All water or wastewater construction work conducted on the public right-of-way or any public property shall be conducted only with proper permission from the water and sewer department manager. The developer shall be required to post a bond with the city so that proper restoration of the disturbed area is assured. All disturbed areas as a result of such construction shall be restored to a condition that is as good as new. The scheduling of such construction activities shall be as approved by the city manager if such scheduling approval is determined to be in the public's best interest. (Re: Development regulation 804.11 in appendix B.)