Skip to content
Georgia Commons
Menu

Carroll County · Zoning Ordinance

Carroll County Zoning Ordinance

This document is shown whole, as one text: its source does not cut it into sections.

About this text

  • As published by Municode, current through 2025-05-06
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
  • Read by OCR from a scanned page: a character, a name, or a number may be misread.

Part 2 of 2. This text is long, so its page prints it in parts, in the source's order. A link to one of its paragraphs leads to the part that holds it.

County means where not used to describe the territorial boundaries of the unincorporated limits of Carroll County, Georgia, the term /county/ is a collective term for the employees, public officials, or boards acting in their official capacity and on behalf of the Carroll County, Georgia to perform duties set forth in this ordinance. [Added Ord. 10/04/05].

County corridor overlay district means land within the primary and secondary corridors as shown on County Corridor Overlay District Map.

County corridor overlay district map means a map delineating land within primary and secondary transportation corridors as more particularly identified in section 16.5.B.

Dark-sky friendly means installation of lighting fixtures that preserves dark skies while at the same time maximizes the quality and efficiency of outdoor lighting. [Added Ord. 08/03/04].

Department means the Carroll County Department of Community Development.

Development means a subdivision of land, the establishment of a use, the construction or placement of buildings, other structures or roads, any construction, excavation, mining, dredging, grading, filling, clearing or vegetation removal, or the deposit of waste or refuse.

The following activities are not considered development: landscape maintenance, including mowing, gardening, tree care and maintenance, or removal of trees or other vegetation damaged by natural forces; farming and ranching; and utility, drainage and street repair and maintenance that does not require land disturbance or result in additional impervious cover.

Development agreement means an agreement between the county and an Applicant containing specific conditions designed to implement the policies and criteria contained in this CDP, which document contains an integrated development scheme for a particular phase or phases of development, and contains maps, diagrams and other appropriate materials by which the Applicant agrees to the conditions contained within the agreement consistent with the provisions of this CDP. [Amended Ord. 08/03/04].

Development area means the metes and bounds of the portion of the site proposed for development.

Development permit means any document that approves or conditionally approves an application for land use or development approval pursuant to the zoning ordinance, subdivision ordinance or similar regulations of the county, including but not limited to:

1. Any building permit.

2. [Deleted Ord. 10/04/05].

3. Any preliminary of final subdivision plat.

4. Any site plan or planned unit development.

5. [Deleted Ord. 10/04/05].

6. [Deleted Ord. 10/04/05].

7. [Deleted Ord. 10/04/05].

8. Any other permit, permission, master plan, plan or approval issued by the county, or any agency or department thereof, that authorizes development within the primary or secondary corridors, excepting those activities or permissions specifically exempted or waived under appendix A. [Amended Ord.

10/04/05].

9. Notice of certain timber harvesting operations within a transportation corridor.

Director means the director of the Carroll County Department of Community Development.

Footcandle means illuminance produced on a surface one foot from a uniform point source of one candela. [Added Ord. 08/03/04].

Larger common plan of development or sale means a contiguous area where multiple separate and distinct construction activities are occurring under one plan of development or sale. For the purposes of this definition, 0plan0 means an announcement; piece of documentation such as a sign, public notice or hearing, sales pitch, advertisement, drawing, permit application, zoning request, or computer design; or physical demarcation such as boundary signs, lot stakes, or surveyor markings, indicating that construction activities may occur on a specific plot means [Added Ord. 10/04/05].

Lumen means unit of luminous flux; the flux emitted within a unit solid angle by a point source with a uniform luminous intensity of one candela. One footcandle is one lumen per square foot. One lux is one lumen per square meter. [Added Ord. 08/03/04].

Master plan means The Carroll County Comprehensive Plan, as amended.

New applications means all applications for development permits submitted to the county after the effective date of this ordinance [from which this section derived].

Ordinance means The CDP together with appendix A, which is referred to throughout as appendix. [Amended Ord. 08/03/04].

Planning commission means the Carroll County Planning Commission. [Amended Ord.

10/04/05].

Platted lot means a parcel of land, which has a specific boundary described within a final subdivision plat that has been duly approved and recorded with county.

Primary corridors. [Amended Ord. 10/04/05]. All land in the unincorporated area of the county located within 500 feet of the center line of the rights-of-way of the following highways and routes; said primary corridor shall be extended beyond the 500 feet boundary to encompass additional lands under the following circumstances:

1. Where a development area contains a portion of land that lies inside the 500 feet and a portion of land lying outside of the 500 feet corridor, the following rules shall apply:

(a) The development area lying outside of the 500 feet shall comply with this ordinance;

(b) Single-family dwellings and uses identified in the agricultural zoning district of the zoning ordinance that lie within the development area identified by subsection (a), (i.e., outside of the 500 feet, shall not be required to comply with this ordinance; and

(c) The boundary interpretation rule provided in subsection (a) above shall supersede and govern the location of primary corridor boundaries over any other rules interpreting district boundaries.

2. Notwithstanding the manner in which the primary corridor may be extended as provided in paragraph 1. above, the primary corridors are identified and more specifically depicted on the county corridor overlay district map, as follows:

(a) State Highway 61 from its origin in Land Lot 140, 5th Land District, Carroll County to the southern incorporated limits of the City of Villa Rica in Land Lots 131 and 126 of the 6th Land District;

(b) State Highway 166 from the intersection of Maple Street in Land Lot 93 of the 10th Land District, Carroll County and encompassing State Highway 166 Bypass around the City of Carrollton to the intersection with State Highway 61 in Land Lot 140 in the 5th District, Carroll County; and

(c) U. S. Highway 27 in the unincorporated limits of Carroll County, excepting that portion from Land Lots 86 and 107 of the 11th District, Carroll County, on the boundary with Heard County, Georgia, and running north to the intersection with State Route 5 in Land Lot 89 of the 11th District, Carroll County.

Retail business means a retail business shall be defined as a commercial or mercantile activity within a principle building, which has a minimum of 1,000 heated square feet, that is engaged and primarily used for the purpose of transacting a sale of any tangible personal property in any quantity or quantities for any use or purpose on the part of the purchaser other than for resale. The principal building shall not include any dwelling that is used, in any part, as a residential structure.

Secondary corridors means [Amended Ord. 10/04/05]. All land in the unincorporated area of the county located within 300 feet of the center line of the rights-of-way of the following highways and routes; said secondary corridor shall be extended beyond the 300 feet boundary to encompass additional lands under the following circumstances:

1. Where a development area contains a portion of land that lies inside the 300 feet and a portion of land lying outside of the 300 feet corridor, the following rules shall apply:

(a) The development area lying outside of the 300 feet shall comply with this ordinance

(b) Single family dwellings and uses identified in the agricultural zoning district of the zoning ordinance that lie within the development area identified by subsection (a), (i.e., outside of the 300 feet), shall not be required to comply with this Ordinance; and

(c) The boundary interpretation rule provided in subsection (a) above shall supersede and govern the location of secondary corridor boundaries over any other rules interpreting district boundaries.

2. Notwithstanding the manner in which the secondary corridor may be extended as provided in paragraph 1. above, the secondary corridors are identified and more specifically depicted on the county corridor overlay district map, as follows:

(a) State Highway 5 in the unincorporated limits of Carroll County;

(b) State Highway 16 in the unincorporated limits of Carroll County;

(c) State Highway 100 in the unincorporated limits of Carroll County;

(d) State Highway 101 in the unincorporated limits of Carroll County;

(e) State Highway 113 in the unincorporated limits of Carroll County;

(f) State Highway 166 from Land Lot 140 of the 5th Land District of Carroll County to the unincorporated boundary with Douglas County, Georgia;

(g) State Highway 166 from the boundary line with the State of Alabama to the western boundaries of the incorporated limits of the City of Bowdon, Georgia in Land Lot 142 of the 9th Land District;

(h) State Highway 166 from the eastern boundaries of the incorporated limits of the City of Bowdon, Georgia in Land Lots 136 and 137 of the 9th Land District to the western incorporated limits of the City of Carrollton, Georgia, being the intersection of Maple Street in Land Lot 93 of the 10th Land District, Carroll County;

(i) U.S. Highway 78 in the unincorporated limits of Carroll County;

(j) U.S. Highway 27 from the boundary with Heard County, Georgia in Land Lots 86 and 107 of the 11th District, Carroll County, running north to the intersection with State Route 5 in Land Lot 89 of the 11th District, Carroll County;

(k) Federal Interstate Highway 20 in the unincorporated limits of Carroll County;

(l) Northside Drive in the unincorporated limits of Carroll County, which begins from the intersection of State Highway 166 and Bankhead Drive in the incorporated limits of the City of Carrollton in Land Lot 202 of the 5th Land District to the intersection with U.S. Highway 27 in Land Lot 195 of the 7th Land District; and

(m) State Highway 61 from the northern incorporated limits of the City of Villa Rica to the unincorporated boundary with Paulding County, Georgia.

Site means The metes and bound of the lot or parcel proposed for development.

Transportation corridors means primary corridors and secondary corridors.

Zoning official means the county planner or his designee responsible for reviewing all applications for development permit approval in the primary or secondary corridors during the term of this CDP. [Amended Ord. 08/03/04].

Zoning ordinance means The Zoning Regulations of Carroll County.

16.5. Applicability.

A. [Deleted Ord. 10/04/05].

B. Affected area. This ordinance shall apply to all land within primary and secondary corridors, as shown on the county corridor overlay district map or maps excerpted therefrom, on file with the county department of community development. The map(s) shall be identified by having the title: "County Corridor Overlay District Map(s)", the signature of the chairman of the board of commissioners with the attestation of the clerk of the board of commissioners, together with the seal of the county and the date of the ordinance that the board adopted the map.[Amended Ord.

10/04/05].

C. Type of uses and development permits affected. This Ordinance shall apply as and to the extent set forth herein, to any and all New Applications.

