Skip to content
Georgia Commons
Menu

Carrollton · Zoning Ordinance

Appendix B - ZONING (RESERVED) / Article 6 - INFRASTRUCTURE IMPROVEMENTS

6.06.02. Drainage Easements

About this text

  • As published by Municode, current through 2025-11-03
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

A. A publicly dedicated drainage easement is to be provided along any manmade drainage channel or drainage pipe located outside a street right-of-way. All easements shall be no less than twenty (20) feet wide when used as an open ditch. Piped storm drainage shall have a minimum easement width of twenty (20) feet.

B. Drainage easements off the street right-of-way shall be clearly defined on the plat and deed of the individual property owner, and such property owner shall keep the easement free of obstructions and maintain that part of the easement within the property owner's boundary line so that free and maximum flow is maintained at all times. The property owner shall not alter any drainage improvements without the prior written approval from the City Engineer.

Read this code where it is posted (Municode) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:carrollton/zoning/6.06.02@2025-11-03-549c376fec

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.

Carrollton Zoning Ordinance, 6.06.02. Drainage Easements | Georgia Commons