Skip to content
Georgia Commons
Menu

Carrollton · Zoning Ordinance

Appendix B - ZONING (RESERVED) / Article 6 - INFRASTRUCTURE IMPROVEMENTS

6.03.00. REQUIRED IMPROVEMENTS

About this text

  • As published by Municode, current through 2025-11-03
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

E. Driveway access to each lot shall be installed by the developer in accordance Section 6.10.00.

F. Project access improvements (deceleration, turn lanes, etc.) as deemed necessary by the City Engineer under the provisions of Section 6.11.00.

G. Sidewalks, if required, under Section 6.12.00.

H. Stormwater drainage and detention facilities in accordance with Section 6.13.00.

I. Public or private water supply as required under Section 6.14.00.

J. Fire hydrants as required under Section 6.15.00.

K. Public or private sanitary waste disposal as required under Section 6.16.00.

Read this code where it is posted (Municode) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:carrollton/zoning/6.03.00@2025-11-03-72af92434b

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.

Carrollton Zoning Ordinance, 6.03.00. REQUIRED IMPROVEMENTS | Georgia Commons