--- title: Carrollton Zoning Ordinance, 6.03.03. Guarantee in Lieu of Completed Improvements (Performance Bonds) collection: local-codes id: local-code:carrollton/zoning/6.03.03 cite_as: Carrollton, Ga., Zoning Ordinance ยง 6.03.03 canonical_url: https://georgiacommons.org/code/local/carrollton/zoning/6.03.03 md_url: https://georgiacommons.org/code/local/carrollton/zoning/6.03.03.md text_url: https://georgiacommons.org/code/local/carrollton/zoning/6.03.03/text source_url: https://library.municode.com/ga/carrollton/codes/code_of_ordinances date: 2025-11-03 status: active jurisdiction: city:carrollton jurisdiction_name: Carrollton place_fips: "1313492" corpus_version: local-codes-carrollton-66c7c129f650 publisher: Georgia Commons, an independent project of Georgia Civic Data. Not the State of Georgia. Not legal advice. up: https://georgiacommons.org/code/local/carrollton/zoning/~appendix-b/~article-6.md previous: https://georgiacommons.org/code/local/carrollton/zoning/6.03.00.md next: https://georgiacommons.org/code/local/carrollton/zoning/6.04.01.md index: https://georgiacommons.org/code/local/carrollton.md branch: zoning edition: As published by Municode, current through 2025-11-03 edition_date_kind: current_through source_publisher: Municode version_id: local-code:carrollton/zoning/6.03.03@2025-11-03-8c32bace57 --- # Carrollton Zoning Ordinance, 6.03.03. Guarantee in Lieu of Completed Improvements (Performance Bonds) > As published by Municode, current through 2025-11-03 > The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included. Part of: Appendix B - ZONING (RESERVED) / Article 6 - INFRASTRUCTURE IMPROVEMENTS No final subdivision plat shall be approved by the City or accepted for recordation by the Clerk of the Superior Court until one of the following conditions has been met: A. All required improvements have been constructed or funded in a satisfactory manner and approved by the City Engineer, or B. The Carrollton Mayor and City Council has received in escrow 150% of the estimated cost of installation of the required improvements, and has received a copy of an executed contract for installation of the improvements between the developer and a qualified contractor. The executed contract shall call for completion of the improvements within twenty-four (24) months of approval of the final subdivision plat. C. The improvements funded through the escrow fund shall be limited to final pavement topping for streets, final grassing of street shoulders, landscaping, and street and parking lot striping and sidewalks. D. Upon completion of deferred improvements, the as-built surveys are to be updated by the developer and submitted to the City Engineer. 6.04.00 SURVEY MONUMENTS