 8-21-2014)