D. Type of uses and development permits not affected. This Ordinance shall not apply to the following: [Amended Ord. 11/18/03]

1. Uses and developments for which a development permit is not required pursuant to the zoning ordinance or subdivision ordinance;

2. Home occupations, rehabilitation of any existing residential or nonresidential building or structure, accessory uses, or reconstruction of a damaged or destroyed building or structure, provided that such change does not enlarge the building or structure, increase the amount of impermeable surface, decrease the vegetation currently existing on the lot, increase storm water runoff or increase the density or intensity of use of the building or structure. Notwithstanding the foregoing, a change that increases the intensity of development on the site as measured by any increase in outdoor display area or an increased demand for parking on the site by the greater of 20 percent or five spaces, the use shall be permitted as long as such use shall provide the required landscaping and screening in accordance with article 4 of the appendix of this ordinance.

3. Public or private utilities, provided the site shall comply with article 4 of the appendix of this ordinance;

4. Building permit for a single-family residence that is not a part of a larger common plan of development or sale. [Amended Ord. 10/04/05].

5. Agricultural production activities exclusive of processing as a primary use;

6. Applications for final plats for developments for which appropriate zoning has been adopted and preliminary plat, which have been submitted prior to the effective date hereof or approval has been obtained prior to the effective date hereof, provided that such preliminary plat approval has not expired; and [Amended Ord. 08/03/04].

7. [Deleted Ord. 08/03/04].

8. Subdivision of land into four or fewer lots having a minimum lot area of at least four acres, provided that such lots comply with the requirements of section 3.2.43.b of the county subdivision regulations.

16.6. Review and approval of affected development.

A. Development permits. Notwithstanding any provision of the county's Zoning or Subdivision Ordinances to the contrary, no development permit shall be issued and no New Application shall be approved in the Primary or Secondary Corridors during the term of this Ordinance unless, following all other applicable administrative procedures for the issuance of the development permit, the Applicant has obtained approval pursuant to the provisions of this Ordinance. [Amended Ord. 11/18/03]

B. Scope of review. Review of all applications for a development permit within the transportation corridors during the term of this ordinance shall be undertaken pursuant to the additional review processes and standards set forth herein, together with all existing review processes and standards in existence prior to the adoption of this CDP, including the necessity to properly plan for the further growth and development of the county, and the need to protect the public health, safety and general welfare. [Amended Ord. 08/03/04].

C. Staff review.

1. No application for development permit approval or development permit within the transportation corridors shall be processed until the zoning official has determined whether the application for such development permit is an application for development permit approval (or is exempt from this ordinance pursuant to section 16.5.D. herein), and that said application is complete with respect to all of the information required by this ordinance. If the application is not complete, the zoning official shall so notify the applicant within five working days. [Amended Ord. 10/04/05].

2. If the zoning official determines that the application is for a development permit approval, the zoning official shall review such application for development permit approval in accordance with the provisions of this CDP. If the zoning official determines that the application is complete, the application shall be processed as follows: [Amended Ord. 08/03/04]

(a) Zoning official approval. If the zoning official determines that the application satisfies the standards set forth in appendix A and does not require a minor exception, variance, or conditional use permit, the zoning official is authorized to approve the application for a development permit.

Upon approval of the application, the department shall issue a certificate of zoning compliance that sets forth the conditions of approval within 15 working days of certification of completeness.

(b) Minor exceptions. If the zoning official determines that the applications does not strictly satisfy the standards set forth in appendix A, but may be considered as a minor exception, he shall forward the application to the director. The director shall review the application and determine whether the application may be authorized as a minor exception. A minor exception is defined as an application that satisfies the purposes and intent of the CDP and no more than an insubstantial deviation from the standards set forth in appendix A. A minor exception is not considered a variance. If the application qualifies as a minor exception, the director shall authorize the approval of the development permit and require the issuance of a

certificate of zoning compliance that sets forth the conditions of approval within 30 working days of certification of completeness. [Amended Ord.

08/03/04]

(c) If the zoning official determines that the application does not satisfy the criteria for zoning official approval or minor exception as set forth in subparagraphs (a) and (b) above, the application shall be reviewed in accordance with the provisions of the CDP and section 16.13 of the zoning ordinance, and the zoning official shall forward his or her staff report to the planning commission within 30 working days of certification of completeness. [Amended Ord. 08/03/04]

3. Appeals to any action by the zoning official or director, as set forth in subparagraphs (a) and (b) above, shall be reviewed as a conditional use permit pursuant to section 16.13 of the zoning ordinance.

D. Standards. Attached hereto in appendix A are the standards for development within the primary and secondary corridors during the term of this CDP. [Amended Ord.

08/03/04]

E. Additional studies. In carrying out its responsibilities pursuant to this section, the board or the zoning official may require an applicant for a development permit or application for development permit approval to submit such additional information, data, studies, plans, analyses, or maps as may be necessary to make the factual determinations set forth herein. If so required, the applicant shall bear the full cost of meeting this requirement.

F. Enforcement. The CDP may be enforced by the county by any appropriate means authorized by state law and county ordinances including, but not limited to, declaratory and/or injunctive relief, fines, withholding of development permits and revocation of development permit approvals and/or development permits. [Amended Ord. 08/03/04]

G. Reconsideration/revocation of approvals and/or permits. An application for a development permit approval and/or for a development permit within the transportation corridors may be reconsidered and revoked by the board (or the director if the approval was granted under section 16.6.C.2(a) or (b)), notwithstanding any other provision of the CDP, if it is determined based upon substantial evidence that the application, decision, or permit was based on materially inaccurate or incomplete information and that correct and complete information was known or was reasonably obtainable by the applicant. [Amended Ord. 11/18/03, 08/03/04]

H. Monitoring.

1. The zoning official shall be responsible for monitoring and maintaining records of the following for each calendar quarter, during the term of this ordinance:

a. Applications for exemptions;

b. Applications for development permits; and

c. Applications for vested rights determinations; and

d. Development agreements.

2. Monitoring shall include:

a. The name and location of the project;

b. The date of application filing;

c. The type of application submitted;

d. The disposition of the application;

e. The reason for the disposition; and

f. The cumulative impact of all applications for development permits.

I. Amendments. Changes to this CDP must be made in the same manner as its adoption.

Nothing herein precludes the board or limits its discretion to make such changes at any time, if deemed necessary or desirable. [Amended Ord. 08/03/04]

J. Fees for processing application. [Amended Ord. 11/18/03]

1. Due to the regulatory nature of the CDP and the benefit provided through the conditional use permit process, the board finds that it is necessary to establish a reasonable processing fee to defray the cost of the administrative services and functions requiring time commitments from county employees involved in reviewing the application. The fee shall allow the county to recover up to, but not more than, the costs associated with administering the CDP. Based upon the foregoing, the Board hereby establishes the following fee schedule: [Amended Ord. 08/03/04, 10/04/05].

(a) [Deleted Ord. 08/03/04].

(b) Application approved under section 6 C 2 (a) and (b) - $325.00 [Amended Ord.

08/03/04]

(c) Application approved under section 16.6.C.2(c) - $550.00

2. All processing fees paid shall be nonrefundable but may be credited against the total fee the applicant is required to submit where the application is denied under section 16.6.J.1(b) and resubmitted under section 16.6.J.1(c)).

K. Time limits. The time limits set forth in this ordinance are mandatory and of the essence; provided, however, that the zoning office, planning commission or board may extend such time periods for a reasonable period of time upon consent of the applicant. Such extension shall indicate the reason for the extension, the additional period of time needed for review, and the purpose for which the application review will be conducted.

L. Variances. After considering the staff recommendation and the recommendations of the planning commission, the application for the conditional use permit and evidence provided at the hearing for the conditional use permit, the board may grant variances from the strict application of the standards of this ordinance and other applicable local regulations subject to the following required findings:

1. Use variances. The board may authorize uses that are not allowed by this ordinance upon finding that:

a. The use will not interfere with legally authorized uses of adjacent properties;

b. All outside storage or operations areas shall be completely screened from the transportation corridor by berms that shall be landscaped and are not more than six feet in height, or existing terrain;

c. The use is not located within 300 feet of the right-of-way of a transportation corridor;

d. The use will not be a detriment to surface or groundwater quality; and

e. The site will be designed and the use will be operated in a way that advances the purposes of this ordinance.

2. Development standards variances. The board may authorize variances from the strict application of zoning and subdivision standards established in this ordinance, the zoning ordinance and the subdivision regulations, subject to the following conditions:

a. The proposed variance will not diminish the development's compliance with the purposes of this ordinance;

b. The proposed variance will not cause the development to interfere with the legally authorized uses of adjacent properties; and

c. The proposed variance represents the least deviation from the standards required to enable viable development of the site.

M. Appeals. No appeal to the community development appeals board from any decision of the board, or any request for a variance, shall lie to the community development appeals board from the provisions of this CDP, and the application shall be ripe for judicial review without further exhaustion of administrative remedies upon the determination of the board.

[Amended Ord. 08/03/04, 10/04/05].

16.7. Conditional use permit requirement and standards. [Amended Ord. 11/18/03]. No development permit within the primary or secondary corridors shall be issued unless such development is found that:

A. The proposed development furthers the purposes set forth in section 16.2 of this CDP; [Amended Ord. 08/03/04]

B. The applicant has documented the availability of adequate public facilities to accommodate water, wastewater, storm water and traffic needs of the proposed development project, taking into account other approved developments. The availability of adequate facilities may be evidenced by a development agreement entered into between the county and the applicant in accordance with section 16.9 hereof;

C. The proposed development conforms to the standards set forth in appendix A attached hereto;

D. The proposed development meets all requirements set forth under sections 16.6.C.2(a), 16.6.C.2(b), or for a conditional use permit set forth in Section 13.0(7) of the zoning ordinance;

E. The proposed development is consistent with the county's economic goals as articulated in the comprehensive plan and other adopted documents; and

F. The proposed development is designed to minimize the loss of highway capacity and safety.

16.8. Vested rights determination.

A. Application eligibility. Any applicant for a development permit claiming entitlement to application approval on the basis of a development permit granted prior to August 6, 2002 may submit an application for a vested rights determination directly to the board on the following grounds: [Amended Ord. 08/03/04]

1. Claiming entitlement to a land use approval or development permit on the basis of common law vesting, equitable estoppel or contractual rights provided the applicant proves by a preponderance of evidence that the owner or contract purchaser, acting in good faith reliance upon some act or omission of the county, has made a substantial change in position or has incurred such extensive obligations and expenses that it would be highly inequitable and unjust to destroy the right to develop or to continue the development of the property;

2. Claiming entitlement to development permit approved on the basis of a pre-existing permit;

3. Claiming entitlement to development permit approved on the basis of an actual phasing plan, for a non-vested first or subsequent phase pursuant to which the applicant has proceeded in good faith, provided or made provision for required public improvements, has in good faith reasonably relied upon the phasing plan to his, her or its detriment and no approvals or permits have lapsed or been revoked; or

4. Claiming entitlement to development approval on the basis of other vested rights principles under state or federal law.

