(a) Septic tank waste may be introduced into the POTW only at locations designated by the city manager, and at such times as are established by the city manager. Such waste shall not violate any section of this chapter or any other requirements established by the city. The city manager may require septic tank waste haulers to obtain wastewater discharge permits. (b) The city manager shall require haulers of industrial waste to obtain wastewater discharge permits. The city manager may require generators of hauled industrial waste to obtain wastewater discharge permits. The city manager also may prohibit the disposal of hauled industrial waste. The discharge of hauled industrial waste is subject to all other requirements of this chapter. (c) Industrial waste haulers may discharge loads only at locations designated by the city manager. No load may be discharged without prior consent of the city manager. The city manager may collect samples of each hauled load to ensure compliance with applicable standards. The city manager may require the industrial waste hauler to provide a waste analysis of any load prior to discharge. (d) Industrial waste haulers must provide a waste-tracking form for every load. This form shall include, at a minimum, the name and address of the industrial waste hauler, permit number, truck identification, names and addresses of sources of waste, and volume and characteristics of waste. The form shall identify the type of industry, known or suspected waste constituents, and whether any wastes are RCRA hazardous wastes.