If the developer wishes the city to consider allowing the relocation of an existing wastewater treatment facility, the following applies: A. All the rules outlined in other sections of these specifications apply. B. The consultant of the city will inspect the facility that is proposed to be relocated and prepare a deficiency list which must be corrected by the developer prior to acceptance by the city. C. All of the costs incurred by the city for the consultant's time will be borne by the developer as will the cost of correcting deficiencies noted in paragraph B.