A. All sanitary sewer treatment facilities shall be designed and constructed in accordance with the latest edition of "Rule and Regulations for Water Quality Control" from the Georgia Department of Natural Resources, Environmental Protection Division and the requirements of "The Ten States Standards." Where requirements conflict, the more restrictive of the requirements shall govern. B. Representatives from the City of Canton Engineering Department shall have the right to review and modify the design of the treatment facility if the modifications are in the best interest of the city. Any revisions to the design made during construction must be approved by the city. C. All reports, studies, plans and specifications submitted to the city must carry the seal of a professional engineer competent in the design of wastewater treatment facilities in the State of Georgia.