B. An application for a vested rights determination shall include the following:

[Amended Ord. 08/03/04]

1. A technically complete, sworn application on a form prepared by the Department:

2. The name and address of the applicant, who shall be the owner, contract purchaser or a person authorized to apply on behalf of the owner; if the property is owned by more than one person, any owner or any authorized agent of the owner may apply;

3. A legal description and survey of the subject property of the application;

4. The name and address of each owner and contract purchaser of the property;

5. A site or development plan for the property;

6. A preliminary plat for the property, if subdivision is required by law;

7. Identification by specific reference to any ordinance, resolution or other action of the county, or failure to act by the county, upon which the applicant relied and which the applicant believes to support the owner's vested rights claim notwithstanding an apparent conflict with the CDP; [Amended Ord. 08/03/04]

8. A statement of facts which the applicant tends to prove in support of the application; and

9. Such other relevant information that the zoning official may request.

C. In addition to the required processing as set forth above, an application for a vested rights determination shall include, but shall not be limited to, the following: a timing and phasing plan for the proposed development; a plan for the provision of public facilities and services to the proposed development, by phase; the conditions under which the proposed development will be authorized to proceed; and the conditions under which approvals or permits will lapse or may be revoked.

16.9. Development agreements.

A. In the event that, in the opinion of the department, any one or more of the existing water, wastewater, storm water and/or road facilities, or other public facilities are not adequate to service the proposed development at the county's level of service standards, the applicant and the board may enter into a development agreement, pursuant to which the applicant shall agree to provide the necessary public facility or facilities, at the applicant's sole cost and expense, to service the proposed development, in accordance with the provisions of this section. The development agreement shall provide that all such public facilities shall be constructed or bonded prior to the issuance of a building permit for all or any portion of the proposed development.

[Amended Ord. 10/04/05].

B. The board may enter into a development agreement with an applicant pursuant to this CDP only if the Board finds that the proposed development which is the subject of the CDP meets all requirements of this CDP, the county zoning regulations, the county subdivision regulations, and all other applicable regulations. [Amended Ord.

08/03/04, 10/04/05].

C. Contents of a development agreement.

1. A development agreement shall be in form satisfactory to the county attorney and shall, at a minimum, include the following:

a. A legal description of the land subject to the agreement and the names of the legal and equitable owners;

b. The duration of the agreement;

c. A general description of the development, the development uses permitted on the land including proposed densities, and building intensities and height, and a description of the impacts and benefits of the development;

d. A description of the public facilities that will service the development, including those that are to be dedicated, constructed or financed by the developer;

e. The date construction of such new facilities will be completed and operation of such facilities will begin;

f. A schedule to assure public facilities are available concurrent with impacts of the development;

g. A description of any reservations or dedications of land for public purpose;

h. A description of all local development permits approved or needed to be approved for the development of the land;

i. A provision that all public facilities to be provided by the applicant will be constructed or bonded prior to the issuance of a building permit for all or any portion of the proposed development; and

j. Such other provisions as are determined by the board to be necessary for the public health, safety, or welfare. [Amended Ord. 10/04/05].

2. Phasing. A development agreement may provide that the entire development or any phase thereof be commenced or concluded within a specific period of time.

D. The development agreement is subject to the approval of the board as part of the approval process of the conditional use permit required under this CDP. Where applicable, no conditional use permit shall be approved by the Board until the development agreement shall be executed by the owner of the property which is the subject of the development agreement. For the purposes of this section 16-9, owner shall be deemed to include the lessee under a lease of land with a term of not less than 50 years. Within ten days following the complete execution of a development agreement, the county shall cause such development agreement to be recorded in the office of the Clerk of the Superior Court of Carroll County. [Amended Ord. 08/03/04, 10/04/05].

16.10. Effect on existing ordinances; conflict.

A. Effect. This CDP is not intended to amend or repeal any existing county ordinance or regulation other than the Interim Development Ordinance that was adopted on August 6, 2002, amended on November 18, 2003, and amended on August 3, 2004. To the maximum extent possible, the requirements of this CDP shall be deemed to be supplemental to, and not in substitution of, existing county ordinances and regulations. Wherever possible, both shall be given effect. [Amended Ord. 08/03/04, 10/04/05].

B. Conflict. To the extent of any conflict between other county ordinances or regulations and this CDP, the more restrictive is deemed to be controlling. [Amended Ord.

08/03/04]

C. Relationship to existing zoning. The provisions of the county corridor overlay districts established in this ordinance apply in addition to the provisions of the underlying zoning. Where apparent conflicts exist, the more stringent provision shall prevail. The overlay zoning districts established additional standards and review requirements for subject development, but:

1. Do not authorize any land use prohibited in the underlying zoning district;

2. Do not relax any standards applicable to the underlying zoning district; and

3. Do not preclude a change in the underlying zoning through the county's zoning map amendment process.

16.11. Severability. If any section, subsection, sentence, clause or phrase of this CDP is, for any reason, held to be invalid, such decision shall not affect the validity of the remaining portions of this CDP. [Amended Ord. 08/03/04]

16.12. Effective date. This CDP shall be in full force and effect on October 4, 2005.

(Ord. of 10-4-2005(1); Ord. of 8-4-20(1), § 1)

APPENDIX A

CORRIDOR DEVELOPMENT PLAN ORDINANCE STANDARDS

ARTICLE I. DEVELOPMENT REVIEW

1.1 Minimum submittal requirements. [Amended Ord. 11/18/03] The applicant shall submit the following information and drawings as part of the application for a development permit:

A. A completed application and applicable fees.

B. Three initial copies of an accurately scaled site plan prepared by a registered architect, registered landscape architect, registered surveyor, or registered engineer showing the locations and dimensions of building footprints of all existing and proposed buildings, parking spaces, driveways, landscape areas, utility easements and alignments, stormwater improvements, the limits of construction of the lot or parcel, and the metes and bounds of the extent of development, which shall be referred to hereinafter as the development area. [Amended Ord. 11/18/03, 08/03/04, 10/04/05]

C. One initial copy of exterior building elevations and dimensions of all sides of existing and proposed structures. [Amended Ord. 10/04/05]

D. One initial copy of exterior building elevations and dimensions of all existing or proposed solid waste and recycling containment areas. [Amended Ord. 10/04/05]

E. The exterior finish material selection for each building elevation shall be clearly noted on the drawing and may be shown as a detail inset. For each elevation, the area covered by each finish material shall be calculated as a percentage of the total area of the elevation and shown in tabular format on the drawing.

F. To aid in evaluating the exterior design, the applicant shall submit schematic floor plans showing window, door and loading dock locations, and other exterior features that clearly define the intent of the completed exterior of the structure.

G. External lighting (to include all new lighting within the development area), heating, ventilating, air conditioning and electrical equipment heights, locations and screening materials shall be clearly noted. Lighting cut-sheets shall be submitted for each new external light. [Amended Ord. 10/04/05]

H. Colored renderings clearly indicating color choices or exterior building and finish material samples may be submitted.

I. Sign application, if applicable, that meets the requirements of the Regulation of on-premise and off-premise signage.

J. Other information as may be deemed necessary by the director of community development, or his designee, in order to evaluate the appearance of the completed structure or as may be specifically required by this appendix.

ARTICLE II. TRANSPORTATION ACCESS REQUIREMENTS 2.1 Highway capacity.

The proposed development will not cause the level of service at any intersection to drop below level of service—D2 as calculated in accordance with the most recent version of the—Highway Capacity Manual.2

2.2 Access

A. All lots and parcels shall be accessed from a county road other than Northside Drive, or private road approved by the county. No lot or parcel shall have direct access from a transportation corridor unless specifically approved by the county in accordance with the spacing standards in table 2.1 of this appendix.

B. Inter-parcel vehicle access points shall be provided between all contiguous commercial, office or industrial tracts. This requirement may be waived if the applicant demonstrates that an inter-parcel connection is not feasible due to traffic safety or unusual topographic concerns, or the properties both access a street that renders the inter-parcel access unnecessary.

C. Undivided driveways shall not exceed 24 feet in width.

D. Driveways and streets shall be separated in accordance with the spacing standards in table 2.1:

Table 2.1: Spacing Standards Between Access Points [Amended Ord. 10/04/05] Situation Maximum Required Separation (feet)

Primary Corridors Secondary Corridors Between 2 side streets (1) DOT Standards DOT Standards Between a business entrance

(4) and a side streets (1) DOT Standards DOT Standards Between 2 driveways (1) DOT Standards 500 Between driveway and side street (1) DOT Standards 500 Between corridor right-of-way and parallel street (2, 3) 250 250 Between driveway on side street and corridor right-ofway 125 125 Situation Maximum Required Separation (feet) Primary Corridors Secondary Corridors Notes:

(1) Minimum distance shall be measured between street and/or driveway center lines. A side street is any street intersecting a transportation corridor.

(2) Minimum distance shall be measured between the nearest right-of-way of the corridor and the centerline of the parallel collector street or driveway

(3) Minimum distance may be reduced where the county approves the use of a frontage road due to constraints on the viability of a parallel collector street. A frontage road is a road that parallels and abuts a transportation corridor.

(4) A business entrance is a driveway or another access point providing egress or ingress to a development have a retail business or another structure that is contained on land rezoned for office/institutional, commercial, or industrial zoning district.

DOT Standards mean the separation requirement shall be measured from Georgia Department of Transportation rules and regulations.

2.3 Paving standards

A. Paving required. All parking areas and driveways for non-residential development shall be paved. Any unscreened outdoor display area for merchandise shall be paved.

Surface for outdoor displays shall be prepared in a manner to produce an all weather surface to be approved by the Director. [Amended Ord. 10/04/05]

B. Paved surfaces. The entire surface of all paved areas shall be designed and constructed to support anticipated loads. At a minimum, paved areas shall be covered with four inches of concrete or two inches of asphalt on six inches of graded aggregate base, or a base and surface material of equivalent durability as certified by the developer's engineer. Such paved areas shall be maintained in good condition by the owner, lessee and/or occupant of the development.

