--- title: Canton Zoning Ordinance, Sec. 114-89. Exception to the billing presumption collection: local-codes id: local-code:canton/zoning/114-89 cite_as: Canton, Ga., Zoning Ordinance § 114-89 canonical_url: https://georgiacommons.org/code/local/canton/zoning/114-89 md_url: https://georgiacommons.org/code/local/canton/zoning/114-89.md text_url: https://georgiacommons.org/code/local/canton/zoning/114-89/text source_url: https://library.municode.com/ga/canton date: 2026-11-11 status: active jurisdiction: city:canton jurisdiction_name: Canton place_fips: "1312988" corpus_version: local-codes-canton-bb716bdc4821 publisher: Georgia Commons, an independent project of Georgia Civic Data. Not the State of Georgia. Not legal advice. up: https://georgiacommons.org/code/local/canton/zoning/~part-iii/~chapter-114/~article-ii/~division-2.md previous: https://georgiacommons.org/code/local/canton/zoning/114-88.md next: https://georgiacommons.org/code/local/canton/zoning/114-90.md index: https://georgiacommons.org/code/local/canton.md branch: zoning edition: As published by Municode, retrieved 2026-11-11 edition_date_kind: retrieved source_publisher: Municode version_id: local-code:canton/zoning/114-89@2026-11-11-eead5c3ef3 --- # Canton Zoning Ordinance, Sec. 114-89. Exception to the billing presumption > As published by Municode, retrieved 2026-11-11 > The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included. Part of: Part III - DEVELOPMENT CODE / Chapter 114 / Article II - FEES AND CHARGES / Division 2 - WASTEWATER SYSTEM FEES (a) Exceptions to rule that wastewater service charges for usage may be based on water consumed and at the discretion of the city manager are as follows. (b) If a significant industrial user has a wastewater return of less than 80 percent of the water purchased then the volume of wastewater may, at the industry's option, be measured directly by a wastewater flow meter. This shall be subject to the following conditions: (1) All costs of meter construction, operation and replacement shall be at the industry's expense. (2) Plans for any proposed metering facility shall bear the seal of a licensed engineer and shall be subject to city approval. (3) The city shall have unrestricted access to the metering facility. (4) If for any reason a spot check shows the meter to be in error by more than ten percent then the city reserves the right to base billing upon metered water usage. (5) For unauthorized use, the customer may be billed on a reasonable estimate of the service taken. The city may access a fee to defray the cost of restoring service provided such charge is specified in the tariff. (c) Increased wastewater flows due to inflow from drainage are not allowed. ## History (Ord. No. 2017-0921-01, § 1, 9-21-2017)