A. The subdivision construction plan submittal shall consist of the following: 1. Engineered construction plans which shall include: a. Street and drainage information; b. Water and sewer plans; and c. Erosion control plans. 2. A performance agreement letter, letter of credit, and/or a water/sewer installation agreement letter as required by the City Manager. B. Qualified Engineers. Engineered construction plans for subdivisions shall be prepared by a qualified and licensed engineer regularly engaged in the design of such facilities. C. General Information. Information shall be provided on the subdivision construction plan in accordance with the Design and Construction Standards on file in the office of the City Engineer.