C. Unpaved surfaces. Screened outdoor display and storage areas in accordance with section 4.6 of this appendix, which are not required to be paved, shall be finished with aggregate to form a durable dust-free surface designed to support anticipated loads.

2.4 Sidewalks

A. The county may, at its sole discretion, require sidewalks within 1/2 mile of a school, park or other public facility. [Amended Ord. 08/03/04].

B. All development abutting any public or common greenspace or recreational area that is accessible to the public shall include at least one direct access path to such area. Access paths shall be a minimum of five feet in width, except as provided in section 6.5.A.3 of this appendix, and constructed as required by the county engineer. [Amended Ord. 10/04/05]

2.5 Development coordination. All development shall be subject to the following:

A. Pedestrian and vehicular circulation shall be coordinated between adjacent properties.

B. Development access shall be designed to avoid impeding traffic on public streets intended to carry through traffic.

2.6 Corridor setbacks. [Amended Ord. 10/04/05] All certain timber harvesting operations shall be set back no less than 100 feet from the adjacent transportation corridor edge of pavement. All certain timber harvesting operations must apply the following method, or an alternative method suggested by the county, in order to 3thin3 trees within 100 feet of the adjacent transportation corridor edge of pavement:

A. The applicant will leave a 50 square foot/acre basal area (i.e., the area of a breast-high cross section of a tree or of all the trees in a stand), that is to be evenly distributed throughout the 100 foot corridor setback.

B. The applicant will mark the trees to be left at stump and chest height.

C. The applicant will remove all diseased trees (Note - diseased trees cannot be counted in the 50 square foot/acre basal area calculation).

D. When items 1 through 3 are completed, the applicant may call the Carroll County Department of Community Development for an inspection.

ARTICLE III. LIGHTING AND UTILITIES

3.1 Streetlights.

A. Streetlights shall be provided at intersections along all public rights-of-way, when new streets or intersection improvements occur, using fixtures that are deemed dark sky friendly by the manufacturer. All street lighting shall be subject to review and approval of the county engineer. [Amended Ord. 08/03/04].

B. Lighting shall be provided throughout all non-residential and multi-family parking areas using box-head, fluted poles, a maximum of 24 feet in height. The county engineer may authorize fixtures that exceed 24 feet. Pedestrian light fixtures, which shall be hooded and less than 14 feet tall, along walkways connecting parking areas and sidewalks shall be provided with the building. Lighting shall be designed to shield public streets and adjacent lands from direct or distracting glare, or hazardous interference of any kind. Direct or distracting glare is defined as 0.5 footcandles of illumination from the source at a distance of five feet inside the property line of an adjacent property owner. [Amended Ord. 08/03/04, 10/04/05]

C. The director may authorize alternative designs for decorative light poles/fixtures.

D. All lighting, except streetlights, whether affixed to a structure or free-standing shall be designed so that the lamp is not visible to an observer at an elevation equal to or greater than the ground line below the light source from any point more than five feet inside the adjacent property. [Amended Ord. 08/03/04].

E. All lights shall be directed downwards and shall not cast a cone of light that is greater than 120 degrees total or greater than 60 degrees from vertical.

3.2 Utilities

A. Electricity and telecommunications. All electric service lines and telecommunications lines shall be located underground. The county engineer may at his/her discretion approve overhead electric distribution lines when the respective utility has demonstrated physical constraints that warrant such placement. [Amended Ord. 08/03/04].

B. Stormwater. All development shall comply with state and local regulations regarding stormwater and erosion control. At a minimum, stormwater detention systems will be designed for the 100-year storm event and current best management practices (BMP) at the time of development. Drainage plans shall conform to the 4Manual for Erosion and Sediment Control in Georgia4 from the Georgia State Soil and Water Conservation Service and to the Subdivision Ordinance.

C. [Deleted Ord. 10/04/05]

D. [Deleted Ord. 10/04/05]

E. State waters. All proposed development within the corridor boundary must be more than 200 feet from state waters and must disturb less than one acre to be exempt from an LDA (Land Disturbance Activity) permit. Otherwise, an E&S (Erosion & Sedimentation) plan and permit is required prior to the issuance of a building permit. [Amended Ord.

08/03/04].

ARTICLE IV. LANDSCAPE REQUIREMENTS

4.1 Purpose and applicability. The purpose of these bufferyard and screening requirements is to promote the public health, safety and welfare by establishing efficient, effective minimum standards for buffering between land uses of different intensities, screening of land uses and utility and equipment areas that may create a negative impact, for the protection of natural resources, and the installation and continued maintenance of landscaped areas within the county corridor overlay districts. Where necessary to interpret the precise meaning of technical landscaping terms used in this section, reference shall be made to The American Standard For Nursery Stock, as published by the American Association of Nurserymen (AAN). All new development or redevelopment required to submit a site plan shall comply with the landscaping standards in accordance with the table 4-1:

Table 4-1 Land Use Applicability Bufferyards Street Trees Parking Lots Other Landscaping Single-family Residential 5 Multi-family Residential 5 5 5 5 Retail/Service/ Office 5 5 5 5 Industrial 5 5 5 5

4.2 Exceptions. Landscaping standards shall apply to remodeling projects that increase floor area, increase outdoor display area, or increase parking requirements by the greater of 5 spaces or 20 percent of the parking requirement for the previous use.

4.3 Landscaping plan required. A plan showing required bufferyards and landscaping of the bufferyards shall be submitted in support of a site plan or building permit for any development within a development area, except for single-family dwellings and twofamily dwellings. All landscaping plans for bufferyards and related areas shall include the following information:

A. The locations, varieties, number and size of plants to be planted within required landscaped bufferyard areas;

B. Topographic information showing the final site grading and drainage for landscape area, and properly specify planting for areas needing slope protection;

C. Impervious surfaces, including sidewalks, pavement areas and building footprints;

D. Property boundaries;

E. Mature sizes of plant materials shall be drawn to scale;

F. Existing trees that measure eight-inch caliper or larger, as measured 2.5 feet above ground level that are proposed to be retained; and

G. The boundaries and edge treatments of all landscaped and bufferyard areas.

4.4 Minimum plantings and sizes of landscape materials

A. Landscape materials shall measure the minimum sizes at the time of planting as described below.

1. Trees: [Amended Ord. 08/03/04].

A. Deciduous trees: Two-inch caliper measured at six inches above ground level. [Added Ord. 08/03/04].

B. Evergreen trees: Shall measure a minimum of five to six feet in height. [Added Ord.

08/03/04].

2. Shrubs: 12 inches tall from ground level to the top of the shrub, except that shrubs used for screening shall be at least 2.5 feet tall at planting and shall reach a mature height of five feet.

B. Minimum landscape area. All development subject to this ordinance shall provide required screening, foundation landscaping, parking lot landscaping, bufferyards and street trees. The total landscape area shall not be less than 15 percent of the project area of multi-family residential, commercial and industrial development areas. [Amended Ord.

10/04/05]

C. Minimum planting requirements. The minimum number of plants shall comply with the standards in Table 4-2. (see appendix A-2, Carroll County Required Tree and Shrub List;

other trees and shrubs may be substituted based upon the approval of the director or the director's designee. [Amended Ord. 08/03/04].

Table 4-2: Required Plantings Type of Plant Number of Plants per 1,000 square feet of required landscape area Trees 1 large or 2 medium to small trees* Shrubs 4

* A large tree includes any tree that typically reaches 30 feet or more in height at maturity.

All other trees are considered small or medium sized trees.

D. New plant materials. All new living plant materials shall satisfy the requirements of No. 1 or better as defined in the most current edition of Grades and Standards for Nursery Plants. All separate landscaped areas shall have a minimum variety of two living plant materials. Paving and artificial plants shall not be counted towards required landscape area.

E. Lawn grass and ground covers: Grass shall be sodded, plugged, sprigged, or seeded except that yards fronting the transportation corridors shall be sodded only. In addition sod shall be used in swales or other areas subject to erosion. In areas where plant material other than solid sod or grass is used, a fast-growing grass seed shall be sown for immediate effect and protection until coverage is otherwise achieved. Grass shall be clean and reasonably free of weeds and noxious pests or disease. The director may at his/her discretion determine whether a yard is a front, side or rear yard [Amended Ord. 10/04/05] Table 4.3: [Deleted Ord. 08/03/04]

F. Existing plant material. Existing vegetation shall be preserved to the extent feasible.

The area encompassed by the canopy of any existing trees retained shall be credited towards the total landscape area requirement.

G. Soils. The planting beds for all landscaping materials shall be free of weeds, debris, and noxious material and shall consist of a healthy plant growth medium. The planting bed soils shall provide adequate support, drainage, and nutrients for the plants and thus may require the incorporation of sand, peat, and/or topsoil into the soil. Such soils shall be placed throughout the planting hole for each plant, and this hole shall be at least twice as wide as the width of the plant ball and 1.5 times as deep as the depth of the plant ball.

H. Planting areas. A minimum planting area of 100 square feet shall be provided for every tree. These planting areas shall be no less than ten (10) feet wide for a large tree and no less than five feet wide for other landscape materials.

I. Streetscape. Applicants shall provide a minimum ten-foot wide landscaped strip between all road rights-of-way and the back-of-curb of abutting off-street paved parking lots.

At least one tree shall be planted every 100 linear feet along the street.

J. Parking lots. For any off-street parking lot containing over ten spaces, or for any combination of parking areas on a single lot providing more than ten spaces, compliance with minimum landscaping shall be required.

1. At least 30 percent of the landscaping requirement for non-residential development shall be provided within or abutting parking areas.

2. Parking lot shade trees may be located at the end of parking bays, between parking bays, and along the perimeters of parking lots, provided that no parking space shall be farther than 100 feet from the trunk of a tree.

3. Vehicle overhang into planting strips is allowable with a minimum separation of three feet between the curb and any tree or shrub. Wheel stops will be used where curbing does not provide the minimum vehicle/tree separation.

