(a) Lift stations serving two or more buildings.All wastewater lift stations installed in the city which serve two or more buildings shall be designed and constructed in strict conformity to the city standards. (See development regulations 706 in appendix B.) Engineering plans shall be prepared for all wastewater lift stations and such plans shall be approved by the city water system prior to construction. Following the construction and acceptance by the city of a wastewater lift station, title to the lift station shall be conveyed to the city. (b) Lift stations serving a single building. Unless otherwise approved by the city manager, all wastewater lift stations serving a single building shall be owned, operated and maintained by the building owner. (Also see section 114-114.)