Skip to content
Georgia Commons
Menu

Carrollton · Zoning Ordinance

Appendix B - ZONING (RESERVED) / Article 6 - INFRASTRUCTURE IMPROVEMENTS

6.07.07. Substandard Streets

About this text

  • As published by Municode, current through 2025-11-03
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

In the event that access to a subdivision or development project is from a substandard street (i.e., a dirt or gravel road), the following project access improvements may be provided by the developer in order to obtain a development permit or building permit, as applicable:

A. The substandard street shall be upgraded by the developer to a paved roadway from all project entrances to the nearest standard paved road along the route of access.

B. The roadway section shall meet the requirements of a local residential street.

C. The developer shall design the road and provide the labor, equipment and materials required for roadway improvements and necessary drainage improvements.

D. The right-of-way required for these off-site improvements shall be acquired by the developer at no expense to the City. If the developer cannot acquire adequate right-of-way, the City Attorney shall initiate condemnation proceedings at the expense of the developer after authorization by the Carrollton Mayor and City Council.

Read this code where it is posted (Municode) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:carrollton/zoning/6.07.07@2025-11-03-a6da2cd525

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.

Carrollton Zoning Ordinance, 6.07.07. Substandard Streets | Georgia Commons