4.5 Bufferyard standards. The following bufferyard standards shall apply to all subdivisions, and to all multifamily, commercial and industrial projects. Site plans shall include detailed drawings of enclosure and screening methods to be provided. Table 4-4 lists the types of bufferyards required between adjacent land uses. Exhibit 4-1 illustrates the minimum widths and plantings for each type of bufferyard listed in table 4-4.

A. Bufferyards required. Bufferyards shall be required between parcels with different land uses as listed in table 4.4 and as otherwise required herein. The bufferyard is required in addition to other landscaping requirements, provided however, that bufferyard plantings may be counted toward total landscape area requirements. The county may authorize a reduction of bufferyard requirements where the land use on abutting property is not consistent with the comprehensive plan. [Amended Ord. 08/03/04].

B. Types of bufferyards required. Table 4-4 shows the type of bufferyard required to buffer an adjacent property based on its land use. Exhibit 4-1 illustrates a typical bufferyard for each type. The applicant may choose to install any of the sub-types of bufferyards. For instance, D-1, D-2 and D-3 are subtypes shown in exhibit 4-1.

C. Bufferyard location. Bufferyards and open spaces shall be provided on the site of the new development, regardless of existing setbacks, bufferyards or open space otherwise provided on the adjacent property. Bufferyards may be included within required building setbacks and shall be shown as landscape areas on the plat and site plan.

Table 4-4: Required Bufferyards [Amended Ord. 08/03/04, 10/04/05] Adjacent

Land Uses Proposed Uses Single-family Residential Subdivision/ Two Family Multi-family Office Commercial Industrial Agricultural Not required B B B Not required Single-family & Duplex Not required B C D E Multi-family & Attached Single-family B Not required A B E Office C A Not required A C Commercial D B A Not required B Industrial E D C C Not required Arterial Road B B B B C Exhibit 4.1: Bufferyard Planting Illustrations* Distances shown are the minimum widths of required bufferyards. The type of bufferyard shall be consistent with table 4.4. The applicant shall determine which subtype (e.g., B-1, B-2 or B-3) to use on the property.

Notes: [Notes added Ord. 08/03/04]

1. The applicant has the option to plant only trees (and not shrubs) in Bufferyards D and E. If this option is pursued, the applicant must plant 10 evergreen trees per 100 feet on ten-foot centers

2. The applicant has the option to plant only deciduous trees in Bufferyard B.

3. Opaque fence required in Bufferyard E

4. All telecommunications towers (i.e., cell towers), shall utilize Bufferyard E-1. [Added Ord. 10/04/05]

4.6 Screening and fence standards

A. Screening of utility areas and equipment.

1. Solid waste collection areas. Solid waste receptacles, shipping pallets, bundled cardboard and similar waste materials stored for collection shall be enclosed on all sides and screened from public view of adjoining residential properties or any street right-of-way with a 6-foot (plus or minus 8 inches) solid enclosure with a gate and shall be constructed of cedar, redwood, masonry or other compatible building material.

The floor of the gated enclosure shall be a concrete pad which shall extend 5 feet beyond the gate and the gate opening itself shall measure 12 feet. Trash enclosures shall be located a minimum of 50 feet from any residential zoning district or use, and the transportation corridor right-of-way, but may otherwise be located within any required building setback area. [Amended Ord. 08/03/04].

2. Mechanical equipment.

(a) Roof-mounted equipment. Roof-mounted equipment, including ventilators and satellite dishes shall be screened from view or isolated so as not to be visible from any public right-of-way or residential zoning district within 150 feet of the subject lot as viewed from five feet above ground level. Roof screens and parapet walls shall be coordinated with the building to present a unified appearance.

Director may waive the requirements of this subsection where screening is incompatible in scale, form, and mass with the appearance of the roof mounted equipment and parapet and such screening provides no aesthetic benefits with screening.[Amended Ord. 10/04/05]

(b) [Deleted Ord. 10/04/05]

B. Fencing standards.

1. Height. Fences shall not exceed six feet in height in agricultural or residential districts except where used for public utilities, public or private schools, public or private recreation facilities or industrial uses, and where required for existing wrecking/disposal operations and junk or salvage yards.

2. Barbed wire fencing. Barbed wire fences, razor wire or barbed wire assemblies atop fences shall not be permitted within 100 feet of any transportation corridor right-of-way, except where incorporated into fencing for telecommunications and utility substations.

C. Commercial and industrial equipment and lot screening.

1. Purpose. The intent of commercial and industrial lot screening is to ensure that items that cannot be enclosed within a building are screened on all sides from the view of adjacent rights-of-way and residential zoning districts.

2. Boundary landscaping. In all commercial and industrial districts, boundary landscaping shall be provided along the abutting public rights-of-way (except alleys). Such landscaping shall consist of a combination of ground covers and deciduous and evergreen shrubs and may also include trees provided that they will not obstruct sight distances or vehicular or pedestrian circulation. No specific spacing shall be required for boundary landscaping, provided that the landscaping is appropriate to the character of the site and that the overall planting density complies with section

4.4 and section 4.5 of this appendix.

3. Outdoor storage. All outdoor storage and operations yards shall be screened from view from adjacent rights-of-way and residential areas using a combination of landscaping, and fencing. Such screens shall contain sufficient planting to comply with table 4.4 planting standards. [Amended Ord. 08/03/04].

4.7 Timing of installation of required landscaping. All required landscaping shall be in place prior to issuance of a certificate of occupancy, weather permitting. In periods of adverse weather conditions, temporary approval to occupy may be granted, subject to the posting of a cash escrow or irrevocable letter of credit in an amount equal to one and one-half times the estimated cost of the landscaping, with the estimated cost to be certified by a landscape provider. The cash escrow or irrevocable letter of credit may be forfeited if the landscaping is not completed within one year after the approval of the temporary occupancy. Forfeiture of any cash escrow or irrevocable letter of credit shall not relieve the owner of the responsibility to maintain the required landscaping. [Added Ord.

10/04/05]

4.8 General landscaping and site maintenance

A. The property owner, lessee and/or occupant shall be responsible for maintenance of any landscaping and any landscaped bufferyard on the property on a continuing basis for the life of the development. All required landscaping shall be maintained in a neat and orderly manner at all times. This shall include, but not be limited to, mowing, edging, pruning, fertilizing, weeding and other activities common to the maintenance of landscaping. Failure to maintain the landscape plantings shall be a violation of this CDP. [Amended Ord.

08/03/04].

B. Landscaped areas shall be kept free of trash, litter, weeds and other materials or plants not a part of the landscaping.

C. All required plant material shall be maintained in a healthy, growing condition as is appropriate for the season. Plant materials that exhibit evidence of insect pests, disease and/or damage shall be appropriately treated, and dead plants promptly removed and replaced within the next planting season.

4.9 Certification of completion. Upon completion of the landscape improvements, the development shall be inspected by the Department of Community Development for compliance with the approved landscape plan before a certificate of occupancy shall be issued for any structures, except as allowed by §4.7.

ARTICLE V. PARKING AND YARD SETBACKS

5.1 Parking standards. In addition to the following general requirements and the parking lot landscaping requirements of article 4 of this appendix, all development shall comply with requirements set forth in this article.

5.2 Parking and loading requirements.

A. On-site parking required. All required off-street parking shall be provided on the same parcel or same development as the principal use. The location and design of off-street parking spaces shall not interfere with normal traffic flow or with operation of queuing and backup areas. Loading areas shall not obstruct pedestrian pathways. Each parking space shall be accessible from a driveway. Maneuvering and turning areas shall be provided so that no vehicle will be required to back into a public street.

B. Use of required off-street parking areas. Off-street parking spaces shall be provided for the use of residents, customers, patrons, and employees. Required parking spaces shall not be used for the storage, sale or display of goods or materials or for the sale, repair, or servicing of vehicles. All vehicles parked within off-street parking areas shall have a current state license tag and be operable. Delivery vehicles shall use loading areas and shall not occupy required parking spaces for more than 24 consecutive hours.

C. Off-street parking to be retained. Required off-street parking and loading spaces associated with newly erected or altered buildings or newly established uses of land shallbe a continuing obligation of the owner of said building or land so long as the structure or use exists or its use requiring vehicle parking or loading facilities continues. In addition, it shall be unlawful for:

1. Any owner, lessee and/or occupant to discontinue, change or dispense with, or to cause the discontinuance or change of the required vehicle parking or loading spaces (apart from the discontinuance, sale ortransfer of the building or use) without establishing alternative vehicle parking or loading spaces which meet the requirements of and are in compliance with this ordinance, or

2. Any owner, lessee and/or occupant to use a building or lot without providing vehicle parking or loading spaces which meet the requirements of and are in compliance with this ordinance.

D. Parking lot dimensions. The minimum required dimensions for regular parking spaces, handicapped parking spaces, and access/circulation drives are as follows:

1. Standard spaces for angled or perpendicular parking shall be nine feet wide by 20 feet long. [Amended Ord. 08/03/04].

2. Handicapped spaces for angled or perpendicular parking shall be 11 feet wide by 20 feet long. [Amended Ord. 10/04/05]

3. Standard parallel parking spaces shall be 9 feet wide by 22 feet long.

4. Handicapped parallel parking spaces shall be 11 feet wide by 24 feet long.

5. One-way parking driveway aisles shall be at least 20 feet wide.

6. Two-way parking driveway aisles shall be at least 24 feet wide, except that when all parking is angled, the minimum aisle width may be reduced to 22 feet wide with the approval of the county engineer. [Amended Ord. 10/04/05]

5.3 Parking spaces required Off-street parking spaces shall be provided in accordance with table 5.1. For any use not listed in the table, the standards for the most similar use shall be applied. The county shall determine the required number of spaces by classifying the unlisted use as similar to a use specified in table 5.1. In making the determination, any evidence of actual parking demand for similar uses shall be considered as well as other reliable traffic engineering and planning information that is available. [Amended Ord. 08/03/04].

Table 5.1: Minimum Off-Street Parking And Loading Standards [Amended Ord.

