--- title: Canton Zoning Ordinance, Sec. 114-280. High strength wastewater surcharge collection: local-codes id: local-code:canton/zoning/114-280 cite_as: Canton, Ga., Zoning Ordinance § 114-280 canonical_url: https://georgiacommons.org/code/local/canton/zoning/114-280 md_url: https://georgiacommons.org/code/local/canton/zoning/114-280.md text_url: https://georgiacommons.org/code/local/canton/zoning/114-280/text source_url: https://library.municode.com/ga/canton date: 2026-11-11 status: active jurisdiction: city:canton jurisdiction_name: Canton place_fips: "1312988" corpus_version: local-codes-canton-bb716bdc4821 publisher: Georgia Commons, an independent project of Georgia Civic Data. Not the State of Georgia. Not legal advice. up: https://georgiacommons.org/code/local/canton/zoning/~part-iii/~chapter-114/~article-v/~division-1.md previous: https://georgiacommons.org/code/local/canton/zoning/114-279.md next: https://georgiacommons.org/code/local/canton/zoning/114-281.md index: https://georgiacommons.org/code/local/canton.md branch: zoning edition: As published by Municode, retrieved 2026-11-11 edition_date_kind: retrieved source_publisher: Municode version_id: local-code:canton/zoning/114-280@2026-11-11-bccd5f34c1 --- # Canton Zoning Ordinance, Sec. 114-280. High strength wastewater surcharge > As published by Municode, retrieved 2026-11-11 > The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included. Part of: Part III - DEVELOPMENT CODE / Chapter 114 / Article V - NON-DOMESTIC USE OF PUBLIC WASTEWATER FACILITIES / Division 1 - GENERALLY (a) Established. All users discharging high strength wastewater into the city wastewater system shall be assessed a monetary surcharge, in addition to the normally required sewer use charges, in an amount to be calculated as shown below. A "high strength" wastewater is defined as wastewater which contains the below shown parameters in excess of the below shown concentrations: (1) Five-day, 20 degrees Celsius biochemical oxygen demand (BOD) of 300 milligrams per liter (mg/l), not to exceed a maximum of 600 mg/l. (2) Total ammonia nitrogen (NH3+NH4) of 30 mg/l, not to exceed a maximum of 50 mg/l. (3) Total phosphorus of ten mg/l, not to exceed a maximum of 20 mg/l. (4) Floatable oil and grease of 100 mg/l, not to exceed a maximum of 250 mg/l. (b) The parameters shall be determined by the utilization of the sampling and testing procedures as provided in section 114-270. The amount of the surcharge, which is hereby charged and assessed against all users discharging high strength wastewater into the city wastewater system, shall reflect the cost incurred by the city in handling the excess oxygen demand, ammonia, total phosphorus, and floatable oil and grease. This surcharge shall include a proportionate share of charges for maintenance and operation of the wastewater treatment facilities including depreciation and other incidental expenses. (c) Formula. When the concentrations of the surcharged parameters shown above exceed the values of the constituents as set forth in subsection (a), above, the excess concentrations shall be subject to a surcharge in the amount derived in accordance with the following formula: Surcharge $/month = P × G × 8.34 × C Where: P Is the excess concentration in mg/l of the parameter (BOD, etc.) being evaluated; i.e. the actual concentration less the allowable concentration listed in subsection (a) would be the excess. G Is equal to the user's monthly wastewater flow in millions of gallons. 8.34 is a conversion factor. C Is equal to the unit cost in dollars per pound ($/lb.) for the treatment of the surcharged parameters. This value shall be established by the department manager based on actual wastewater treatment costs which shall be revised from time to time as necessary. (d) Quantitative measurement of surchargeable parameters. The measurement of the surcharge parameters (BOD, COD, ammonia, total phosphorus, or floatable oil and grease) shall be conducted as follows: (1) The city shall sample and test the user as provided in section 114-270 a minimum of once per year, except that the duration of the sampling to determine surcharge shall be for a period of not less than 14 calendar days. (2) The city need not provide any prior notice to the industry with regard to the sampling period. (3) The city may sample the user as often as desired at the city's expense if, in the opinion of the city, representative samples have not been previously obtained. (4) If in the opinion of the user, the samples taken by the city are not representative of the user's typical wastewater, then the user may request a resampling. At the user's request, the city shall grant the user not more than two resamplings per year. All user requested resampling shall be done at the user's expense. A reasonable cost shall be charged to the user by the city therefore. (e) Billing procedure. Wastewater surcharges as provided for in this section shall be prepared and rendered in the following manner: (1) For users who purchase water from and discharge wastewater to the city water and wastewater systems, the surcharge will be included on the user's regular water and sewer bill or on a separate wastewater surcharge bill. (2) For users who purchase water from city water systems within the city, the surcharge will be on a separate wastewater surcharge bill from the city or in such other manner as is in accordance with current city agreements regarding wastewater billings. ## History (Ord. No. 2017-0921-01, § 1, 9-21-2017)