--- title: Canton Zoning Ordinance, 111.03.07. SCADA Requirements collection: local-codes id: local-code:canton/zoning/111.03.07 cite_as: Canton, Ga., Zoning Ordinance § 111.03.07 canonical_url: https://georgiacommons.org/code/local/canton/zoning/111.03.07 md_url: https://georgiacommons.org/code/local/canton/zoning/111.03.07.md text_url: https://georgiacommons.org/code/local/canton/zoning/111.03.07/text source_url: https://library.municode.com/ga/canton date: 2026-11-11 status: active jurisdiction: city:canton jurisdiction_name: Canton place_fips: "1312988" corpus_version: local-codes-canton-bb716bdc4821 publisher: Georgia Commons, an independent project of Georgia Civic Data. Not the State of Georgia. Not legal advice. up: https://georgiacommons.org/code/local/canton/zoning/~part-iii/~chapter-111.md previous: https://georgiacommons.org/code/local/canton/zoning/111.03.06.md next: https://georgiacommons.org/code/local/canton/zoning/111.03.08.md index: https://georgiacommons.org/code/local/canton.md branch: zoning edition: As published by Municode, retrieved 2026-11-11 edition_date_kind: retrieved source_publisher: Municode version_id: local-code:canton/zoning/111.03.07@2026-11-11-b2b0657970 --- # Canton Zoning Ordinance, 111.03.07. SCADA Requirements > As published by Municode, retrieved 2026-11-11 > The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included. Part of: Part III - DEVELOPMENT CODE / Chapter 111 - DESIGN STANDARDS: SEWER SYSTEM TABLE OF CONTENTS A. The control panel manufacturer shall coordinate with the pump manufacturer and the generator manufacturer, such that the SCADA system can be installed into the control panel. The control panel shall be sized such that there is adequate space for this equipment. The control panel manufacturer shall coordinate the receipt and installation of the SCADA equipment in the control panel. Make all connections between the SCADA equipment and the pump controls as required by the SCADA manufacturer. B. Each lift station shall be provided with a remote terminal unit (RTU) to communicate with the city's SCADA System as provided by Dexter Fortson Associates, Inc. Each RTU at a minimum will provide the following monitoring/control points: 1) Each phase voltage, current, and power factor for each pump in the station. 2) Station voltage phase to phase and phase to neutral and current in each phase at the line side of the main disconnect switch and at the emergency power input to the ATS. 3) Manual on/off control for each pump from a remote signal to the RTU. 4) Status of each pump - on/off. 5) Pump trouble alarm for each pump with 20-second time delay. 6) Station operation — simplex, duplex, triplex or quadplex. 7) Station on normal power. 8) Station on emergency power. 9) Generator running. 10) Generator alarm. 11) Maintenance shutdown. 12) SCADA control off. 13) Low wet well alarm. 14) High wet well alarm. 15) Manual off/on. 16) Provide alternator for the operation of pumps (triplex and quadplex only). 17) ATS open (normal power) and closed (emergency power) indication. 18) Control voltage alarm. 19) Status of control voltage to the RTU. C. Line power shall be provided with a quick disconnect and a transient voltage surge suppressor at the main service entrance. Disconnects shall utilize a solid state circuit breaker. ## History (Ord. No. 2014-18, § 2, 8-21-2014)