10/04/05] Use Parking Loading Apartment or other multi-family use (excluding duplex) 2 spaces per dwelling unit +0.25 guest parking spaces per unit for all dwelling units with common parking areas N/A Appliance sales 1 space per 200 sf of GFA B Automotive or machinery sales and service garage 1 space per 400 sf of GFA + 1 space per employee A Automotive paint or body shop 1 space per 250 sf of GFA N/A Bank or financial institution 1 space per 200 sf of GFA of teller and office areas (excluding storage, stairways and file rooms) N/A Beauty, barber shop, and personal services 3 spaces per operator N/A Boarding or rooming house 1 space per bedroom with a minimum of 2 spaces N/A Bowling alley 2 spaces per lane + 1 space per 250 sf of nonbowling recreation area C Church or place of worship 1 space per 45 sf of main assembly area if fixed seats (pews) or 1 space per 21 sf if movable seats (chairs) N/A Club or organization hall 1 space per 100 sf of assembly space + 1 space per 2 employees N/A Club or organization hall 1 space per 100 sf of assembly space + 1 space per 2 employees N/A College or university 1 space per 2 students + 1 space per 4 seats in auditorium and gymnasium + 1 space per 300 sf of administrative and educational office space C Telecommunications tower 1 space + 1 additional space for each 1000 sf of equipment building N/A Use Parking Loading Day care center less than 100 capacity 5 transient spaces + 1 space per employee N/A 100 or more capacity 10 transient spaces + 1 space per employee N/A Duplex 2 spaces per dwelling unit N/A Entertainment, indoor (except bowling alleys) 1 space per 250 sf of GFA C Fraternity or sorority house 1 space per occupant plus 1 space N/A Funeral home or mortuary

1 space per 3 seats in chapel or 1 space per 50 sf of public area, whichever is greater 1 for each hearse or ambulance Furniture or carpet sales 1 space per 200 sf of display area + 1 space per 750 sf of indoor storage area B Gasoline service station 2 spaces per gas pump + 3 spaces for each service bay + 1 space for each attendant N/A Golf course 4 spaces per hole N/A Greenhouse or nursery 1 space per 10,000 sf + 1 space per employee B Hospital 1 space per 3 beds + 1 space for each staff member + 1 space for each employee on the greatest shift C Hotel, motel 1 space per guest room + 1 space per 2 employees on the greatest shift C Kennel, commercial 1 space per 300 sf of cage and retail area N/A Library or museum 1 space per 400 sf of GFA + 1 space per employee A Lounge, bar or tavern 1 space per 2 occupant capacity C Manufacturing and processing, basic industry 1 space per 1,000 sf A Medical or dental office or clinic 6 spaces per practitioner N/A Mobile home park 2 spaces per dwelling unit N/A Nursing or convalescent facility 1 space per 4 beds + 1 space per employee D

Office, business or professional 1 space per 200 sf of GFA N/A Public assembly or amusement without fixed seats 1 space per 200 sf of floor area devoted to public use N/A Use Parking Loading Public assembly (including theaters and auditoriums) 1 space per 3 seats + 1 space per employee N/A Restaurant, fast food 1 space per 3 seats + 1 space for each employee on the greatest shift C Retail store 1 space per 300 sf of GFA A School, elementary 1 space per classroom + 1 space per employee C Self service storage facility 1 space per 75 storage bays + 1 space per employee + 2 customer spaces N/A Shopping center, community or regional 1 space per 200 sf of GLFA B Single-family residence, townhouse cluster 2 spaces per dwelling unit N/A Small item service and repair shop 1 space per 250 sf of GFA N/A Stable, commercial 1 space per 300 sf within stable +1 space per 3 animal stalls N/A Swimming pool, private community or public 1 space per 50 sf of pool area N/A Tennis court, private community or public 1.5 spaces per court N/A Utility, public or private 1 space per 10,000 sf + 1 space per employee N/A Vehicle sales and rental 1 space per 500 sf of enclosed area + 1 space per 4,500 sf of outdoor sales, rental, and display area, + 1 space per service bay + 1 space per employee A sf = square feet N/A = Not applicable GFA = Gross (total) floor area measured in square footage of the portion of a building enclosed by walls and covered by a roof

GLFA = Gross leasable floor area

5.4 Loading Space Ratios. Loading spaces shall be provided in accordance with the letter indicated in the Loading Column of Table 5.1 and the following conversion factors:

A. Standard 6A6 - 1 space for the first 5,000 sf of GFA as defined above + 1 space for each additional 30,000 sf of floor area.

B. Standard 6B6 - 1 space for the first 10,000 sf of GFA as defined above + 1 space for each additional 50,000 sf of floor area. [Amended Ord. 10/04/05]

C. Standard 7C7 - 1 space for the first 10,000 sf of GFA as defined above + 1 space for each additional 100,000 sf of floor area.

D. Standard 7D7 - 1 space per 50 beds for all facilities containing 20 or more beds.

5.5 Handicapped space ratios. The number of handicapped spaces required may be included within the overall total number of parking spaces required. The minimum number of handicapped spaces shall comply with the table 5.2.

Table 5.2: Handicapped Accessible Spaces Required [Amended Ord. 10/04/05] Total Parking

Spaces Required* Total Handicapped Accessible Spaces Required (minimum 60-inch wide access aisle with standard and universal parking design) Van Accessible Spaces Required (minimum 96-inch wide access aisle with standard parking design) 1 to 25 1 1 26 to 50 2 1 51 to 75 3 1 76 to 100 4 1 101 to 150 5 1 151 to 200 6 1 201 to 300 7 1 301 to 400 8 1 401 to 500 9 2 501 to 1,000 2% of total 1 in every 8 accessible spaces 1,001 and over 20 + 1 per 100 Over 1,000 1 in every 8 accessible spaces *Per Table 5.1.

Note: Designated 7van7 accessible spaces are not required if all accessible spaces comply with 7universal parking design.7

5.6 Parking space location. Developments containing 7,500 or fewer square feet of gross floor area shall provide no more than 80 percent of parking areas between the building and the transportation corridor right-of-way. [Amended Ord. 10/04/05]

ARTICLE VI. ARCHITECTURAL DESIGN

Architectural design of all buildings shall comply with the following performance guidelines:

6.1 Building facades. [Amended Ord. 10/04/05]

A. Building façades for new buildings. Building facades shall be of the following architectural treatments:

1. Front façade—Shall be constructed of glass, stucco, brick and/or masonry, except that metal siding may be used provided that it covers not more than 25 percent of any Front Façade, including banding, cornice and roofing with a pitch of 12:12 or steeper (12 vertical feet for every 12 horizontal feet).

2. Side façade—Shall be constructed of glass, stucco, brick and/or masonry, except that metal siding may be used provided that it covers not more than 25 percent of any side Façade, including banding, cornice and roofing with a pitch of 12:12 or steeper (12 vertical feet for every 12 horizontal feet).

3. Rear façade—May be constructed solely of metal siding.

4. The director may at his/her discretion make the determination whether any certain façade is a front, side, or rear façade.

B. Building facades for additions to existing buildings

1. Building façade requirements for additions to existing buildings shall be exempted under the following circumstances:

(a) Where the proposed building addition is not visible from the transportation corridor right-of-way; the director may at his/her discretion make the determination whether an addition to an existing building is visible from the transportation corridor right-of-way; or

(b) Where the total proposed building addition is the greater of the following:

(1) Equal to or less than 300 square feet of the footprint of the existing building; or

(2) Equal to or less than ten percent of the footprint of the existing building.

2. If the addition to an existing building is deemed visible from the transportation corridor right-of-way by the Director, then appendix A: 6.1 A will apply.

6.2 Colors. Contrasting accent colors of any wall, awning or other feature shall be limited to no more than 30 percent of the total area for any single façade, including banding, cornice and roofing with a pitch of 12:12 or greater. The remainder of facades shall be a muted, earth-tone color unless specifically approved by the county. Approved earthtones include, but not limited to, whites, browns and grays. Metal siding may be used solely on facades not visible from the transportation corridor right-of-way. For purposes of this section, 8visible8 means capable of being seen from the right-of-way of the transportation corridor. For example, if two or three sides of a building or structure are visible, each of the visible sides must comply with this Article. [Amended Ord. 08/03/04, 10/04/05]

6.3 Accessory structures. Accessory structures shall be constructed with the same materials as the principal structure and shall match the predominant facade colors and roof lines.

Sign materials and colors shall be consistent with those of the principal structure unless specifically approved through the conditional use process.

6.4 Roof lines.

A. Buildings and accessory structures of less than 5,000 square feet of gross floor area shall be designed with minimum 4:12 roof pitches (four feet in rise for every 12feet in run) or may be designed with flat roofs having thre plane parapets where each side that is visible from the transportation corridor right-of-way. Banding and roofing materials of accessory structures, which shall include, but not be limited to gasoline sales island canopies, shall match the materials and colors of the primary structure. Roofing materials for pitched or mansard roofs shall be limited to the following:

1. Metal standing seam.

2. Shingles with a slate, tile or metal appearance.

3. Tile, slate or stone.

4. Wood shake or wood shake appearance. [Amended Ord. 11/18/03]

B. Buildings of 5,000 square feet or greater shall have at least four roof planes, provided however that the Commission may recommend and the county may approve the use of flat roofs with parapets surrounding all sides visible from transportation corridor right-of-way.

Parapets shall simulate at least 3 roof planes per building face. [Amended Ord. 08/03/04]

6.5 Ground level equipment. All electrical and mechanical equipment other than public utility equipment that is located at ground level shall be screened from view or isolated so as not to be visible from the right-of-way of an arterial street or residential zoning district within 150 feet of the subject lot. Such screens and enclosures shall be coordinated with the building to present a unified appearance. [Added Ord. 10/04/05]

6.6 Big box standards. Buildings with more than 50,000 square feet of floor area shall comply with the standards in this section in addition to the provisions in all other sections of this CDP. Italicized text reflects the county's findings supporting, and intent of, the non-italicized regulatory text. [Amended Ord. 08/03/04].

A. Site design.

1. Community spaces: Large retail developments shall provide outdoor spaces and amenities to link structures with the remainder of the community. Passenger drop-off/pick-up points shall be integrated with traffic patterns on the site. Special design features shall enhance the building's function as a center of community activity.

(a) Each retail development shall provide at least two of the following design features: patio/seating area, pedestrian plaza with benches, window shopping walkway, outdoor playground area, kiosk area, water feature, clock tower, or other focal feature approved by the board.

(b) Each of these features shall be constructed of materials that match the principal structure and linked by sidewalks to the principal structure.

