--- title: Canton Zoning Ordinance, 109.03.12. Development access collection: local-codes id: local-code:canton/zoning/109.03.12 cite_as: Canton, Ga., Zoning Ordinance § 109.03.12 canonical_url: https://georgiacommons.org/code/local/canton/zoning/109.03.12 md_url: https://georgiacommons.org/code/local/canton/zoning/109.03.12.md text_url: https://georgiacommons.org/code/local/canton/zoning/109.03.12/text source_url: https://library.municode.com/ga/canton date: 2026-11-11 status: active jurisdiction: city:canton jurisdiction_name: Canton place_fips: "1312988" corpus_version: local-codes-canton-bb716bdc4821 publisher: Georgia Commons, an independent project of Georgia Civic Data. Not the State of Georgia. Not legal advice. up: https://georgiacommons.org/code/local/canton/zoning/~part-iii/~chapter-109.md previous: https://georgiacommons.org/code/local/canton/zoning/109.03.11.md next: https://georgiacommons.org/code/local/canton/zoning/109.03.13.md index: https://georgiacommons.org/code/local/canton.md branch: zoning edition: As published by Municode, retrieved 2026-11-11 edition_date_kind: retrieved source_publisher: Municode version_id: local-code:canton/zoning/109.03.12@2026-11-11-5af65599d9 --- # Canton Zoning Ordinance, 109.03.12. Development access > As published by Municode, retrieved 2026-11-11 > The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included. Part of: Part III - DEVELOPMENT CODE / Chapter 109 - DESIGN STANDARDS: STREETS AND STORMWATER SYSTEMS TABLE OF CONTENTS Development Type Required Access Connecting Street Residential, under 125 units 1 Residential arterial or collector street Residential, 125—300 units 2 Collector street Residential, over 300 units 3 Collector street Non-residential, less than 300 required parking spaces 1 Collector street Non-residential, 300—999 required parking spaces 2 Major or minor arterial or collector street Non-residential, 1,000 or more required parking spaces 2 or more as determined by the city Major or minor arterial or collector street Second (2nd) required access shall be installed prior to the issuance of the 1st certificate of occupancy A. Access to every development shall be provided over an existing public street. Existing developments with private streets can be continued without additional access to a public street, subject to subsection B below. B. Access means a point of entrance to and a point of exit from land adjacent to a public road. C. Where the property configuration prohibits or makes impractical the installation of two access points to an existing public street, and alternative access may be approved or this provision may be waived by the city council. In the event an alternative secondary access point is required and approved, said access point must be at least 20 feet wide and be constructed of asphalt, concrete, brick, cement pavers or other approved hard surface other than gravel or loose fill. D. When a new access point for a development is provided from an existing county road, it shall be permitted and approved through Cherokee County. The developer shall provide approval by Cherokee County for existing county road improvements. E. Any development accessed by a city road shall conform to city standard details. F. Access onto a state road shall meet existing Georgia DOT requirements. 1) Before the plans can be approved, a copy of the Georgia DOT permit or D.O.T. letter of intent shall be submitted to the city stating that a curb cut will be granted as long as the applicant meets all D.O.T. standards. 2) The submitted construction plans must indicate by a note on the preliminary plat that the plans have been approved subject to all modifications or requirements placed upon the development by the Georgia DOT. G. Deceleration lane and taper length shall be based on the main roadway posted speed limit as follows (see table 109-9). The city may require residential subdivisions exceeding 125 units or at its discretion below 125 units to install longer deceleration lanes and/or a center turn lane. If the city determines that the entrance onto a city roadway could result in a safety problem then the City of Canton may require the developer to present a traffic study to address any safety concerns. Table 109-9 Deceleration Lane and Taper Length Main Road Speed Limit Deceleration Lane Length (feet) Transition Taper Length (feet) 55 mph 200' 50' 50 mph 150' 40' 45 mph 110' 35' 40 mph 90' 30' 35 mph or less 50' 25' H. The minimum pavement width of a deceleration lane shall be 12 feet, and the minimum turning radius shall conform with standard detail #206. The minimum pavement design for the proposed deceleration lane shall match the subdivision street shall be 6"/2"/11 /2" or match the existing pavement specification, whichever is greater. I. Additional street right-of-way necessary for deceleration lanes shall be dedicated as needed, and as illustrated in standard detail 206 "Subdivision Entrance Intersection." J. The cross slope of any deceleration lane shall follow the crown or super elevation of the existing street. A minimum of one-quarter-inch per foot shall be maintained. K. Vertical faced curb and gutter is required through the radius, excluding the tapers. L. The developer shall be responsible for the costs of any utility relocation or catch basins that must be constructed. ## History (Ord. No. 2014-18, § 2, 8-21-2014; Ord. No. 2017-0817-2, § 1, 8-17-2017; Ord. No. 2019-0117-08, 1-17-2019)