Canton · Zoning Ordinance
Part III - DEVELOPMENT CODE / Chapter 114 / Article III - CONSTRUCTION STANDARDS
Sec. 114-126. Elevation of wastewater connections.
About this text
- As published by Municode, retrieved 2026-11-11
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
(a) It shall be the obligation of the owner of the building or buildings being connected to the city wastewater system to determine the elevations, grades and alignment of sewer lines necessary to serve the building prior to the pouring of the building foundation or footings, and to design and construct the connecting sewer in accordance with the information thus obtained.
(b) Whenever possible, a building sewer shall be brought to the building at an elevation below the basement floor. In all buildings in which any building drain is too low to permit gravity flow to the city wastewater system, the wastewater carried by such building drain shall be lifted by an approved means into the city wastewater system. Operation and maintenance of such a lifting system shall be the sole responsibility of the property owner.
History
(Ord. No. 2017-0921-01, § 1, 9-21-2017)
Read this code where it is posted (Municode) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.