2. Landscaping: all buildings with more than 50,000 square feet of floor area shall provide the following landscaping:

(a) Peripheral: A 30-foot wide landscaped buffer shall be provided along all property lines abutting roadways, with breaks for approved access points. A minimum1 15-footwide landscape buffer shall be planted along all other property lines. No parking is permitted within these required landscape areas.

The minimum setback for any building facade shall be 50 feet from the nearest property line. Where the facade faces adjacent residentially zoned property, a minimum six feet tall earthen berm shall be provided, which shall be planted with evergreen trees planted at intervals of not more than 20 feet on center.

(b) Parking lot: A minimum of five percent of the area within the boundaries of the parking lot shall be landscaped. Landscaped areas shall be protected by raised curbs or fixed wheel stops approved by the county engineer, and shall be a minimum of 150 square feet in size. No parking space shall be located more than 100 feet from a tree. Shrubs shall be planted at a ratio of four for every required tree.

3. Pedestrian circulation: Pedestrian accessibility opens auto-oriented developments to nearby neighborhoods, thereby reducing traffic impacts and enabling the development to project a friendlier, more inviting image. This section sets forth standards for public sidewalks and internal pedestrian circulation systems that will provide user-friendly pedestrian access as well as pedestrian safety, shelter, and convenience.

All buildings with more than 50,000 square feet of floor area shall provide the following:

(a) Sidewalks at least six feet in width shall be provided along all sides of the lot that abut a public street.

(b) Continuous internal pedestrian walkways, no less than six feet in width, shall be provided from the public sidewalk or right-of-way to the principal customer entrance of all principal buildings on the site. At a minimum, walkways shall connect focal points of pedestrian activity such as, but not limited to, transit stops, street crossings, building and store entry points, and shall feature adjoining landscaped areas that includes trees, shrubs, benches, flower beds, groundcovers, or other such materials for no less than 50 percent of its length.

(c) Sidewalks, no less than six feet in width, shall be provided along the full length of the building along any facade featuring a customer entrance, and along any facade abutting public parking areas. Such sidewalks shall be located at least six feet from the facade of the building to provide planting beds for foundation landscaping, except where features such as arcades or entryways are part of the facade.

(d) Internal pedestrian walkways provided in conformance with part b above shall provide weather protection features such as awnings or arcades within ten feet of all customer entrances.

(e) All internal pedestrian walkways shall be distinguished from driving surfaces through the use of durable, low maintenance surface materials such as pavers, bricks, or scored concrete to enhance pedestrian safety and comfort, as wellas the attractiveness of the walkways.

4. Parking lot orientation. For any retail building, no more than 80 percent of the off-street parking area for the entire property shall be located between the principal building(s) and the transportation corridor. [Amended Ord. 10/04/05]

5. Outdoor storage, trash collection and loading areas. The following standards are intended to reduce the impacts of outdoor storage, loading and operations areas on adjacent land uses. While these uses often are necessary, they should be attractively screened from adjacent parcels and streets. All buildings with more than 50,000 square feet of floor area shall comply with the following:

(a) Areas for truck parking and loading shall be screened by a combination of structures and evergreen landscaping to minimize visibility from adjacent streets and property lines.

(b) No areas for outdoor storage, trash collection or compaction, loading, or other such uses shall be located within 30 feet of any internal pedestrian way.

(c) Outdoor storage, HVAC equipment, trash collection, trash compaction, and other service functions shall be incorporated into the overall design of the building and the landscaping plan. Views of these areas shall be screened from visibility from all property lines and separated from pedestrian areas.

(d) Screening structures shall be made of the same materials as the principal structure.

(e) Non-enclosed areas for the storage and sale of seasonal inventory shall be permanently defined and screened with walls and/or fences. Materials, colors, and design of screening walls and/or fences shall conform to those used as in the principal structure. If such areas are to be covered, then the covering shall conform to the exposed roofing colors on the building.

(f) For structures on parcels abutting a residential district, no delivery, loading, trash removal or compaction, or other such operations shall be permitted between the hours of 10:00 p.m. and 7:00 a.m. unless the applicant submits evidence that sound barriers between all areas for such operations effectively reduce noise emissions to a level of 45 dB or less, as measured at the lot line of any adjoining residential property.

B. Building design.

1. Facades and exterior walls. The following standards, which apply to all building facades which are visible from adjoining public streets or properties, are intended to reduce the massive scale of large buildings which, without application of these standards, be incompatible with County's desired character.

(a) Facades greater than 150 feet in length, measured horizontally, shall incorporate wall plane projections or recesses having a depth of at least three percent of the length of the facade and extending at least 20 percent of the length of the facade. No uninterrupted length of any facade shall exceed 150 horizontal feet.

(b) Ground floor facades of retail businesses that face public streets shall have arcades, display windows, entry areas, awnings, or other such features along no less than 60 percent of their horizontal length, excepting side and rear facades that are landscaped with a type B bufferyard.

2. Detail features. Buildings should have architectural features and patterns that provide visual interest, at the scale of the pedestrian, reduce massive aesthetic effects, and reflect the local character. The following elements should be integral parts of the building fabric, and not superficially applied trim or graphics, or paint:

color changes, material changes, texture changes and relief feature (such as offsets, projections and reveals).

3. Roofs. The following standards are intended to foster variations in roof lines to add interest to, and reduce the massive scale of, large buildings. Roof features should complement the character of adjoining development. Roofs shall have no less than two of the following features:

(a) Parapets concealing flat roofs and rooftop equipment, such as HVAC units from public view. The average height of such parapets shall not exceed 15 percent of the height of the supporting walland such parapets shall not at any point exceed one-third of the height of the supporting wall. Such parapets shall feature three dimensional cornice treatment and shall not be of a constant height for a distance of greater than 150 feet.

(b) Overhanging eaves, extending no less than three feet past the supporting walls, for no less than 30 percent of the building perimeter.

(c) Sloping roofs that do not exceed the average height of the supporting walls, with an average slope greater than or equal to one foot of vertical rise for every three feet of horizontal run and less than or equal to one foot of vertical rise for every one foot of horizontal run.

(d) Three or more roof slope planes.

4. Materials and colors. The following standards are intended to ensure that large structures are consistent with the community's aesthetic values:

(a) Predominant exterior buildings materials shall be high quality materials.

These include, without limitation: brick, wood, rock, or tinted and textured concrete masonry units.

(b) Building trim and accent areas may feature brighter colors, including primary colors, but these colors may not comprise more than 30 percent of any building facade. [Amended Ord. 10/04/05]

(c) Not more than 20 percent of exterior building materials shall include the following: pre-fabricated steel panels. [Amended Ord. 10/04/05]

5. Entryways. Large retail buildings should feature multiple entrances. Multiple building entrances reduce walking distances from cars, facilitate pedestrian and bicycle access from public sidewalks, and provide convenience where certain entrances offer access to individual stores, or identified departments of a store.

Multiple entrances also mitigate the effect of the unbroken walls and neglected areas that often characterize building facades that face bordering land uses.

(a) All sides of a principal building that directly face an abutting public street shall feature at least one customer entrance. Where a principal building directly faces more than two abutting public streets, this requirement shall apply only to two sides of the building, including the side of the building facing the transportation corridor, and another side of the building facing another street.

(b) Entryway design elements and variations should give orientation and aesthetically pleasing character to the building. The following standards identify desirable entryway design features. Each principal building on a site shall have clearly defined, highly visible customer entrances featuring no less than three of the following:

• Canopies or porticos

• Overhangs

• Recesses/projections

• Arcades

• Raised corniced parapets over the door

• Peaked roof forms

• Arches

• Outdoor patios

• Display windows

• Architectural details such as tile work and moldings which are integrated into the building structure and design

• Integral planters or wing walls that incorporate landscaped areas and/or places for sitting.

6. Mechanical appurtenances. External mechanical appurtenances such as heating and air conditioning equipment shall be screened and finished to match the colors of adjacent building materials.

ARTICLE VII. USE LIMITATIONS

Land within the transportation corridor may be used as permitted in the underlying zoning district in which the land is located, subject to the conditions of this ordinance and the following:

7.1 All transportation corridors. The following uses are prohibited in any county corridor overlay district:

A. Junkyards;

B. Salvage yards;

C. Outdoor recycling facilities;

D. Concrete or asphalt batch plants;

E. Manufactured home parks;

F. Outdoor sales, storage or displays of merchandise, except as authorized in section 7.4 of this appendix; and

G. Outdoor operations, except when within a fully screened area.

7.2 Primary corridors. The following uses are prohibited in any primary corridor:

A. Residential subdivisions within 300 feet of the primary corridor right-of-way. [Amended Ord. 08/03/04].

B. [Deleted Ord. 10/04/05]

7.3 Secondary corridors. The following uses are prohibited in any secondary corridor:

A. Any development requiring the provision of centralized sanitary sewer service, except pursuant to an improvement agreement between the county, the applicant and the service provider.

B. [Deleted Ord. 10/04/05]

7.4 Specific use standards. The following standards apply to specific uses that may be established within the corridor overlay districts:

A. Outdoor display of automobiles, campers, recreational vehicles, boats, farm vehicles, manufactured or modular homes is authorized in the primary and secondary corridor overlay district by development permit subject to the placement of all display items on a paved or a porous surface approved by the engineer. Modular or manufactured homes must be skirted to conceal supports. [Amended Ord. 11/18/03, 08/03/04].

B. Outdoor display of any other goods, other than that specifically provided for in section

7.4 A, shall be limited to screened areas located on the opposite side of the primary structure from the transportation corridor right-of-way so as to screen the use from the transportation corridor right-of-way. [Amended Ord. 11/18/03]

C. Temporarily outdoor display permit (TODP) [Subsection Added Ord. 11/18/03]

1. Intent. It is the intent of the temporarily outdoor display permit (TODP) to establish a temporary outdoor display use of a limited area in a commercial zoning district within the overlay districts.

2. Administrative review. The Board of commissioners finds that a temporary outdoor display of sales and products, which are related to the primary business use of the lot or parcel, may be permitted under administrative review and by approval from the zoning official for a limited time period.

