Skip to content
Georgia Commons
Menu

Canton · Zoning Ordinance

Part III - DEVELOPMENT CODE / Chapter 109 - DESIGN STANDARDS: STREETS AND STORMWATER SYSTEMS TABLE OF CONTENTS

109.03.11. Sidewalks.

About this text

  • As published by Municode, retrieved 2026-11-11
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

A. Concrete sidewalks shall be required in all residential developments, and on all roads for commercial and industrial developments. Sidewalks shall be provided and located on both sides of all road frontages (existing and proposed); both public and private.

B. When a subdivision project abuts a public right-of-way, sidewalks shall be required for a length equal to the distance of the required road improvements along the road frontage. Sidewalks will be constructed on both sides of the road (if development abuts both sides of the road) when the road is classified as an arterial, major collector or minor collector roadway.

C. The concrete sidewalk shall be four inches thick, shall have a maximum side-to-side slope of one-quarterinch per foot, and shall have a minimum compressive strength of 3,000 PSI at 28 days.

D. Sidewalks shall be constructed per standard sidewalk detail #213.

E. Sidewalk location and width requirements.

1) Sidewalks located within one foot of the curb shall have a minimum width of six feet.

2) Sidewalks located within one to four feet from the curb shall have a minimum width of five feet.

3) Sidewalks located greater than four feet from the curb shall have a minimum width of four feet.

F. Sidewalks shall be located as stated in subsection E above, but not less than one foot from the property line to prevent interference of encroachment by fencing, walls, hedges or other planting or structures placed on the property line at a later date.

G. Amenity areas must be accessible by sidewalks from the nearest sidewalk in the subdivision.

H. All sidewalks, crosswalks, handicap ramps and access to amenity areas shall be constructed in compliance with the 2010 Americans with Disabilities Act Accessibility Design Guidelines (ADAAG) and the Americans with Disabilities Act (ADA) of 1990.

I. Handicapped access ramps and curb cuts shall be provided at all street intersections.

J. No certificate of occupancy will be granted for any specific lot that the installation of sidewalks is required until they are constructed.

History

The history line the source prints at the end of the section.

(Ord. No. 2014-18, § 2, 8-21-2014)

Read this code where it is posted (Municode) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:canton/zoning/109.03.11@2026-11-11-128c562462

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.

Canton Zoning Ordinance, 109.03.11. Sidewalks | Georgia Commons