3. Applications. Applications for a TODP shall include an appropriate number of copies of a completed application to be filed on forms prescribed by the department. The application shall contain the following:

(a) The notarized signatures of the applicant and at least 51 percent of all record titleholder(s) shall appear upon the application;

(b) The nonrefundable application fee of $25.00 shall be paid for each permit event;

(c) Any other information reasonably necessary to make determinations as to conformity with the provisions of this Subpart, and as applicable, conformity with the standards herein;

(d) A separate statement of the applicant that recognizes the temporary nature of the TODP and that certification that the applicant and landowner shall cause the removal of the temporary outdoor display on the termination of the permit event of the TODP; and

(e) The application shall comply with paragraph C 7, general conditions.

4. Administrative approval. All applications will be subject to review for completeness by the zoning official. During the review process, the zoning official may confer with the director before making a written decision on the application. If the requirements of this section are satisfied, the zoning official shall issue a TODP within threedays of receipt of a completed application. If the requirements of this subsection are not met, the zoning official shall deny the application for the TODP.

5. TODP use defined in time. Where a TODP is granted, the use may continue for a three consecutive day period (hereinafter referred to as a 9permit event9).

6. Renewal of a TODP. An applicant may renew the TODP for a total of six permit events for every calendar year. The renewal application shall comply with paragraph C 7, general conditions. To reapply, the applicant shall submit the following:

(a) A completed application to be filed on forms prescribed by the office of community development;

(b) A nonrefundable application fee of $25.00;

(c) Other information reasonably necessary to make determinations as to conformity with the provisions of this subpart; and

(d) A separate statement of the applicant that recognizes the temporary nature of the TODP and that certification that the applicant and landowner shall cause the removal of the temporary outdoor display on the termination of the permit event of the TODP.

7. General conditions. The following general conditions shall apply before a TODP is issued.

(a) The lot or parcel shall be designated within a commercial zoning district;

(b) The outdoor display of products shall be related to the primary business use of the lot or parcel; and

(c) The total temporary display area that may be permitted is no more than 15 percent of the total floor area of the retail business located upon the lot or parcel. All outdoor display shall be set back a minimum of five feet from the public right-of-way. No vacant lot or parcel may be used as for a TODP, except as provided in paragraph 8.

8. Holiday TODP. From October 1 through the end of the calendar year, a property owner having property within the overlay districts may submit an Application for a Holiday TODP, in compliance with paragraph 3 (a), (b), (c), and (d), that complies with the following:

(a) The lot or parcel may be designated in any zoning district;

(b) The holiday TODP may be granted for 60 consecutive days;

(c) The total temporary display area under a Holiday TODP is 10,000 square feet;

(d) A vacant lot or parcel may be used for a temporary outdoor display area under a holiday TODP; and

(e) Outdoor display and sales shall be limited to agricultural and horticultural products. By way of example but not being limited thereto, such products may be trees, wreaths, and pumpkins.

9. Posting of TODP card or holiday TODP card. Where a TODP or holiday TODP has been granted, the permit holder or his/her agent shall post the TODP card or holiday TODP in a conspicuous location on the lot or parcel, visible from the transportation corridor, and if not visible from that vantage, the TODP card or holiday TODP shall be posted to be visible from the nearest street or road. The TODP card or holiday TODP shall be protected from the weather and placed in such position and the permit holder shall maintain the TODP card or holiday TODP in such position until such permit event has expired.

10. Any violation of this section, its paragraphs, provisions, standards, or conditions herein or placed upon the TODP, including paragraph 8, shall terminate the TODP.

At the expiration of the TODP or in the event the TODP is terminated, all outdoor display items, products and the like shall be immediately removed so as to comply with the permanent outdoor display provision of this CDP. [Amended Ord. 08/03/04].

11. Appeal of decisions. Any person, person or entities whose application for a TODP is denied by a decision by the zoning official may appeal the decision within 30 days of their denial to the board of commissioners. Failure to file an appeal within 30 days of the decision of the zoning official shall result in a final decision. W ith the transmission of the appeal, the zoning official shall include the written reasons for the denial and any other pertinent circumstances that may be relevant to the appeal.

(a) The appeal shall be posted and advertised as a conditional use permit and appeal from an application for a TODP prior to being placed on the agenda for a hearing.

(b) The board of commissioners shall review the decision of the director under the standards set forth in section 13.0 of the zoning ordinance. Any person, persons or entities jointly or severally aggrieved by any decision by the board of commissioners on a TODP, including paragraph 8, may take an appeal to the superior court of the county by writ of certiorari.

Carroll County, Georgia Corridor Development Plan Ordinance

(CDP)

Required Tree and Shrub List Required Tree List Common Name/Botanical Name Height/Spread Japanese Zelkova/Zelkova serrata (D) 60-80'/30-40' Lacebark Elm/Ulmus parvifolia (D) 40-60'/30-40' Red Maple/Acer rubrum (D) 40-60'/25-40' River Birch/Betula nigra (D) 50-60'/40-50' Sawtooth Oak/Quercus acutissima (D) 50-60'/30-60' Yellow Poplar or Tulip Tree/Liriodendron tulipifera (D) 80-100'/30-40' Willow Oak/Quercus phellos (D) 40-60'/30-60' Goldenrain Tree/Koelreuteria paniculata

(D)(PL)

20-30'/10-15' Green Ash/Franxinus Pennsylvania (D) 60-80'/40-50' Sycamore/Platanus occidentalis (D) 80-100'/40-50' Water Oak/Quercus nigra (D) 60-100'/50-60' White Ash/Fraxinus americana (D) 75-100'/60-80' American Holly/Ilex opaca (E) 20-50'/15-30' Japanese or Saucer Magnolia/Magnolia soulangiana (D)(PL) 20-30'/15-20' Star Magnolia/Magnolia stellata (D)(PL) 12-20'/10-15' Sweetbay Magnolia/Magnolia virginiana

(E)(PL)

15-20'/10-20' Japanese Crabapple/Malus floribunda (D) 15-20'/15-20' Sourwood/Oxydendrum arboreum (D) 30-41'/15-20' Chinese Pistache or Pistacio/Pistacia chinensis (D) 30-40'/20-30' Purpleleaf Plum/Prunus cerasifera 'Pissardii' (D)(PL) 20-30'/10-15' Double Flowered Peach/Prunus persica (D) 10-15'/8-12' Contorted Willow/Salix matsundana 'Tortuosa' (D) 20-50'/20-30' Japanese Maple/Acer palmatum (D)(PL) 15-20'/10-15' Flowering Dogwood/Cornus florida (D)(PL) 15-25'/15-20' Washington Hawthorne/Crataegus phaenopyrum (D) 25-30'/15-20' Hybrid Holly/Ilex x attenuata hybrids (E) 10-40'/6-15' Leyland cypress/x Cupressocyparis leylandii (E) 60-90'/12-15' Eastern redbud/Cercis canadensis (D)(PL) 20-30'/25-35' Arborvitae-Pyramidalis/Thuja occidentalis

(E)(PL)

15-25'/3-5' Hazelnut/Corylus americana (D)(PL) 8-15'/8-15' Common Name/Botanical Name Height/Spread Ginkgo (Maidenhair tree)/Ginkgo biloba (D) 40-70'/20-40' Post oak/Quercus stellata (D) 40-50'/NA Sugar maple/Acer saccharum (D) 50-75'/30-45' American chestnut/Castanea dentata (D) 80-100'/NA Persimmon/Diospyros virginiana (D) 30-60'/NA Bald cypress/Taxodium distichum (D) 50-100'/20-30' Japanese cryptomeria (Japanese cedar)/ Cryptomeria japonica (E) 50-60'/25-30' Yoshino cherry/Prunus x yedoensis (D) 30-40'/30-50' Mockernut hickory/Carya tomentosa (D) 50-60'/NA Chestnut oak/Quercus prinus (D) 60-70'/NA Michaux oak (Swamp chestnut oak)/Quercus michauxii (D) 60-80'/50-70' Silver Maple/Acer saccharinum (D) 50-70'/40-60' Weeping Cherry/Prunus subhirtella 'Pendula' (D) 30-40'/15-25' Eastern Red Cedar/Juniperus virginiana (E) 30-60'/8-25' Dawn Redwood/Metasequoia glyptostroboides (D) 50-90'/15-25' Southern sugar maple; Florida maple/Acer barbatum (D) 20-25'/20-40' (PL) - indicates that the tree is appropriate to plant under power lines

(D) - indicates a deciduous tree

(E) - indicates an evergreen tree Required Shrub List Botanical Name/Common Name Normal Height Abelia X grandiflora/Abelia 4-6 ft.

Aucuba japonica/Japanese Aucuba 6-8 ft.

Berberis julianae B. thunbergii/Wintergreen Barberry 5-6 ft.

Cytisus scoparius/Scotch Broom 5-6 ft.

Forsythia X intermedia/Border Forsythia 5-7 ft.

Hydrangea macrophylla/Bigleaf Hydrangea 5-8 ft.

Hydrangea quercifolia/Oakleaf Hydrangea 6-8 ft.

Ilex cornuta/'Burfordii Nana' Dwarf Burford Holly 5-8 ft.

Ilex glabra/Inkberry 6-8 ft.

Mahonia bealei/Leatherleaf Mahonia 6-7 ft.

Botanical Name/Common Name Normal Height Nandina domestica/Nandina or Heavenly Bamboo 5-6 ft.

Rhododendron Hybrids/Evergreen Azaleas 5-8 ft.

Spirea cantoniensis/'Lanceata' Reeves Spirea 5-7 ft.

Spiraea prunifolia 'Plena' Bridalwreath Spirea 5-7 ft.

Spiraea X vanhouttei Vanhoutte Spirea 5-7 ft.

Note: All the trees and shrubs listed above are appropriate for Carroll County's Plant Hardiness Zone (Zone 7b - See map directly above).

Sources:

: University of Georgia Cooperative Extension Service Horticulture 3 Leaflet 350,/Revised June, 2003 www.ces.uga.edu/pubcd/L350.htm Horticulture Fact Sheet H-94-019 : Carroll County Extension Service : www.ces.ncsu.edu (North Carolina Cooperative Extension) (Ord. of 10-4-05, App. A)

Read this code where it is posted (Municode) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:carroll-county/zoning/whole@2025-05-06-3a9a00e764

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.

Carroll County Zoning Ordinance (the whole text) (Part 2 of 2) | Georgia Commons